Bill Text: HI SB1340 | 2012 | Regular Session | Introduced


Bill Title: CIP; 16th Senatorial District

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2011-12-01 - Carried over to 2012 Regular Session. [SB1340 Detail]

Download: Hawaii-2012-SB1340-Introduced.html

THE SENATE

S.B. NO.

1340

TWENTY-SIXTH LEGISLATURE, 2011

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE sixteenth SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $           or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2011-2012 for the purpose of capital improvement projects for the sixteenth senatorial district, as follows:

1.   To be expended by the department of education:

     A.   Aiea elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                         $75,000

          Construction                  $500,000

          Total funding                                $575,000

     B.   Aiea elementary school, Oahu

          Design, construction, and equipment to complete air conditioning of building A and various campus buildings, ground and site improvements, and equipment and appurtenances.

          Design                          $1,000

          Construction                  $899,000

          Equipment                     $150,000

          Total funding                              $1,050,000

     C.   Aiea intermediate school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $225,000

          Construction                $1,500,000

          Total funding                              $1,725,000

     D.   Aiea intermediate school, Oahu

          Design, construction, and equipment for electrical upgrades and heat abatement improvements, including appurtenances.

          Design                         $99,000

          Construction                  $400,000

          Equipment                       $1,000

          Total funding                                $500,000

     E.   Aiea high school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $240,000

          Construction                $2,000,000

          Total funding                              $2,240,000

     F.   Aiea high school, Oahu

          Design, construction, and equipment for a new building or an addition to existing buildings for two classrooms, a weight training room, permanent restrooms, and a concession for the athletic field.

          Design                        $520,000

          Construction                $5,820,000

          Equipment                      $50,000

          Total funding                              $6,390,000

     G.   Aiea high school, Oahu

          Design and construction for an amphitheater, sidewalk safety improvements, retaining walls, and ground and site improvements.

          Design                        $200,000

          Construction                $2,208,000

          Total funding                              $2,408,000

     H.   Aiea high school, Oahu

          Design, construction, and equipment for a weight training room, ground and site improvements, and equipment and appurtenances.

          Design                        $160,000

          Construction                  $754,000

          Equipment                       $1,000

          Total funding                                $915,000

     I.   Aiea high school, Oahu

          Design, construction, and equipment to complete the expansion and renovation project for the administration building, and ground and site improvements.

          Design                          $5,000

          Construction                  $125,000

          Equipment                     $100,000

          Total funding                                $230,000

     J.   Aiea high school, Oahu

          Plans, design, and construction for campus-wide erosion control, drainage improvements and exterior commons, Phase 1, ground and site improvements, and equipment and appurtenances.

          Plans                          $50,000

          Design                        $200,000

          Construction                $2,250,000

          Total funding                              $2,500,000

     K.   Alvah Scott elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $150,000

          Construction                $1,000,000

          Total funding                              $1,150,000

     L.   Alvah Scott elementary school, Oahu

          Design and construction for traffic safety improvements and parking expansion, ground and site improvements, and equipment and appurtenances.

          Design                         $75,000

          Construction                  $650,000

          Total funding                                $725,000

     M.   Gustav H. Webling elementary school, Oahu

          Design and construction for campus-wide electrical upgrades, and equipment and appurtenances.

          Design                        $150,000

          Construction                $1,099,000

          Equipment                        1,000

          Total funding                              $1,250,000

     N.   Gustav H. Webling elementary school, Oahu

          Plans, design, and construction to redesign the administration building to improve the health room, and to provide air conditioning and doorways.

          Plans                           $1,000

          Design                          $1,000

          Construction                  $223,000

          Total funding                                $225,000

     O.   Highlands intermediate school, Oahu

          Design and construction of a fence fronting Highlands intermediate school.

          Design                         $20,000

          Construction                  $160,000

          Total funding                                $180,000

     P.   Highlands intermediate school, Oahu

          Design and construction to renovate the chorus classroom, including asbestos removal.

          Design                         $80,000

          Construction                  $400,000

          Total funding                                $480,000

     Q.   Lehua elementary school, Oahu

          Plans, design, and construction for a new six‑classroom building.

          Plans                           $1,000

          Design                          $1,000

          Construction                $5,998,000

          Total funding                              $6,000,000

     R.   Lehua elementary school, Oahu

          Construction to improve the structural integrity of building B.

          Construction                $1,000,000

          Total funding                         $1,000,000

     S.   Lehua elementary school, Oahu

          Design and construction to expand the school parking lot.

          Design                        $100,000

          Construction                  $500,000

          Total funding                                $600,000

     T.   Lehua elementary school, Oahu

          Construction for campus-wide electrical upgrades.

          Construction                $1,114,000

          Total funding                              $1,114,000

     U.   Manana elementary school, Oahu

          Construction to provide ramps, elevators, and other measures to improve access to school facilities.

          Construction                   $85,000

          Total funding                                 $85,000

     V.   Manana elementary school, Oahu

          Construction to provide disabled accessibility for science laboratory in building K and classrooms in building J.

          Construction                  $120,000

          Total funding                                $120,000

     W.   Manana elementary school, Oahu

          Design to improve school campus drainage.

          Design                        $400,000

          Total funding                                $400,000

     X.   Manana elementary school, Oahu

          Design and construction to complete renovations to the library.

          Design                         $60,000

          Construction                  $300,000

          Total funding                                $360,000

     Y.   Manana elementary school, Oahu

          Design and construction of retaining walls and for drainage improvements for buildings H, F, G, and J.

          Design                         $50,000

          Construction                  $400,000

          Total funding                                $450,000

     Z.   Momilani elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $100,000

          Construction                  $500,000

          Total funding                                $600,000

     AA.  Palisades elementary school, Oahu

          Design and construction to improve the slope of the front parking lot.

          Design                        $180,000

          Construction                  $900,000

          Total funding                              $1,080,000

     BB.  Palisades elementary school, Oahu

          Construction of ten-stall parking lot, driveway, and retaining wall to be added to existing parking lot.

          Construction                  $600,000

          Total funding                                $600,000

     CC.  Pearl City high school, Oahu

          Design and construction for air conditioning for building R.

          Design                      $1,000,000

          Construction                $5,000,000

          Total funding                              $6,000,000

     DD.  Pearl City Highlands elementary school, Oahu

          Design and construction for campus-wide electrical system upgrades.

          Design                          $1,000

          Construction                  $949,000

          Total funding                                $950,000

     EE.  Pearl City library, Oahu

          Design and construction to renovate the library's parking lot.

          Design                         $75,000

          Construction                  $705,000

          Total funding                                $780,000

     FF.  Pearl Ridge elementary school, Oahu

          Design, construction, and equipment to improve the administration building and courtyard, including air conditioning.

          Design                          $1,000

          Construction                $3,598,000

          Equipment                       $1,000

          Total funding                              $3,600,000

     GG.  Pearl Ridge elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $150,000

          Construction                $1,000,000

          Total funding                              $1,150,000

     HH.  Pearl Ridge elementary school, Oahu

          Design and construction for administration building heat abatement and central courtyard improvements, ground and site improvements, and equipment and appurtenances.

          Design                        $200,000

          Construction                  $900,000

          Total funding                              $1,100,000

     II.  Red Hill elementary school, Oahu

          Construction to install ceiling fans in various campus buildings.

          Construction                  $126,000

          Total funding                                $126,000

     JJ.  Waiau elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $600,000

          Construction                $3,000,000

          Total funding                              $3,600,000

     KK.  Waimalu elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                        $150,000

          Construction                $1,000,000

          Total funding                              $1,150,000

     LL.  Waimalu elementary school, Oahu

          Design, construction, and equipment for electrical upgrades and installation of air conditioning systems for buildings D and E, excluding E1, E2, and E7.

          Design                               $

          Construction                         $

          Equipment                            $

          Total funding                             $          

     MM.  Waimalu elementary school, Oahu

          Design and construction for electrical upgrades and installation of air conditioning systems for various classrooms.

          Design                        $500,000

          Construction                $3,000,000

          Total funding                              $3,500,000

     NN.  Waimalu elementary school, Oahu

          Design and construction of covered roof above concrete walkways from building A to portable classrooms.

          Design                               $

          Construction                         $

          Total funding                             $          

2.   To be expended by the department of transportation:

     A.   Kamehameha highway, Oahu

          Plans, design, and construction for improvements to Kamehameha highway, including signal operation and monitoring improvements Phase II, a feasibility study for bottleneck intersections, utility undergrounding, Pearl Harbor historic sites gateway project, and HARS demonstration program.  These projects are deemed necessary to qualify for federal aid financing and/or reimbursement.

          Plans                       $4,100,000

          Design                          $1,000

          Construction                $5,829,000

          Total funding                              $9,930,000

     B.   Kamehameha highway, Oahu

          Construction to equip all crosswalks along Kamehameha highway with in-roadway lighted warning systems.

          Construction                          $1,000,000

          Total funding                              $1,000,000

3.   To be expended by the city and county of Honolulu:

     A.   Halawa Heights road, Oahu

          Design and construction for a retaining wall to prevent erosion of hillside along Halawa Heights road adjacent to 99-614 Kaakau place.

          Design                          $1,000

          Construction                  $949,000

          Total funding                                $950,000

     SECTION 2.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.


     SECTION 3.  This Act shall take effect on July 1, 2011.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 16th Senatorial District

 

Description:

Appropriates funds for capital improvement projects in the sixteenth senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.