Bill Text: HI HB2066 | 2010 | Regular Session | Introduced
Bill Title: CIP; 33rd, 34th, and 36th Representative Districts
Spectrum: Partisan Bill (Democrat 3-0)
Status: (Introduced - Dead) 2010-01-20 - (H) Referred to FIN, referral sheet 2 [HB2066 Detail]
Download: Hawaii-2010-HB2066-Introduced.html
HOUSE OF REPRESENTATIVES |
H.B. NO. |
2066 |
TWENTY-FIFTH LEGISLATURE, 2010 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE THIRTY-THIRD, THIRTY-FOURTH, AND THIRTY-SIXTH REPRESENTATIVE DISTRICTS.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2010-2011:
1. To be expended by the department of education:
A. Aiea elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $75,000
Construction $500,000
Total funding $575,000
B. Aiea elementary school, Oahu
Design and construction of a covered walkway connecting building C with the cafeteria.
Design $20,000
Construction $180,000
Total funding $200,000
C. Aiea intermediate school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $225,000
Construction $1,500,000
Total funding $1,725,000
D. Aiea intermediate school, Oahu
Design, construction, and equipment for electrical upgrades and heat abatement improvements, including appurtenances.
Design $99,000
Construction $400,000
Equipment $1,000
Total funding $500,000
E. Aiea high school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $240,000
Construction $2,000,000
Total funding $2,240,000
F. Aiea high school, Oahu
Design, construction, and equipment for a new building or an addition to existing buildings for two classrooms, a weight training room, permanent restrooms, and a concession for the athletic field.
Design $520,000
Construction $5,820,000
Equipment $50,000
Total funding $6,390,000
G. Aiea high school, Oahu
Design and construction for an amphitheater, sidewalk safety improvements, retaining walls, and ground and site improvements.
Design $200,000
Construction $2,208,000
Total funding $2,408,000
H. Aiea high school, Oahu
Design, construction, and equipment for a weight training room, ground and site improvements, and equipment and appurtenances.
Design $160,000
Construction $754,000
Equipment $1,000
Total funding $915,000
I. Alvah Scott elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $150,000
Construction $1,000,000
Total funding $1,150,000
J. Gustav H. Webling elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $150,000
Construction $1,000,000
Total funding $1,150,000
K. Gustav H. Webling elementary school, Oahu
Plans, design, and construction to redesign the administration building to improve the health room, and to provide air conditioning and doorways.
Plans $1,000
Design $1,000
Construction $223,000
Total funding $225,000
L. Highlands intermediate school, Oahu
Design and construction of a fence fronting Highlands intermediate school.
Design $20,000
Construction $160,000
Total funding $180,000
M. Lehua elementary school, Oahu
Plans, design, and construction for a new six-classroom building.
Plans $1,000
Design $1,000
Construction $5,998,000
Total funding $6,000,000
N. Lehua elementary school, Oahu
Construction to improve the structural integrity of building B.
Construction $1,000,000
Total funding $1,000,000
O. Lehua elementary school, Oahu
Design and construction to expand the school parking lot.
Design $100,000
Construction $500,000
Total funding $600,000
P. Manana elementary school, Oahu
Construction to provide ramps, elevators, and other measures to improve access to school facilities.
Construction $85,000
Total funding $85,000
Q. Manana elementary school, Oahu
Construction to provide disabled accessibility for science labs in building K and classrooms in building J.
Construction $120,000
Total funding $120,000
R. Manana elementary school, Oahu
Design to improve school campus drainage.
Design $400,000
Total funding $400,000
S. Manana elementary school, Oahu
Design and construction to complete renovations to the library.
Design $60,000
Construction $300,000
Total funding $360,000
T. Momilani elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $100,000
Construction $500,000
Total funding $600,000
U. Palisades elementary school, Oahu
Design and construction to improve the slope of the front parking lot.
Design $180,000
Construction $900,000
Total funding $1,080,000
V. Pearl City high school, Oahu
Design and construction for air conditioning for building R.
Design $1,000,000
Construction $5,000,000
Total funding $6,000,000
W. Pearl City Highlands elementary school, Oahu
Design and construction for campus-wide electrical system upgrades.
Design $1,000
Construction $949,000
Total funding $950,000
X. Pearl City library, Oahu
Design and construction to renovate the library's parking lot.
Design $75,000
Construction $705,000
Total funding $780,000
Y. Pearl Ridge elementary school, Oahu
Design, construction, and equipment to improve the administration building and courtyard, including air conditioning.
Design $1,000
Construction $3,598,000
Equipment $1,000
Total funding $3,600,000
Z. Pearl Ridge elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $150,000
Construction $1,000,000
Total funding $1,150,000
AA. Red Hill elementary school, Oahu
Design and construction for school-wide electrical upgrades.
Design $30,000
Construction $435,000
Total funding $465,000
BB. Red Hill elementary school, Oahu
Construction to install ceiling fans in various campus buildings.
Construction $126,000
Total funding $126,000
CC. Waiau elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $600,000
Construction $3,000,000
Total funding $3,600,0000
DD. Waimalu elementary school, Oahu
Design and construction for campus-wide electrical upgrades.
Design $150,000
Construction $1,000,000
Total funding $1,150,000
EE. Waimalu elementary school, Oahu
Design, construction, and equipment for electrical upgrades and installation of air conditioning systems for buildings D and E, excluding E1, E2, and E7.
Design $
Construction $
Equipment $
Total funding $
FF. Waimalu elementary school, Oahu
Design and construction for electrical upgrades and installation of air conditioning systems for various classrooms.
Design $500,000
Construction $3,000,000
Total funding $3,500,000
2. To be expended by the department of transportation:
A. H-1 Freeway near Ulune street, Oahu
Design and construction of a noise barrier wall along the H-1 Freeway near Ulune street to provide traffic noise reduction.
Design $1,000
Construction $824,000
Total funding $825,000
B. Interstate route H-1, vicinity of Aiea Hongwanji, Oahu
Design and construction for a noise-attenuating wall along interstate route H-1 in the vicinity of Aiea Hongwanji.
Design $150,000
Construction $6,553,000
Total funding $6,703,000
C. Kamehameha highway, Oahu
Plans, design, and construction for improvements to Kamehameha highway, including signal operation and monitoring improvements Phase II, a feasibility study for bottleneck intersections, utility undergrounding, Pearl Harbor historic sites gateway project, and HARS demonstration program. These projects are deemed necessary to qualify for federal aid financing and/or reimbursement.
Plans $4,100,000
Design $1,000
Construction $5,829,000
Total funding $9,930,000
D. Kamehameha highway, Oahu
Construction to equip all crosswalks along Kamehameha highway with in-roadway lighted warning systems.
Construction $1,000,000
Total funding $1,000,000
3. To be expended by the city and county of Honolulu:
A. Halawa Heights road, Oahu
Design and construction for a retaining wall to prevent erosion of hillside along Halawa Heights road adjacent to 99-614 Kaakau place.
Design $1,000
Construction $949,000
Total funding $950,000
4. To be expended by the University of Hawaii:
A. University of Hawaii, West Oahu, Oahu
Design, construction, and equipment for a modified container office and furniture for the west Oahu campus.
Design $10,000
Construction $91,000
Equipment $49,000
Total funding $150,000
B. Leeward community college, Oahu
Plans, design, and construction for a second access road between the campus and Waipio Point access road.
Plans $500,000
Design $1,200,000
Construction $15,300,000
Total funding $17,000,000
C. Leeward community college, Oahu
Plans, design, construction, and equipment for the construction of a new Native Hawaiian success center.
Plans $100,000
Design $250,000
Construction $4,000,000
Equipment $500,000
Total funding $4,850,000
D. Leeward community college, Oahu
Plans, design, construction, and equipment to upgrade and renovate the operation and maintenance facility on the campus.
Plans $90,000
Design $210,000
Construction $2,500,000
Equipment $250,000
Total funding $3,050,000
E. Leeward community college, Oahu
Plans, design, construction, and equipment for facility repairs and improvements to the college theater and performing arts complex.
Plans $90,000
Design $180,000
Construction $2,100,000
Equipment $500,000
Total funding $2,870,000
F. Leeward community college, Oahu
Design, construction, and equipment to improve a portion of the campus library and convert this space to a learning commons.
Design $121,000
Construction $845,000
Equipment $33,000
Total funding $999,000
G. Leeward community college, Oahu
Design, construction, and equipment to improve the student services counseling center.
Design $74,000
Construction $521,000
Equipment $21,000
Total funding $616,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 3. This Act shall take effect on July 1, 2010.
INTRODUCED BY: |
_____________________________ |
Report Title:
CIP; 33rd, 34th, and 36th Representative Districts
Description:
Appropriates funds for capital improvement projects for the benefit of the 33rd, 34th, and 36th representative districts.
The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.