Bill Text: NY A03099 | 2015-2016 | General Assembly | Introduced
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Relates to asbestos project notification fees per square foot for friable material.
Spectrum: Bipartisan Bill
Status: (Introduced - Dead) 2016-01-06 - referred to labor [A03099 Detail]
Download: New_York-2015-A03099-Introduced.html
Bill Title: Relates to asbestos project notification fees per square foot for friable material.
Spectrum: Bipartisan Bill
Status: (Introduced - Dead) 2016-01-06 - referred to labor [A03099 Detail]
Download: New_York-2015-A03099-Introduced.html
S T A T E O F N E W Y O R K ________________________________________________________________________ 3099 2015-2016 Regular Sessions I N A S S E M B L Y January 22, 2015 ___________ Introduced by M. of A. LUPARDO, CROUCH, GOODELL, MAGNARELLI, GIGLIO, McDONALD, THIELE, SALADINO -- read once and referred to the Committee on Labor AN ACT to amend the labor law, in relation to asbestos project notifica- tion fees THE PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM- BLY, DO ENACT AS FOLLOWS: 1 Section 1. Subdivision 2 of section 904 of the labor law, as amended 2 by section 1 of part BB of chapter 57 of the laws of 2009, is amended to 3 read as follows: 4 2. Any contractor engaged in an asbestos project involving more than 5 two hundred sixty linear feet or more than one hundred sixty square feet 6 of asbestos or asbestos materials shall notify both the United States 7 Environmental Protection Agency, Region II, Air and Hazardous Material 8 Division and the commissioner in writing ten days prior to the commence- 9 ment of work on the project or, if emergency conditions make it impossi- 10 ble to provide ten days prior notice, as soon as practicable after iden- 11 tification of the project. The notice to the commissioner shall include 12 the following information: the name, address and asbestos handling 13 license number of the contractor working on the project; the address and 14 description of the building or area, including size, age and prior use 15 of the building or area; the amount of friable asbestos material present 16 in square feet and/or linear feet, if applicable; room designation 17 numbers or other local information where such asbestos material is found 18 unless such material is found throughout the entire structure; the sche- 19 duled starting and completion dates for removal; the procedures and 20 equipment, including ventilating systems that will be employed; any 21 additional information which the commissioner may require; and shall be 22 accompanied by a project notification fee as follows: 23 Project Size/Linear Feet Fee EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets [ ] is old law to be omitted. LBD06330-01-5 A. 3099 2 1 260-429 $200 2 430-824 400 3 825-1649 1,000 4 1650 or more 2,000 5 Project Size/Square Feet (FRIABLE) Fee 6 160-259 $200 7 260-499 400 8 500-999 1,000 9 1000 or more 2,000 10 PROJECT SIZE/SQUARE FEET FEE 11 (NON-FRIABLE/RACM) 12 160-259 $50 13 260-499 75 14 500-999 100 15 1,000-1,999 200 16 2,000-2,999 500 17 3,000-3,999 800 18 4,000-4,999 1,000 19 5,000 OR MORE 2,000 20 ALL OWNER OCCUPIED ONE AND TWO FAMILY HOMES THAT ARE OCCUPIED DURING A 21 DISASTER AND THEN CONDEMNED DUE TO DISASTERS SUCH AS, BUT NOT LIMITED 22 TO, FLOODS, FIRES, TORNADOES OR HURRICANES SHALL PAY A FIXED NOTIFICA- 23 TION FEE FOR NOTIFICATION PURPOSES OF DEMOLITION OF TWO HUNDRED DOLLARS. 24 RESIDENTIAL HOMES ACQUIRED BY TOWNS AND MUNICIPALITIES AND CONDEMNED 25 SHALL NOTIFY THE DEPARTMENT OF LABOR PER THE NORMAL NOTIFICATION PROCESS 26 BUT SHALL NOT BE REQUIRED TO PAY ANY NOTIFICATION FEE. 27 S 2. This act shall take effect immediately.