Bill Text: HI SB1124 | 2018 | Regular Session | Introduced


Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Fourteenth Senatorial District.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2017-11-30 - Carried over to 2018 Regular Session. [SB1124 Detail]

Download: Hawaii-2018-SB1124-Introduced.html

THE SENATE

S.B. NO.

1124

TWENTY-NINTH LEGISLATURE, 2017

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE fourteenth SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $60,838,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2017-2018 for the purpose of capital improvement projects for the fourteenth senatorial district, as follows:

1.   Aiea Elementary School

     A.   Install a restroom near the library, ground and site improvements, and equipment and appurtenances.

          Design                         $35,000

          Construction                  $315,000

          Total funding                                $350,000

     B.   Install covered walkways throughout campus, ground and site improvements, and equipment and appurtenances.

          Design                        $100,000

          Construction                  $900,000

          Total funding                              $1,000,000

2.   Aiea High School

     A.   Plans, design, and construction for a girls' locker room.

          Total funding                             $19,000,000

3.   Aiea Intermediate School

     A.   Renovation and expansion of stage portion of cafeteria.

          Plans                          $10,000

          Design                         $15,000

          Construction                  $225,000

          Equipment                     $300,000

          Total funding                                $550,000

4.   Farrington High School

     A.   Phase II of redesign project; new gymnasium/music building.

          Design                      $2,000,000

          Total funding                              $2,000,000

5.   Fern Elementary School

     A.   Install covered walkways between B building and the cafeteria.

          Plans                          $15,000

          Design                         $20,000

          Construction                   $50,000

          Total funding                                 $85,000

6.   Kalihi Uka Elementary School

     A.   Replace air conditioning system in the library.

          Construction/labor             $20,000

          Equipment                      $30,000

          Total funding                                 $50,000

7.   Moanalua Elementary School

     A.   New multi-purpose innovation center to educate students on STEM, robotics, computers and multi-media, music, and fine arts curricula.

          Design                        $320,000

          Construction                $2,880,000

          Equipment                      $50,000

          Total funding                              $3,250,000

     B.   Expansion of the library for a multi-purpose innovation center, ground and site improvements, and equipment and appurtenances.

          Design                        $400,000

          Construction                $3,075,000

          Equipment                      $50,000

          Total funding                              $3,525,000

8.   Moanalua Middle School

     A.   Centralized covered and cemented area for student drop-off and pickup between cafeteria and administration office.

          Plans                           $1,000

          Land Acquisition                $1,000

          Design                          $1,000

          Construction                  $100,000

          Equipment                     $100,000

          Total funding                                $203,000


9.   Moanalua High School

     A.   New Performing Arts Center building.

          Construction               $14,000,000

          Equipment                   $1,000,000

          Total funding                             $15,000,000

10.  Red Hill Elementary School

     A.   New covered play court.

          Design                        $500,000

          Construction                $2,300,000

          Total funding                              $2,800,000

     B.   Replace existing playground equipment, ground and site improvements, and equipment and appurtenances for lower and upper elementary students.

          Design                         $25,000

          Construction                  $225,000

          Total funding                                $250,000

11.  Shafter Elementary School

     A.   Expansion of the Administration/Classroom building for a multi-purpose science center, ground and site improvements, and equipment and appurtenances.

          Design                        $400,000

          Construction                $3,075,000

          Equipment                      $50,000

          Total funding                              $3,525,000

12.  Webling Elementary School

     A.   Expansion of administration and library buildings due to district boundary changes resulting in increased school enrollment.  Would be used for computer labs, multi-media rooms, transition center, and additional office spaces.

          Design                        $800,000

          Construction                $6,650,000

          Equipment                      $50,000

          Total funding                              $7,500,000

     B.   Covered walkways throughout school.

          Design                        $100,000

          Construction                  $900,000

          Total funding                              $1,000,000

13.  Moanalua Gardens Foundation, Inc.

     A.   Master plan for Kamananui (Moanalua) Valley for protection, preservation, and maintenance of the last undeveloped valley in urban Honolulu.

          Plans                         $750,000

          Total funding                                $750,000

     SECTION 2.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2020, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended for the purposes of this Act as follows:

     (1)  The sums appropriated in items 1 to 12 shall be expended by the department of education; and

     (2)  The sum appropriated in item 13 shall be expended by the department of land and natural resources; and

     SECTION 4.  This Act shall take effect on July 1, 2017.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; Fourteenth Senatorial District; Appropriation

 

Description:

Appropriates funds for capital improvement projects in the fourteenth senatorial district.

 

 

 