Bill Text: HI SB945 | 2021 | Regular Session | Introduced


Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Fourteenth Senatorial District.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2021-01-29 - Referred to WAM. [SB945 Detail]

Download: Hawaii-2021-SB945-Introduced.html

THE SENATE

S.B. NO.

945

THIRTY-FIRST LEGISLATURE, 2021

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE fourteenth SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $23,712,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2021-2022 for the purpose of capital improvement projects for the fourteenth senatorial district, as follows:

1.   Aiea Intermediate School

     A.   Install cover over the basketball/tennis/volleyball court areas.

          Plans                           $25,000

          Design                          $25,000

          Construction                 $2,500,000

          Equipment                      $100,000

          Total funding                               $2,650,000

     B.   Bus/car stop shelter.

          Plans                           $25,000

          Design                          $25,000

          Construction                 $2,500,000

          Equipment                      $150,000

          Total funding                               $2,700,000

2.   Dole Middle School

     A.   Outdoor learning and meeting space for students.

          Construction                   $100,000

          Equipment                       $50,000

          Total funding                                 $150,000

3.   Fern Elementary School

     A.   Paved play court for the back area of F building.

          Plans                           $10,000

          Design                          $10,000

          Construction                    $20,000

          Equipment                       $10,000

          Total funding                                  $50,000

4.   Kalihi Waena Elementary School

     A.   Kalihi Stream Footbridge

          Plans, design, and

          construction                 $3,000,000

          Total funding                               $3,000,000

5.   Linapuni Elementary School

     A.   Install a handwashing sink in the cafeteria entrance.

          Construction                   $500,000

          Total funding                                 $500,000

     B.   Install a six-foot chain link fence in front of the school.

          Construction                   $700,000

          Total funding                                 $700,000

     C.   Repave and repaint staff parking lot.

          Construction                   $800,000

          Total funding                                 $800,000

6.   Moanalua Elementary School

     A.   Design, construction, and equipment for electrical upgrade and air conditioning improvements, ground and site improvements, equipment, and appurtenances.

          Design                         $100,000

          Construction                   $400,000

          Equipment                      $100,000

          Total funding                                 $600,000

     B.   Design, construction, and equipment for a multi-purpose innovation center, ground and site improvements, equipment, and appurtenances.

          Design                         $320,000

          Construction                 $2,880,000

          Equipment                       $50,000

          Total funding                               $3,250,000

7.   Moanalua Middle School

     A.   Replace existing cafeteria window louvers to tinted double pane aluminum awning windows.

          Plans                            $5,000

          Construction                    $12,000

          Equipment                       $75,000

          Total funding                                  $92,000

8.   Red Hill Elementary School

     A.   Covered play court (design and construction, ground and site improvements, equipment, and appurtenances).

          Construction                 $4,000,000

          Total funding                               $4,000,000

     B.   New parking lot (design and construction for new parking lot, including a new lot and ADA access to campus, ground and site improvements, equipment, and appurtenances).

          Design                         $350,000

          Construction                 $2,500,000

          Total funding                               $2,850,000

9.   Webling Elementary School

     A.   Design, construction, and equipment for campus covered walkways, ground and site improvements, equipment, and appurtenances.

          Design                         $100,000

          Construction                   $900,000

          Total funding                               $1,000,000

     B.   Design, construction, and equipment for new phone system throughout campus, support facilities, ground and site improvements, equipment, and appurtenances).

          Design                         $100,000

          Construction                   $900,000

          Equipment                       $20,000

          Total funding                               $1,020,000

10.  Moanalua Gardens Foundation

     A.   Engineering services for the conceptual and construction plans of the section of road between crossings 15 and 16 of the existing four-mile Kamananui Valley Road.

          Design                         $350,000

          Total funding                                 $350,000

     SECTION 3.  The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2024, shall lapse as of that date.

     SECTION 4.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended for the purposes of this Act as follows:

     (1)  The sums appropriated in items (1) through (9) shall be expended by the department of education; and

     (2)  The sum appropriated in item (10) shall be expended by the department of land and natural resources.

     SECTION 5.  This Act shall take effect on July 1, 2021.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 14th Senatorial District

 

Description:

Appropriates funds for capital improvement projects in the 14th senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback