Bill Text: HI HB2066 | 2010 | Regular Session | Introduced


Bill Title: CIP; 33rd, 34th, and 36th Representative Districts

Spectrum: Partisan Bill (Democrat 3-0)

Status: (Introduced - Dead) 2010-01-20 - (H) Referred to FIN, referral sheet 2 [HB2066 Detail]

Download: Hawaii-2010-HB2066-Introduced.html

HOUSE OF REPRESENTATIVES

H.B. NO.

2066

TWENTY-FIFTH LEGISLATURE, 2010

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE THIRTY-THIRD, THIRTY-FOURTH, AND THIRTY-SIXTH REPRESENTATIVE DISTRICTS.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2010-2011:

      1.  To be expended by the department of education:

      A.  Aiea elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                                   $75,000

          Construction                            $500,000

          Total funding                           $575,000

      B.  Aiea elementary school, Oahu

          Design and construction of a covered walkway connecting building C with the cafeteria.

          Design                                   $20,000

          Construction                            $180,000

          Total funding                           $200,000

      C.  Aiea intermediate school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                                  $225,000

          Construction                          $1,500,000

          Total funding                         $1,725,000

      D.  Aiea intermediate school, Oahu

          Design, construction, and equipment for electrical upgrades and heat abatement improvements, including appurtenances.

          Design                                   $99,000

          Construction                            $400,000

          Equipment                                 $1,000

          Total funding                           $500,000

      E.  Aiea high school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                                  $240,000

          Construction                          $2,000,000

          Total funding                         $2,240,000

      F.  Aiea high school, Oahu

          Design, construction, and equipment for a new building or an addition to existing buildings for two classrooms, a weight training room, permanent restrooms, and a concession for the athletic field.

          Design                                  $520,000

          Construction                          $5,820,000

          Equipment                                $50,000

          Total funding                         $6,390,000

      G.  Aiea high school, Oahu

          Design and construction for an amphitheater, sidewalk safety improvements, retaining walls, and ground and site improvements.

          Design                                  $200,000

          Construction                          $2,208,000

          Total funding                         $2,408,000

      H.  Aiea high school, Oahu

          Design, construction, and equipment for a weight training room, ground and site improvements, and equipment and appurtenances.

          Design                                  $160,000

          Construction                            $754,000

          Equipment                                 $1,000

          Total funding                           $915,000

      I.  Alvah Scott elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                                  $150,000

          Construction                          $1,000,000

          Total funding                         $1,150,000

      J.  Gustav H. Webling elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                                  $150,000

          Construction                          $1,000,000

          Total funding                         $1,150,000

      K.  Gustav H. Webling elementary school, Oahu

          Plans, design, and construction to redesign the administration building to improve the health room, and to provide air conditioning and doorways.

          Plans                                     $1,000

          Design                                    $1,000

          Construction                            $223,000

          Total funding                           $225,000

      L.  Highlands intermediate school, Oahu

          Design and construction of a fence fronting Highlands intermediate school.

          Design                                   $20,000

          Construction                            $160,000

          Total funding                           $180,000

      M.  Lehua elementary school, Oahu

          Plans, design, and construction for a new six-classroom building.

          Plans                                     $1,000

          Design                                    $1,000

          Construction                          $5,998,000

          Total funding                         $6,000,000

      N.  Lehua elementary school, Oahu

          Construction to improve the structural integrity of building B.

          Construction                          $1,000,000

          Total funding                         $1,000,000

      O.  Lehua elementary school, Oahu

          Design and construction to expand the school parking lot.

          Design                                  $100,000

          Construction                            $500,000

          Total funding                           $600,000

      P.  Manana elementary school, Oahu

          Construction to provide ramps, elevators, and other measures to improve access to school facilities.

          Construction                             $85,000

          Total funding                            $85,000

      Q.  Manana elementary school, Oahu

          Construction to provide disabled accessibility for science labs in building K and classrooms in building J.

          Construction                            $120,000

          Total funding                           $120,000

      R.  Manana elementary school, Oahu

          Design to improve school campus drainage.

          Design                                  $400,000

          Total funding                           $400,000

      S.  Manana elementary school, Oahu

          Design and construction to complete renovations to the library.

          Design                                   $60,000

          Construction                            $300,000

          Total funding                           $360,000

      T.  Momilani elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                                  $100,000

          Construction                            $500,000

          Total funding                           $600,000

      U.  Palisades elementary school, Oahu

          Design and construction to improve the slope of the front parking lot.

          Design                                  $180,000

          Construction                            $900,000

          Total funding                         $1,080,000

      V.  Pearl City high school, Oahu

          Design and construction for air conditioning for building R.

          Design                                $1,000,000

          Construction                          $5,000,000

          Total funding                         $6,000,000

      W.  Pearl City Highlands elementary school, Oahu

          Design and construction for campus-wide electrical system upgrades.

          Design                                    $1,000

          Construction                            $949,000

          Total funding                           $950,000

      X.  Pearl City library, Oahu

          Design and construction to renovate the library's parking lot.

          Design                                   $75,000

          Construction                            $705,000

          Total funding                           $780,000

      Y.  Pearl Ridge elementary school, Oahu

          Design, construction, and equipment to improve the administration building and courtyard, including air conditioning.

          Design                                    $1,000

          Construction                          $3,598,000

          Equipment                                 $1,000

          Total funding                         $3,600,000

      Z.  Pearl Ridge elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                                  $150,000

          Construction                          $1,000,000

          Total funding                         $1,150,000

     AA.  Red Hill elementary school, Oahu

          Design and construction for school-wide electrical upgrades.

          Design                                   $30,000

          Construction                            $435,000

          Total funding                           $465,000

     BB.  Red Hill elementary school, Oahu

          Construction to install ceiling fans in various campus buildings.

          Construction                            $126,000

          Total funding                           $126,000

     CC.  Waiau elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                                  $600,000

          Construction                          $3,000,000

          Total funding                        $3,600,0000

     DD.  Waimalu elementary school, Oahu

          Design and construction for campus-wide electrical upgrades.

          Design                                  $150,000

          Construction                          $1,000,000

          Total funding                         $1,150,000

     EE.  Waimalu elementary school, Oahu

          Design, construction, and equipment for electrical upgrades and installation of air conditioning systems for buildings D and E, excluding E1, E2, and E7.

          Design                                         $

          Construction                                   $

          Equipment                                      $

          Total funding                                  $

     FF.  Waimalu elementary school, Oahu

          Design and construction for electrical upgrades and installation of air conditioning systems for various classrooms.

          Design                                  $500,000

          Construction                          $3,000,000

          Total funding                         $3,500,000

      2.  To be expended by the department of transportation:

      A.  H-1 Freeway near Ulune street, Oahu

          Design and construction of a noise barrier wall along the H-1 Freeway near Ulune street to provide traffic noise reduction.

          Design                                    $1,000

          Construction                            $824,000

          Total funding                           $825,000

      B.  Interstate route H-1, vicinity of Aiea Hongwanji, Oahu

          Design and construction for a noise-attenuating wall along interstate route H-1 in the vicinity of Aiea Hongwanji.

          Design                                  $150,000

          Construction                          $6,553,000

          Total funding                         $6,703,000

      C.  Kamehameha highway, Oahu

          Plans, design, and construction for improvements to Kamehameha highway, including signal operation and monitoring improvements Phase II, a feasibility study for bottleneck intersections, utility undergrounding, Pearl Harbor historic sites gateway project, and HARS demonstration program.  These projects are deemed necessary to qualify for federal aid financing and/or reimbursement.

          Plans                                 $4,100,000

          Design                                    $1,000

          Construction                          $5,829,000

          Total funding                         $9,930,000

      D.  Kamehameha highway, Oahu

          Construction to equip all crosswalks along Kamehameha highway with in-roadway lighted warning systems.

          Construction                          $1,000,000

          Total funding                         $1,000,000

      3.  To be expended by the city and county of Honolulu:

      A.  Halawa Heights road, Oahu

          Design and construction for a retaining wall to prevent erosion of hillside along Halawa Heights road adjacent to 99-614 Kaakau place.

          Design                                    $1,000

          Construction                            $949,000

          Total funding                           $950,000

      4.  To be expended by the University of Hawaii:

      A.  University of Hawaii, West Oahu, Oahu

          Design, construction, and equipment for a modified container office and furniture for the west Oahu campus.

          Design                                   $10,000

          Construction                             $91,000

          Equipment                                $49,000

          Total funding                           $150,000

      B.  Leeward community college, Oahu

          Plans, design, and construction for a second access road between the campus and Waipio Point access road.

          Plans                                   $500,000

          Design                                $1,200,000

          Construction                         $15,300,000

          Total funding                        $17,000,000

      C.  Leeward community college, Oahu

          Plans, design, construction, and equipment for the construction of a new Native Hawaiian success center.

          Plans                                   $100,000

          Design                                  $250,000

          Construction                          $4,000,000

          Equipment                               $500,000

          Total funding                         $4,850,000

      D.  Leeward community college, Oahu

          Plans, design, construction, and equipment to upgrade and renovate the operation and maintenance facility on the campus.

          Plans                                    $90,000

          Design                                  $210,000

          Construction                          $2,500,000

          Equipment                               $250,000

          Total funding                         $3,050,000

      E.  Leeward community college, Oahu

          Plans, design, construction, and equipment for facility repairs and improvements to the college theater and performing arts complex.

          Plans                                    $90,000

          Design                                  $180,000

          Construction                          $2,100,000

          Equipment                               $500,000

          Total funding                         $2,870,000

      F.  Leeward community college, Oahu

          Design, construction, and equipment to improve a portion of the campus library and convert this space to a learning commons.

          Design                                  $121,000

          Construction                            $845,000

          Equipment                                $33,000

          Total funding                           $999,000

      G.  Leeward community college, Oahu

          Design, construction, and equipment to improve the student services counseling center.

          Design                                   $74,000

          Construction                            $521,000

          Equipment                                $21,000

          Total funding                           $616,000

     SECTION 2.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 3.  This Act shall take effect on July 1, 2010.

 

INTRODUCED BY:

_____________________________


Report Title:

CIP; 33rd, 34th, and 36th Representative Districts

 

Description:

Appropriates funds for capital improvement projects for the benefit of the 33rd, 34th, and 36th representative districts.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback