Bill Text: HI HB2488 | 2022 | Regular Session | Introduced
Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Forty-fourth Representative District.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2022-01-28 - Referred to FIN, referral sheet 3 [HB2488 Detail]
Download: Hawaii-2022-HB2488-Introduced.html
HOUSE OF REPRESENTATIVES |
H.B. NO. |
2488 |
THIRTY-FIRST LEGISLATURE, 2022 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of THE Forty-fourth REPRESENTATIVE DISTRICT.
BE IT
ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $289,050,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2022-2023 for the purpose of capital improvement projects for the forty-fourth representative district, as follows:
1. Leihoku elementary school, Oahu
Design and construction for covered walkways throughout the campus; ground and site improvements; and equipment and appurtenances.
Design $210,000
Construction $490,000
Total funding $700,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
2. Leihoku elementary school, Oahu
Design and construction for covered walkways throughout the campus that connects all classrooms to the cafeteria; ground and site improvements; and equipment and appurtenances.
Design $150,000
Construction $350,000
Total funding $500,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
3. Leihoku elementary school, Oahu
Design and construction for parking lot expansion.
Design $150,000
Construction $350,000
Total funding $500,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
4. Leihoku elementary school, Oahu
Design and construction for perimeter fence upgrades, including cattle gates to reduce vandalism and increase the safety of students and staff.
Design $90,000
Construction $210,000
Total funding $300,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
5. Makaha elementary school, Oahu
Design and construction for installing a twenty-first century learning space between buildings A and B, to include a concrete stage area and shade sails; grading and conditioning of the soil; ground and site improvements; and equipment and appurtenances.
Design $600,000
Construction $2,400,000
Total funding $3,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
6. Waianae elementary school, Oahu
Design and construction for a covered play court; ground and site improvements; and equipment and appurtenances.
Design $600,000
Construction $1,400,000
Total funding $2,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
7. Waianae elementary school, Oahu
Design and construction for a parking lot expansion.
Design $50,000
Construction $250,000
Total funding $300,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
8. Waianae high school, Oahu
Design and construction for a rubberized all-weather track.
Design $400,000
Construction $3,600,000
Total funding $4,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
9. Waianae high school, Oahu
Design and construction for an all-weather field.
Design $500,000
Construction $4,500,000
Total funding $5,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
10. Waianae high school, Oahu
Design and construction for electrical upgrades for building A; ground and site improvements; and equipment and appurtenances.
Design $600,000
Construction $1,400,000
Total funding $2,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
11. Waianae high school, Oahu
Equipment for Waianae high school sports programs.
Equipment $3,000,000
Total funding $3,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
12. Waianae high school, Oahu
Land, design, construction, and equipment for installing a pool.
Land $500,000
Design $1,000,000
Construction $18,000,000
Equipment $500,000
Total funding $20,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
13. Waianae high school, Oahu
Design and construction for the expansion of the marine science learning center, including facilities that allow gamut of scientific investigation
Design $120,000
Construction $1,880,000
Total funding $2,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
14. Waianae intermediate school, Oahu
Design and construction for a covered campus playground and basketball court; ground and site improvements; and equipment and appurtenances.
Design $1,000,000
Construction $3,000,000
Total funding $4,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
15. Waianae intermediate school, Oahu
Design, construction, and equipment for a sixth-grade building; ground and site improvements; and equipment and appurtenances.
Design $13,500,000
Construction $31,050,000
Equipment $450,000
Total funding $45,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
16. Kaena point state park, Oahu
Plans, land, design, and construction for security measures; facility structure and storage improvements; comfort station; sewer improvements and replacements; water system improvements; roadway and parking improvements; and related improvements.
Plans $75,000
Land $25,000
Design $250,000
Construction $1,800,000
Total funding $2,150,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
17. Waianae small boat harbor, Oahu
Design and construction for asphalt pavement and drainage improvements for the dirt parking area near harbor entrance.
Design $100,000
Construction $900,000
Total funding $1,000,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
18. Waianae small boat harbor, Oahu
Design and construction for repairing damage to the main loading dock at Waianae small boat harbor.
Design $200,000
Construction $500,000
Total funding $700,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
19. Farrington highway, Oahu
Design and construction for building a pedestrian walk bridge above Farrington highway.
Design $4,500,000
Construction $10,500,000
Total funding $15,000,000
The sum appropriated for this capital improvement project shall be expended by the department of transportation.
20. Farrington highway, Oahu
Plans, land, design, construction, and equipment for the extension of the fifth lane to widen Farrington highway; creation of a parallel route for the Waianae Coast; the extension of Paakea Road; and other traffic improvements.
Plans $1,500,000
Land $1,000,000
Design $1,500,000
Construction $20,000,000
Equipment $1,000,000
Total funding $25,000,000
The sum appropriated for this capital improvement project shall be expended by the department of transportation.
21. Pedestrian overpass, Maliona street
Plans, design, and construction for a pedestrian overpass over Farrington highway in front of Maliona street for traffic mitigation, including ground and site improvements.
Plans $2,100,000
Design $2,100,000
Construction $25,800,000
Total funding $30,000,000
The sum appropriated for this capital improvement project shall be expended by the department of transportation.
22. Pedestrian overpass, Puhano street, Waianae
Plans, design, and construction for a pedestrian overpass over Farrington highway in front of Puhano street, Waianae, for traffic mitigation, including ground and site improvements.
Plans $2,100,000
Design $2,100,000
Construction $25,800,000
Total funding $30,000,000
The sum appropriated for this capital improvement project shall be expended by the department of transportation.
23. Pedestrian overpass, Waianae boat harbor
Plans, design, and construction for a pedestrian overpass over Farrington highway in front of Waianae boat harbor for traffic mitigation, including ground and site improvements.
Plans $2,100,000
Design $2,100,000
Construction $25,800,000
Total funding $30,000,000
The sum appropriated for this capital improvement project shall be expended by the department of transportation.
24. Pedestrian overpass, Waianae high school
Plans, design, and construction for a pedestrian overpass fronting Waianae high school.
Plans $2,100,000
Design $2,100,000
Construction $25,800,000
Total funding $30,000,000
The sum appropriated for this capital improvement project shall be expended by the department of transportation.
25. Pedestrian overpass, Waianae intermediate school
Plans, design, and construction for a pedestrian overpass in front of Waianae intermediate school for traffic mitigation, including ground and site improvements.
Plans $2,100,000
Design $2,100,000
Construction $25,800,000
Total funding $30,000,000
The sum appropriated for this capital improvement project shall be expended by the department of transportation.
26. Secondary access routes, Waianae
Plans for secondary access roads that pass through Waianae coast and connect that area to the rest of Oahu's transportation infrastructure.
Plans $
Total funding $
The sum appropriated for this capital improvement project shall be expended by the department of transportation.
27. Kamaile academy public charter school, Oahu
Design and construction for installation of air conditioning system in the cafeteria, library, and administrative buildings; ground and site improvements; and equipment and appurtenances.
Design $330,000
Construction $1,370,000
Total funding $1,700,000
The sum appropriated for this capital improvement project shall be expended by the state public charter school commission.
28. Kamaile academy public charter school, Oahu
Design and construction for installation of campus playground, additional parking, irrigation system, and fencing; grading and conditioning of soil; ground and site improvements; and equipment and appurtenances.
Design $80,000
Construction $1,120,000
Total funding $1,200,000
The sum appropriated for this capital improvement project shall be expended by the state public charter school commission.
SECTION 2. The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2024, shall lapse as of that date.
SECTION 3. This Act shall take effect on July 1, 2022.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; Forty-fourth Representative District; Appropriation
Description:
Appropriates funds for capital improvement projects in the forty-fourth representative district.
The summary description
of legislation appearing on this page is for informational purposes only and is
not legislation or evidence of legislative intent.