Bill Text: TX HB2973 | 2023-2024 | 88th Legislature | Introduced
Bill Title: Relating to facilities and construction machinery used to respond to power outages.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced) 2023-03-14 - Referred to State Affairs [HB2973 Detail]
Download: Texas-2023-HB2973-Introduced.html
88R8944 JXC-F | ||
By: Guillen | H.B. No. 2973 |
|
||
|
||
relating to facilities and construction machinery used to respond | ||
to power outages. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 39.918, Utilities Code, is amended to | ||
read as follows: | ||
Sec. 39.918. UTILITY FACILITIES FOR RESPONDING TO | ||
SIGNIFICANT [ |
||
OUTAGE. (a) In this section, "significant [ |
||
outage" means an event that [ |
||
(1) results in a loss of electric power that: | ||
(A) affects a significant number of distribution | ||
customers of a transmission and distribution utility, creates a | ||
risk to public health or safety,[ |
||
[ |
||
least six [ |
||
(B) affects distribution customers of a | ||
transmission and distribution utility in an area for which the | ||
governor has issued a disaster or emergency declaration; | ||
(C) affects customers served by a radial | ||
transmission or distribution facility, creates a risk to public | ||
health or safety, and has lasted or is expected to last for at least | ||
twelve hours; or | ||
(D) creates [ |
||
[ |
||
affects a critical infrastructure facility, hospital, health care | ||
facility, law enforcement facility, fire station, or water or | ||
wastewater facility; or | ||
(2) causes the independent system operator to order a | ||
transmission and distribution utility to shed load. | ||
(a-1) The Texas Division of Emergency Management, the | ||
independent organization certified under Section 39.151 for the | ||
ERCOT power region, or the executive director of the commission may | ||
determine that a power outage other than an outage described by | ||
Subsection (a) is a significant power outage for the purposes of | ||
this section. | ||
(b) Notwithstanding any other provision of this subtitle, a | ||
transmission and distribution utility may: | ||
(1) lease or own and operate facilities that provide | ||
temporary emergency electric energy to aid in providing power to | ||
the utility's distribution customers when a significant power | ||
outage is imminent or restoring power to the utility's distribution | ||
customers during a significant [ |
||
[ |
||
[ |
||
(2) procure, own, and operate, or enter into a | ||
cooperative agreement with other transmission and distribution | ||
utilities to procure, own, and operate jointly, transmission and | ||
distribution facilities that have a lead time of at least six months | ||
and would aid in restoring power to the utility's distribution | ||
customers following a significant [ |
||
(b-1) In this section, long lead time facilities described | ||
by Subsection (b) may not be electric energy storage equipment or | ||
facilities described by [ |
||
(c) A transmission and distribution utility that [ |
||
not sell electric energy or ancillary services from the facility | ||
[ |
||
(d) A facility [ |
||
(1) must be operated in isolation from the bulk power | ||
system; and | ||
(2) may not be included in independent system | ||
operator: | ||
(A) locational marginal pricing calculations; | ||
(B) pricing; or | ||
(C) reliability models. | ||
(e) A transmission and distribution utility that [ |
||
ensure, to the extent reasonably practicable, that retail customer | ||
usage during operation of the facility [ |
||
adjusted out of the usage reported for billing purposes by the | ||
retail customer's retail electric provider. | ||
(f) A transmission and distribution utility shall, when | ||
reasonably practicable, use a competitive bidding process to lease | ||
a facility [ |
||
(g) A transmission and distribution utility that leases or | ||
owns and operates facilities under Subsection (b)(1) or that | ||
procures, owns, and operates facilities under Subsection (b)(2) | ||
shall include in the utility's emergency operations plan filed with | ||
the commission, as described by Section 186.007, a detailed plan on | ||
the utility's use of those facilities. | ||
(h) The commission shall allow [ |
||
(1) a transmission and distribution utility that | ||
leases or owns and operates facilities under Subsection (b)(1) to | ||
recover the reasonable and necessary costs of leasing or owning and | ||
operating the facilities, including the present value of future | ||
payments required under a [ |
||
investment established in the commission's final order in the | ||
utility's most recent base rate proceeding; and | ||
(2) a transmission and distribution utility that | ||
procures, owns, and operates facilities under Subsection (b)(2) to | ||
recover the reasonable and necessary costs of procuring, owning, | ||
and operating the facilities, using the rate of return on | ||
investment established in the commission's final order in the | ||
utility's most recent base rate proceeding. | ||
(i) The commission shall authorize a transmission and | ||
distribution utility to defer for recovery in a future ratemaking | ||
proceeding the incremental operations and maintenance expenses and | ||
the return, not otherwise recovered in a rate proceeding, | ||
associated with the leasing, [ |
||
operation of the facilities. | ||
(j) A transmission and distribution utility may request | ||
recovery of the reasonable and necessary costs of leasing, [ |
||
procuring, owning, or [ |
||
section, including any deferred expenses, through an expedited | ||
periodic rate adjustment [ |
||
another ratemaking proceeding. The commission may review costs | ||
recovered through a periodic rate adjustment in the following base | ||
rate proceeding and order refunds to customers if appropriate. | ||
(k) A transmission and distribution utility requesting cost | ||
recovery under Subsection (j) is entitled to select whether the | ||
costs are considered to be distribution substation equipment costs | ||
or distribution transformer costs unless the commission has found | ||
in a previous base rate proceeding for the utility that temporary | ||
emergency electric energy costs should be categorized in a | ||
different manner. A lease under Subsection (b)(1) must be treated | ||
as a capital lease or finance lease for ratemaking purposes. | ||
(l) The fact that the commission has not previously approved | ||
a facility operated under this section or a cost of leasing, | ||
procuring, owning, or operating a facility under this section is | ||
not grounds for dismissal of the facility or the cost from a | ||
proceeding under Section 36.210 or another ratemaking proceeding. | ||
(m) If the capacity of facilities a transmission and | ||
distribution utility operates under Subsection (b)(1) is less than | ||
or equal to three percent of the utility's historical peak load, the | ||
commission shall find that: | ||
(1) the facilities are used and useful to the utility | ||
in providing service; and | ||
(2) the costs of leasing or owning and operating the | ||
facilities are prudent, reasonable, and necessary. | ||
[ |
||
SECTION 2. Section 502.146(b), Transportation Code, is | ||
amended to read as follows: | ||
(b) An owner is not required to register a vehicle that is | ||
used only temporarily on the highways if the vehicle is: | ||
(1) a farm trailer or farm semitrailer with a gross | ||
weight of more than 4,000 pounds but not more than 34,000 pounds | ||
that is used exclusively: | ||
(A) to transport seasonally harvested | ||
agricultural products or livestock from the place of production to | ||
the place of processing, market, or storage; | ||
(B) to transport farm supplies from the place of | ||
loading to the farm; or | ||
(C) for the purpose of participating in equine | ||
activities or attending livestock shows, as defined by Section | ||
87.001, Civil Practice and Remedies Code; | ||
(2) machinery used exclusively for the purpose of | ||
drilling water wells; | ||
(3) oil well servicing or drilling machinery and if at | ||
the time of obtaining the license plates, the applicant submits | ||
proof that the applicant has a permit under Section 623.142; or | ||
(4) construction machinery, including construction | ||
machinery that is: | ||
(A) owned by a transmission and distribution | ||
utility as defined by Section 31.002, Utilities Code; and | ||
(B) used to maintain or repair electrical lines | ||
or substations in response to a power outage. | ||
SECTION 3. The changes in law made by this Act apply only to | ||
a proceeding before the Public Utility Commission of Texas, or | ||
other regulatory authority described by Section 11.003, Utilities | ||
Code, that commences on or after the effective date of this Act. A | ||
proceeding before the Public Utility Commission of Texas or other | ||
regulatory authority described by Section 11.003, Utilities Code, | ||
that commenced before the effective date of this Act is governed by | ||
the law in effect on the date the proceeding commenced, and that law | ||
is continued in effect for that purpose. | ||
SECTION 4. To the extent of any conflict, this Act prevails | ||
over another Act of the 88th Legislature, Regular Session, 2023, | ||
relating to nonsubstantive additions to and corrections in enacted | ||
codes. | ||
SECTION 5. This Act takes effect September 1, 2023. |