Bill Text: HI HB1047 | 2013 | Regular Session | Introduced
Bill Title: CIP; 38th Representative District ($)
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2013-01-28 - Referred to FIN, referral sheet 6 [HB1047 Detail]
Download: Hawaii-2013-HB1047-Introduced.html
HOUSE OF REPRESENTATIVES |
H.B. NO. |
1047 |
TWENTY-SEVENTH LEGISLATURE, 2013 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of the thirty-eighth representative district.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2013-2014.
1. To be expended by the department of education:
A. August Ahrens elementary school, Oahu
Design, construction, and equipment for ceiling fans in existing portables and second floor classrooms; ground and site improvements.
Design $10,000
Construction $80,000
Equipment $90,000
Total funding $180,000
B. August Ahrens elementary school, Oahu
Design, construction, and equipment for renovations to restrooms in Building B and upstairs of Building A; ground and site improvements.
Design $40,000
Construction $309,000
Equipment $1,000
Total funding $350,000
C. August Ahrens elementary school, Oahu
Design, construction, and equipment for a new walkway at front of campus for pedestrian safety; ground and site improvements.
Design $20,000
Construction $279,000
Equipment $1,000
Total funding $300,000
D. Honowai elementary school, Oahu
Design, construction, and equipment for an air-conditioned, eight-classroom building; ground and site improvements.
Design $1,000
Construction $8,798,000
Equipment $1,000
Total funding $8,800,000
E. Waipahu elementary school, Oahu
Plans, design, and construction for painting of a campus portable.
Plans $1,000
Design $1,000
Construction 98,000
Total funding $100,000
F. Waipahu high school, Oahu
Plans, design, and construction of a building with ten classrooms.
Plans $1,000
Design $1,000
Construction $10,998,000
Total funding $11,000,000
G. Waipahu high school, Oahu
Plans, design, and construction of a school-wide electrical upgrade.
Plans $1,000
Design $1,000
Construction $3,998,000
Total funding $4,000,000
H. Waipahu high school, Oahu
Design and construction of an all-weather turf field and running track.
Design $1,000
Construction $4,999,000
Total funding $5,000,000
I. Waipahu high school, Oahu
Design and construction of a retaining wall behind the school as a phase of a long-term expansion project.
Design $1,000
Construction $3,999,000
Total funding $4,000,000
J. Waipahu intermediate school, Oahu
Design and construction for a building with eight classrooms.
Design $1,000
Construction $7,999,000
Total funding $8,000,000
K. Waipahu intermediate school, Oahu
Design and construction for an electrical upgrade.
Design $1,000
Construction $915,000
Total funding $916,000
L. Waipahu intermediate school, Oahu
Design and construction for school air conditioning.
Design $1,000
Construction $3,499,000
Total funding $3,500,000
M. Waipahu intermediate school, Oahu
Design and construction for Building I walkway.
Design $1,000
Construction $199,000
Total funding $200,000
N. Waipahu intermediate school, Oahu
Design and construction for SPED trailer.
Design $1,000
Construction $374,000
Total funding $375,000
O. Waipahu intermediate school, Oahu
Design and construction for drainage improvement.
Design $1,000
Construction $299,000
Total funding $300,000
2. To be expended by the University of Hawaii:
A. Leeward Community College, Oahu
Design, construction, and equipment for theatre renovations.
Design $1,000
Construction $7,498,000
Equipment $1,000
Total funding $7,500,000
B. Leeward Community College, Oahu
Plans and design for Native Hawaiian Center for Excellence.
Plans $1,000,000
Design $1,000,000
Total funding $2,000,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 3. This Act shall take effect on July 1, 2013.
INTRODUCED BY: |
_____________________________ |
Report Title:
CIP; 38th Representative District
Description:
Appropriates funds for capital improvement projects in the 38th representative district. Effective July 1, 2013.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.