Bill Text: NC H465 | 2011-2012 | Regular Session | Introduced

NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: REPS Credits at Cleanfields Parks

Spectrum: Bipartisan Bill

Status: (Introduced - Dead) 2011-04-07 - Re-ref Com On Agriculture [H465 Detail]

Download: North_Carolina-2011-H465-Introduced.html

GENERAL ASSEMBLY OF NORTH CAROLINA

SESSION 2011

H                                                                                                                                                   D

HOUSE DRH80104-LD-60A  (03/17)

 

 

 

Short Title:        REPS Credits at Cleanfields Parks.

(Public)

Sponsors:

Representatives Bell, Langdon, Brisson, and McCormick (Primary Sponsors).

Referred to:

 

 

 

A BILL TO BE ENTITLED

AN ACT to provide that, when the north carolina utility commission assigns triple credit to any electric power or renewable energy certificates generated from renewable energy resources at a biomass renewable energy facility  located in a cleanfields renewable energy demonstration park, the additional credits are eligible to meet the requirements for public utilities, electric membership corporations, and municipalities under the renewable energy and energy efficiency portfolio standards (REPS)  rather than requiring that these additional credits must  first be used to meet all the REPS requirements through the use of poultry waste resources.

The General Assembly of North Carolina enacts:

SECTION 1.  Section 4 of S.L. 2010‑195 reads as rewritten:

"SECTION 4.  Renewable energy generation. – The definitions in G.S. 62‑133.8 apply to this act. If the Utilities Commission determines that a biomass renewable energy facility located in the cleanfields renewable energy demonstration park is a new renewable energy facility, the Commission shall assign triple credit to any electric power or renewable energy certificates generated from renewable energy resources at the biomass renewable energy facility that are purchased by an electric power supplier for the purposes of compliance with G.S. 62‑133.8. The additional credits shall be eligible for use to meet the requirements of G.S. 62‑133.8(f).  The additional credits shall first be used to satisfy the requirements of G.S. 62‑133.8(f).  Only when the requirements of G.S. 62‑133.8(f) are met, shall the additional credits be utilized to comply with G.S. 62‑133.8(b) and (c). The triple credit shall apply only to the first 20 megawatts of biomass renewable energy facility generation capacity located in all cleanfields renewable energy demonstration parks in the State."

SECTION 2.  This act is effective when it becomes law.

feedback