Bill Text: NY A09472 | 2023-2024 | General Assembly | Introduced
Bill Title: Requires the commissioner create rules, regulations, policies, and procedures for the creation of a resilient electric vehicle charging system pilot program to provide power through an extended outage.
Spectrum: Partisan Bill (Democrat 7-0)
Status: (Introduced) 2024-03-14 - referred to energy [A09472 Detail]
Download: New_York-2023-A09472-Introduced.html
STATE OF NEW YORK ________________________________________________________________________ 9472 IN ASSEMBLY March 14, 2024 ___________ Introduced by M. of A. MAGNARELLI -- read once and referred to the Committee on Energy AN ACT to amend the public service law and the public authorities law, in relation to creating a resilient electric vehicle charging system pilot program The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. The public service law is amended by adding a new section 2 66-x to read as follows: 3 § 66-x. Resilient electric vehicle charging system pilot program. 1. 4 For the purposes of this section: 5 (a) "Resilient carbon free power generation" shall mean only those 6 generating stations which are: 7 (i) manufactured, installed, and operated in accordance with applica- 8 ble government and industry standards; 9 (ii) connected to the electric system and operated in conjunction with 10 an electric corporation's transmission and distribution system; 11 (iii) operated in compliance with any standards and requirements 12 established under this section; 13 (iv) utilize a synchronous generator with black start capability, 14 frequency control, and disconnect capability; and 15 (v) do not include the active use of fossil fuels and have a name 16 plate capacity of 1.5 megawatts or less. 17 (b) "Resilient electric vehicle charging system" shall mean an elec- 18 tric vehicle (EV) microgrid designed to provide uninterrupted electric 19 service for electric vehicle charging throughout an extended outage. 20 (c) "Extended outage" shall mean an outage of the electric distrib- 21 ution system that continues for a period of twenty-four hours or longer. 22 (d) "Uninterrupted" shall mean that the resilient electric vehicle 23 charging system generates electricity throughout an extended outage, 24 with the exception of momentary interruptions associated with transi- 25 tions to and from grid parallel and grid-islanded operations. 26 (e) "EV microgrid" is a group of energy generating resources with at 27 least one source of resilient carbon free power generation and energy EXPLANATION--Matter in italics (underscored) is new; matter in brackets [] is old law to be omitted. LBD14221-02-4A. 9472 2 1 storage within clearly defined electrical boundaries that acts as a 2 single controllable entity with respect to the grid for the purpose of 3 electric vehicle charging and other emergency response needs during an 4 extended outage. An EV microgrid can connect and disconnect from the 5 grid to enable it to operate in both grid-connected or island-mode. 6 2. The commissioner shall promulgate such rules, policies, and proce- 7 dures necessary and appropriate no later than one hundred eighty days 8 following the effective date of this section for: 9 (a) creating a resilient electric vehicle charging system pilot 10 program at the commercial retail rate with a monthly cash out option 11 program and a total program cap of 50 megawatts; 12 (b) establishing a value stack adder for valuation of uninterrupted 13 resilient carbon free power generation generated within an EV microgrid 14 that is participating in the pilot program that supports a resilient 15 electric vehicle charging system at the commercial retail rate; and 16 (c) creating a timely interconnection process for resilient carbon 17 free power generation comprising an EV microgrid. 18 § 2. Section 1005 of the public authorities law is amended by adding a 19 new subdivision 31 to read as follows: 20 31. The authority in a manner consistent with section sixty-six-x of 21 the public service law, shall promulgate such rules, policies, and 22 procedures necessary and appropriate no later than one hundred eighty 23 days following the effective date of this subdivision for: 24 (a) creating a resilient electric vehicle charging system at the 25 commercial retail rate with a monthly cash out option program and a 26 total program cap of 50 megawatts; 27 (b) establishing a value stack adder for valuation of uninterrupted 28 resilient carbon free power generation generated within an EV microgrid 29 that is also a participant of the pilot program that supports a resil- 30 ient electric vehicle charging system at the commercial retail rate; and 31 (c) creating a timely interconnection process for resilient carbon 32 free power generation comprising an EV microgrid. 33 § 3. Section 1020-f of the public authorities law, as added by chapter 34 517 of the laws of 1986, is amended by adding a new subdivision (ll) to 35 read as follows: 36 (ll) The authority in a manner consistent with section sixty-six-x of 37 the public service law, shall promulgate such rules, policies, and 38 procedures necessary and appropriate no later than one hundred eighty 39 days following the effective date of this section for: 40 1. creating a resilient electric vehicle charging system at the 41 commercial retail rate with a monthly cash out option program and the 42 total program cap of 50 megawatts; 43 2. establishing a value stack adder for valuation of uninterrupted 44 resilient carbon free power generation generated within an EV microgrid 45 that is also a participant of the pilot program that supports a resil- 46 ient electric vehicle charging system at the commercial retail rate; and 47 3. creating a timely interconnection process for resilient carbon free 48 power generation comprising an EV microgrid. 49 § 4. This act shall take effect immediately.