Bill Text: IL SB1821 | 2011-2012 | 97th General Assembly | Amended
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Creates the Carbon Dioxide Transport by Pipeline Act. Contains only a short title provision.
Spectrum: Moderate Partisan Bill (Democrat 7-1)
Status: (Passed) 2011-08-23 - Public Act . . . . . . . . . 97-0534 [SB1821 Detail]
Download: Illinois-2011-SB1821-Amended.html
Bill Title: Creates the Carbon Dioxide Transport by Pipeline Act. Contains only a short title provision.
Spectrum: Moderate Partisan Bill (Democrat 7-1)
Status: (Passed) 2011-08-23 - Public Act . . . . . . . . . 97-0534 [SB1821 Detail]
Download: Illinois-2011-SB1821-Amended.html
| |||||||
| |||||||
| |||||||
1 | AMENDMENT TO SENATE BILL 1821
| ||||||
2 | AMENDMENT NO. ______. Amend Senate Bill 1821, AS AMENDED, | ||||||
3 | with reference to page and line numbers of House Amendment No. | ||||||
4 | 1 as follows:
| ||||||
5 | on page 7, by replacing lines 6 through 17 with the following: | ||||||
6 | "(f) The Commission shall make its determination on any | ||||||
7 | application for a certificate of authority filed pursuant to | ||||||
8 | this Section and issue its final order within 11 months after | ||||||
9 | the date that the application is filed. The Commission's | ||||||
10 | failure to act within this time period shall not be deemed an | ||||||
11 | approval or denial of the application. | ||||||
12 | (g) A final order of the Commission granting a certificate | ||||||
13 | of authority pursuant to this Act shall be conditioned upon the | ||||||
14 | applicant obtaining all required permits or approvals from the | ||||||
15 | Pipeline and Hazardous Materials Safety Administration of the | ||||||
16 | U.S. Department of Transportation, U.S. Army Corps of | ||||||
17 | Engineers, and Illinois Department of Agriculture, in addition |
| |||||||
| |||||||
1 | to all other permits and approvals necessary for the | ||||||
2 | construction and operation of the pipeline prior to the start | ||||||
3 | of any construction. The final order must specifically prohibit | ||||||
4 | the start of any construction until all such permits and | ||||||
5 | approvals have been obtained.".
|