NJ S3289 | 2018-2019 | Regular Session
Note: Carry Foward to future S1923
Note: Carry Foward to future A2583
Note: Carry Foward to future A2583
Status
Spectrum: Slight Partisan Bill (Democrat 2-1)
Status: Introduced on December 17 2018 - 25% progression, died in committee
Action: 2018-12-17 - Introduced in the Senate, Referred to Senate Economic Growth Committee
Pending: Senate Economic Growth Committee
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on December 17 2018 - 25% progression, died in committee
Action: 2018-12-17 - Introduced in the Senate, Referred to Senate Economic Growth Committee
Pending: Senate Economic Growth Committee
Text: Latest bill text (Introduced) [HTML]
Summary
Directs BPU to conduct study to determine whether microgrid and generator deployment will reduce length of power outages.
Title
Directs BPU to conduct study to determine whether microgrid and generator deployment will reduce length of power outages.
Sponsors
History
Date | Chamber | Action |
---|---|---|
2018-12-17 | Senate | Introduced in the Senate, Referred to Senate Economic Growth Committee |
Same As/Similar To
S3289 (Carry Over) 2018-12-17 - Introduced in the Senate, Referred to Senate Economic Growth Committee
S3289 (Carry Over) 2018-12-17 - Introduced in the Senate, Referred to Senate Economic Growth Committee
A4499 (Same As) 2018-12-17 - Assembly Floor Amendment Passed (Johnson)
S3289 (Carry Over) 2018-12-17 - Introduced in the Senate, Referred to Senate Economic Growth Committee
A4499 (Same As) 2018-12-17 - Assembly Floor Amendment Passed (Johnson)
Subjects
New Jersey State Sources
Type | Source |
---|---|
Summary | https://www.njleg.state.nj.us/bill-search/2018/S3289 |
Text | https://pub.njleg.gov/Bills/2018/S3500/3289_I1.HTM |