Bill Text: HI SB1340 | 2012 | Regular Session | Introduced
Bill Title: CIP; 16th Senatorial District
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2011-12-01 - Carried over to 2012 Regular Session. [SB1340 Detail]
Download: Hawaii-2012-SB1340-Introduced.html
THE SENATE |
S.B. NO. |
1340 |
TWENTY-SIXTH LEGISLATURE, 2011 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of THE sixteenth SENATORIAL DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $ or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2011-2012 for the purpose of capital improvement projects for the sixteenth senatorial district, as follows:
1. To be expended by the department of education:
A. Aiea elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $75,000
Construction $500,000
Total funding $575,000
B. Aiea elementary school, Oahu
Design, construction, and equipment to complete air conditioning of building A and various campus buildings, ground and site improvements, and equipment and appurtenances.
Design $1,000
Construction $899,000
Equipment $150,000
Total funding $1,050,000
C. Aiea intermediate school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $225,000
Construction $1,500,000
Total funding $1,725,000
D. Aiea intermediate school, Oahu
Design, construction, and equipment for electrical upgrades and heat abatement improvements, including appurtenances.
Design $99,000
Construction $400,000
Equipment $1,000
Total funding $500,000
E. Aiea high school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $240,000
Construction $2,000,000
Total funding $2,240,000
F. Aiea high school, Oahu
Design, construction, and equipment for a new building or an addition to existing buildings for two classrooms, a weight training room, permanent restrooms, and a concession for the athletic field.
Design $520,000
Construction $5,820,000
Equipment $50,000
Total funding $6,390,000
G. Aiea high school, Oahu
Design and construction for an amphitheater, sidewalk safety improvements, retaining walls, and ground and site improvements.
Design $200,000
Construction $2,208,000
Total funding $2,408,000
H. Aiea high school, Oahu
Design, construction, and equipment for a weight training room, ground and site improvements, and equipment and appurtenances.
Design $160,000
Construction $754,000
Equipment $1,000
Total funding $915,000
I. Aiea high school, Oahu
Design, construction, and equipment to complete the expansion and renovation project for the administration building, and ground and site improvements.
Design $5,000
Construction $125,000
Equipment $100,000
Total funding $230,000
J. Aiea high school, Oahu
Plans, design, and construction for campus-wide erosion control, drainage improvements and exterior commons, Phase 1, ground and site improvements, and equipment and appurtenances.
Plans $50,000
Design $200,000
Construction $2,250,000
Total funding $2,500,000
K. Alvah Scott elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $150,000
Construction $1,000,000
Total funding $1,150,000
L. Alvah Scott elementary school, Oahu
Design and construction for traffic safety improvements and parking expansion, ground and site improvements, and equipment and appurtenances.
Design $75,000
Construction $650,000
Total funding $725,000
M. Gustav H. Webling elementary school, Oahu
Design and construction for campus-wide electrical upgrades, and equipment and appurtenances.
Design $150,000
Construction $1,099,000
Equipment 1,000
Total funding $1,250,000
N. Gustav H. Webling elementary school, Oahu
Plans, design, and construction to redesign the administration building to improve the health room, and to provide air conditioning and doorways.
Plans $1,000
Design $1,000
Construction $223,000
Total funding $225,000
O. Highlands intermediate school, Oahu
Design and construction of a fence fronting Highlands intermediate school.
Design $20,000
Construction $160,000
Total funding $180,000
P. Highlands intermediate school, Oahu
Design and construction to renovate the chorus classroom, including asbestos removal.
Design $80,000
Construction $400,000
Total funding $480,000
Q. Lehua elementary school, Oahu
Plans, design, and construction for a new six‑classroom building.
Plans $1,000
Design $1,000
Construction $5,998,000
Total funding $6,000,000
R. Lehua elementary school, Oahu
Construction to improve the structural integrity of building B.
Construction $1,000,000
Total funding $1,000,000
S. Lehua elementary school, Oahu
Design and construction to expand the school parking lot.
Design $100,000
Construction $500,000
Total funding $600,000
T. Lehua elementary school, Oahu
Construction for campus-wide electrical upgrades.
Construction $1,114,000
Total funding $1,114,000
U. Manana elementary school, Oahu
Construction to provide ramps, elevators, and other measures to improve access to school facilities.
Construction $85,000
Total funding $85,000
V. Manana elementary school, Oahu
Construction to provide disabled accessibility for science laboratory in building K and classrooms in building J.
Construction $120,000
Total funding $120,000
W. Manana elementary school, Oahu
Design to improve school campus drainage.
Design $400,000
Total funding $400,000
X. Manana elementary school, Oahu
Design and construction to complete renovations to the library.
Design $60,000
Construction $300,000
Total funding $360,000
Y. Manana elementary school, Oahu
Design and construction of retaining walls and for drainage improvements for buildings H, F, G, and J.
Design $50,000
Construction $400,000
Total funding $450,000
Z. Momilani elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $100,000
Construction $500,000
Total funding $600,000
AA. Palisades elementary school, Oahu
Design and construction to improve the slope of the front parking lot.
Design $180,000
Construction $900,000
Total funding $1,080,000
BB. Palisades elementary school, Oahu
Construction of ten-stall parking lot, driveway, and retaining wall to be added to existing parking lot.
Construction $600,000
Total funding $600,000
CC. Pearl City high school, Oahu
Design and construction for air conditioning for building R.
Design $1,000,000
Construction $5,000,000
Total funding $6,000,000
DD. Pearl City Highlands elementary school, Oahu
Design and construction for campus-wide electrical system upgrades.
Design $1,000
Construction $949,000
Total funding $950,000
EE. Pearl City library, Oahu
Design and construction to renovate the library's parking lot.
Design $75,000
Construction $705,000
Total funding $780,000
FF. Pearl Ridge elementary school, Oahu
Design, construction, and equipment to improve the administration building and courtyard, including air conditioning.
Design $1,000
Construction $3,598,000
Equipment $1,000
Total funding $3,600,000
GG. Pearl Ridge elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $150,000
Construction $1,000,000
Total funding $1,150,000
HH. Pearl Ridge elementary school, Oahu
Design and construction for administration building heat abatement and central courtyard improvements, ground and site improvements, and equipment and appurtenances.
Design $200,000
Construction $900,000
Total funding $1,100,000
II. Red Hill elementary school, Oahu
Construction to install ceiling fans in various campus buildings.
Construction $126,000
Total funding $126,000
JJ. Waiau elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $600,000
Construction $3,000,000
Total funding $3,600,000
KK. Waimalu elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $150,000
Construction $1,000,000
Total funding $1,150,000
LL. Waimalu elementary school, Oahu
Design, construction, and equipment for electrical upgrades and installation of air conditioning systems for buildings D and E, excluding E1, E2, and E7.
Design $
Construction $
Equipment $
Total funding $
MM. Waimalu elementary school, Oahu
Design and construction for electrical upgrades and installation of air conditioning systems for various classrooms.
Design $500,000
Construction $3,000,000
Total funding $3,500,000
NN. Waimalu elementary school, Oahu
Design and construction of covered roof above concrete walkways from building A to portable classrooms.
Design $
Construction $
Total funding $
2. To be expended by the department of transportation:
A. Kamehameha highway, Oahu
Plans, design, and construction for improvements to Kamehameha highway, including signal operation and monitoring improvements Phase II, a feasibility study for bottleneck intersections, utility undergrounding, Pearl Harbor historic sites gateway project, and HARS demonstration program. These projects are deemed necessary to qualify for federal aid financing and/or reimbursement.
Plans $4,100,000
Design $1,000
Construction $5,829,000
Total funding $9,930,000
B. Kamehameha highway, Oahu
Construction to equip all crosswalks along Kamehameha highway with in-roadway lighted warning systems.
Construction $1,000,000
Total funding $1,000,000
3. To be expended by the city and county of Honolulu:
A. Halawa Heights road, Oahu
Design and construction for a retaining wall to prevent erosion of hillside along Halawa Heights road adjacent to 99-614 Kaakau place.
Design $1,000
Construction $949,000
Total funding $950,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 3. This Act shall take effect on July 1, 2011.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; 16th Senatorial District
Description:
Appropriates funds for capital improvement projects in the sixteenth senatorial district.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.