Bill Text: IN SB0346 | 2016 | Regular Session | Introduced


Bill Title: Prevailing wage. Requires that, whenever the actual costs for the construction of a public improvement are at least $150,000, a contractor or subcontractor shall pay the workers employed in the performance of work for the construction of the public improvement a rate of wages that is not less than the prevailing wage determined by the commissioner (commissioner) of the department of labor. Requires that employer contributions for fringe benefits paid under a bona fide collective bargaining agreement be included in the prevailing wage determination unless a contractor or subcontractor is required by federal, state, or local law to provide the

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2016-01-07 - First reading: referred to Committee on Rules & Legislative Procedure [SB0346 Detail]

Download: Indiana-2016-SB0346-Introduced.pdf
It appears your computer is unable to display this document, however you can download the file from the links above.
feedback