Bill Text: HI HB2012 | 2012 | Regular Session | Amended

NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: State budget.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Passed) 2012-06-13 - (S) Act 106, 6/8/2012 (Gov. Msg. No. 1208). [HB2012 Detail]

Download: Hawaii-2012-HB2012-Amended.html

HOUSE OF REPRESENTATIVES

H.B. NO.

2012

TWENTY-SIXTH LEGISLATURE, 2012

H.D. 1

STATE OF HAWAII

S.D. 1

 

 

 

 

 

A BILL FOR AN ACT

 

 

RELATING TO THE STATE BUDGET.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  This Act shall be known and may be cited as the Supplemental Appropriations Act of 2012.

     SECTION 2.  This Act amends Act 164, Session Laws of Hawaii 2011, and other appropriations and authorizations effective during fiscal biennium 2011‑2013.

     SECTION 3.  Part II, Act 164, Session Laws of Hawaii 2011, is amended by amending section 3 to read as follows:

     "SECTION 3.  APPROPRIATIONS.  The following sums, or so much thereof as may be sufficient to accomplish the purposes and programs designated herein, are hereby appropriated or authorized, as the case may be, from the means of financing specified to the expending agencies designated for the fiscal biennium beginning July 1, 2011 and ending June 30, 2013.  The total expenditures and the number of positions in each fiscal year of the biennium shall not exceed the sums and the number indicated for each fiscal year, except as provided elsewhere in this Act, or as provided by general law.


A. ECONOMIC DEVELOPMENT

1.   BED100 - STRATEGIC MARKETING AND SUPPORT

                                       12.00* [       10.00*]

                                                    9.00*

OPERATING                    BED    [  1,177,828A ][    921,828A]

                                    1,187,828A      925,043A

                                           *        2.00*

                           BED              B [     362,800B]

                                                 354,982B

                           BED        148,718N      148,718N

                           BED        250,000V           V

                           BED      1,821,915W    1,821,915W

 

2.   BED105 - CREATIVE INDUSTRIES DIVISION

                                        8.00* [        8.00*]

                                                   11.00*

OPERATING                    BED        813,704A [     841,454A]

                                                 979,345A

INVESTMENT CAPITAL             BED              C    3,450,000C

 

3.   BED107 - FOREIGN TRADE ZONE

                                       17.00*       17.00*

OPERATING                    BED      2,066,145B [   2,066,145B]

                                                2,023,354B

INVESTMENT CAPITAL             BED      4,500,000D           D

                           BED      3,000,000N           N

 

4.   BED142 - GENERAL SUPPORT FOR ECONOMIC DEVELOPMENT

                                       21.00* [       21.00*]

                                                   23.00*

OPERATING                    BED      1,536,061A [   1,536,061A]

                                                1,594,854A

INVESTMENT CAPITAL             BED              C    2,200,000C

 

5.   BED113 - TOURISM

                                        6.00*        6.00*

OPERATING                    BED     141,162,298B [ 141,162,298B]

                                              141,073,635B

 

6.   AGR101 - FINANCIAL ASSISTANCE FOR AGRICULTURE

                                        9.00*        9.00*

OPERATING                    AGR      1,089,967B [   1,089,967B]

                                                1,064,967B

                           AGR      5,000,000W    5,000,000W

 

7.   AGR122 - PLANT, PEST, AND DISEASE CONTROL

                                       50.00* [       50.00*]

                                                   59.00*

OPERATING                    AGR      3,341,420A [   3,341,420A]

                                                4,599,153A

                                       62.00*       62.00*

                           AGR      10,515,874B [  10,515,874B]

                                                8,590,889B

                           AGR        753,383N [     753,383N]

                                                 733,051N

                           AGR        512,962T [     512,962T]

                                                 512,854T

                                        9.00*        9.00*

                           AGR      1,029,791U [   1,029,791U]

                                                 986,938U

                           AGR         50,360W      50,360W

 

8.   AGR131 - RABIES QUARANTINE

                                       36.32*       36.32*

OPERATING                    AGR      3,281,623B [   3,281,623B]

                                                3,209,123B

 

9.   AGR132 - ANIMAL DISEASE CONTROL

                                       13.68*       13.68*

OPERATING                    AGR        971,700A [     971,700A]

                                                 947,200A

                           AGR        377,518N      377,518N

                           AGR        473,224U      473,224U

 

10.  LNR172 - FORESTRY - RESOURCE MANAGEMENT AND DEVELOPMENT

                                       15.00*       15.00*

OPERATING                    LNR        553,023A [     553,023A]

                                                 534,780A

                                        1.50* [        1.50*]

                                                    2.50*

                           LNR      3,909,996B [   3,637,996B]

                                                3,614,783B

                                        1.50*        1.50*

                           LNR        992,847N [     992,847N]

                                                 989,990N

 

11.  AGR151 - QUALITY AND PRICE ASSURANCE

                                       16.00*       16.00*

OPERATING                    AGR      1,093,246A [   1,093,246A]

                                                1,067,746A

                                        1.00* [        1.00*]

                                                    3.00*

                           AGR        204,885B [     204,885B]

                                                 372,738B

                           AGR         77,424N      77,424N

                           AGR        300,000T      300,000T

                           AGR        570,353W [     502,553W]

                                                 489,559W

 

12.  AGR171 - AGRICULTURAL DEVELOPMENT AND MARKETING

                                       12.00*       12.00*

OPERATING                    AGR        995,183A [     995,183A]

                                                 972,683A

                           AGR         20,000B      20,000B

                           AGR        184,500N      184,500N

 

13.  AGR141 - AGRICULTURAL RESOURCE MANAGEMENT

                                        1.00*        1.00*

OPERATING                    AGR        543,814A [     543,814A]

                                                  89,399A

                                        9.00* [        9.00*]

                                                   23.50*

                           AGR      1,925,210B [   1,925,210B]

                                                2,041,000B

                                       13.00* [       13.00*]

                                                    7.50*

                           AGR      1,488,383W [   1,488,383W]

                                                1,101,416W

INVESTMENT CAPITAL             AGR      12,710,000C [  11,900,000C]

                                               24,045,000C

                           AGR      7,050,000N [   8,350,000N]

                                                9,350,000N

 

14.  AGR161 - AGRIBUSINESS DEVELOPMENT AND RESEARCH

OPERATING                    AGR         50,601A      50,601A

                           AGR        500,000B      500,000B

                           AGR      3,452,371W [   3,397,691W]

                                                3,372,691W

INVESTMENT CAPITAL             AGR        750,000C [           0C]

                                               10,050,000C

 

15.  AGR192 - GENERAL ADMINISTRATION FOR AGRICULTURE

                                       20.00*       20.00*

OPERATING                    AGR      1,448,696A [   1,448,696A]

                                                1,407,196A

                                        4.00*        4.00*

                           AGR        272,350B      272,350B

INVESTMENT CAPITAL             AGR        750,000C      500,000C

 

16.  LNR153 - COMMERCIAL FISHERIES AND RESOURCE ENHANCEMENT

                                        6.00* [        6.00*]

                                                    7.00*

OPERATING                    LNR        581,020A [     581,020A]

                                                 548,769A

                                           * [        0.00*]

                                                    1.00*

                           LNR        303,474B [     303,474B]

                                                 302,235B

                                        1.00* [        1.00*]

                                                    3.00*

                           LNR        750,305N [     750,305N]

                                                 746,632N

INVESTMENT CAPITAL             LNR         50,000C      320,000C

 

17.  AGR153 - AQUACULTURE DEVELOPMENT PROGRAM

                                        4.00*        4.00*

OPERATING                    AGR        310,405A [     310,405A]

                                                 303,905A

                           AGR         60,000B      60,000B

                           AGR         46,134N      46,134N

 

18.  BED120 - PROGRAM ON ENVIRONMENT AND ENERGY DEVELOPMENT

                                        3.00* [        3.00*]

                                                    0.00*

OPERATING                    BED        305,176A [     305,176A]

                                                      0A

                                        5.00*        5.00*

                           BED      4,085,300B [   4,285,300B]

                                                4,238,583B

                                        5.00* [        5.00*]

                                                    0.00*

                           BED      4,952,266N [   4,952,266N]

                                                4,673,394N

                           BED    [  6,083,138V ][     59,468V]

                                    4,659,324V    1,483,282V

 

19.  BED143 - HIGH TECHNOLOGY DEVELOPMENT CORPORATION

                                        1.50*        1.50*

OPERATING                    BED      1,049,658A [   1,049,658A]

                                                1,038,016A

                                        1.50*        1.50*

                           BED      3,755,410B [   3,755,410B]

                                                3,736,746B

                           BED      5,521,710N [   5,521,710N]

                                                5,491,482N

                           BED      1,500,000W    1,500,000W

INVESTMENT CAPITAL             BED        734,000B           B

                           BED              C    3,000,000C

 

20.  BED145 - HAWAII STRATEGIC DEVELOPMENT CORPORATION

OPERATING                    BED      2,608,516B    2,608,516B

                           BED      4,218,756W [   4,218,756W]

                                                4,284,672W

 

21.  BED146 - NATURAL ENERGY LAB OF HAWAII AUTHORITY

OPERATING                    BED      7,672,917B [   7,672,917B]

                                                7,615,034B

                           BED      9,926,408N [   9,926,408N]

                                                9,894,248N

INVESTMENT CAPITAL             BED      3,500,000C           C

                           BED              D    1,000,000D

 

22.  LNR141 - WATER AND LAND DEVELOPMENT

                                        2.00* [        2.00*]

                                                    1.50*

OPERATING                    LNR        250,828A [     250,828A]

                                                 196,898A

                                        2.00* [        2.00*]

                                                    4.00*

                           LNR        325,168B [     325,168B]

                                                 606,041B

                           LNR        188,181W [     188,181W]

                                                 185,338W

INVESTMENT CAPITAL             LNR      3,740,000C [   2,500,000C]

                                                6,000,000C

 

23.  BED150 - HAWAII COMMUNITY DEVELOPMENT AUTHORITY

                                        2.00*        2.00*

OPERATING                    BED      1,086,818W [   1,086,818W]

                                                1,072,019W

INVESTMENT CAPITAL             BED      1,855,000C [   1,855,000C]

                                               10,656,000C

 

24.  BED160 - HAWAII HOUSING FINANCE AND DEVELOPMENT CORP

OPERATING                    BED      9,677,735N    9,677,735N

                           BED      21,923,698T   21,923,698T

                                       31.00*       31.00*

                           BED      6,874,086W [   6,874,086W]

                                                6,699,612W

INVESTMENT CAPITAL             BED      43,000,000C    5,000,000C

 

25.  BED128 - OFFICE OF AEROSPACE

OPERATING                    BED         78,984A [      78,984A]

                                                 157,847A

 


 

B. EMPLOYMENT

1.   LBR111 - WORKFORCE DEVELOPMENT PROGRAM

                                        0.20*        0.20*

OPERATING                    LBR        101,259A [     101,259A]

                                                 100,783A

                           LBR      5,940,010B [   5,940,010B]

                                                5,938,654B

                                      116.80*      116.80*

                           LBR      50,768,891N [  50,768,891N]

                                               50,062,557N

                           LBR      1,505,580U [   1,505,580U]

                                                1,493,319U

 

2.   LBR135 - WORKFORCE DEVELOPMENT COUNCIL

                                        1.00* [        1.00*]

                                                    0.10*

OPERATING                    LBR         11,577A [      11,577A]

                                                  11,303A

                                           * [        0.00*]

                                                    0.90*

                           LBR        492,261N [     492,261N]

                                                 579,974N

 

3.   LBR171 - UNEMPLOYMENT INSURANCE PROGRAM

OPERATING                    LBR     623,391,310B [ 361,191,310B]

                                              361,168,457B

                                      243.50* [      243.50*]

                                                  255.50*

                           LBR      18,152,181N [  18,152,181N]

                                               17,695,372N

 

4.   LBR903 - OFFICE OF COMMUNITY SERVICES

                                        2.00*        2.00*

OPERATING                    LBR      1,841,633A [   1,841,633A]

                                                1,834,684A

                                        2.00*        2.00*

                           LBR      5,882,044N [   5,882,044N]

                                                5,844,542N

                           LBR      1,200,000U    1,200,000U

INVESTMENT CAPITAL             LBR      8,310,000C [           0C]

                                                8,595,000C

 

5.   LBR905 - HI CAREER (KOKUA) INFORMATION DELIVERY SYS

OPERATING                    LBR        204,513A [     204,513A]

                                                 198,751A

                           LBR        143,372N [     143,372N]

                                                  73,994N

 

6.   HMS802 - VOCATIONAL REHABILITATION

                                       23.41* [       23.41*]

                                                   23.63*

OPERATING                    HMS      3,516,863A [   3,516,863A]

                                                3,957,234A

                                       81.09* [       81.09*]

                                                   81.87*

                           HMS      13,440,880N [  13,440,880N]

                                               13,797,986N

                           HMS      1,330,200W    1,330,200W

INVESTMENT CAPITAL             HMS        497,000C           C

 

7.   LBR143 - HAWAII OCCUPATIONAL SAFETY AND HEALTH PROGRAM

                                       26.50* [       26.50*]

                                                   14.50*

OPERATING                    LBR      1,498,757A [   1,498,757A]

                                                 799,247A

                                           *       22.00*

                           LBR              B    1,436,559B

                                       16.50*       16.50*

                           LBR      1,830,524N [   1,830,524N]

                                                1,765,447N

                           LBR         70,000W      70,000W

 

8.   LBR152 - WAGE STANDARDS PROGRAM

                                       18.00*       18.00*

OPERATING                    LBR      1,051,219A [   1,051,219A]

                                                1,018,056A

 

9.   LBR153 - HAWAII CIVIL RIGHTS COMMISSION

                                       17.50* [       17.50*]

                                                   18.50*

OPERATING                    LBR      1,111,480A [   1,111,480A]

                                                1,120,727A

                                        4.50*        4.50*

                           LBR        600,287N [     600,287N]

                                                 623,510N

 

10.  LBR183 - DISABILITY COMPENSATION PROGRAM

                                       81.00* [       81.00*]

                                                   74.00*

OPERATING                    LBR      4,237,423A [   4,237,423A]

                                                4,105,537A

                                        8.00*        8.00*

                           LBR      23,791,406B [  23,791,406B]

                                               23,774,182B

 

11.  LBR316 - OFFICE OF LANGUAGE ACCESS

                                        3.00*        3.00*

OPERATING                    LBR        312,228A [     312,228A]

                                                 306,937A

 

12.  LBR161 - HAWAII LABOR RELATIONS BOARD

                                        1.00*        1.00*

OPERATING                    LBR        568,548A [     568,548A]

                                                 551,327A

 

13.  LBR812 - LABOR AND INDUSTRIAL RELATIONS APPEALS BOARD

                                        9.00*        9.00*

OPERATING                    LBR        782,657A [     782,657A]

                                                 759,313A

 

14.  LBR871 - EMPLOYMENT SECURITY APPEALS REFEREES' OFFICE

                                       10.80* [       10.80*]

                                                   12.00*

OPERATING                    LBR        809,372N [     809,372N]

                                                 854,870N

 

15.  LBR901 - DATA GATHERING, RESEARCH, AND ANALYSIS

                                        4.38*        4.38*

OPERATING                    LBR        303,933A [     303,933A]

                                                 294,150A

                                       27.62*       27.62*

                           LBR      2,418,373N [   2,418,373N]

                                                2,310,003N

 

16.  LBR902 - GENERAL ADMINISTRATION

                                       19.52*       19.52*

OPERATING                    LBR      1,247,936A [   1,247,936A]

                                                1,212,641A

                                       27.06* [       27.06*]

                                                   28.48*

                           LBR      2,763,168N [   2,763,168N]

                                                2,838,676N

 


 

C. TRANSPORTATION FACILITIES

1.   TRN102 - HONOLULU INTERNATIONAL AIRPORT

                                      586.50*      586.50*

OPERATING                    TRN     116,915,768B [ 116,915,768B]

                                              132,369,942B

                           TRN      1,000,000N    1,000,000N

INVESTMENT CAPITAL             TRN      20,287,000E [  27,188,000E]

                                              366,421,000E

                           TRN      40,725,000N [  44,512,000N]

                                               55,302,000N

                           TRN      6,400,000X   16,000,000X

 

2.   TRN104 - GENERAL AVIATION

                                       30.00*       30.00*

OPERATING                    TRN      5,946,642B [   5,946,642B]

                                                5,840,748B

                           TRN        330,000N           N

INVESTMENT CAPITAL             TRN      2,375,000B      775,000B

                           TRN              E      500,000E

                           TRN      7,750,000N    7,750,000N

 

3.   TRN111 - HILO INTERNATIONAL AIRPORT

                                       82.00*       82.00*

OPERATING                    TRN      13,435,989B [  13,430,989B]

                                               13,245,952B

                           TRN      2,375,000N    1,000,000N

INVESTMENT CAPITAL             TRN      2,500,000B           B

                           TRN      14,000,000E      900,000E

                           TRN              N    8,550,000N

 

4.   TRN114 - KONA INTERNATIONAL AIRPORT AT KEAHOLE

                                       85.00*       85.00*

OPERATING                    TRN      15,506,905B [  15,513,450B]

                                               15,327,878B

                           TRN        475,000N    1,000,000N

INVESTMENT CAPITAL             TRN              E   10,400,000E

 

5.   TRN116 - WAIMEA-KOHALA AIRPORT

                                        6.00*        6.00*

OPERATING                    TRN        873,712B [     867,167B]

                                                 859,757B

                           TRN        283,000N      500,000N

 

6.   TRN118 - UPOLU AIRPORT

OPERATING                    TRN        239,500B      239,500B

                           TRN        249,000N      500,000N

 

7.   TRN131 - KAHULUI AIRPORT

                                      151.00* [      151.00*]

                                                  162.00*

OPERATING                    TRN      23,636,119B [  23,631,119B]

                                               23,845,871B

                           TRN      1,000,000N    1,000,000N

INVESTMENT CAPITAL             TRN      1,500,000B [           0B]

                                               20,000,000B

                           TRN      18,995,000E [   6,000,000E]

                                              190,715,000E

                           TRN      11,625,000N [           0N]

                                                3,750,000N

                           TRN              X  50,000,000X

 

8.   TRN133 - HANA AIRPORT

                                        9.00*        9.00*

OPERATING                    TRN        696,912B [     696,912B]

                                                 999,441B

                           TRN        373,500N           N

INVESTMENT CAPITAL             TRN              E   19,000,000E

 

9.   TRN135 - KAPALUA AIRPORT

                                       11.00*       11.00*

OPERATING                    TRN      1,846,635B [   1,846,635B]

                                                1,819,016B

INVESTMENT CAPITAL             TRN              E      113,000E

 

10.  TRN141 - MOLOKAI AIRPORT

                                       13.00*       13.00*

OPERATING                    TRN      2,262,129B [   2,262,129B]

                                                2,226,735B

                           TRN      3,325,000N    1,000,000N

INVESTMENT CAPITAL             TRN              E      150,000E

 

11.  TRN143 - KALAUPAPA AIRPORT

                                        9.00*        9.00*

OPERATING                    TRN        780,691B [     730,691B]

                                                 727,784B

                           TRN        350,000N           N

 

12.  TRN151 - LANAI AIRPORT

                                       10.00*       10.00*

OPERATING                    TRN      1,982,364B [   2,462,364B]

                                                2,435,765B

                           TRN        950,000N    1,000,000N

INVESTMENT CAPITAL             TRN      2,825,000B           B

                           TRN      32,286,000N           N

 

13.  TRN161 - LIHUE AIRPORT

                                      101.00*      101.00*

OPERATING                    TRN      14,751,779B [  14,751,779B]

                                               16,568,979B

                           TRN        475,000N    1,000,000N

INVESTMENT CAPITAL             TRN      5,700,000E    9,380,000E

                           TRN              N   20,520,000N

 

14.  TRN163 - PORT ALLEN AIRPORT

OPERATING                    TRN         19,841B      26,841B

                           TRN        340,000N           N

 

15.  TRN195 - AIRPORTS ADMINISTRATION

                                      111.00*      111.00*

OPERATING                    TRN     124,510,416B [ 141,124,063B]

                                              177,084,815B

                           TRN              N      300,000N

INVESTMENT CAPITAL             TRN      11,450,000B [  12,850,000B]

                                               13,350,000B

                           TRN              E  151,000,000E

                           TRN      7,500,000N    7,500,000N

                           TRN        100,000X [     100,000X]

                                               35,699,000X

 

16.  TRN301 - HONOLULU HARBOR

                                      116.00*      116.00*

OPERATING                    TRN      24,115,612B [  24,115,612B]

                                               23,853,022B

INVESTMENT CAPITAL             TRN              E   50,000,000E

 

17.  TRN303 - KALAELOA BARBERS POINT HARBOR

                                        3.00*        3.00*

OPERATING                    TRN      2,104,534B [   2,104,534B]

                                                2,097,677B

INVESTMENT CAPITAL             TRN              E   27,150,000E

 

18.  TRN311 - HILO HARBOR

                                       14.00*       14.00*

OPERATING                    TRN      2,375,457B [   2,375,457B]

                                                2,353,966B

INVESTMENT CAPITAL             TRN        750,000B [           0B]

                                               10,000,000B

                           TRN              E   51,000,000E

                           TRN              N       1,000N

 

19.  TRN313 - KAWAIHAE HARBOR

                                        2.00*        2.00*

OPERATING                    TRN      1,234,031B [   1,234,031B]

                                                1,229,503B

INVESTMENT CAPITAL             TRN              E   11,500,000E

                           TRN              N       1,000N

 

20.  TRN331 - KAHULUI HARBOR

                                       18.00*       18.00*

OPERATING                    TRN      3,427,632B [   3,427,632B]

                                                3,384,033B

INVESTMENT CAPITAL             TRN      48,400,000E [           0E]

                                               17,000,000E

 

21.  TRN341 - KAUNAKAKAI HARBOR

                                        1.00*        1.00*

OPERATING                    TRN        606,144B [     606,144B]

                                                 603,066B

 

22.  TRN361 - NAWILIWILI HARBOR

                                       15.00*       15.00*

OPERATING                    TRN      2,807,157B [   2,807,157B]

                                                2,773,435B

 

23.  TRN363 - PORT ALLEN HARBOR

                                        1.00*        1.00*

OPERATING                    TRN        393,619B [     393,619B]

                                                 391,089B

 

24.  TRN351 - KAUMALAPAU HARBOR

OPERATING                    TRN        259,837B      259,837B

 

25.  TRN395 - HARBORS ADMINISTRATION

                                       71.00*       71.00*

OPERATING                    TRN      53,223,480B [  53,252,339B]

                                               53,070,043B

INVESTMENT CAPITAL             TRN      7,502,000B [   3,500,000B]

                                               18,500,000B

                           TRN      9,235,000E [   1,735,000E]

                                                6,735,000E

                           TRN      4,003,000N [           0N]

                                                   3,000N

 

26.  TRN333 - HANA HARBOR

OPERATING                    TRN         42,519B      42,519B

 

27.  TRN501 - OAHU HIGHWAYS

                                      225.00* [      225.00*]

                                                  224.00*

OPERATING                    TRN      82,971,062B [  98,714,062B]

                                              100,158,216B

                           TRN      2,200,000N [   2,200,000N]

                                                3,100,000N

INVESTMENT CAPITAL             TRN      24,193,000E [   5,534,000E]

                                               51,149,000E

                           TRN      45,947,000N [  11,554,000N]

                                               72,814,000N

                           TRN              R    1,000,000R

 

28.  TRN511 - HAWAII HIGHWAYS

                                      124.00*      124.00*

OPERATING                    TRN      22,557,598B [  29,557,598B]

                                               29,783,139B

INVESTMENT CAPITAL             TRN      12,195,000E [   2,040,000E]

                                                9,990,000E

                           TRN      22,380,000N [   8,160,000N]

                                               24,880,000N

 

29.  TRN531 - MAUI HIGHWAYS

                                       81.00*       81.00*

OPERATING                    TRN      22,588,385B [  30,970,902B]

                                               31,046,476B

INVESTMENT CAPITAL             TRN      24,292,000E [   5,740,000E]

                                                7,240,000E

                           TRN      19,720,000N    8,260,000N

                           TRN      1,500,000S           S

 

30.  TRN561 - KAUAI HIGHWAYS

                                       51.00*       51.00*

OPERATING                    TRN      13,283,171B [  18,283,171B]

                                               18,416,623B

INVESTMENT CAPITAL             TRN      23,510,000E [  14,290,000E]

                                               19,410,000E

                           TRN      23,120,000N   15,160,000N

                           TRN      4,500,000S           S

 

31.  TRN595 - HIGHWAYS ADMINISTRATION

                                       83.00* [       83.00*]

                                                   84.00*

OPERATING                    TRN      79,904,352B [  78,549,288B]

                                               82,485,657B

                           TRN      1,757,957N [   1,757,957N]

                                                4,155,423N

INVESTMENT CAPITAL             TRN      12,000,000B   12,000,000B

                           TRN      20,760,000E [  21,740,000E]

                                               25,585,000E

                           TRN      17,740,000N   38,160,000N

 

32.  TRN597 - HIGHWAY SAFETY

                                       33.00*       33.00*

OPERATING                    TRN      6,847,705B [   6,847,705B]

                                                6,775,074B

                                        7.00*        7.00*

                           TRN      5,945,280N [   5,945,280N]

                                                5,924,840N

 

33.  TRN995 - GENERAL ADMINISTRATION

                                      104.00*      104.00*

OPERATING                    TRN      14,946,700B [  14,946,700B]

                                               14,833,618B

                           TRN      33,322,783N [  33,322,783N]

                                               33,319,866N

                           TRN        423,067R      423,067R

 

33A. TRN695 - ALOHA TOWER DEVELOPMENT CORPORATION

OPERATING                    TRN              B    1,725,000B

 


 

D. ENVIRONMENTAL PROTECTION

1.   HTH840 - ENVIRONMENTAL MANAGEMENT

                                       36.00*       36.00*

OPERATING                    HTH      2,604,474A [   2,604,474A]

                                                2,522,059A

                                       60.00*       60.00*

                           HTH      80,627,387B [  80,627,387B]

                                               80,446,444B

                                       44.80* [       44.80*]

                                                   45.80*

                           HTH      9,167,057N [   9,167,057N]

                                                9,167,441N

                                           *        2.00*

                           HTH              U      174,454U

                                       56.20* [       56.20*]

                                                   47.20*

                           HTH     164,949,186W [ 164,945,186W]

                                                4,183,133W

INVESTMENT CAPITAL             HTH      5,872,000C    5,872,000C

                           HTH      29,354,000N   29,354,000N

 

2.   AGR846 - PESTICIDES

                                        8.00*        8.00*

OPERATING                    AGR        496,810A [     496,810A]

                                                 483,310A

                                        2.00*        2.00*

                           AGR        475,561N      475,561N

                                        8.00*        8.00*

                           AGR      1,101,976W [   1,101,976W]

                                                1,072,439W

 

3.   LNR401 - AQUATIC RESOURCES

                                       27.00* [       27.00*]

                                                   27.25*

OPERATING                    LNR      2,384,172A [   2,384,172A]

                                                2,197,469A

                                        1.00* [        1.00*]

                                                    1.75*

                           LNR      3,478,709N [   3,478,709N]

                                                3,453,492N

INVESTMENT CAPITAL             LNR      1,000,000C           C

 

4.   LNR402 - NATIVE RESOURCES AND FIRE PROTECTION PROGRAM

                                       49.50*       49.50*

OPERATING                    LNR      3,722,025A [   3,722,025A]

                                                3,629,840A

                           LNR      3,470,749B [   3,405,749B]

                                                3,405,525B

                                        6.50*        6.50*

                           LNR      5,151,190N [   5,148,690N]

                                                5,196,726N

                           LNR              T      136,197T

                           LNR              U      800,000U

INVESTMENT CAPITAL             LNR      1,180,000C    2,500,000C

 

5.   LNR404 - WATER RESOURCES

                                       19.00*       19.00*

OPERATING                    LNR      2,335,185A [   2,335,185A]

                                                2,225,795A

                                        3.00*        3.00*

                           LNR        426,818B [     426,818B]

                                                 479,749B

 

6.   LNR405 - CONSERVATION AND RESOURCES ENFORCEMENT

                                      114.25*      114.25*

OPERATING                    LNR      6,644,604A [   6,644,604A]

                                                7,186,522A

                                       18.00*       18.00*

                           LNR      1,626,083B [   1,626,083B]

                                                1,583,055B

                                        1.75*        1.75*

                           LNR        768,114N [     768,114N]

                                                 761,973N

                                        1.00*        1.00*

                           LNR        108,114W [     108,114W]

                                                 106,481W

INVESTMENT CAPITAL             LNR        280,000C      120,000C

 

7.   LNR407 - NATURAL AREA RESERVES AND WATERSHED MANAGEMENT

                                       19.00*       19.00*

OPERATING                    LNR        812,151A [     812,151A]

                                                 735,709A

                                        5.50*        5.50*

                           LNR      7,660,731B [   7,195,731B]

                                                9,620,788B

                                        0.50*        0.50*

                           LNR      1,638,030N [   1,638,030N]

                                                1,637,269N

INVESTMENT CAPITAL             LNR              C    6,055,000C

 

8.   HTH850 - OFFICE OF ENVIRONMENTAL QUALITY CONTROL

                                        5.00*        5.00*

OPERATING                    HTH        344,488A [     344,488A]

                                                 337,190A

 

9.   LNR906 - LNR - NATURAL AND PHYSICAL ENVIRONMENT

                                       31.00*       31.00*

OPERATING                    LNR      2,340,578A [   1,865,578A]

                                                1,902,251A

                                       11.00* [       11.00*]

                                                   12.00*

                           LNR        986,801B [     986,801B]

                                                1,368,713B

INVESTMENT CAPITAL             LNR      10,340,000C [   2,540,000C]

                                                3,597,000C

 

10.  HTH849 - ENVIRONMENTAL HEALTH ADMINISTRATION

                                       10.00*       10.00*

OPERATING                    HTH        893,616A [     893,616A]

                                                 871,517A

                                        0.50*        0.50*

                           HTH         48,271B      48,271B

                                       14.50*       14.50*

                           HTH      3,201,314N [   3,201,314N]

                                                3,015,173N

                                       14.00* [       14.00*]

                                                   25.00*

                           HTH      3,315,298W [   3,315,298W]

                                              164,013,228W

 


 

E. HEALTH

1.   HTH100 - COMMUNICABLE DISEASE SERVICES

                                       99.00* [       99.00*]

                                                  251.87*

OPERATING                    HTH      13,388,725A [  13,388,725A]

                                               23,402,804A

                           HTH              B      90,720B

                                       16.50* [       16.50*]

                                                   16.00*

                           HTH      8,407,452N [   8,407,452N]

                                               8,281,674N

                           HTH              U      125,185U

INVESTMENT CAPITAL             AGS              C      930,000C

 

2.   HTH131 - DISEASE OUTBREAK CONTROL

                                       20.60*       20.60*

OPERATING                    HTH      1,613,768A [   1,613,768A]

                                                1,578,391A

                                       34.40* [       34.40*]

                                                   31.40*

                           HTH      10,473,680N [  10,473,680N]

                                               12,350,566N

 

3.   HTH141 - GENERAL MEDICAL AND PREVENTIVE SERVICES

                                      166.87* [      166.87*]

                                                    0.00*

OPERATING                    HTH      12,480,474A [  12,480,474A]

                                                      0A

                           HTH         90,720B [      90,720B]

                                                      0B

                           HTH        131,746U [     131,746U]

                                                      0U

 

4.   HTH730 - EMERGENCY MEDICAL SERVICES AND INJURY PREVENTION SYSTEM

                                       13.00*       13.00*

OPERATING                    HTH      56,691,251A [  56,691,251A]

                                               55,864,040A

                           HTH      20,072,874B [  20,072,874B]

                                               20,063,956B

                                        3.00*        3.00*

                           HTH      3,807,055N [   3,814,055N]

                                                1,257,947N

 

5.   HTH560 - FAMILY HEALTH

                                      108.00*      108.00*

OPERATING                    HTH      23,985,044A [  23,985,044A]

                                               24,035,948A

                                       13.50*       13.50*

                           HTH      13,955,451B [  13,955,451B]

                                               14,175,350B

                                      181.50*      181.50*

                           HTH      49,038,560N [  49,038,560N]

                                               53,968,162N

                                        0.50*        0.50*

                           HTH      1,868,031U [   1,868,031U]

                                                1,864,562U

 

6.   HTH590 - TOBACCO SETTLEMENT

                                        1.00* [        1.00*]

                                                    0.00*

OPERATING                    HTH         64,114A [      64,114A]

                                                      0A

                                       38.00* [       38.00*]

                                                   39.00*

                           HTH      50,319,643B [  50,319,643B]

                                               50,210,366B

                                       11.00*       11.00*

                           HTH      4,833,514N [   4,833,514N]

                                                5,261,085N

                           HTH      4,673,541U [   4,673,541U]

                                                1,586,451U

 

7.   HTH595 - HEALTH RESOURCES ADMINISTRATION

                                        2.00*        2.00*

OPERATING                    HTH        150,379A      150,379A

INVESTMENT CAPITAL             HTH      6,000,000C [           0C]

                                                4,385,000C

 

8.   HTH210 - HAWAII HEALTH SYSTEMS CORPORATION – CORPORATE OFFICE

                                       54.50*       54.50*

OPERATING                    HTH      12,509,280B   12,509,280B

INVESTMENT CAPITAL             HTH      1,340,000C           C

 

9.   HTH211 - KAHUKU HOSPITAL

OPERATING                    HTH      1,500,000A    1,500,000A

 

10.  HTH212 - HAWAII HEALTH SYSTEMS CORPORATION –  REGIONS

OPERATING                    HTH      82,140,000A [  82,140,000A]

                                               84,640,000A

                                     2,780.75*     2,780.75*

                           HTH     508,583,900B [ 508,583,900B]

                                              508,083,900B

INVESTMENT CAPITAL             HTH      25,000,000C [  15,000,000C]

                                               17,903,000C

 

11.  HTH213 - ALII COMMUNITY CARE

OPERATING                    HTH      1,500,000B [   1,500,000B]

                                                2,000,000B

 

11A. HTH214 - HAWAII HEALTH SYSTEMS CORPORATION RESIDENCY PROGRAMS

OPERATING                    HTH              A      400,000A

 

12.  HTH420 - ADULT MENTAL HEALTH - OUTPATIENT

                                      145.50*      145.50*

OPERATING                    HTH      74,000,162A [  74,060,662A]

                                               72,255,141A

                           HTH      11,670,500B   11,610,000B

                           HTH      1,632,230N    1,632,230N

 

13.  HTH430 - ADULT MENTAL HEALTH - INPATIENT

                                      615.00*      615.00*

OPERATING                    HTH      52,895,657A [  52,895,657A]

                                               51,617,843A

INVESTMENT CAPITAL             AGS      11,614,000C [           0C]

                                                2,800,000C

 

14.  HTH440 - ALCOHOL AND DRUG ABUSE

                                       22.00*       22.00*

OPERATING                    HTH      18,375,362A [  18,375,362A]

                                               18,533,930A

                           HTH        300,000B [     300,000B]

                                                 500,000B

                                        6.00*        6.00*

                           HTH      13,609,867N [  13,609,867N]

                                               13,826,731N

 

15.  HTH460 - CHILD AND ADOLESCENT MENTAL HEALTH

                                      168.50*      168.50*

OPERATING                    HTH      40,811,045A [  40,859,131A]

                                               40,012,731A

                                       17.00*       17.00*

                           HTH      15,033,910B [  14,985,824B]

                                               14,930,963B

                           HTH      4,439,309N [   4,439,309N]

                                                4,382,719N

                           HTH      2,264,888U [   2,264,888U]

                                                2,258,470U

 

16.  HTH501 - DEVELOPMENTAL DISABILITIES

                                      191.75* [      191.75*]

                                                  203.75*

OPERATING                    HTH      68,439,167A [  69,737,652A]

                                               68,051,558A

                                        3.00*        3.00*

                           HTH      1,038,992B    1,038,992B

 

17.  HTH495 - BEHAVIORAL HEALTH ADMINISTRATION

                                       57.50*       57.50*

OPERATING                    HTH      6,882,191A [   6,882,191A]

                                                6,575,207A

                           HTH      3,557,363N [   3,557,363N]

                                                3,380,962N

 

18.  HTH610 - ENVIRONMENTAL HEALTH SERVICES

                                       98.00* [       98.00*]

                                                   96.00*

OPERATING                    HTH      5,652,031A [   5,652,031A]

                                                5,364,482A

                                       13.00*       13.00*

                           HTH      1,376,633B [   1,316,633B]

                                                1,389,351B

                                        6.00*        6.00*

                           HTH        594,682N [     594,682N]

                                                 577,269N

                                        1.00*        1.00*

                           HTH         55,481U [      55,481U]

                                                  53,031U

 

19.  HTH710 - STATE LABORATORY SERVICES

                                       72.00*       72.00*

OPERATING                    HTH      6,080,558A [   6,080,558A]

                                                5,941,588A

                           HTH        497,363N [     497,363N]

                                                 486,234N

 

20.  HTH720 - HEALTH CARE ASSURANCE

                                       20.90*       20.90*

OPERATING                    HTH      1,508,133A [   1,508,133A]

                                                1,457,829A

                           HTH        406,000B      406,000B

                                       19.90*       19.90*

                           HTH      1,659,515N [   1,659,515N]

                                                1,586,387N

 

21.  HTH906 - STATE HEALTH PLANNING AND DEVELOPMENT AGENCY

                                        8.00* [        8.00*]

                                                    7.00*

OPERATING                    HTH        508,814A [     508,814A]

                                                 493,600A

                           HTH        114,000B      114,000B

 

22.  HTH760 - HEALTH STATUS MONITORING

                                       29.50*       29.50*

OPERATING                    HTH      1,382,629A [   1,410,190A]

                                                1,364,867A

                           HTH        587,271B [     587,271B]

                                                 583,608B

                                        4.00*        4.00*

                           HTH        264,516N [     264,516N]

                                                 217,543N

 

23.  HTH905 - DEVELOPMENTAL DISABILITIES COUNCIL

                                        1.50*        1.50*

OPERATING                    HTH        218,048A [     218,048A]

                                                 214,722A

                                        6.50*        6.50*

                           HTH        478,797N [     478,797N]

                                                 462,664N

 

24.  HTH907 - GENERAL ADMINISTRATION

                                      118.50* [      118.50*]

                                                  119.50*

OPERATING                    HTH      8,027,259A [   8,027,259A]

                                                7,937,932A

                           HTH      1,051,850N [   1,051,850N]

                                                1,479,609N

INVESTMENT CAPITAL             AGS      13,510,000C [   5,431,000C]

                                               13,649,000C

 


 

F. SOCIAL SERVICES

1.   HMS301 - CHILD PROTECTIVE SERVICES

                                      222.88* [      222.88*]

                                                  221.96*

OPERATING                    HMS      21,497,187A [  21,497,187A]

                                               32,271,566A

                           HMS        617,587B [     617,587B]

                                                1,007,587B

                                      202.62* [      202.62*]

                                                  198.54*

                           HMS      38,685,170N [  38,685,170N]

                                               38,146,283N

 

2.   HMS302 - GENERAL SUPPORT FOR CHILD CARE

                                       21.07* [       21.07*]

                                                   22.07*

OPERATING                    HMS        996,913A [     996,913A]

                                                1,000,334A

                                       14.93* [       14.93*]

                                                   16.93*

                           HMS      10,945,263N [  10,945,263N]

                                               10,962,692N

 

3.   HMS303 - CHILD PROTECTIVE SERVICES PAYMENTS

OPERATING                    HMS      41,816,013A [  41,816,013A]

                                               36,816,013A

                           HMS      20,095,666N   20,095,666N

 

4.   HMS305 - CASH SUPPORT FOR CHILD CARE

OPERATING                    HMS      15,011,811A   15,011,811A

                           HMS      38,530,754N   38,530,754N

 

5.   HMS501 - IN-COMMUNITY YOUTH PROGRAMS

                                       12.00*       12.00*

OPERATING                    HMS      7,243,874A [   7,243,874A]

                                                6,981,308A

                           HMS      3,657,363N [   3,657,363N]

                                                3,653,524N

 

6.   HMS503 - HAWAII YOUTH CORRECTIONAL FACILITY (HYCF)

                                      124.00* [      124.00*]

                                                  126.00*

OPERATING                    HMS      10,078,850A [  10,043,850A]

                                               10,906,562A

 

7.   DEF112 - SERVICES TO VETERANS

                                       24.00*       24.00*

OPERATING                    DEF      2,358,443A [   4,913,716A]

                                                4,882,000A

INVESTMENT CAPITAL             DEF    [  8,220,000C ][  3,534,000C]

                                    7,021,000C    4,044,000C

                           DEF    [      2,000N ]       1,000N

                                       3,000N           

 

8.   HMS601 - ADULT AND COMMUNITY CARE SERVICES

                                       62.42* [       62.42*]

                                                   63.92*

OPERATING                    HMS      5,480,824A [   5,480,824A]

                                                5,353,096A

                                        6.58* [        6.58*]

                                                    8.08*

                           HMS      5,005,123N [   5,005,123N]

                                                4,952,073N

                           HMS         10,000R      10,000R

                           HMS        382,003U [     382,003U]

                                                 366,525U

 

9.   HMS202 - AGED, BLIND AND DISABLED PAYMENTS

OPERATING                    HMS      4,029,480A    4,029,480A

 

10.  HMS204 - GENERAL ASSISTANCE PAYMENTS

OPERATING                    HMS      21,289,056A   21,289,056A

 

11.  HMS206 - FEDERAL ASSISTANCE PAYMENTS

OPERATING                    HMS      5,108,943N    5,108,943N

 

12.  HMS211 - CASH SUPPORT FOR FAMILIES - SELF-SUFFICIENCY

OPERATING                    HMS      26,073,079A   22,694,156A

                           HMS      44,000,000N   44,000,000N

 

13.  HMS220 - RENTAL HOUSING SERVICES

OPERATING                    HMS      4,401,556A    4,301,556A

                                      171.00* [      171.00*]

                                                  190.00*

                           HMS      36,142,225N [  35,470,497N]

                                               36,503,079N

                                       13.00*       13.00*

                           HMS      4,112,106W [   4,062,106W]

                                                4,043,038W

INVESTMENT CAPITAL             HMS    [ 37,670,000C ][ 40,800,000C]

                                   31,120,000C   34,000,000C

 

14.  HMS229 - HPHA ADMINISTRATION

                                       71.00*       71.00*

OPERATING                    HMS      34,769,688N [  34,769,688N]

                                               34,532,922N

                                       17.00*       17.00*

                           HMS      2,558,320W [   2,558,320W]

                                                2,514,399W

 

15.  HMS222 - RENTAL ASSISTANCE SERVICES

                                        1.25*        1.25*

OPERATING                    HMS      1,059,030A [   1,059,030A]

                                                1,053,819A

                                       16.75*       16.75*

                           HMS      25,875,685N [  25,875,685N]

                                               25,819,450N

 

16.  HMS224 - HOMELESS SERVICES

                                        4.00*        4.00*

OPERATING                    HMS      15,525,824A [  15,525,824A]

                                               15,460,711A

                           HMS      1,369,108N    1,369,108N

 

17.  HMS605 - COMMUNITY-BASED RESIDENTIAL SUPPORT

OPERATING                    HMS      17,125,395A [  17,125,395A]

                                               17,553,529A

 

18.  HMS401 - HEALTH CARE PAYMENTS

OPERATING                    HMS     785,583,342A [ 787,466,250A]

                                              795,601,950A

                           HMS     847,877,988N [ 870,295,801N]

                                              885,040,887N

                           HMS      12,000,000U   12,000,000U

 

19.  HMS236 - CASE MANAGEMENT FOR SELF-SUFFICIENCY

                                      310.66* [      310.66*]

                                                  304.98*

OPERATING                    HMS      13,241,512A [  13,241,512A]

                                               13,276,042A

                                      244.34* [      244.34*]

                                                  240.02*

                           HMS      18,821,328N [  18,821,328N]

                                               18,126,638N

 

20.  HMS238 - DISABILITY DETERMINATION

                                       45.00*       45.00*

OPERATING                    HMS      7,335,374N [   7,335,374N]

                                                7,227,756N

 

21.  ATG500 - CHILD SUPPORT ENFORCEMENT SERVICES

                                       81.94*       81.94*

OPERATING                    ATG      3,859,392A [   3,859,392A]

                                                3,898,136A

                                      159.06*      159.06*

                           ATG      14,911,287N [  14,911,287N]

                                               14,584,925N

                           ATG      2,231,224T [   2,231,224T]

                                                2,226,871T

 

22.  HMS237 - EMPLOYMENT AND TRAINING

OPERATING                    HMS        469,505A      469,505A

                           HMS        699,734N      699,734N

 

23.  HHL602 - PLANNING AND DEVELOPMENT FOR HAWAIIAN HOMESTEADS

                                      115.00*      115.00*

OPERATING                    HHL      13,030,827B [  13,030,827B]

                                               12,784,660B

                                        3.00*        3.00*

                           HHL      15,341,820N   15,341,820N

                                       82.00*       82.00*

                           HHL     157,091,393T [ 157,091,393T]

                                              156,865,624T

INVESTMENT CAPITAL             HHL      5,000,000C           C

                           HHL      20,000,000N   20,000,000N

 

24.  HTH904 - EXECUTIVE OFFICE ON AGING

                                        5.74*        5.74*

OPERATING                    HTH      5,948,402A [   5,948,402A]

                                                7,333,014A

                                        8.26*        8.26*

                           HTH      7,802,796N [   7,533,492N]

                                                7,569,144N

INVESTMENT CAPITAL             HTH        500,000C           C

 

25.  HTH520 - DISABILITY AND COMMUNICATIONS ACCESS BOARD

                                        5.00*        5.00*

OPERATING                    HTH      1,230,625A [   1,230,625A]

                                                1,199,421A

                           HTH         10,000B      10,000B

                                        2.00*        2.00*

                           HTH        195,776U [     195,776U]

                                                 188,295U

 

26.  HMS902 - GENERAL SUPPORT FOR HEALTH CARE PAYMENTS

                                      121.67* [      121.67*]

                                                  129.17*

OPERATING                    HMS    [  9,337,999A ][  6,458,643A]

                                    6,674,351A   10,601,853A

                                      117.33* [      117.33*]

                                                  124.83*

                           HMS    [ 44,849,236N ][ 18,845,032N]

                                   20,786,398N   42,885,493N

 

27.  HMS903 - GENERAL SUPPORT FOR SELF-SUFFICIENCY SERVICES

                                       34.05* [       34.05*]

                                                   44.22*

OPERATING                    HMS      49,536,954A [  21,786,954A]

                                               38,531,448A

                                       38.95* [       38.95*]

                                                   46.78*

                           HMS      62,928,283N [  62,928,283N]

                                               63,166,266N

 

28.  HMS904 - GENERAL ADMINISTRATION (DHS)

                                      141.50*      141.50*

OPERATING                    HMS      7,102,509A [   7,125,297A]

                                                6,863,209A

                                       13.50*       13.50*

                           HMS      1,347,016N [   1,347,016N]

                                                1,308,532N

 

29.  HMS901 - GENERAL SUPPORT FOR SOCIAL SERVICES

                                       10.22* [       10.22*]

                                                   13.97*

OPERATING                    HMS      1,774,170A [   1,774,170A]

                                                2,203,872A

                                        5.78* [        5.78*]

                                                    7.03*

                           HMS      1,539,447N [   1,539,447N]

                                                1,685,886N

 


 

G. FORMAL EDUCATION

1.   EDN100 - SCHOOL-BASED BUDGETING

                                    12,552.60*    12,552.60*

OPERATING                    EDN     775,148,488A [ 775,148,488A]

                                              773,510,601A

                           EDN      7,530,000B    7,530,000B

                           EDN     168,983,026N [ 167,399,091N]

                                              166,428,581N

                           EDN      28,990,000T [  28,990,000T]

                                               28,919,060T

                           EDN      4,000,000U [   4,000,000U]

                                                3,995,605U

                           EDN      28,525,743V           V

                           EDN      3,389,438W [   3,389,438W]

                                                3,379,491W

INVESTMENT CAPITAL             EDN    [144,336,000B ][165,760,000B]

                                  130,160,000B  255,859,000B

                           EDN        300,000C           C

                           EDN              N   22,000,000N

 

2.   EDN150 - COMPREHENSIVE STUDENT SUPPORT SERVICES

                                     5,116.62*     5,116.62*

OPERATING                    EDN     322,144,665A [ 324,226,356A]

                                              313,456,272A

                           EDN        100,000B      100,000B

                                        2.00*        2.00*

                           EDN      45,714,379N [  45,714,379N]

                                               44,932,504N

                                        4.00*        4.00*

                           EDN      3,500,000W    3,500,000W

 

3.   EDN200 - INSTRUCTIONAL SUPPORT

                                      384.00* [      384.00*]

                                                  379.00*

OPERATING                    EDN      45,745,674A [  45,745,674A]

                                               43,767,584A

                                        6.00* [        6.00*]

                                                   11.00*

                           EDN      2,000,000B [   2,000,000B]

                                                2,321,746B

                           EDN        687,000N [     687,000N]

                                                 667,385N

                           EDN        250,000U [     250,000U]

                                                 242,099U

                           EDN      19,356,874V   20,073,434V

 

4.   EDN300 - STATE ADMINISTRATION

                                      449.00*      449.00*

OPERATING                    EDN      43,344,985A [  43,344,985A]

                                               42,695,114A

                           EDN         35,000N      35,000N

 

5.   EDN400 - SCHOOL SUPPORT

                                      640.00*      640.00*

OPERATING                    EDN     174,109,976A [ 154,109,976A]

                                              171,929,086A

                                      726.50*      726.50*

                           EDN      33,827,160B [  35,287,877B]

                                               42,045,157B

                                        3.00*        3.00*

                           EDN      47,240,109N [  49,527,115N]

                                               49,143,812N

                                        4.00*        4.00*

                           EDN      12,522,625W [  12,522,325W]

                                               12,495,846W

INVESTMENT CAPITAL             EDN      5,200,000B    5,200,000B

 

6.   EDN500 - SCHOOL COMMUNITY SERVICES

                                       31.50*       31.50*

OPERATING                    EDN      5,072,889A [   5,072,889A]

                                                2,500,000A

                           EDN      3,631,000B    3,631,000B

                           EDN        954,222N [   1,410,849N]

                                                3,266,540N

                           EDN      4,000,000T    4,000,000T

                           EDN      6,300,000U    6,300,000U

                           EDN      10,995,000W   10,995,000W

 

7.   EDN600 - CHARTER SCHOOLS

OPERATING                    EDN      59,680,071A [  63,007,613A]

                                               61,742,960A

INVESTMENT CAPITAL             EDN      2,118,000C [           0C]

                                                 181,000C

 

8.   BUF745 - RETIREMENT BENEFITS PAYMENTS - DOE

OPERATING                    BUF     280,677,870A [ 277,200,000A]

                                              252,741,189A

 

9.   BUF765 - HEALTH PREMIUM PAYMENTS - DOE

OPERATING                    BUF    [236,284,465A ][264,546,608A]

                                  236,950,282A  225,126,160A

 

10.  BUF725 - DEBT SERVICE PAYMENTS - DOE

OPERATING                    BUF     222,989,025A [ 264,173,610A]

                                              254,331,904A

 

11.  AGS807 - SCHOOL R&M, NEIGHBOR ISLAND DISTRICTS

                                       78.00* [      78.00*]

                                                   80.00*

OPERATING                    AGS      4,470,406A [   4,470,406A]

                                                4,347,975A

                           AGS      1,500,000U    1,500,000U

 

12.  EDN407 - PUBLIC LIBRARIES

                                      555.50* [      555.50*]

                                                  555.00*

OPERATING                    EDN      28,847,163A [  28,847,163A]

                                               28,570,484A

                           EDN      3,125,000B    3,125,000B

                           EDN      1,365,244N    1,365,244N

INVESTMENT CAPITAL             AGS      3,075,000C    3,770,000C

 

13.  DEF114 - HAWAII NATIONAL GUARD YOUTH CHALLENGE ACADEMY

OPERATING                    DEF      1,570,882A [   1,570,882A]

                                                1,551,864A

                           DEF      5,631,208N [   5,631,208N]

                                                5,568,699N

 

14.  UOH100 - UNIVERSITY OF HAWAII, MANOA

                                     3,421.12* [    3,421.12*]

                                                 3,416.87*

OPERATING                    UOH     203,626,623A [ 203,626,623A]

                                              180,988,561A

                                      293.25* [      293.25*]

                                                  398.25*

                           UOH     220,023,752B [ 228,475,255B]

                                              286,495,335B

                                       78.06*       78.06*

                           UOH      5,821,702N [   5,941,206N]

                                                5,890,412N

                                      134.25* [      134.25*]

                                                   31.25*

                           UOH      72,091,625W [  72,091,625W]

                                               55,253,604W

INVESTMENT CAPITAL             UOH    [    700,000C ][          0C]

                                          0C   14,240,000C

 

15.  UOH110 - UNIVERSITY OF HAWAII, JOHN A. BURNS SCHOOL OF MEDICINE

                                      198.22* [      198.22*]

                                                  200.47*

OPERATING                    UOH      16,928,514A [  16,928,514A]

                                               15,988,940A

                           UOH      13,408,949B [  13,408,949B]

                                               18,408,949B

                           UOH      4,568,547W [   4,568,547W]

                                                5,953,547W

 

16.  UOH210 - UNIVERSITY OF HAWAII, HILO

                                      514.75*      514.75*

OPERATING                    UOH      30,414,945A [  30,414,945A]

                                               27,977,399A

                                       95.00*       95.00*

                           UOH      33,378,541B [  33,426,134B]

                                               40,655,319B

                           UOH        394,018N      394,018N

                                        8.50*        8.50*

                           UOH      6,271,946W [   6,271,946W]

                                                5,747,237W

INVESTMENT CAPITAL             UOH      20,000,000C [           0C]

                                               33,000,000C

                           UOH      16,000,000E [           0E]

                                                5,000,000E

                           UOH      4,000,000N           N

 

17.  UOH220 - HAWAII SMALL BUSINESS DEVELOPMENT CENTER

OPERATING                    UOH        978,941A      978,941A

 

18.  UOH700 - UNIVERSITY OF HAWAII, WEST OAHU

                                       93.00* [       93.00*]

                                                   95.00*

OPERATING                    UOH      5,694,225A [   5,694,225A]

                                                5,114,520A

                           UOH      6,897,408B [   8,561,172B]

                                               35,000,000B

                           UOH         13,193N [      13,193N]

                                                  20,000N

                           UOH        327,958W [     327,958W]

                                                3,700,000W

INVESTMENT CAPITAL             UOH      2,500,000C [           0C]

                                                8,770,000C

 

19.  UOH800 - UNIVERSITY OF HAWAII, COMMUNITY COLLEGES

                                     1,831.00* [    1,831.00*]

                                                 1,846.00*

OPERATING                    UOH     116,190,704A [ 116,190,704A]

                                              108,599,924A

                                       82.00* [       82.00*]

                                                   48.00*

                           UOH      85,655,448B [  87,965,448B]

                                               86,487,889B

                                       15.60* [       15.60*]

                                                    0.75*

                           UOH      4,275,325N [   4,394,828N]

                                                3,622,882N

                           UOH      5,041,211W    5,041,211W

INVESTMENT CAPITAL             UOH      32,013,000C [   5,001,000C]

                                               68,611,000C

 

20.  UOH900 - UNIVERSITY OF HAWAII, SYSTEMWIDE SUPPORT

                                      403.00* [      403.00*]

                                                  454.00*

OPERATING                    UOH    [ 11,862,050A ][ 10,227,424A]

                                   11,913,724A   37,560,236A

                                        8.00* [        8.00*]

                                                   21.00*

                           UOH      35,736,560B [  35,736,560B]

                                               38,898,396B

                                        4.00*        4.00*

                           UOH        909,175N      909,175N

                                       15.00*       15.00*

                           UOH      17,096,150W [  17,131,574W]

                                               17,033,031W

INVESTMENT CAPITAL             UOH      80,004,000C   13,977,000C

 

21.  BUF748 - RETIREMENT BENEFITS PAYMENTS - UH

OPERATING                    BUF     123,256,258A [ 122,684,000A]

                                              123,163,259A

 

22.  BUF768 - HEALTH PREMIUM PAYMENTS - UH

OPERATING                    BUF    [ 78,550,089A ][ 88,092,504A]

                                   78,731,201A   79,482,140A

 

23.  BUF728 - DEBT SERVICE PAYMENTS - UH

OPERATING                    BUF      82,527,939A [  97,770,299A]

                                               94,127,897A

 


 

H. CULTURE AND RECREATION

1.   UOH881 - UNIVERSITY OF HAWAII, AQUARIA

                                       13.00*       13.00*

OPERATING                    UOH        611,256A [     611,256A]

                                                 571,746A

                                        7.00*        7.00*

                           UOH      3,117,141B    3,117,141B

                           UOH        996,499W      996,499W

 

2.   AGS881 - STATE FOUNDATION ON CULTURE AND THE ARTS

OPERATING                    AGS        936,332A      936,332A

                                       15.50* [       15.50*]

                                                   16.50*

                           AGS      4,215,466B [   4,215,466B]

                                                4,175,415B

                                        5.00*        5.00*

                           AGS      1,306,936N [   1,306,936N]

                                                1,298,127N

                           AGS        625,000U [     625,000U]

                                                      0U

 

3.   AGS818 - KING KAMEHAMEHA CELEBRATION COMMISSION

OPERATING                    AGS         57,874T [      57,874T]

                                                  55,280T

 

4.   LNR802 - HISTORIC PRESERVATION

                                       17.00*       17.00*

OPERATING                    LNR      1,360,596A [   1,285,596A]

                                                1,245,006A

                           LNR        151,228B [     151,228B]

                                                 146,124B

                           LNR        751,089N [     746,089N]

                                                 734,069N

 

5.   LNR804 - FOREST AND OUTDOOR RECREATION

                                       29.50*       29.50*

OPERATING                    LNR      1,251,336A [   1,251,336A]

                                                1,210,541A

                                        6.50*        6.50*

                           LNR        712,912B [     712,912B]

                                                 692,766B

                                        5.00*        5.00*

                           LNR      1,921,072N [   1,921,072N]

                                                2,199,104N

                           LNR        572,088W [     572,088W]

                                                 569,534W

INVESTMENT CAPITAL             LNR      3,325,000C [           0C]

                                                 610,000C

 

6.   LNR805 - RECREATIONAL FISHERIES

                                        7.00*        7.00*

OPERATING                    LNR        265,524A [     265,524A]

                                                 256,231A

                           LNR         76,131B [      76,131B]

                                                  75,815B

                           LNR      1,021,746N [   1,021,746N]

                                                1,017,216N

 

7.   LNR806 - PARKS ADMINISTRATION AND OPERATION

                                       78.00*       78.00*

OPERATING                    LNR      4,214,163A [   4,214,163A]

                                                3,966,421A

                                       38.00* [       38.00*]

                                                   35.00*

                           LNR      6,467,439B [   6,467,439B]

                                                6,386,491B

                           LNR      1,218,456N    1,218,456N

INVESTMENT CAPITAL             LNR      31,075,000C [  19,520,000C]

                                               25,520,000C

                           LNR        200,000N      200,000N

                           LNR              S    2,000,000S

 

8.   LNR801 - OCEAN-BASED RECREATION

                                      104.00*      104.00*

OPERATING                    LNR      16,808,643B [  16,808,643B]

                                               16,618,658B

                           LNR      1,001,411N [   1,001,411N]

                                                1,000,703N

INVESTMENT CAPITAL             LNR      13,825,000C [   4,000,000C]

                                                4,900,000C

                           LNR      2,000,000E           E

                           LNR      1,500,000N    1,000,000N

 

9.   AGS889 - SPECTATOR EVENTS AND SHOWS - ALOHA STADIUM

                                       38.50*       38.50*

OPERATING                    AGS      8,944,121B [   8,944,121B]

                                                8,841,719B

INVESTMENT CAPITAL             AGS      5,150,000C [   5,150,000C]

                                               10,150,000C

 


 

I. PUBLIC SAFETY

1.   PSD402 - HALAWA CORRECTIONAL FACILITY

                                      395.00*      395.00*

OPERATING                    PSD      22,526,784A [  22,526,784A]

                                               21,872,081A

                           PSD         28,719W      28,719W

 

2.   PSD404 - WAIAWA CORRECTIONAL FACILITY

                                      110.00* [      110.00*]

                                                  116.00*

OPERATING                    PSD      5,943,026A [   5,943,026A]

                                                6,078,169A

                           PSD         15,000W      15,000W

 

3.   PSD405 - HAWAII COMMUNITY CORRECTIONAL CENTER

                                      163.00*      163.00*

OPERATING                    PSD      8,475,622A [   8,475,622A]

                                                8,386,368A

 

4.   PSD406 - MAUI COMMUNITY CORRECTIONAL CENTER

                                      185.00*      185.00*

OPERATING                    PSD      9,328,952A [   9,328,952A]

                                                9,040,051A

                           PSD        209,721S      209,721S

 

5.   PSD407 - OAHU COMMUNITY CORRECTIONAL CENTER

                                      488.00*      488.00*

OPERATING                    PSD      26,897,053A [  26,897,053A]

                                               26,089,016A

                           PSD         30,000W      30,000W

 

6.   PSD408 - KAUAI COMMUNITY CORRECTIONAL CENTER

                                       68.00*       68.00*

OPERATING                    PSD      3,651,826A [   3,651,826A]

                                                3,557,841A

 

7.   PSD409 - WOMEN'S COMMUNITY CORRECTIONAL CENTER

                                      132.00*      132.00*

OPERATING                    PSD      6,473,553A [   6,473,553A]

                                                6,280,526A

 

8.   PSD410 - INTAKE SERVICE CENTERS

                                       59.00* [       59.00*]

                                                   62.00*

OPERATING                    PSD      3,275,470A [   3,275,470A]

                                                3,300,484A

 

9.   PSD420 - CORRECTIONS PROGRAM SERVICES

                                      164.00*      164.00*

OPERATING                    PSD      18,588,472A [  18,588,472A]

                                               18,627,742A

 

10.  PSD421 - HEALTH CARE

                                      196.10*      196.10*

OPERATING                    PSD      20,775,735A [  20,775,735A]

                                               21,475,211A

 

11.  PSD422 - HAWAII CORRECTIONAL INDUSTRIES

                                        2.00*        2.00*

OPERATING                    PSD      9,987,705W [   9,887,705W]

                                                9,813,527W

 

12.  PSD808 - NON-STATE FACILITIES

                                        9.00*        9.00*

OPERATING                    PSD      64,659,911A [  64,659,911A]

                                               58,194,278A

 

13.  PSD502 - NARCOTICS ENFORCEMENT

                                       13.00*       13.00*

OPERATING                    PSD        954,449A [     954,449A]

                                                 916,360A

                           PSD        206,161N [     206,161N]

                                                 201,933N

                                        7.00*        7.00*

                           PSD        682,964W [     673,984W]

                                                 661,051W

 

14.  PSD503 - SHERIFF

                                      296.00*      296.00*

OPERATING                    PSD      13,213,117A [  13,423,849A]

                                               12,853,995A

                                       59.00*       59.00*

                           PSD      5,076,280U [   5,076,280U]

                                                4,897,003U

 

15.  PSD611 - ADULT PAROLE DETERMINATIONS

                                        3.00* [        3.00*]

                                                    5.00*

OPERATING                    PSD        216,988A [     216,988A]

                                                 339,673A

 

16.  PSD612 - ADULT PAROLE SUPERVISION AND COUNSELING

                                       55.00* [       55.00*]

                                                   65.00*

OPERATING                    PSD      3,523,983A [   3,523,983A]

                                                3,912,725A

 

17.  PSD613 - CRIME VICTIM COMPENSATION COMMISSION

                                           *        5.00*

OPERATING                    PSD              A      476,300A

                                        8.00*        8.00*

                           PSD      1,892,173B [   1,892,173B]

                                                1,865,067B

                           PSD        859,315N [     859,315N]

                                                 856,625N

 

18.  PSD900 - GENERAL ADMINISTRATION

                                      137.00* [      137.00*]

                                                  154.00*

OPERATING                    PSD      10,364,924A [  10,364,924A]

                                               13,156,849A

                           PSD        667,984B      667,984B

                           PSD         75,065T       75,065T

INVESTMENT CAPITAL             PSD      9,000,000C    8,000,000C

 

19.  ATG231 - STATE CRIMINAL JUSTICE INFORMATION AND IDENTIFICATION

                                       26.50*       26.50*

OPERATING                    ATG      1,499,894A [   1,499,894A]

                                                1,456,795A

                           ATG      2,005,443N [   2,005,443N]

                                                2,285,972N

                                       30.50*       30.50*

                           ATG      3,485,609W [   3,185,609W]

                                                3,205,835W

 

20.  LNR810 - PREVENTION OF NATURAL DISASTERS

                                        8.50*        8.50*

OPERATING                    LNR      2,059,158B [   2,059,158B]

                                                2,033,971B

                                        0.50*        0.50*

                           LNR        560,602N [     370,602N]

                                                 369,405N

 

21.  DEF110 - AMELIORATION OF PHYSICAL DISASTERS

                                      114.10*      114.10*

OPERATING                    DEF      10,606,579A [  10,664,584A]

                                               10,797,065A

                                       99.65* [       99.65*]

                                                  101.15*

                           DEF      88,233,296N [  85,298,962N]

                                               85,712,950N

                           DEF        464,458S      464,458S

                           DEF      12,044,738U [  12,044,738U]

                                                 586,827U

INVESTMENT CAPITAL             AGS        707,000C           C

                           DEF      9,593,000C [   6,700,000C]

                                               10,050,000C

                           AGS      1,046,000N           N

                           DEF      47,026,000N [  56,385,000N]

                                               62,935,000N

 


 

J. INDIVIDUAL RIGHTS

1.   CCA102 - CABLE TELEVISION

                                        4.00* [        4.00*]

                                                    7.00*

OPERATING                    CCA      1,786,537B [   1,786,537B]

                                                4,610,809B

 

2.   CCA103 - CONSUMER ADVOCATE FOR COMMUNICATION, UTILITIES, AND TRANSPORTATION SERVICES

                                       23.00*       23.00*

OPERATING                    CCA      2,701,465B [   3,003,599B]

                                                2,938,787B

 

3.   CCA104 - FINANCIAL SERVICES REGULATION

                                       34.00*       34.00*

OPERATING                    CCA      3,387,006B [   3,384,920B]

                                                3,277,594B

                           CCA        110,000T      110,000T

 

4.   CCA105 - PROFESSIONAL AND VOCATIONAL LICENSING

                                       52.00* [       52.00*]

                                                   54.00*

OPERATING                    CCA      5,573,217B [   5,573,217B]

                                                5,847,701B

                                        5.00* [        5.00*]

                                                    8.00*

                           CCA      2,086,311T [   2,061,311T]

                                                2,026,466T

 

5.   BUF901 - PUBLIC UTILITIES COMMISSION

                                       62.00*       62.00*

OPERATING                    BUF      11,049,409B [  11,386,174B]

                                               11,269,551B

 

6.   CCA106 - INSURANCE REGULATORY SERVICES

                                       81.00*       81.00*

OPERATING                    CCA      14,281,755B [  14,281,755B]

                                               14,040,126B

                           CCA        200,000T      200,000T

 

7.   CCA110 - OFFICE OF CONSUMER PROTECTION

                                       14.00* [       14.00*]

                                                   16.00*

OPERATING                    CCA      1,573,840B [   1,573,840B]

                                                1,524,748B

                           CCA        100,681T      100,681T

 

8.   AGR812 - MEASUREMENT STANDARDS

                                        7.00*        7.00*

OPERATING                    AGR        384,525A [     384,525A]

                                                 376,025A

                                           *        4.00*

                           AGR              B      420,000B

 

9.   CCA111 - BUSINESS REGISTRATION AND SECURITIES REGULATION

                                       70.00* [       70.00*]

                                                   71.00*

OPERATING                    CCA      6,649,240B [   6,649,240B]

                                                6,472,012B

 

10.  CCA112 - REGULATED INDUSTRIES COMPLAINTS OFFICE

                                       65.00* [       65.00*]

                                                   66.00*

OPERATING                    CCA      5,579,836B [   5,579,836B]

                                                5,405,578B

 

11.  CCA191 - GENERAL SUPPORT

                                       43.00* [       43.00*]

                                                   44.00*

OPERATING                    CCA      6,383,469B [   6,267,869B]

                                                6,532,299B

 

12.  LTG105 - ENFORCEMENT OF INFORMATION PRACTICES

                                        5.00*        5.00*

OPERATING                    LTG        401,935A [     401,935A]

                                                 390,870A

 

13.  BUF151 - OFFICE OF THE PUBLIC DEFENDER

                                       81.00*       81.00*

OPERATING                    BUF      9,795,299A [   9,795,299A]

                                                9,479,864A

 

14.  LNR111 - CONVEYANCES AND RECORDINGS

                                       60.00* [       60.00*]

                                                   58.00*

OPERATING                    LNR      4,129,966B [   4,129,966B]

                                                4,396,939B

 

15.  HMS888 - COMMISSION ON THE STATUS OF WOMEN

                                        1.00*        1.00*

OPERATING                    HMS        161,915A [     161,915A]

                                                 155,084A

 


 

K. GOVERNMENT-WIDE SUPPORT

1.   GOV100 - OFFICE OF THE GOVERNOR

                                       27.00* [       27.00*]

                                                   25.00*

OPERATING                    GOV      3,176,357A [   3,176,357A]

                                                2,921,286A

                           GOV         87,147T      87,147T

INVESTMENT CAPITAL             GOV          1,000C       1,000C

 

2.   LTG100 - OFFICE OF THE LIEUTENANT GOVERNOR

                                        3.00*        3.00*

OPERATING                    LTG        646,188A [     646,188A]

                                                 629,904A

 

3.   BED144 - STATEWIDE PLANNING AND COORDINATION

                                       12.00*       12.00*

OPERATING                    BED      1,110,081A [   1,110,081A]

                                                1,079,447A

                                        5.00*        5.00*

                           BED      2,692,310N [   2,692,310N]

                                                2,693,496N

                           BED      2,000,000W    2,000,000W

 

4.   BED103 - STATEWIDE LAND USE MANAGEMENT

                                        5.00*        5.00*

OPERATING                    BED        488,771A [     488,771A]

                                                 477,300A

 

5.   BED130 - ECONOMIC PLANNING AND RESEARCH

                                       13.00* [       13.00*]

                                                   14.00*

OPERATING                    BED        853,009A [     853,009A]

                                                 861,411A

 

6.   BUF101 - DEPARTMENTAL ADMINISTRATION AND BUDGET DIVISION

                                       39.25*       39.25*

OPERATING                    BUF    [ 11,332,082A ][ 11,154,203A]

                                   11,764,411A   11,835,833A

                           BUF      2,141,007B    2,579,623B

                           BUF        239,798N      306,558N

                           BUF          8,548T      10,116T

                                        0.75*        0.75*

                           BUF    [     31,343U ][     31,343U]

                                      43,632U      49,598U

                           BUF         26,491W      33,136W

INVESTMENT CAPITAL             BUF         22,000B      24,000B

                           BUF    [569,836,000C ][200,960,000C]

                                  550,160,000C  285,664,000C

 

7.   AGS871 - CAMPAIGN SPENDING COMMISSION

                                        5.00*        5.00*

OPERATING                    AGS      1,108,051T [   4,683,051T]

                                                4,657,202T

 

8.   AGS879 - OFFICE OF ELECTIONS

                                       17.50*       17.50*

OPERATING                    AGS      1,829,581A [   2,636,469A]

                                                2,603,423A

                                        0.50*        0.50*

                           AGS      7,473,714N [   7,473,714N]

                                                7,471,636N

 

9.   TAX100 - COMPLIANCE

                                      179.00* [      179.00*]

                                                  189.00*

OPERATING                    TAX      8,786,865A [   8,786,865A]

                                                8,810,585A

 

10.  TAX105 - TAX SERVICES AND PROCESSING

                                      122.00*      122.00*

OPERATING                    TAX      6,209,621A [   6,209,621A]

                                                6,020,361A

 

11.  TAX107 - SUPPORTING SERVICES - REVENUE COLLECTION

                                       72.00*       72.00*

OPERATING                    TAX      7,339,726A [   7,030,556A]

                                                6,880,202A

                           TAX      1,057,875B [   1,057,875B]

                                                1,053,627B

INVESTMENT CAPITAL             TAX        333,000C           C

 

12.  AGS101 - ACCOUNTING SYSTEM DEVELOPMENT AND MAINTENANCE

                                        6.00*        6.00*

OPERATING                    AGS        513,981A [     513,981A]

                                                 499,348A

 

13.  AGS102 - EXPENDITURE EXAMINATION

                                       16.00*       16.00*

OPERATING                    AGS      1,098,527A [   1,098,527A]

                                                1,074,357A

 

14.  AGS103 - RECORDING AND REPORTING

                                       11.00*       11.00*

OPERATING                    AGS        694,124A [     694,124A]

                                                 753,395A

 

15.  AGS104 - INTERNAL POST AUDIT

                                        6.00*        6.00*

OPERATING                    AGS        441,975A [     441,975A]

                                                 428,238A

 

16.  BUF115 - FINANCIAL ADMINISTRATION

                                       11.00* [       11.00*]

                                                   12.00*

OPERATING                    BUF      1,793,147A [   1,793,147A]

                                                1,814,216A

                                        9.00*        9.00*

                           BUF      7,018,984T [   7,018,984T]

                                                7,000,402T

                                        1.00*        1.00*

                           BUF         70,260U      70,260U

 

17.  BUF721 - DEBT SERVICE PAYMENTS

OPERATING                    BUF     258,583,782A [ 306,342,481A]

                                              294,929,786A

 

18.  ATG100 - LEGAL SERVICES

                                      223.46* [      223.46*]

                                                  220.30*

OPERATING                    ATG      17,712,629A [  17,712,629A]

                                               17,745,949A

                                       22.52* [       22.52*]

                                                   21.80*

                           ATG      2,405,785B [   2,405,785B]

                                                2,450,840B

                                       13.00* [       13.00*]

                                                   13.50*

                           ATG      8,539,330N [   8,496,088N]

                                                8,512,435N

                           ATG              R      52,760R

                                        0.50*        0.50*

                           ATG      3,990,504T [   3,990,504T]

                                                3,979,153T

                                       57.35* [       57.35*]

                                                   56.53*

                           ATG      9,381,701U [   9,476,083U]

                                                9,110,189U

                                           * [        0.00*]

                                                    0.20*

                           ATG      2,539,009V [     744,959V]

                                                 766,321V

                                        4.45*        4.45*

                           ATG      3,114,984W [   3,114,984W]

                                                3,130,747W

 

19.  AGS131 - INFORMATION PROCESSING AND COMMUNICATION SERVICES

                                      115.00* [      115.00*]

                                                  117.00*

OPERATING                    AGS      12,404,923A [  12,671,645A]

                                               24,451,168A

                                           * [        0.00*]

                                                    7.00*

                           AGS         74,410B [      90,016B]

                                                  86,944B

                                       33.00*       33.00*

                           AGS      3,312,584U    3,312,584U

INVESTMENT CAPITAL             AGS      8,235,000C [   8,135,000C]

                                               23,135,000C

 

20.  AGS111 - ARCHIVES - RECORDS MANAGEMENT

                                       16.00*       16.00*

OPERATING                    AGS        780,072A [     780,072A]

                                                 842,274A

                           AGS              U      200,000U

 

21.  AGS891 - WIRELESS ENHANCED 911 BOARD

OPERATING                    AGS      14,000,000B    9,000,000B

 

22.  HRD102 - WORK FORCE ATTRACTION, SELECTION, CLASSIFICATION, AND EFFECTIVENESS

                                       81.00*       81.00*

OPERATING                    HRD      12,979,935A [  12,979,935A]

                                               12,792,779A

                           HRD        700,000B      700,000B

                           HRD      4,886,281U    4,886,281U

 

23.  HRD191 - SUPPORTING SERVICES – HUMAN RESOURCES DEV

                                       11.00*       11.00*

OPERATING                    HRD      1,444,386A [   1,444,386A]

                                                1,425,386A

 

24.  BUF141 - EMPLOYEES’ RETIREMENT SYSTEM

                                       99.00*       99.00*

OPERATING                    BUF      10,828,223X [  10,828,223X]

                                               16,598,987X

 

25.  BUF143 - HAWAII EMPLOYER - UNION TRUST FUND

                                       36.00* [       36.00*]

                                                   41.00*

OPERATING                    BUF      5,109,314T [   5,104,514T]

                                                5,337,112T

 

26.  BUF741 - RETIREMENT BENEFITS PAYMENTS

OPERATING                    BUF     189,315,975A [ 185,809,000A]

                                              256,807,477A

 

27.  BUF761 - HEALTH PREMIUM PAYMENTS

OPERATING                    BUF    [137,687,959A ][160,386,311A]

                                  138,579,993A  200,743,419A

 

28.  LNR101 - PUBLIC LANDS MANAGEMENT

                                       49.00* [       49.00*]

                                                   50.00*

OPERATING                    LNR      12,308,577B [  12,258,577B]

                                               12,267,547B

                           LNR         75,238N [      75,238N]

                                                  73,932N

INVESTMENT CAPITAL             LNR              C    7,000,000C

                           LNR      2,500,000S [           0S]

                                                2,500,000S

 

29.  AGS203 - STATE RISK MANAGEMENT AND INSURANCE ADMINISTRATION

OPERATING                    AGS      6,987,995A [   6,987,995A]

                                                5,987,995A

                                        4.00*        4.00*

                           AGS      25,285,334W [  25,285,334W]

                                               25,271,640W

 

30.  AGS211 - LAND SURVEY

                                       10.00*       10.00*

OPERATING                    AGS        646,586A [     646,586A]

                                                 627,633A

                           AGS        285,000U      285,000U

 

31.  AGS223 - OFFICE LEASING

                                        4.00*        4.00*

OPERATING                    AGS      10,613,034A [  10,613,034A]

                                               10,304,702A

                           AGS      5,500,000U    5,500,000U

 

32.  AGS221 - PUBLIC WORKS - PLANNING, DESIGN, AND CONSTRUCTION

                                       16.00*       16.00*

OPERATING                    AGS      1,199,707A [   1,199,707A]

                                                1,160,938A

                           AGS      4,000,000W    4,000,000W

INVESTMENT CAPITAL             AGS      46,004,000C [  23,365,000C]

                                               49,365,000C

                           AGS      3,261,000R           R

 

33.  AGS231 - CENTRAL SERVICES - CUSTODIAL SERVICES

                                      117.00* [      117.00*]

                                                  119.00*

OPERATING                    AGS      15,228,845A [  14,628,845A]

                                               19,433,620A

                           AGS         58,744B      58,744B

                           AGS      1,099,084U [   1,099,084U]

                                                1,699,084U

 

34.  AGS232 - CENTRAL SERVICES - GROUNDS MAINTENANCE

                                       27.00*       27.00*

OPERATING                    AGS      1,652,934A [   1,652,934A]

                                                1,619,616A

 

35.  AGS233 - CENTRAL SERVICES - BUILDING REPAIRS AND ALTERATIONS

                                       33.00*       33.00*

OPERATING                    AGS      2,860,134A [   2,860,134A]

                                                2,803,323A

                           AGS              U      100,000U

 

36.  AGS240 - STATE PROCUREMENT

                                       22.00*       22.00*

OPERATING                    AGS      1,014,722A [   1,126,903A]

                                                1,089,605A

 

37.  AGS244 - SURPLUS PROPERTY MANAGEMENT

                                        5.00*        5.00*

OPERATING                    AGS      1,798,996W [   1,798,996W]

                                                1,786,042W

 

38.  AGS251 - AUTOMOTIVE MANAGEMENT - MOTOR POOL

                                       12.50*       12.50*

OPERATING                    AGS      2,549,863W [   2,549,863W]

                                                2,515,558W

 

39.  AGS252 - AUTOMOTIVE MANAGEMENT - PARKING CONTROL

                                       24.50*       24.50*

OPERATING                    AGS      3,355,757W [   3,355,757W]

                                                3,304,697W

 

40.  AGS901 - GENERAL ADMINISTRATIVE SERVICES

                                       35.00*       35.00*

OPERATING                    AGS      2,694,264A [   2,694,264A]

                                                2,623,500A

                                        2.00*        2.00*

                           AGS        146,503U [     146,503U]

                                                 139,795U

 

41.  SUB201 - CITY AND COUNTY OF HONOLULU

OPERATING                    SUB              A      365,250A

INVESTMENT CAPITAL             CCH      2,000,000C [   2,000,000C]

                                                2,025,000C

 

41A. SUB301 - COUNTY OF HAWAII

OPERATING                    SUB              A      303,177A

 

42.  SUB401 - COUNTY OF MAUI

OPERATING                    SUB              A      134,512A

INVESTMENT CAPITAL             COM              C [   1,000,000C]

                                                1,920,000C

 

43.  SUB501 - COUNTY OF KAUAI

OPERATING                    SUB              A      70,920A

INVESTMENT CAPITAL             COK              C      30,000C"


     SECTION 4.  Act 164, Session Laws of Hawaii 2011, is amended by amending Part III as follows:

     (1)  By amending section 9 to read:

     "SECTION 9.  Provided that of the special fund appropriation for airports administration (TRN 195), the sum of $78,107,803 or so much thereof as may be necessary for fiscal year 2011‑2012 and the sum of [$95,148,450$131,372,000 or so much thereof as may be necessary for fiscal year 2012‑2013 shall be expended for the following purposes:

     Purpose                  FY 2011‑2012        FY 2012‑2013

     Interest and principal on

     revenue bonds            $78,107,803        [$95,148,450;]

                                                 $131,372,000;

provided further that any unexpected fund appropriation may be expended for principal and interest on revenue bonds payable from the passenger facility charge special fund, as necessary; and provided further that any unexpended funds shall lapse to the airport special fund."

     (2)  By amending section 12 to read:

     "SECTION 12.  Provided that of the special fund appropriations for the highways division (TRN 501‑TRN [561595), the following sums specified for special repair and maintenance projects in fiscal biennium 2011‑2013 shall be expended for special repair and maintenance purposes only as follows:

     Program I.D.        FY 2011-2012        FY 2012-2013

       TRN 501            $20,700,000        [$36,443,000]

                                              $36,693,000

       TRN 511            $ 9,500,000         $16,500,000

       TRN 531            $12,000,000         $20,500,000

       TRN 561            $ 7,000,000         $12,000,000[;]

       TRN 595                                $   757,000;

and provided further that any unexpended funds shall lapse to the state highway fund."

     (3)  By amending section 13 to read:

     "SECTION 13.  Provided that of the special fund appropriation for highways administration (TRN 595), the sum of $52,871,334 or so much thereof as may be necessary for fiscal year 20112012 and the sum of [$51,523,720] $54,233,616 or so much thereof as may be necessary for fiscal year 20122013 shall be expended for the following purposes:

     Purpose                 FY 20112012       FY 20122013

     Interest and principal on

     general obligation bonds $ 8,166,474        $ 4,820,206

     Interest and principal on

     revenue bonds            $44,704,860       [$46,703,514;]                                                  $49,413,410;

provided that any unexpended funds shall lapse to the highway special fund."

     (4)  By amending section 14 to read:

     "SECTION 14.  Provided that of the special fund appropriation for Kauai Highways (TRN 561), the sum of $500,000 or so much thereof as may be necessary for fiscal year 2011‑2012 and the sum of [$500,000$250,000 or so much thereof as may be necessary for fiscal year 2012‑2013 shall be expended by the department of transportation to provide Saturday contraflow services along Kuhio Highway State Route 56 from Kapaa to Hanamaulu."

     (5)  By adding a new section to read:

     "SECTION 16.1.  Provided that of the general fund appropriation for Hawaii health systems regions (HTH 212), the sum of $10,000,000 or so much thereof as may be necessary for fiscal year 2012‑2013 shall be expended for payment into and settlement of the promissory note dated May 8, 2009, between Maui Regional Healthcare System and the State of Hawaii; provided further that the funds shall not be expended for any other purpose; provided further that any unexpended funds shall lapse to the general fund."

     (6)  By adding a new section to read:

     "SECTION 18.1.  Provided that of the general fund appropriation for state administration (EDN 300), the sum of $500,000 or so much thereof as may be necessary for fiscal year 2012‑2013 shall be expended under the direction of the board of education for an implementation and transition coordinator, to implement the recommendations of the charter school governance, accountability, and authority task force pursuant to Act 130, Session Laws of Hawaii 2011, and to transition from the current charter school system under chapter 302B, Hawaii Revised Statutes, to the charter school system set forth under S.B. 2115, S.D. 2, H.D. 1; provided further that the funds shall be used for no other purpose; and provided further that any unexpended funds shall lapse to the general fund."

     (7)  By adding a new section to read:

     "SECTION 18.2.  (a)  Provided that of the general fund appropriation for school support (EDN 400), the sum of $23,000,000 or so much thereof as may be necessary for fiscal year 2012‑2013 shall be expended by the department of education for home-to-school transportation costs not mandated by state or federal law; provided further that the funds shall be expended only if all of the following occur:

     (1)  The department conducts a comprehensive assessment of need for each student transportation route that considers ridership rates, socioeconomic background of riders, distances from homes to schools, student safety, and cost effectiveness;

     (2)  Student transportation routes are provided based upon need;

     (3)  The board of education approves of the expenditure of funds for each provided route; and

     (4)  Student transportation routes not mandated by state or federal law are provided in all four counties.

     (b)  Provided further that the department of education shall prepare a report that includes the following:

     (1)  Documentation of all assessments performed and actions taken related to this section;

     (2)  Cost savings measures implemented and changes to the methods used to procure student transportation services for fiscal year 2012-2013; and

     (3)  Planned cost savings measures, changes to the methods used to procure student transportation services, and a comprehensive plan for providing and paying for student transportation services for fiscal biennium 2013-2015;

provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2013 regular session."

     (8)  By amending section 19 to read:

     "SECTION 19.  Provided that of the general fund appropriation for charter schools (EDN 600), the sum of $57,446,372 or so much thereof as may be necessary for fiscal year 2011‑2012 [and the sum of $60,603,057 or so much thereof as may be necessary for fiscal year 2012‑2013] shall be expended by charter schools to fund their educational programs; provided further that the funds shall not be expended for any other purpose; provided further that for fiscal [years] year 2011‑2012 [and 2012‑2013], any general fund amount that exceeds the product derived from multiplying:

     (1)  The actual charter school enrollment count on October 15, 2011, [and October 15, 2012,] as reviewed and verified by the charter school administrative office by November 15, 2011[, and November 15, 2012]; and

     (2)  The sum of $5,867 for fiscal year 2011‑2012 [and the sum of $5,749 for fiscal year 2012‑2013];

shall lapse to the [charter schools account within the state treasury;] general fund; provided further that charter schools shall prepare a report that shall include but not be limited to a detailed breakout of the all means of financing budget for the current and next fiscal year and actual expenditures for the last completed fiscal year for each charter school, a report of all other funds expended on behalf of each school, and a report detailing by school:

     (1)  The enrollment projections used to submit the current budget request;

     (2)  The actual October 15, 2011, and the actual October 15, 2012, enrollment count as reported by each school for the current school year;

     (3)  The charter school administrative office's reviewed and verified October 15, 2011, and October 15, 2012, enrollment count; and

     (4)  The charter school administrative office's reviewed and verified November 15, 2011, and November 15, 2012, enrollment count;

and provided further that the charter school administrative office shall submit these reports to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular sessions."

     (9)  By amending section 20 to read:

     "SECTION 20.  Provided that of the general fund appropriation for charter schools (EDN 600), the sum of $2,233,699 or so much thereof as may be necessary for fiscal year 2011-2012 [and the sum of $2,404,556 or so much thereof as may be necessary for fiscal year 2012-2013] shall be expended for facility costs; provided further that the amount that exceeds $228 multiplied by the actual October 15 charter school enrollment count [for the current school year], as reviewed and verified by the charter school administrative office by November 15, shall lapse to the [charter schools account within the state treasury;] general fund; provided further that the funds shall be distributed to charter schools based on methodology developed by the charter school administrative office; provided further that charter school administrative office shall prepare a report that shall include but not be limited to a detailed breakout of actual facility-related expenditures for the last completed fiscal year for each charter school and the method of funding; provided further that the report shall include an explanation of the methodology developed by the charter school administrative office to distribute the funds; and provided further that the charter school administrative office shall submit the report to the legislature no later than thirty days prior to the convening of the 2012 [and 2013 regular sessions.] session."

     (10)  By adding a new section to read:

     "SECTION 29.1.  Provided that of the funds appropriated or authorized from the sources of funding indicated below to the departmental administration and budget division (BUF 101) the following sums or so much thereof as may be necessary for fiscal year 2011-2012 and fiscal year 2012-2013 shall be used for the implementation of a directed leave without pay (DLWOP) program and the exemption of certain non-general funds from the DLWOP program for collective bargaining unit 1; provided that this appropriation shall be allotted by the director of finance to the appropriate state departments for expenditure in the respective fiscal year for the purposes of this section.

                               FY 2011—2012      FY 2012—2013

General funds                   $   95,074        $  646,002

Special funds                   $2,141,007        $2,578,096

Federal funds                   $  239,798        $  306,077

Trust                           $    8,548        $   10,116

Interdepartmental transfer funds $   12,289        $   14,633

Revolving funds                 $   26,491        $   33,132"

     (11)  By adding a new section to read:

     "SECTION 29.2.  Provided that of the funds appropriated or authorized from the sources of funding indicated below to the departmental administration and budget division (BUF 101), the following sums or so much thereof as may be necessary for fiscal year 2011-2012 and fiscal year 2012-2013 shall be used for the implementation of a directed leave without pay (DLWOP) program and the exemption of certain non-general funds from the DLWOP program for state officers and employees excluded from collective bargaining who belong to the same compensation plans as those officers and employees within collective bargaining unit 1; provided that this appropriation shall be allotted by the director of finance to the appropriate state departments for expenditure in the respective fiscal year for the purposes of this section.

                               FY 2011—2012      FY 2012—2013

General funds                     $337,255         $369,808

Special funds                                     $  1,527

Federal funds                                     $    481

Revolving funds                                   $      4"

     (12)  By adding a new section to read:

     "SECTION 29.3.  Provided that of the special funds appropriated or authorized for departmental administration and budget division (BUF 101), the sum of $21,261 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $23,206 or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for the implementation of a directed leave without pay (DLWOP) program and the exemption of certain non-general funds from the DLWOP program for collective bargaining unit 1; provided that this appropriation shall be allotted by the director of finance to the appropriate state departments for expenditure in the respective fiscal year for the purposes of this section."

     (13)  By amending section 32 to read:

     "SECTION 32.  Provided that of the general fund appropriations for debt service payments (BUF 721—BUF 728), the following sums specified in fiscal biennium 2011‑2013 shall be expended for principal and interest payments on general obligation bonds only as follows:

Program I.D.       FY 2011—2012       FY 2012—2013

  BUF 721          $258,583,782     [$306,342,481]

                                      $294,929,786

  BUF 725          $222,989,025     [$264,173,610]

                                      $254,331,904

  BUF 728          $ 82,527,939    [$ 97,770,299;]

                                     $ 94,127,897;

provided further that unrequired balances may be transferred only to retirement benefits payments (BUF 741—BUF 748) and health premium payments (BUF 761—BUF 768); provided further that the funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund."

     (14)  By adding a section to read:

     "SECTION 32.1.  Provided that of the general fund appropriation for information processing and communication services (AGS 131), the sum of $12,067,141 or so much thereof as may be necessary for fiscal year 2012-2013 shall be used as follows:

     (1)  $3,442,141 for technology triage projects, equipment, and staffing;

     (2)  $6,800,000 for business process and IT/IRM reengineering projects, including demonstration projects for electronic filing of tax returns, a contracts processing dashboard, and streamlining film and media production permit processing to generate increased revenues and provide timely, comprehensive economic data; and

     (3)  $1,825,000 for IT integration pilot projects, including development of a centralized website and electronic posting of state and county information to reduce legal notice publication requirements and to provide increased access to public information requirements, and phase one of the State Archives digitization project;

provided further that the funds shall not be expended for any other purpose; provided further that any unexpended funds shall lapse to the general fund."

     (15)  By amending section 33 to read:

     "SECTION 33.  Provided that of the general fund appropriations for retirement benefits payments (BUF 741‑BUF 748), the following sums specified in fiscal biennium 2011‑2013 shall be expended for the state employer's share of the employees' retirement system's pension accumulation only as follows:

Program I.D.       FY 2011—2012       FY 2012—2013

  BUF 741          $171,388,684     [$173,662,109]

                                      $178,947,975

  BUF 745          $181,970,000     [$184,245,000]

                                      $171,534,825

  BUF 748          $ 81,275,000    [$ 82,291,000;]

                                     $ 85,038,332;

[Provided] provided that the amounts in BUF 741 accounts for amounts that shall be transferred in pursuant to section 96; provided further that unrequired balances may be transferred only to debt service payments (BUF 721‑BUF 728) and health premium payments (BUF 761‑BUF 768); provided further that the funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund."

     (16)  By amending section 34 to read:

     "SECTION 34.  Provided that of the general fund appropriations for retirement benefits payments (BUF 741‑BUF 748), the following sums specified in fiscal biennium 2011‑2013 shall be expended for the state employer's share of the social security/Medicare payment for employees only as follows:

Program I.D.       FY 2011—2012       FY 2012—2013

  BUF 741          $90,621,637       [$84,840,795]

                                       $77,859,502

  BUF 745          $98,707,870       [$92,955,000]

                                       $81,206,365

  BUF 748          $41,981,258      [$40,393,000;]

                                      $38,124,926;

[Provided] provided that the amounts in BUF 741 accounts for amounts that shall be transferred in pursuant to section 96; provided further that unrequired balances may be transferred only to debt service payments (BUF 721‑BUF 728) and health premium payments (BUF 761‑BUF 768); provided further that the funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund."

     (17)  By amending section 35 to read:

     "SECTION 35.  Provided that of the general fund appropriations for health premium payments (BUF 761—BUF 768), the following sums specified in fiscal biennium 2011—2013 shall be expended for the state employer's share of health premiums for active employees and retirees only as follows:

Program I.D.       FY 2011—2012       FY 2012—2013

  BUF 761          $187,687,959     [$210,386,311]

                                      $200,743,419

  BUF 765          $236,284,465     [$264,546,608]

                                      $225,126,160

  BUF 768          $ 78,550,089    [$ 88,092,504;]

                                     $ 79,482,140;

[Provided] provided that the amounts in BUF 761 accounts for amounts that shall be transferred in pursuant to section 97; provided further that of the amounts in health premiums payments (BUF 761‑BUF 768) for fiscal year 2011‑2012, $691,402 in BUF 761; $763,427 in BUF 765; and $283,916 in BUF 768 are for costs above the 50/50 contribution for the period of five months from July through November 2011 necessary to implement the United Public Workers Union Unit 1 settlement; provided further that unrequired balances may be transferred only to debt service payments (BUF 721‑BUF 728) and retirement benefits payments (BUF 741‑BUF 748); provided further that the funds shall not be expended for any other purpose; and provided further that any unexpended funds shall lapse to the general fund."

     SECTION 5.  Act 164, Session Laws of Hawaii 2011, is amended by amending section 36 to read as follows:

     "SECTION 36.  CAPITAL IMPROVEMENT PROJECTS AUTHORIZED.  The sums of money appropriated or authorized in part II of this Act for capital improvements shall be expended for the projects listed below.  Accounting of the appropriations by the department of accounting and general services shall be based on the projects as such projects are listed in this section.  Several related or similar projects may be combined into a single project if such combination is advantageous or convenient for implementation; and provided further that the total cost of the projects thus combined shall not exceed the total of the sum specified for the projects separately.  (The amount after each cost element and the total funding for each project listed in this part are in thousands of dollars.)


 

A. ECONOMIC DEVELOPMENT

BED105 - CREATIVE INDUSTRIES DIVISION

 

0.01. CID001     HAWAII FILM STUDIO, VARIOUS IMPROVEMENTS (PHASE I), OAHU

 

          DESIGN AND CONSTRUCTION OF VARIOUS IMPROVEMENTS AT THE HAWAII FILM STUDIO.

          DESIGN                                           345

          CONSTRUCTION                                     3,105

            TOTAL FUNDING           BED              C      3,450 C

 

BED107 - FOREIGN TRADE ZONE

 

1.        FOREIGN TRADE ZONE IMPORT-EXPORT STEP-UP INCUBATOR, MAUKA RENOVATION, OAHU

 

          DESIGN AND CONSTRUCTION FOR RENOVATION OF MAUKA END OF THE FOREIGN TRADE ZONE WAREHOUSE TO PROVIDE 30,000 SQ. FT. OF ADDITIONAL OFFICE SPACE WITH 40 INDIVIDUAL OFFICES, COMMON CONFERENCE ROOM AND OTHER FACILITIES TO SUPPORT IMPORT-EXPORT RELATED SMALL BUSINESSES.  THIS IS A "SHOVEL-READY" PROJECT.

          DESIGN                                  750         

          CONSTRUCTION                           6,750         

            TOTAL FUNDING           BED          4,500 D           D

                                    BED          3,000 N           N

 


 

BED142 - GENERAL SUPPORT FOR ECONOMIC DEVELOPMENT

 

1.01. BED100     TRANSPACIFIC CABLE PROJECT, STATEWIDE

 

          PLANS TO CREATE PRIVATELY-MANAGED SHARED OPEN-ACCESS SUBMARINE FIBER OPTIC CABLE LAND STATIONS, STATEWIDE.

          PLANS                                          2,200

            TOTAL FUNDING           BED              C      2,200  C

 

AGR141 - AGRICULTURAL RESOURCE MANAGEMENT

 

[2. SW0602  STATE IRRIGATION SYSTEM RESERVOIR SAFETY IMPROVEMENTS, STATEWIDE

 

          LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR STATEWIDE RESERVOIR SAFETY IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                     1         1

          DESIGN                                1,000         1

          CONSTRUCTION                           2,499      2,498

            TOTAL FUNDING           AGR          2,500 C      1,500 C

                                    AGR          1,000 N      1,000 N]

 


 

2. SW0602  STATE IRRIGATION SYSTEM RESERVOIR SAFETY IMPROVEMENTS, STATEWIDE

 

          LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR STATEWIDE RESERVOIR SAFETY IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                     1         1

          DESIGN                                1,000         1

          CONSTRUCTION                           2,499     12,998

            TOTAL FUNDING           AGR          2,500 C     11,000 C

                                  AGR          1,000 N      2,000 N

 

3. 980002  LOWER HAMAKUA DITCH WATERSHED PROJECT, HAWAII

 

          LAND, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE LOWER HAMAKUA DITCH SYSTEM,  TOGETHER WITH APPURTENANT WORKS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                     2         2

          DESIGN                                   2         2

          CONSTRUCTION                           6,396      2,996

            TOTAL FUNDING           AGR          3,200 C      1,500 C

                                    AGR          3,200 N      1,500 N

 

4. 200603  WAIMANALO IRRIGATION SYSTEM IMPROVEMENTS, OAHU

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE WAIMANALO IRRIGATION SYSTEM, OAHU

          DESIGN                                  100         

          CONSTRUCTION                           1,750      1,000

            TOTAL FUNDING           AGR          1,850 C      1,000 C

 


 

5. P97002  UPCOUNTRY MAUI WATERSHED PROJECT, MAUI

 

          LAND ACQUISITION, DESIGN, AND CONSTRUCTION FOR THE INSTALLATION OF PIPELINE FOR THE UPCOUNTRY MAUI WATERSHED, MAUI.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                     2         2

          DESIGN                                   2         2

          CONSTRUCTION                           2,996      2,996

            TOTAL FUNDING           AGR          1,500 C      1,500 C

                                    AGR          1,500 N      1,500 N

 

6. 201006  KEKAHA DITCH IMPROVEMENTS, KAUAI

 

          PLANS, DESIGN, AND CONSTRUCTION FOR IMPROVEMENTS TO THE BLACK PIPE SIPHON, PALI WOODEN FLUME, AND OTHER STRUCTURES.

          PLANS                                  100         

          DESIGN                                  200         

          CONSTRUCTION                                     1,400

            TOTAL FUNDING           AGR            300 C      1,400 C

 

7. 200402  MOLOKAI IRRIGATION SYSTEM IMPROVEMENTS, MOLOKAI

 

          PLANS, DESIGN, AND CONSTRUCTION FOR IMPROVEMENTS TO THE MOLOKAI IRRIGATION SYSTEM.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           1,248         

            TOTAL FUNDING           AGR          1,250 C           C

 


 

8. 201101  KAHUKU AGRICULTURAL PARK SUBDIVISION MISCELLANEOUS IMPROVEMENTS, OAHU

 

          CONSTRUCTION OF MISCELLANEOUS IMPROVEMENTS TO THE KAHUKU AGRICULTURAL PARK SUBDIVISION.

          CONSTRUCTION                             110         

            TOTAL FUNDING           AGR            110 C           C

 

9.        STATE AGRICULTURAL WATER USE DEVELOPMENT PLAN, STATEWIDE

 

          PLANS FOR STATE AGRICULTURAL WATER USE DEVELOPMENT PLAN, STATEWIDE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                 2,350      5,350

            TOTAL FUNDING           AGR          1,000 C      1,000 C

                                    AGR          1,350 N      4,350 N

 

10. 201104  WAIAHOLE WATER SYSTEMS IMPROVEMENTS, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO WAIAHOLE WATER SYSTEM, OAHU.

          PLANS                                    1         

          DESIGN                                  499         

          CONSTRUCTION                                     2,500

            TOTAL FUNDING           AGR            500 C      2,500 C

 


 

11. 21103  KA'U IRRIGATION SYSTEM, HAWAII

 

          PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE TRANSMISSION DITCH AND FLUME SYSTEM OF THE FORMER KA'U AGRIBUSINESS PLANTATION'S IRRIGATION SYSTEM.

          PLANS                                    1         

          DESIGN                                  499         

          CONSTRUCTION                                     1,500

            TOTAL FUNDING           AGR            500 C      1,500 C

 

11.01. ASC01     CAPITAL IMPROVEMENT PROGRAM STAFF COSTS, STATEWIDE

 

          PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF AGRICULTURE. PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

          PLANS                                            530

            TOTAL FUNDING           AGR              C       530  C

 

11.02.     EAST KAUAI IRRIGATION SYSTEM, KAUAI

 

          PLANS, DESIGN AND CONSTRUCTION TO UPGRADE AND REPAIR THE EAST KAUAI IRRIGATION SYSTEM.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                       73

            TOTAL FUNDING           AGR              C        75 C

 


 

11.03.     KAMUELA VACUUM COOLING PLANT, HAWAII

 

          CONSTRUCTION AND EQUIPMENT FOR RENOVATION AND IMPROVEMENTS TO THE KAMUELA VACUUM COOLING PLANT.

          CONSTRUCTION                                      999

          EQUIPMENT                                          1

            TOTAL FUNDING           AGR              C      1,000  C

 

11.04.     WAIMEA IRRIGATION SYSTEM IMPROVEMENTS, HAWAII

 

          PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE WAIMEA IRRIGATION SYSTEM.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                       38

            TOTAL FUNDING           AGR              C        40 C

 

11.05.     KUNIA AGRICULTURAL PARK, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR UTILITY, ROAD, GRADING, DRAINAGE AND OTHER IMPROVEMENTS, TO INCLUDE POSSIBLE SUBDIVISION OF PARCEL.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      998

            TOTAL FUNDING           AGR              C      1,000  C

 


 

AGR161 - AGRIBUSINESS DEVELOPMENT AND RESEARCH

 

[12.       HAWAII LIVESTOCK SLAUGHTERHOUSE, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO INSTALL A PHOTVOLTAIC SYSTEM FOR THE LIVESTOCK SLAUGHTERHOUSE LOCATED IN CAMPBELL INDUSTRIAL PARK.

          DESIGN                                   1         

          CONSTRUCTION                             748         

          EQUIPMENT                                 1         

            TOTAL FUNDING           AGR            750 C           C]

 

12.       HAWAII LIVESTOCK SLAUGHTERHOUSE, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO INSTALL A PHOTOVOLTAIC SYSTEM FOR THE LIVESTOCK SLAUGHTERHOUSE LOCATED IN CAMPBELL INDUSTRIAL PARK.

          DESIGN                                   1         

          CONSTRUCTION                             748         

          EQUIPMENT                                 1         

            TOTAL FUNDING           AGR            750 C          C

 

12.01.     STATE PACKING AND PROCESSING FACILITY, OAHU

 

          PLANS, LAND ACQUISITION, DESIGN AND CONSTRUCTION TO PURCHASE 24 ACRES AND FOR INFRASTRUCTURE IMPROVEMENTS FOR AN AGRICULTURAL PACKING AND PROCESSING FACILITY ON TMK-1-02-09.

          PLANS                                              1

          LAND                                           2,000

          DESIGN                                           600

          CONSTRUCTION                                      999

            TOTAL FUNDING           AGR              C      3,600  C

 


 

12.02.     STATE AGRICULTURAL PARK, OAHU

 

          LAND ACQUISITION, DESIGN AND CONSTRUCTION TO PURCHASE 257 ACRES AND FOR IMPROVEMENTS TO EXISTING STRUCTURES AT THE DOLE FACILITIES LOCATED NEAR WHITMORE VILLAGE ON TMK 7-1-02-04.

          LAND                                           4,000

          DESIGN                                             1

          CONSTRUCTION                                     1,699

            TOTAL FUNDING           AGR              C      5,700 C

 

12.03.     GALBRAITH LANDS IRRIGATION SYSTEM AT LAKE WILSON, OAHU

 

          PLANS AND DESIGN FOR AN IRRIGATION SYSTEM, INCLUDING RESERVOIR, TO PUMP WATER OUT OF THE NORTH FORK OF KAOKONAHUA STREAM TO IRRIGATE THE 1,723 ACRES OF GALBRAITH LANDS.

          PLANS                                              1

          DESIGN                                           749

            TOTAL FUNDING           AGR              C       750 C

 

AGR192 - GENERAL ADMINISTRATION FOR AGRICULTURE

 

13. 981921  MISCELLANEOUS HEALTH, SAFETY, CODE, AND OTHER REQUIREMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO ADDRESS HEALTH, SAFETY, CODE, AND OTHER REQUIREMENTS, STATEWIDE.

          DESIGN                                  250       100

          CONSTRUCTION                             500       400

            TOTAL FUNDING           AGR            750 C       500 C

 


 

LNR153 - COMMERCIAL FISHERIES AND RESOURCE ENHANCEMENT

 

14.       ANUENUE FISHERIES RESEARCH CENTER MAINTENANCE AND ELECTRICAL UPGRADES, OAHU

 

          DESIGN AND CONSTRUCTION FOR MAINTENANCE AND SAFETY UPGRADES AT THE ANUENUE FISHERIES RESEARCH CENTER, OAHU.

          DESIGN                                  50         

          CONSTRUCTION                                      320

            TOTAL FUNDING           LNR             50 C       320 C

 

BED143 - HIGH TECHNOLOGY DEVELOPMENT CORPORATION

 

15. TE0012  CHILLER REPLACEMENT WITH ENERGY EFFICIENT TECHNOLOGIES AT MRTC, MAUI

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR REPLACEMENT AND RELOCATION OF THE CHILLER WITH ENERGY EFFICIENT TECHNOLOGIES AT THE MAUI RESEARCH AND TECHNOLOGY CENTER.

          PLANS                                   25         

          DESIGN                                  69         

          CONSTRUCTION                             200         

          EQUIPMENT                               440         

            TOTAL FUNDING           BED            734 B           B

 

15.01.     HIGH TECHNOLOGY DEVELOPMENT CORPORATION FACILITY, OAHU

 

          PLANS AND DESIGN FOR A NEW FACILITY FOR THE HIGH TECHNOLOGY DEVELOPMENT CORPORATION.

          PLANS                                            100

          DESIGN                                          2,900

            TOTAL FUNDING           BED              C      3,000 C

 


 

BED146 - NATURAL ENERGY LAB OF HAWAII AUTHORITY

 

16. NELHA28 NELHA 40" SEAWATER PIPES UPGRADE, HAWAII

 

          CONSTRUCTION FOR MOORING SYSTEM OF 40" SEAWATER PIPELINES UPGRADE.

          CONSTRUCTION                           3,500         

            TOTAL FUNDING           BED          3,500 C           C

 

16.01.     NELHA ALTERNATIVE ENERGY AND BIOTECHNOLOGY INCUBATOR, HAWAII

 

          PLANS, DESIGN, AND CONSTRUCTION FOR RENOVATIONS TO NELHA'S EXISTING MAIN ADMINISTRATION BUILDING TO DEVELOP AN ALTERNATIVE ENERGY AND BIOTECHNOLOGY INCUBATOR.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      998

            TOTAL FUNDING           BED              D      1,000  D

 


 

LNR141 - WATER AND LAND DEVELOPMENT

 

[17. J45   ROCKFALL AND FLOOD MITIGATION, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR ROCKFALL AND FLOOD MITIGATION AT VARIOUS LOCATIONS, STATEWIDE. THE LEGISLATURE FINDS AND DECLARES THAT THIS APPROPRIATION IS IN THE PUBLIC INTEREST AND FOR THE PUBLIC'S HEALTH, SAFETY AND GENERAL WELFARE OF THE STATE.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           3,238      2,498

            TOTAL FUNDING           LNR          3,240 C      2,500 C]

 

17. J45    ROCKFALL AND FLOOD MITIGATION, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR ROCKFALL AND FLOOD MITIGATION AT VARIOUS LOCATIONS, STATEWIDE. THE LEGISLATURE FINDS AND DECLARES THAT THIS APPROPRIATION IS IN THE PUBLIC INTEREST AND FOR THE PUBLIC'S HEALTH, SAFETY AND GENERAL WELFARE OF THE STATE.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           3,238      3,498

            TOTAL FUNDING           LNR          3,240 C      3,500 C

 


 

18.       KOKEE ROAD, WAIMEA, KAUAI

 

          PLANS, DESIGN AND CONSTRUCTION TO UPGRADE AND RESURFACE KOKEE ROAD FROM MILE MARKER 15 TO THE KALALAU LOOKOUT.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             498         

            TOTAL FUNDING           LNR            500 C           C

 

18.01. J38B STATE WATER PROJECTS PLAN UPDATE, STATEWIDE

 

          PLANS TO UPDATE THE STATE WATER PROJECTS PLAN, AS MANDATED BY THE STATE WATER CODE, CHAPTER 174C, HRS.

          PLANS                                            500

            TOTAL FUNDING           LNR              C       500  C

 

18.02.     LUALUALEI FLATS, IMPROVEMENT DISTRICT, OAHU

 

          PLANS, LAND ACQUISITION, DESIGN AND CONSTRUCTION TO SUPPORT AN IMPROVEMENT DISTRICT FOR FLOOD MITIGATION CONSTRUCTION PROJECTS ALONG PAAKEA, ILIILI, HAKIMO, PAPAYA AND MAILIILI ROADS. THE LEGISLATURE FINDS AND DECLARES THAT THIS APPROPRIATION IS IN THE PUBLIC INTEREST AND FOR THE PUBLIC'S HEALTH, SAFETY AND GENERAL WELFARE OF THE STATE.

          PLANS                                              1

          LAND                                           1,000

          DESIGN                                             1

          CONSTRUCTION                                      998

            TOTAL FUNDING           LNR              C      2,000 C

 


 

BED150 - HAWAII COMMUNITY DEVELOPMENT AUTHORITY

 

19. HCD001  HAWAII COMMUNITY DEVELOPMENT AUTHORITY'S COMMUNITY DEVELOPMENT DISTRICTS, OAHU

 

          PLANS FOR COSTS RELATED TO WAGES AND FRINGE BENEFITS FOR PERMANENT AND NON-PERMANENT PROJECT-FUNDED STAFF POSITIONS FOR IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE HAWAII COMMUNITY DEVELOPMENT AUTHORITY'S COMMUNITY DEVELOPMENT DISTRICTS.  FUNDS MAY BE USED TO MATCH FEDERAL AND NON-STATE FUNDS AS MAY BE AVAILABLE.

          PLANS                                 1,855      1,855

            TOTAL FUNDING           BED          1,855 C      1,855 C

 

19.01. KA008     POHUKAINA STREET MIXED USE TRANSIENT ORIENT DEVELOPMENT PROJECT, KAKAAKO, OAHU

 

          PLANS FOR A MIXED USE PROJECT ON POHUKAINA STREET. THIS PROJECT WILL BE USED AS A MODEL FOR TRANSIT ORIENTED DEVELOPMENT (TOD) FOR THE KAKAAKO COMMUNITY DEVELOPMENT DISTRICT (KCCD).

          PLANS                                          1,500

            TOTAL FUNDING           BED              C      1,500  C

 


 

19.02. KL006     KALAELOA EAST ENERGY CORRIDOR, KALAELOA, OAHU

 

          PLANS, DESIGN, AND CONSTRUCTION OF AN ELECTRICAL DISTRIBUTION SYSTEM BETWEEN ROOSEVELT ROAD TO TRIPOLI ROAD. THE PROJECT MAY ALSO INCLUDE THE CONSTRUCTION OF SERVICE ROADWAY TO MAINTAIN CORRIDOR AS REQUIRED BY HECO.

          PLANS                                              1

          DESIGN                                           599

          CONSTRUCTION                                     4,400

            TOTAL FUNDING           BED              C      5,000 C

 

19.03.     CULTURAL PUBLIC MARKET, OAHU

 

          PLANS, LAND ACQUISITION, DESIGN, AND CONSTRUCTION OF THE CULTURAL PUBLIC MARKET.

          PLANS                                              1

          LAND                                              1

          DESIGN                                           299

          CONSTRUCTION                                     2,000

            TOTAL FUNDING           BED              C      2,301 C

 

BED160 - HAWAII HOUSING FINANCE AND DEVELOPMENT CORP

 

20. HFDC04  RENTAL HOUSING TRUST FUND INFUSION, STATEWIDE

 

          CONSTRUCTION TO PROVIDE AN INFUSION OF FUNDS TO FINANCE ADDITIONAL AFFORDABLE RENTAL HOUSING STATEWIDE.

          CONSTRUCTION                          10,000      5,000

            TOTAL FUNDING           BED          10,000 C      5,000 C

 


 

21. HFDC06  SENIOR RESIDENCE AT IWILEI, OAHU

 

          CONSTRUCTION OF 160 LOW INCOME ELDERLY RENTAL APARTMENTS; MAY INCLUDE ADULT DAY CARE CENTER, OFFICE SPACE FOR NON-PROFIT AGENCIES, ON-SITE PARKING, RESIDENT MANAGER'S UNIT AND OFFICE, AND OTHER COMMON AREAS.

          CONSTRUCTION                          26,000         

            TOTAL FUNDING           BED          26,000 C           C

 

[22.       LOW-INCOME HOUSING TAX CREDIT LOANS, STATEWIDE

 

          CONSTRUCTION TO PROVIDE LOW-INCOME HOUSING TAX CREDIT LOANS PURSUANT TO SECTION 201H, HAWAII REVISED STATUTES.

          CONSTRUCTION                           7,000         

            TOTAL FUNDING           BED          7,000 C           C]

 

22. P11003  LOW-INCOME HOUSING TAX CREDIT LOANS, STATEWIDE

 

          CONSTRUCTION TO PROVIDE LOW-INCOME HOUSING TAX CREDIT LOANS PURSUANT TO SECTION 201H, HAWAII REVISED STATUTES.

          CONSTRUCTION                           7,000         

            TOTAL FUNDING           BED          7,000 C          C

 


 

B. EMPLOYMENT

LBR903 - OFFICE OF COMMUNITY SERVICES

 

1.        PACIFIC GATEWAY CENTER, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION TO CONSTRUCT THE KE'EHI COMMUNITY RESOURCE CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             998         

            TOTAL FUNDING           LBR          1,000 C           C

 

2.        PAPAKOLEA DEVELOPMENT CENTER, OAHU

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE PAPAKOLEA DEVELOPMENT CENTER, OAHU. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          DESIGN                                   1         

          CONSTRUCTION                             249         

            TOTAL FUNDING           LBR            250 C           C

 

[3.       HAWAII PUBLIC TELEVISION FOUNDATION, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR A NEW BUILDING FOR PBS HAWAII. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           1,998         

            TOTAL FUNDING           LBR          2,000 C           C]

 


 

3.        HAWAII PUBLIC TELEVISION FOUNDATION, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR A NEW BUILDING FOR PBS HAWAII. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           1,998      1,998

            TOTAL FUNDING           LBR          2,000 C      2,000 C

 

4.        EASTER SEALS HAWAII, MAUI

 

          PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE EASTER SEALS HAWAII CAMPUS, MAUI. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             948         

            TOTAL FUNDING           LBR            950 C           C

 

5.        HALE KIPA, INC., OAHU

 

          PLANS, DESIGN AND CONSTRUCTION TO CONSTRUCT THE HALE KIPA SERVICES CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           1,298         

            TOTAL FUNDING           LBR          1,300 C           C

 


 

6.        ST. FRANCIS HEALTHCARE FOUNDATION OF HAWAII, OAHU

 

          DESIGN AND CONSTRUCTION FOR AN INTERGENERATIONAL CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          DESIGN                                   1         

          CONSTRUCTION                             999         

            TOTAL FUNDING           LBR          1,000 C           C

 

7.        WAIKIKI COMMUNITY CENTER, OAHU

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE WAIKIKI COMMUNITY CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          DESIGN                                   1         

          CONSTRUCTION                             229         

            TOTAL FUNDING           LBR            230 C           C

 

8.        SPECIAL OLYMPICS HAWAII, INC, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR A SPORTS AND FITNESS COMPLEX IN KAPOLEI, OAHU. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           1,498         

            TOTAL FUNDING           LBR          1,500 C           C

 


 

9.        KAUAI ECONOMIC OPPORTUNITY, INC. , KAUAI

 

          PLANS, DESIGN AND CONSTRUCTION TO REPLACE DAMAGED ROOF. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                              78         

            TOTAL FUNDING           LBR             80 C           C

 

9.01.      BOY SCOUTS OF AMERICA - MAUI COUNTY, MAUI

 

          CONSTRUCTION FOR REPAIRS AND IMPROVEMENTS TO SCOUTING FACILITIES, INCLUDING BUT NOT LIMITED TO CAMP MALUHIA. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          CONSTRUCTION                                     1,500

            TOTAL FUNDING           LBR              C      1,500  C

 

9.02.      HONOLULU ACADEMY OF ARTS, TEACHER RESOURCE CENTER, OAHU

 

          PLANS FOR A TEACHER RESOURCE ART CENTER ADJACENT TO THE LINEKONA ART CENTER, HONOLULU, OAHU. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                            120

            TOTAL FUNDING           LBR              C       120 C

 


 

9.03.      FILIPINO COMMUNITY CENTER, OAHU

 

          CONSTRUCTION FOR THE INSTALLATION OF PHOTOVOLTAIC PANELS FOR THE FILIPINO COMMUNITY CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          CONSTRUCTION                                      450

            TOTAL FUNDING           LBR              C       450  C

 

9.04.      HERITAGE HALL, INC., MAUI

 

          PLANS, DESIGN, AND CONSTRUCTION FOR HERITAGE HALL FACILITIES IN PAIA, MAUI, TO INCLUDE A MULTIPURPOSE HALL WITH A KITCHEN FOR COMMUNITY USE AND TWO CULTURAL RESOURCE CENTERS. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                     1,498

            TOTAL FUNDING           LBR              C      1,500 C

 

9.05.      FRIENDS OF SHRINERS HOSPITALS - HONOLULU, INC.

 

          PLANS, DESIGN, AND CONSTRUCTION FOR IMPROVEMENTS AND UPGRADES FOR THE SHRINERS HOSPITAL FOR CHILDREN, HONOLULU THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                     1,498

            TOTAL FUNDING           LBR              C      1,500 C

 


 

9.06.      COMMUNITY BASED EDUCATION SUPPORT SERVICES, CBESS, HAWAII

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR RENOVATION AND IMPROVEMENTS FOR THE KRESS BUILDING, HILO, HAWAII. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                     1,497

          EQUIPMENT                                          1

            TOTAL FUNDING           LBR              C      1,500  C

 

9.07.      POI DOGS POPOKI, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR RENOVATION AND IMPROVEMENTS FOR POPOKI PLACE. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                       22

          EQUIPMENT                                          1

            TOTAL FUNDING           LBR              C        25 C

 


 

HMS802 - VOCATIONAL REHABILITATION

 

10.       HOOPONO VOCATIONAL REHABILITATION FOR BLIND DIVISION, DEPARTMENT OF HUMAN SERVICES, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR VARIOUS UPGRADES FOR THE HOOPONO PROGRAM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             494         

          EQUIPMENT                                 1         

            TOTAL FUNDING           HMS            497 C           C

 


 

C. TRANSPORTATION FACILITIES

TRN102 - HONOLULU INTERNATIONAL AIRPORT

 

1. A23N    HONOLULU INTERNATIONAL AIRPORT, RUNWAY 4R IMPROVEMENTS, OAHU

 

          CONSTRUCTION FOR RUNWAY 4R STRUCTURAL IMPROVEMENTS AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.  (OTHER FUNDS FROM PASSENGER FACILITY CHARGES)

          CONSTRUCTION                          21,400         

            TOTAL FUNDING           TRN          15,000 N           N

                                    TRN          6,400 X           X

 

[2. A23O   HONOLULU INTERNATIONAL AIRPORT, RUNWAY 22 CULVERT IMPROVEMENTS, OAHU

 

          CONSTRUCTION FOR RUNWAY 22 CULVERT IMPROVEMENTS INCLUDING SITE WORK, INSTALLATION OF A DRAINAGE SYSTEM AND BOX CULVERT AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                          14,400         

            TOTAL FUNDING           TRN          3,600 E           E

                                    TRN          10,800 N           N]

 


 

2. A23O    HONOLULU INTERNATIONAL AIRPORT, RUNWAY 22 CULVERT IMPROVEMENTS, OAHU

 

          CONSTRUCTION FOR RUNWAY 22 CULVERT IMPROVEMENTS INCLUDING SITE WORK, INSTALLATION OF A DRAINAGE SYSTEM AND BOX CULVERT AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                          14,400     16,023

            TOTAL FUNDING           TRN          3,600 E      5,233 E

                                    TRN          10,800 N     10,790  N

 

3. A23P    HONOLULU INTERNATIONAL AIRPORT, TAXIWAY Z STRUCTURAL IMPROVEMENTS, OAHU

 

          DESIGN AND CONSTRUCTION FOR STRUCTURAL IMPROVEMENTS TO TAXIWAY Z AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.  (OTHER FUNDS FROM PASSENGER FACILITY CHARGES)

          DESIGN                                5,000         

          CONSTRUCTION                                    53,500

            TOTAL FUNDING           TRN          1,250 E           E

                                    TRN          3,750 N     37,500 N

                                    TRN               X     16,000 X

 


 

4. A10C    HONOLULU INTERNATIONAL AIRPORT, ROADWAY IMPROVEMENTS, OAHU

 

          CONSTRUCTION TO REPAVE AOLELE STREET FROM LAGOON DRIVE TO NIMITZ HIGHWAY AND LAGOON DRIVE FROM AOLELE STREET TO IOLANA STREET.

          CONSTRUCTION                           7,740         

            TOTAL FUNDING           TRN          7,740 E           E

 

5.        HONOLULU INTERNATIONAL AIRPORT, NOISE MONITORING SYSTEM UPGRADE, OAHU

 

          DESIGN AND CONSTRUCTION FOR THE UPGRADE OF THE EXISTING NOISE MONITORING SYSTEM.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  35         

          CONSTRUCTION                                      350

            TOTAL FUNDING           TRN             35 E        88 E

                                    TRN               N       262 N

 

6. A37F    HONOLULU INTERNATIONAL AIRPORT, LOADING BRIDGE MODERNIZATION, OAHU

 

          CONSTRUCTION FOR THE INSTALLATION OF NEW PASSENGER LOADING BRIDGES AND REMOVAL OF EXISTING LOADING BRIDGES.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                     9,450

            TOTAL FUNDING           TRN               E      2,700 E

                                    TRN               N      6,750 N

 


 

7. A35D    HONOLULU INTERNATIONAL AIRPORT, OVERSEAS TERMINAL SIGNAGE AND SIDEWALK IMPROVEMENTS, OAHU

 

          CONSTRUCTION FOR SIGNAGE AND SIDEWALK IMPROVEMENTS AT THE OVERSEAS TERMINAL.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                          11,300         

            TOTAL FUNDING           TRN          2,825 E           E

                                    TRN          8,475 N           N

 

8. A18A    HONOLULU INTERNATIONAL AIRPORT, NEW RAMP CONTROL OFFICE, OAHU

 

          CONSTRUCTION FOR A NEW RAMP CONTROL OFFICE.

          CONSTRUCTION                             685         

            TOTAL FUNDING           TRN            685 E           E

 

9. A20C    HONOLULU INTERNATIONAL AIRPORT, WIKI WIKI SHUTTLE STATION IMPROVEMENTS, OAHU

 

          CONSTRUCTION FOR IMPROVEMENTS TO THE TWO WIKI WIKI SHUTTLE STATIONS LOCATED ON THE 3RD LEVEL OF THE OVERSEAS TERMINAL.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                           3,852         

            TOTAL FUNDING           TRN          1,152 E           E

                                    TRN          2,700 N           N

 


 

10. A41M   HONOLULU INTERNATIONAL AIRPORT, TERMINAL FACILITY IMPROVEMENTS, OAHU

 

          DESIGN AND CONSTRUCTION TO RENOVATE THE TERMINAL AREA TO INCORPORATE THE CURRENT THEME OF THE AIRPORT TO CREATE A POSITIVE IMAGE TO PASSENGERS.

          DESIGN                                3,000         

          CONSTRUCTION                                    24,400

            TOTAL FUNDING           TRN          3,000 E     24,400 E

 

10.01. A41Q HONOLULU INTERNATIONAL AIRPORT, NEW MAUKA CONCOURSE IMPROVEMENTS, OAHU

 

          CONSTRUCTION FOR A NEW COMMUTER TERMINAL, NEW MAUKA CONCOURSE, AIRCRAFT APRON, TAXIWAYS AND BLAST FENCE NEAR THE INTERISLAND TERMINAL, AND OTHER RELATED IMPROVEMENTS FOR THE AIRPORT MODERNIZATION PROGRAM.

          CONSTRUCTION                                   261,000

            TOTAL FUNDING           TRN              E    261,000 E

 

10.02. A11E HONOLULU INTERNATIONAL AIRPORT, ELLIOT STREET SUPPORT FACILITIES, OAHU

 

          CONSTRUCTION FOR SUPPORT FACILITIES NEAR ELLIOT STREET INCLUDING MAINTENANCE FACILITIES, CARGO FACILITIES, TAXIWAY G AND L WIDENING AND REALIGNMENT, AND OTHER RELATED IMPROVEMENTS FOR THE AIRPORT MODERNIZATION PROGRAM.

          CONSTRUCTION                                    37,000

            TOTAL FUNDING           TRN              E     37,000 E

 


 

10.03. A10D HONOLULU INTERNATIONAL AIRPORT, OVERSEAS TERMINAL 2ND LEVEL ROADWAY IMPROVEMENTS, OAHU

 

          CONSTRUCTION FOR CONCRETE RECONSTRUCTION, EXPANSION JOINT REPLACEMENT, DRAINAGE AND LIGHTING IMPROVEMENTS, AND OTHER RELATED IMPROVEMENTS ON THE 2ND LEVEL ROADWAY FRONTING THE OVERSEAS TERMINAL.

          CONSTRUCTION                                     3,000

            TOTAL FUNDING           TRN              E      3,000  E

 

10.04. A41P HONOLULU INTERNATIONAL AIRPORT, INTERNATIONAL ARRIVALS BUILDING CEILING REPLACEMENT, OAHU

 

          CONSTRUCTION FOR CEILING REPLACEMENT INCLUDING ASBESTOS REMOVAL AND OTHER RELATED IMPROVEMENTS FOR THE AIRPORT MODERNIZATION PROGRAM.

          CONSTRUCTION                                    16,000

            TOTAL FUNDING           TRN              E     16,000 E

 

10.05. A41S HONOLULU INTERNATIONAL AIRPORT, PROGRAM MANAGEMENT, OAHU

 

          DESIGN FOR PROGRAM MANAGEMENT OF THE AIRPORT MODERNIZATION PROGRAM.

          DESIGN                                         15,000

            TOTAL FUNDING           TRN              E     15,000 E

 


 

10.07. A23Q HONOLULU INTERNATIONAL AIRPORT, HARDSTAND AT TAXIWAY F, OAHU

 

          DESIGN FOR NEW HARDSTANDS AND OTHER RELATED IMPROVEMENTS ADJACENT TO TAXIWAY F.

          DESIGN                                          2,000

            TOTAL FUNDING           TRN              E      2,000 E

 

TRN104 - GENERAL AVIATION

 

11. A71C   KALAELOA AIRPORT, FACILITY IMPROVEMENTS, OAHU

 

          DESIGN AND CONSTRUCTION FOR KALAELOA AIRPORT FACILITY IMPROVEMENTS INCLUDING LEASE LOTS, APRONS, RUNWAYS, TAXIWAYS AND AVIATION FACILITIES SUCH AS THE CONTROL TOWER, AIRPORT RESCUE FIRE FIGHTING (ARFF) BUILDING, T-HANGER, AVIATION FUEL SYSTEMS AND OTHER RELATED IMPROVEMENTS FOR THE AIRPORT MODERNIZATION PROGRAM.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                1,600         

          CONSTRUCTION                           8,525      8,525

            TOTAL FUNDING           TRN          2,375 B      775  B

                                    TRN          7,750 N      7,750 N

 

11.01. A71F KALAELOA AIRPORT, UTILITY CORRIDOR, OAHU

 

          CONSTRUCTION OF A UTILITY CORRIDOR AT THE AIRPORT.

          CONSTRUCTION                                      500

            TOTAL FUNDING           TRN              E       500 E

 


 

TRN111 - HILO INTERNATIONAL AIRPORT

 

12. B10M   HILO INTERNATIONAL AIRPORT, ARFF FACILITY IMPROVEMENTS, HAWAII

 

          CONSTRUCTION FOR THE RENOVATION OF THE AIRCRAFT RESCUE AND FIRE FIGHTING STATION, AND OTHER RELATED IMPROVEMENTS FOR THE AIRPORT MODERNIZATION PROGRAM.  THIS PROGRAM IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                     9,450

            TOTAL FUNDING           TRN               E       900 E

                                    TRN               N      8,550 N

 

13. B10X   HILO INTERNATIONAL AIRPORT, LAND ACQUISITION, HAWAII

 

          LAND ACQUISITION OF A 2.847 ACRE PARCEL.

          LAND                                  2,500         

            TOTAL FUNDING           TRN          2,500 B           B

 

14. B10B   HILO INTERNATIONAL AIRPORT, CARGO BUILDING AND RAMP, HAWAII

 

          CONSTRUCTION FOR ADDITIONAL CARGO FACILITIES WITHIN THE AIRPORT INCLUDING A CARGO RAMP AND OTHER RELATED IMPROVEMENTS.

          CONSTRUCTION                          14,000         

            TOTAL FUNDING           TRN          14,000 E           E

 


 

TRN114 - KONA INTERNATIONAL AIRPORT AT KEAHOLE

 

14.01. C03C KONA INTERNATIONAL AIRPORT, RE-ROOF TERMINAL, HAWAII

 

          CONSTRUCTION FOR THE RE-ROOFING OF THE TERMINAL AND OTHER RELATED IMPROVEMENTS.

          CONSTRUCTION                                    10,400

            TOTAL FUNDING           TRN              E     10,400 E

 

TRN131 - KAHULUI AIRPORT

 

15. D04E   KAHULUI AIRPORT, RE-ROOF TERMINAL BUILDINGS, MAUI

 

          DESIGN AND CONSTRUCTION FOR THE RE-ROOFING OF THE TERMINAL BUILDINGS AND OTHER RELATED IMPROVEMENTS.

          DESIGN                                1,500         

          CONSTRUCTION                                     6,000

            TOTAL FUNDING           TRN          1,500 B           B

                                    TRN               E      6,000 E

 

16. D04F   KAHULUI AIRPORT, PASSENGER INFORMATION SYSTEM IMPROVEMENTS, MAUI

 

          CONSTRUCTION OF PASSENGER INFORMATION SYSTEM IMPROVEMENTS AND OTHER RELATED IMPROVEMENTS.

          CONSTRUCTION                           2,500         

            TOTAL FUNDING           TRN          2,500 E           E

 


 

17. D04S   KAHULUI AIRPORT, LOADING BRIDGE MODERNIZATION, MAUI

 

          CONSTRUCTION FOR THE INSTALLATION OF NEW PASSENGER LOADING BRIDGES AND REMOVAL OF EXISTING LOADING BRIDGES.

          CONSTRUCTION                           9,620         

            TOTAL FUNDING           TRN          9,620 E           E

 

18. D04D   KAHULUI AIRPORT, TERMINAL IMPROVEMENTS, MAUI

 

          DESIGN AND CONSTRUCTION OF TERMINAL IMPROVEMENTS INCLUDING CONFERENCE ROOMS, FAMILY RESTROOMS, HOLDROOMS, SECURITY BADGING OFFICE IMPROVEMENTS, AND OTHER RELATED IMPROVEMENTS.

          DESIGN                                  300         

          CONSTRUCTION                           2,700         

            TOTAL FUNDING           TRN          3,000 E           E

 

[19. D04U  KAHULUI AIRPORT, LAND ACQUISITION, MAUI

 

          LAND ACQUISITION OF A PARCEL NEAR THE AIRPORT.

          LAND                                 15,500         

            TOTAL FUNDING           TRN          3,875 E           E

                                    TRN          11,625 N           N]

 


 

19. D04U   KAHULUI AIRPORT, LAND ACQUISITION, MAUI

 

          LAND ACQUISITION OF PARCELS  NEAR THE AIRPORT. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                 15,500     20,000

            TOTAL FUNDING           TRN              B     20,000 B

                                    TRN          3,875 E          E

                                    TRN          11,625 N          N

 

19.01. D10C KAHULUI AIRPORT, RUNWAY IMPROVEMENTS, MAUI

 

          CONSTRUCTION FOR STRUCTURAL IMPROVEMENTS OF RUNWAY 2-20 AND OTHER RELATED IMPROVEMENTS.

          CONSTRUCTION                                   150,000

            TOTAL FUNDING           TRN              E    150,000  E

 

19.02. D04R KAHULUI AIRPORT, FIRE SPRINKLER SYSTEM REPLACEMENT, MAUI

 

          CONSTRUCTION FOR THE REPLACEMENT OF THE FIRE SPRINKLER SUPPRESSION SYSTEMS, AND OTHER RELATED IMPROVEMENTS FOR THE AIRPORT MODERNIZATION PROGRAM.

          CONSTRUCTION                                     4,000

            TOTAL FUNDING           TRN              E      4,000 E

 

19.03. D04V KAHULUI AIRPORT, RESTROOM RECONSTRUCTION, MAUI

 

          CONSTRUCTION FOR RENOVATION OF AIRPORT RESTROOMS AT THE AIRPORT.

          CONSTRUCTION                                     6,000

            TOTAL FUNDING           TRN              E      6,000  E

 


 

19.04. D04P KAHULUI AIRPORT, ELEVATOR AND ESCALATOR IMPROVEMENTS, MAUI

 

          CONSTRUCTION FOR ELEVATOR AND ESCALATOR REPLACEMENT AND OTHER RELATED IMPROVEMENTS FOR THE AIRPORT MODERNIZATION PROGRAM.

          CONSTRUCTION                                     6,465

            TOTAL FUNDING           TRN              E      6,465  E

 

19.05. D04M KAHULUI AIRPORT, ACCESS ROAD, MAUI

 

          CONSTRUCTION FOR A NEW ACCESS ROAD TO THE AIRPORT FROM HANA HIGHWAY. IMPROVEMENTS INCLUDE SITE WORK, PAVING, ELECTRICAL, DRAINAGE, UTILITIES, AND OTHER RELATED IMPROVEMENTS.

          CONSTRUCTION                                    50,000

            TOTAL FUNDING           TRN              X     50,000 X

 

19.06. D06B KAHULUI AIRPORT, PARKING LOT EXPANSION, MAUI

 

          CONSTRUCTION OF ADDITIONAL PARKING SPACES AND OTHER RELATED IMPROVEMENTS AT THE AIRPORT.

          CONSTRUCTION                                    17,000

            TOTAL FUNDING           TRN              E     17,000  E

 


 

19.07. F04T KAHULUI AIRPORT, ENVIRONMENTAL IMPACT STATEMENT, MAUI

 

          PLANS FOR SEPARATE STATE AND FEDERAL ENVIRONMENTAL IMPACT STATEMENTS AND OTHER RELATED IMPROVEMENTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                          5,000

            TOTAL FUNDING           TRN              E      1,250 E

                                    TRN              N      3,750 N

 

TRN133 - HANA AIRPORT

 

19.08.     HANA AIRPORT, MAUI

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO MEET 14 CFR, PART 139 REQUIREMENTS.

          DESIGN                                          1,000

          CONSTRUCTION                                    18,000

            TOTAL FUNDING           TRN              E     19,000 E

 

TRN135 - KAPALUA AIRPORT

 

20.       KAPALUA AIRPORT, MAUI

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR SOLAR POWERED RUNWAY LIGHTS AND HARDWARE FOR EMERGENCY USE AT KAPALUA AIRPORT.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      110

          EQUIPMENT                                          1

            TOTAL FUNDING           TRN               E       113 E

 


 

TRN141 - MOLOKAI AIRPORT

 

20.01. D55F MOLOKAI AIRPORT, ELECTRICAL UPGRADES, MOLOKAI

 

          DESIGN FOR ELECTRICAL UPGRADES AT THE AIRPORT.

          DESIGN                                           150

            TOTAL FUNDING           TRN              E       150 E

 

TRN151 - LANAI AIRPORT

 

21. D70H   LANAI AIRPORT, RUNWAY SAFETY AREA IMPROVEMENTS, LANAI

 

          CONSTRUCTION OF THE RUNWAY SAFETY AREA IMPROVEMENTS INCLUDING SITE WORK, INSTALLATION OF A DRAINAGE SYSTEM, CONSTRUCTION OF NEW SERVICE ROAD, RELOCATION OF PERIMETER FENCING AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                          35,111         

            TOTAL FUNDING           TRN          2,825 B           B

                                    TRN          32,286 N           N

 


 

TRN161 - LIHUE AIRPORT

 

22. E10B   LIHUE AIRPORT, AIRFIELD IMPROVEMENTS, KAUAI

 

          DESIGN AND CONSTRUCTION FOR AIRFIELD IMPROVEMENTS AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                2,400         

          CONSTRUCTION                                    21,600

            TOTAL FUNDING           TRN          2,400 E      1,080 E

                                    TRN               N     20,520 N

 

23. E03O   LIHUE AIRPORT, AHUKINI LANDFILL RESTORATION, KAUAI

 

          CONSTRUCTION FOR THE RESTORATION OF THE AHUKINI LANDFILL AT LIHUE AIRPORT.

          CONSTRUCTION                           2,500         

            TOTAL FUNDING           TRN          2,500 E           E

 

24. E03U   LIHUE AIRPORT, TICKET LOBBY AND HOLDROOM IMPROVEMENTS, KAUAI

 

          DESIGN AND CONSTRUCTION FOR TICKET LOBBY AND HOLDROOM IMPROVEMENTS.

          DESIGN                                  800         

          CONSTRUCTION                                     8,300

            TOTAL FUNDING           TRN            800 E      8,300 E

 


 

TRN195 - AIRPORTS ADMINISTRATION

 

25.       AIRPORTS DIVISION CAPITAL IMPROVEMENT PROGRAM PROJECT STAFF COSTS, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF TRANSPORTATION'S AIRPORT DIVISION.  PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM PROJECT RELATED POSITIONS.  (OTHER FUNDS FROM PASSENGER FACILITY CHARGES)

          PLANS                                  250       250

          DESIGN                                  900       900

          CONSTRUCTION                           1,400      1,400

            TOTAL FUNDING           TRN          2,450 B      2,450 B

                                    TRN            100 X       100 X

 

26. F05I   AIRFIELD IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR AIRFIELD IMPROVEMENTS AT STATEWIDE AIRPORTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                1,000      1,000

          CONSTRUCTION                          11,000     11,000

            TOTAL FUNDING           TRN          4,500 B      4,500 B

                                    TRN          7,500 N      7,500 N

 


 

27. F08G   MISCELLANEOUS AIRPORT PROJECTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION OF IMPROVEMENTS AT VARIOUS STATE AIRPORTS.  IMPROVEMENTS FOR SAFETY AND CERTIFICATION REQUIREMENTS, OPERATIONAL EFFICIENCY, AND PROJECTS REQUIRED FOR AIRPORT RELATED DEVELOPMENT.

          DESIGN                                1,000      1,000

          CONSTRUCTION                           2,500      2,500

            TOTAL FUNDING           TRN          3,500 B      3,500 B

 

28. F04J   AIRPORT PLANNING STUDY, STATEWIDE

 

          PLANS FOR AIRPORT IMPROVEMENTS, ECONOMIC STUDIES, RESEARCH, NOISE MONITORING STUDIES, NOISE COMPATIBILITY STUDIES, AND ADVANCE PLANNING OF FEDERAL AID AND NON-FEDERAL AID PROJECTS.

          PLANS                                 1,000      1,000

            TOTAL FUNDING           TRN          1,000 B      1,000 B

 

29. F05N   RADIO COMMUNICATIONS IMPROVEMENTS, STATEWIDE

 

          CONSTRUCTION FOR NEW DIGITAL RADIO INFRASTRUCTURE UPGRADES INCLUDING ANTENNAS, SYSTEM WATCH TERMINALS, FLASH UPGRADES, WIRING AND NETWORKING DIGITAL RADIO RECORDERS, AND OTHER RELATED IMPROVEMENTS AT STATEWIDE AIRPORTS.

          CONSTRUCTION                                     1,400

            TOTAL FUNDING           TRN               B      1,400 B

 


 

29.01. F05J AIRPORT IMPROVEMENTS, STATEWIDE

 

          PLANS, LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS AT STATEWIDE AIRPORTS PREVIOUSLY APPROVED BY THE FEDERAL AVIATION ADMINISTRATION FOR PASSENGER FACILITY CHARGE REIMBURSEMENT. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                            550

          LAND                                          13,290

          DESIGN                                          5,615

          CONSTRUCTION                                    16,144

            TOTAL FUNDING           TRN              X     35,599 X

 

29.02. F08Y PROGRAM MANAGEMENT, STATEWIDE

 

          DESIGN FOR THE PROGRAM MANAGEMENT OF THE MODERNIZATION PROGRAM AT STATEWIDE AIRPORTS.

          DESIGN                                          1,000

            TOTAL FUNDING           TRN              E      1,000 E

 

29.03. F05M ENERGY SAVINGS PERFORMANCE CONTRACTING, STATEWIDE

 

          CONSTRUCTION OF ENERGY SAVINGS RETROFITS AT STATEWIDE AIRPORT FACILITIES.

          CONSTRUCTION                                   150,000

            TOTAL FUNDING           TRN              E    150,000 E

 


 

29.04. F08X ARFF REGIONAL TRAINING FACILITY, STATEWIDE

 

          PLANS FOR SITE SELECTION AND BUSINESS PLAN FOR A NEW ARFF REGIONAL TRAINING FACILITY TO INCLUDE ITEMS NECESSARY FOR CURRENT AVIATION AND EMERGENCY RESPONDER NEEDS.

          PLANS                                            500

            TOTAL FUNDING           TRN              B       500 B

 

TRN301 - HONOLULU HARBOR

 

29.05. J42  NDWP-KAPALAMA MILITARY RESERVATION IMPROVEMENTS, HONOLULU HARBOR, OAHU

 

          DESIGN AND CONSTRUCTION FOR THE DEVELOPMENT OF A NEW CONTAINER TERMINAL FACILITY AND OTHER RELATED IMPROVEMENTS. THIS IS A NEW DAY WORK PROJECT.

          DESIGN                                          2,000

          CONSTRUCTION                                    48,000

            TOTAL FUNDING           TRN              E     50,000  E

 

TRN303 - KALAELOA BARBERS POINT HARBOR

 

29.06. J44  FUEL PIER FACILITY IMPROVEMENTS, KALAELOA BARBERS POINT HARBOR, OAHU

 

          PLANS AND DESIGN FOR A NEW FUEL PIER FACILITY AND OTHER RELATED SITE IMPROVEMENTS.

          PLANS                                            500

          DESIGN                                          1,500

            TOTAL FUNDING           TRN              E      2,000 E

 


 

29.07. J11  KALAELOA BARBERS POINT HARBOR IMPROVEMENTS, OAHU

 

          PLANS AND LAND ACQUISITION FOR KALAELOA BARBERS POINT HARBOR IMPROVEMENTS.

          PLANS                                          1,000

          LAND                                          24,150

            TOTAL FUNDING           TRN              E     25,150  E

 

TRN311 - HILO HARBOR

 

30. L16    MITIGATION AT HILO HARBOR, HAWAII

 

          DESIGN AND CONSTRUCTION TO MITIGATE ENVIRONMENTAL MEASURES AT HILO HARBOR.

          DESIGN                                  150         

          CONSTRUCTION                             600         

            TOTAL FUNDING           TRN            750 B           B

 

30.01. L12  NDWP-PIER 4 INTERISLAND CARGO TERMINAL, HILO HARBOR, HAWAII

 

          LAND ACQUISITION AND CONSTRUCTION FOR AN ADDITIONAL INTERISLAND CARGO TERMINAL AREA INCLUDING A PIER, YARD, ROADWAYS AND UTILITIES. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                           1,000

          CONSTRUCTION                                    50,001

            TOTAL FUNDING           TRN              E     51,000 E

                                    TRN              N         1 N

 


 

30.02. L10  HILO HARBOR IMPROVEMENTS, HAWAII

 

          CONSTRUCTION FOR PIER IMPROVEMENTS AT HILO HARBOR AND OTHER RELATED IMPROVEMENTS.

          CONSTRUCTION                                    10,000

            TOTAL FUNDING           TRN              B     10,000  B

 

TRN313 - KAWAIHAE HARBOR

 

30.03. L14  NDWP-PIER 2 TERMINAL IMPROVEMENTS, KAWAIHAE HARBOR, HAWAII

 

          DESIGN AND CONSTRUCTION OF TERMINAL IMPROVEMENTS INCLUDING BUT NOT LIMITED TO; PAVING, UTILITIES, AND THE RELOCATION OF THE HARBOR AGENT'S OFFICE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                          1,001

          CONSTRUCTION                                    10,000

            TOTAL FUNDING           TRN              E     11,000 E

                                    TRN              N         1 N

 

30.04. L15  NDWP-PIER 4, KAWAIHAE HARBOR, HAWAII

 

          DESIGN OF TERMINAL IMPROVEMENTS ADJACENT TO THE FUTURE PROPOSED PIER 3/4 INTER-ISLAND TERMINAL BARGE FACILITY.

          DESIGN                                           500

            TOTAL FUNDING           TRN              E       500 E

 


 

TRN331 - KAHULUI HARBOR

 

31.       KAHULUI HARBOR, MAUI

 

          PLANS, DESIGN AND CONSTRUCTION OF A PROTRUDING PIER STRUCTURE DEDICATED TO FUEL TRANSFER.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                          48,398         

            TOTAL FUNDING           TRN          48,400 E           E

 

31.01. M15  NDWP-KAHULUI HARBOR LAND ACQUISITION AND IMPROVEMENTS, MAUI

 

          LAND ACQUISITION AND DESIGN FOR IMPROVEMENTS OF THE ACQUIRED LAND INCLUDING DEMOLITION OF EXISTING STRUCTURES, PAVING, UTILITIES, LANDSCAPING, FENCING, AND OTHER RELATED SITEWORK IMPROVEMENTS.

          LAND                                          15,000

          DESIGN                                          2,000

            TOTAL FUNDING           TRN              E     17,000 E

 


 

TRN395 - HARBORS ADMINISTRATION

 

32. I21    HMP HARBORS DIVISION CAPITAL IMPROVEMENT PROGRAM STAFF COSTS, STATEWIDE

 

          PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT HARBOR MODERNIZATION PLAN PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF HARBOR MODERNIZATION PLAN CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF TRANSPORTATION'S HARBORS DIVISION.  PROJECTS MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

          PLANS                                 1,735      1,735

            TOTAL FUNDING           TRN          1,735 E      1,735 E

 

33. I13    CONSTRUCTION MANAGEMENT SUPPORT, STATEWIDE

 

          CONSTRUCTION FOR CONSULTANT SERVICES FOR CONSTRUCTION PROJECTS AT HARBOR FACILITIES STATEWIDE.

          CONSTRUCTION                           1,500         

            TOTAL FUNDING           TRN          1,500 B           B

 

34. I06    ARCHITECTURAL AND ENGINEERING SUPPORT, STATEWIDE

 

          DESIGN FOR CONSULTANT SERVICES DURING THE DESIGN OF CAPITAL PROJECTS AT HARBOR FACILITIES STATEWIDE.

          DESIGN                                  200       200

            TOTAL FUNDING           TRN            200 B       200 B

 


 

[35. I20   HMP CONSTRUCTION MANAGEMENT SUPPORT, STATEWIDE

 

          CONSTRUCTION FOR CONSULTANT SERVICES DURING CONSTRUCTION OF HARBOR MODERNIZATION PLAN PROJECTS AT HARBOR FACILITIES STATEWIDE.

          CONSTRUCTION                           2,500         

            TOTAL FUNDING           TRN          2,500 E           E]

 

35. I20    NDWP-CONSTRUCTION MANAGEMENT SUPPORT, STATEWIDE

 

          CONSTRUCTION FOR CONSULTANT SERVICES DURING CONSTRUCTION OF NEW DAY WORK PROJECTS AT COMMERCIAL HARBOR FACILITIES STATEWIDE.

          CONSTRUCTION                           2,500      5,000

            TOTAL FUNDING           TRN          2,500 E      5,000 E

 

36. I01    HARBOR PLANNING, STATEWIDE

 

          PLANS FOR CONTINUING HARBOR STUDIES, RESEARCH, AND ADVANCE PLANNING OF HARBOR AND TERMINAL FACILITIES ON ALL ISLANDS.

          PLANS                                 1,000         

            TOTAL FUNDING           TRN          1,000 B           B

 


 

37. I22    HMP PROGRAMMATIC MANAGEMENT SUPPORT, STATEWIDE

 

          PLANS FOR CONSULTANT SERVICES DURING PLANS, DESIGN AND CONSTRUCTION OF HARBORS MODERNIZATION PLAN PROJECTS AT HARBOR FACILITIES STATEWIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.  THIS IS A HARBOR MODERNIZATION PROJECT.

          PLANS                                 5,001         

            TOTAL FUNDING           TRN          5,000 E           E

                                    TRN              1 N           N

 

38. I15    SECURITY IMPROVEMENTS AT COMMERCIAL HARBORS, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR SECURITY SYSTEM IMPROVEMENTS AT COMMERCIAL HARBOR FACILITIES, STATEWIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                    2         

          DESIGN                                   2         

          CONSTRUCTION                           5,000         

            TOTAL FUNDING           TRN          1,002 B           B

                                    TRN          4,002 N           N

 


 

39. I03    MISCELLANEOUS IMPROVEMENTS TO FACILITIES AT NEIGHBOR ISLAND PORTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO YARD AREAS, SHEDS, PIERS, UTILITIES, WATER AREAS, AND OTHER FACILITIES.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  250       250

          CONSTRUCTION                           1,000      1,000

            TOTAL FUNDING           TRN          1,250 B      1,250 B

 

40. I05    MISCELLANEOUS IMPROVEMENTS TO PORT FACILITIES, OAHU

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO YARD AREAS, SHEDS, PIERS, UTILITIES, WATER AREAS, MARITIME-INDUSTRIAL FACILITIES, AND OTHER RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  250       250

          CONSTRUCTION                           1,000      1,000

            TOTAL FUNDING           TRN          1,250 B      1,250 B

 

41. I19    BOLLARD IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR BOLLARD IMPROVEMENTS, STATEWIDE.

          DESIGN                                  500         

          CONSTRUCTION                             800       800

            TOTAL FUNDING           TRN          1,300 B       800 B

 


 

41.01. I23  MITIGATION OF DEBRIS FROM JAPAN'S MARCH 11, 2011 TSUNAMI, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION COSTS FOR THE MITIGATION OF THE ANTICIPATED ARRIVAL OF DEBRIS FROM JAPAN'S MARCH 11, 2011 TSUNAMI. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                          1,001

          DESIGN                                          1,001

          CONSTRUCTION                                     8,001

            TOTAL FUNDING           TRN              B     10,000 B

                                    TRN              N         3 N

 

41.02. I24  COMMERCIAL HARBOR FACILITY IMPROVEMENTS, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION OF SHORE-SIDE AND WATER IMPROVEMENTS FOR COMMERCIAL HARBOR FACILITIES, STATEWIDE.

          PLANS                                            250

          DESIGN                                           500

          CONSTRUCTION                                     4,250

            TOTAL FUNDING           TRN              B      5,000 B

 


 

TRN501 - OAHU HIGHWAYS

 

42. S344   MISCELLANEOUS PERMANENT BEST MANAGEMENT PRACTICES, OAHU

 

          LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR PERMANENT BEST MANAGEMENT PRACTICE IMPROVEMENTS TO EXISTING HIGHWAY FACILITIES INCLUDING INSTALLATION OF STRUCTURAL AND NATURAL BEST MANAGEMENT PRACTICES AT VARIOUS LOCATIONS ON OAHU.

          LAND                                   150         

          DESIGN                                  520         

          CONSTRUCTION                              30      1,640

            TOTAL FUNDING           TRN            700 E      1,640 E

 

43. S319   PEARL CITY, WAIANAE, AND KANEOHE BASEYARDS WASHDOWN RACKS, OAHU

 

          CONSTRUCTION FOR INSTALLING WASHDOWN RACKS TO INCLUDE A WATER RECYCLING UNIT, STEAM PRESSURE WASHERS, AND A CONCRETE PAD FOR COMPLIANCE WITH THE DEPARTMENT OF HEALTH REGULATIONS AND THE CLEAN WATER ACT.

          CONSTRUCTION                             500         

            TOTAL FUNDING           TRN            500 E           E

 


 

44. S318   HIGHWAY LIGHTING REPLACEMENT AT VARIOUS LOCATIONS, OAHU

 

          DESIGN AND CONSTRUCTION FOR REPLACING AND/OR UPGRADING THE EXISTING HIGHWAY LIGHTING SYSTEM ON STATE HIGHWAYS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                           150

          CONSTRUCTION                                     8,800

            TOTAL FUNDING           TRN               E      1,910 E

                                    TRN               N      7,040 N

 

45. S301   FARRINGTON HIGHWAY, MAKAHA BRIDGES NO. 3 AND NO. 3A REPLACEMENT, OAHU

 

          CONSTRUCTION FOR THE REPLACEMENT OF BRIDGES NO. 3 AND 3A IN THE VICINITY OF MAKAHA BEACH PARK TO INCLUDE SIDEWALKS, BRIDGE RAILINGS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                           1,700         

            TOTAL FUNDING           TRN            340 E           E

                                    TRN          1,360 N           N

 


 

46. S296   KAMEHAMEHA HIGHWAY, KAIPAPAU STREAM BRIDGE REPLACEMENT AND/OR REHABILITATION, OAHU

 

          CONSTRUCTION FOR REPLACEMENT AND/OR REHABILITATION OF KAIPAPAU STREAM BRIDGE TO INCLUDE SIDEWALKS, BRIDGE RAILINGS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                          18,500         

            TOTAL FUNDING           TRN          3,700 E           E

                                    TRN          14,800 N           N

 

[47. S317  KAMEHAMEHA HIGHWAY, REHABILITATION OF WAIPILOPILO STREAM BRIDGE, OAHU

 

          LAND ACQUISITION FOR REHABILITATION OF A CONCRETE TEE-BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF HAUULA TO INCLUDE BRIDGE RAILINGS, WALKWAYS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                   250         

            TOTAL FUNDING           TRN             50 E           E

                                    TRN            200 N           N]

 


 

47. S317   KAMEHAMEHA HIGHWAY, REHABILITATION OF WAIPILOPILO STREAM BRIDGE, OAHU

 

          LAND ACQUISITION AND CONSTRUCTION FOR REHABILITATION OF A CONCRETE TEE-BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF HAUULA TO INCLUDE BRIDGE RAILINGS, WALKWAYS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                   250         

          CONSTRUCTION                                     5,500

            TOTAL FUNDING           TRN             50 E      1,100 E

                                    TRN            200 N      4,400 N

 

48. S348   FARRINGTON HIGHWAY, ULEHAWA STREAM BRIDGE REHABILITATION, OAHU

 

          LAND ACQUISITION AND DESIGN FOR THE REHABILITATION OF ULEHAWA STREAM BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALITY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                   300         

          DESIGN                                1,500         

            TOTAL FUNDING           TRN            360 E           E

                                    TRN          1,440 N           N

 


 

49. S328   KAMEHAMEHA HIGHWAY, REHABILITATION AND/OR REPLACEMENT OF MAKAUA STREAM BRIDGE, OAHU

 

          LAND ACQUISITION AND DESIGN FOR THE REHABILITATION AND/OR REPLACEMENT OF MAKAUA STREAM BRIDGE TO INCLUDE BRIDGE RAILINGS, SHOULDERS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                   250         

          DESIGN                                  450         

            TOTAL FUNDING           TRN            140 E           E

                                    TRN            560 N           N

 

50. S314   KAMEHAMEHA HIGHWAY, UPPER POAMOHO STREAM BRIDGE REPLACEMENT, OAHU

 

          LAND ACQUISITION FOR REPLACEMENT OF A MULTI-GIRDER REINFORCED CONCRETE BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF WAHIAWA TO INCLUDE BRIDGE RAILINGS, PEDESTRIAN WALKWAYS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                   400         

            TOTAL FUNDING           TRN             80 E           E

                                    TRN            320 N           N

 


 

51. S315   KAMEHAMEHA HIGHWAY, REHABILITATION AND/OR REPLACEMENT OF LAIELOA STREAM BRIDGE, OAHU

 

          CONSTRUCTION FOR REHABILITATION AND/OR REPLACEMENT OF A CONCRETE SLAB BRIDGE ON KAMEHAMEHA HIGHWAY IN THE VICINITY OF LAIE TO INCLUDE BRIDGE RAILINGS, WALKWAYS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                           8,600         

            TOTAL FUNDING           TRN          1,720 E           E

                                    TRN          6,880 N           N

 

52. S346   INTERSTATE ROUTE H-1, KAPALAMA CANAL BRIDGE REHABILITATION, OAHU

 

          DESIGN FOR THE REHABILITATION OF KAPALAMA CANAL BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  800         

            TOTAL FUNDING           TRN            160 E           E

                                    TRN            640 N           N

 


 

53. S349   KAMEHAMEHA HIGHWAY, WAIALEE STREAM BRIDGE REPLACEMENT, OAHU

 

          LAND ACQUISITION AND DESIGN FOR THE REPLACEMENT OF WAIALEE STREAM BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                             500

          DESIGN                                  890         

            TOTAL FUNDING           TRN            178 E       100 E

                                    TRN            712 N       400 N

 

[54. S284  INTERSTATE ROUTES H-1 AND H-2, DESTINATION SIGN UPGRADE/REPLACEMENT, OAHU

 

          DESIGN AND CONSTRUCTION FOR REPLACING AND/OR UPGRADING THE EXISTING DESTINATION SIGNS AND SIGN SUPPORT STRUCTURES ON INTERSTATE ROUTES H-1 AND H-2.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                           350

          CONSTRUCTION                                     2,500

            TOTAL FUNDING           TRN               E       570 E

                                    TRN               N      2,280 N]

 


 

54. S284   FREEWAY DESTINATION SIGN UPGRADE/REPLACEMENT, OAHU

 

          DESIGN AND CONSTRUCTION FOR REPLACING AND/OR UPGRADING THE EXISTING FREEWAY DESTINATION SIGNS AND SIGN SUPPORT STRUCTURES.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                           350

          CONSTRUCTION                                     4,250

            TOTAL FUNDING           TRN              E       920 E

                                    TRN              N      3,680  N

 

55. S313   INTERSTATE ROUTE H-1, ADDITION AND/OR MOD. OF FREEWAY ACCS. MAKAKILO TO PALAILAI IC, OAHU

 

          LAND ACQUISITION, DESIGN AND CONSTRUCTION TO IMPROVE AND/OR MODIFY THE MAKAKILO AND PALAILAI INTERCHANGES AND CONSTRUCT A NEW INTERCHANGE (KAPOLEI INTERCHANGE).  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                             408

          DESIGN                                           500

          CONSTRUCTION                          23,900         

            TOTAL FUNDING           TRN          5,090 E        91 E

                                    TRN          18,810 N       817 N

 


 

[56.       INTERSTATE ROUTE H-3, JUNCTION AT H-1 TO KANEOHE MARINE CORPS AIR STATION, OAHU

 

          DESIGN AND CONSTRUCTION FOR A DIVIDED HIGHWAY FROM JUNCTION H-1 TO KANEOHE MARINE CORPS AIR STATION, OAHU.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  25       113

          CONSTRUCTION                             225      1,017

            TOTAL FUNDING           TRN             25 E       113 E

                                    TRN            225 N      1,017 N]

 

56.       INTERSTATE ROUTE H-3, JUNCTION AT H-1 TO KANEOHE MARINE CORPS AIR STATION, OAHU

 

          DESIGN AND CONSTRUCTION FOR A DIVIDED HIGHWAY FROM JUNCTION H-1 TO KANEOHE MARINE CORPS AIR STATION, OAHU.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  25      2,713

          CONSTRUCTION                             225      1,017

            TOTAL FUNDING           TRN             25 E       373 E

                                    TRN            225 N      3,357 N

 


 

57.       FLOOD MITIGATION, LUALUALEI VALLEY AND FARRINGTON HIGHWAY, OAHU

 

          DESIGN AND CONSTRUCTION FOR FLOOD MITIGATION EFFORTS ON FARRINGTON HIGHWAY BETWEEN MAILI AND NANAKULI, OAHU.

          DESIGN                                  500         

          CONSTRUCTION                           7,500         

            TOTAL FUNDING           TRN          8,000 E           E

 

58.       KAHEKILI AND KAMEHAMEHA HIGHWAYS, OAHU

 

          DESIGN AND CONSTRUCTION OF MULTI-USE PATHS ALONG KAHEKILI BEGINNING AT THE INTERSECTION WITH HAIKU ROAD, ALONG KAMEHAMEHA HIGHWAY UP TO WAIAHOLE VALLEY.

          DESIGN                                  300         

          CONSTRUCTION                           1,300         

            TOTAL FUNDING           TRN          1,600 E           E

 

59.       KALANIANAOLE HIGHWAY, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION TO UPGRADE CROSSWALK.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             298         

            TOTAL FUNDING           TRN            300 E           E

 


 

60.       FARRINGTON HIGHWAY, LAHILAHI STREET, OAHU

 

          DESIGN AND CONSTRUCTION FOR FLOOD MITIGATION SYSTEM.

          DESIGN                                  200         

          CONSTRUCTION                             800         

            TOTAL FUNDING           TRN          1,000 E           E

 

61.       KAMEHAMEHA HIGHWAY, OAHU

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO KAMEHAMEHA HIGHWAY, INCLUDING SIGNAL OPERATION AND MONITORING IMPROVEMENTS PHASE II, A FEASIBILITY STUDY FOR BOTTLENECK INTERSECTIONS, UTILITY UNDERGROUNDING, PEARL HARBOR HISTORIC SITE GATEWAY PROJECT, AND HARS DEMONSTRATION PROGRAM.

          DESIGN                                  50         

          CONSTRUCTION                             200         

            TOTAL FUNDING           TRN            250 E           E

 

62.       KAMEHAMEHA HIGHWAY AND KAHEKILI HIGHWAY, OAHU

 

          DESIGN AND CONSTRUCTION FOR CLEAN UP, TREE TRIMMING, INSTALLATION OF CAMERAS, BEAUTIFICATION, AND PLANTING.

          DESIGN                                           110

          CONSTRUCTION                                     1,000

            TOTAL FUNDING           TRN               E      1,110 E

 


 

62.01. SP0603    FARRINGTON HIGHWAY IMPROVEMENTS BETWEEN HONOKAI HALE AND HAKIMO ROAD, OAHU

 

          CONSTRUCTION FOR IMPROVEMENTS ALONG FARRINGTON HIGHWAY FOR ALTERNATIVE CONGESTION RELIEF AND/OR SAFETY IMPROVEMENTS ALONG FARRINGTON HIGHWAY BETWEEN HONOKAI HALE AND HAKIMO ROAD. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                     7,500

            TOTAL FUNDING           TRN              E      1,500 E

                                    TRN              N      6,000  N

 

62.02. S074 OAHU BIKEWAYS, OAHU

 

          LAND ACQUISITION FOR A MULTI-USE PATH FROM THE VICINITY OF WAIPIO POINT ACCESS ROAD TO LUALUALEI NAVAL ROAD. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                             100

            TOTAL FUNDING           TRN              E        20 E

                                    TRN              N        80 N

 


 

62.03. S297 KAMEHAMEHA HIGHWAY, KAWELA STREAM BRIDGE REPLACEMENT, OAHU

 

          CONSTRUCTION FOR REPLACEMENT OF THE EXISTING BRIDGE ON KAMEHAMEHA HIGHWAY AT KAWELA STREAM WITH A LARGER BRIDGE INCLUDING IMPROVEMENTS TO THE ROADWAY APPROACHES, SEISMIC UPGRADES, TEMPORARY DETOUR ROAD, AND UTILITY RELOCATIONS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                      925

            TOTAL FUNDING           TRN              E       185 E

                                    TRN              N       740 N

 

62.04. S350 INTERSTATE ROUTE H-1, AIRPORT VIADUCT IMPS, VIC OF VALKENBURGH ST TO MIDDLE ST, OAHU

 

          CONSTRUCTION FOR IMPROVEMENTS TO THE AIRPORT VIADUCT, INCLUDING DECK REPAIRS AND SEALING, AND GUARDRAIL AND PLANTER BOX REPAIRS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                    25,000

            TOTAL FUNDING           TRN              E      2,500 E

                                    TRN              N     22,500 N

 


 

62.05. S239 FREEWAY MANAGEMENT SYSTEM, OAHU

 

          DESIGN AND CONSTRUCTION FOR A FREEWAY MANAGEMENT SYSTEM, INTELLIGENT TRANSPORTATION SYSTEMS TECHNOLOGIES AND INTERAGENCY COORDINATION TO MONITOR AND MANAGE TRAFFIC OPERATIONS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                          1,900

          CONSTRUCTION                                     1,850

            TOTAL FUNDING           TRN              E       750 E

                                    TRN              N      3,000 N

 

62.06. S270 TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAYS FACILITIES, OAHU

 

          CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS FOR MORE EFFICIENT TRAFFIC FLOW.

          CONSTRUCTION                                      750

            TOTAL FUNDING           TRN              E       750 E

 


 

62.07. S324 FARRINGTON HIGHWAY, REPLACEMENT OF MAIPALAOA BRIDGE, OAHU

 

          CONSTRUCTION FOR REPLACEMENT OF A PRE-STRESSED TEE-BEAM BRIDGE ON FARRINGTON HIGHWAY IN THE VICINITY OF MAILI. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                    11,000

            TOTAL FUNDING           TRN              E      2,200 E

                                    TRN              N      8,800 N

 

62.08. S334 VINEYARD BOULEVARD IMPR. AT LUSITANA ST., VICINITY OF QUEEN'S MEDICAL CENTER, OAHU

 

          CONSTRUCTION OF A RIGHT TURN LANE FROM LUSITANA STREET ONTO VINEYARD BOULEVARD TO PROVIDE EASTBOUND FREEWAY ACCESS FROM THE QUEEN'S MEDICAL CENTER. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                     1,000

            TOTAL FUNDING           TRN              R      1,000 R

 

62.09.     KUALAKAI PARKWAY EXTENSION, KAPOLEI PARKWAY TO ROOSEVELT AVENUE, OAHU

 

          CONSTRUCTION FOR AN APPROXIMATE 1/2 MILE EXTENSION BETWEEN KAPOLEI PARKWAY AND ROOSEVELT AVENUE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                    15,000

            TOTAL FUNDING           TRN              E      3,000 E

                                    TRN              N     12,000  N

 


 

62.10.     KAMEHAMEHA HIGHWAY SIDEWALKS, OAHU

 

          DESIGN AND CONSTRUCTION OF SIDEWALKS ALONG BOTH SIDES OF KAMEHAMEHA HIGHWAY FROM MEHEULA PARKWAY TO LANIKUHANA AVENUE. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                           300

          CONSTRUCTION                                     2,700

            TOTAL FUNDING           TRN              E      3,000  E

 

62.11.     KAMEHAMEHA HIGHWAY, KIPAPA GULCH BRIDGE, OAHU

 

          DESIGN AND CONSTRUCTION FOR REPLACEMENT OR RENOVATION OF KIPAPA GULCH BRIDGE FROM A TWO-LANE TO A FOUR-LANE BRIDGE BETWEEN MILILANI AND WAIPIO GENTRY.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                          2,500

          CONSTRUCTION                                    22,500

            TOTAL FUNDING           TRN              E     25,000 E

 

62.12.     KAMEHAMEHA HIGHWAY, WAIPAHU STREET TO WAPIO UKA BOULEVARD, OAHU

 

          DESIGN AND CONSTRUCTION FOR INSTALLATION OF GRAFFITI RESISTANT WALL MATERIALS TO MATCH EXISTING WALL COVERINGS.

          DESIGN                                           500

          CONSTRUCTION                                     4,500

            TOTAL FUNDING           TRN              E      5,000 E

 


 

TRN511 - HAWAII HIGHWAYS

 

63. T119   WAIMEA AND HILO BASEYARDS IMPROVEMENTS, HAWAII

 

          CONSTRUCTION TO PROVIDE WASTEWATER IMPROVEMENTS FOR THE WAIMEA BASEYARD AND A SEPTIC TANK SYSTEM TO THE HILO BASEYARD NECESSARY TO MEET DEPARTMENT OF HEALTH COMPLIANCE AND ENVIRONMENTAL PROTECTION AGENCY (EPA) COMPLIANCE.

          CONSTRUCTION                             250         

            TOTAL FUNDING           TRN            250 E           E

 

64. T145   ROCKFALL PROTECTION/SLOPE STABILIZATION AT VARIOUS LOCATIONS, HAWAII

 

          LAND ACQUISITION AND CONSTRUCTION FOR ROCKFALL/SLOPE PROTECTION, AND SLOPE AND/OR ROADWAY STABILIZATION MITIGATION MEASURES AT VARIOUS LOCATIONS ON HAWAII.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                   125         

          CONSTRUCTION                           3,000         

            TOTAL FUNDING           TRN            625 E           E

                                    TRN          2,500 N           N

 


 

[65. T110  HAWAII BELT ROAD ROCKFALL PROTECTION AT MAULUA, LAUPAHOEHOE, AND KAAWALII, HAWAII

 

          DESIGN FOR SLOPE PROTECTION ALONG ROUTE 19, HAWAII BELT ROAD IN THE VICINITY OF MAULUA GULCH, LAUPAHOEHOE GULCH, AND KAAWALII GULCH.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                          2,000

            TOTAL FUNDING           TRN               E       400 E

                                    TRN               N      1,600 N]

 

65. T110   HAWAII BELT ROAD ROCKFALL PROTECTION AT MAULUA, LAUPAHOEHOE, AND KAAWALII, HAWAII

 

          DESIGN FOR SLOPE PROTECTION ALONG ROUTE 19, HAWAII BELT ROAD IN THE VICINITY OF MAULUA GULCH, LAUPAHOEHOE GULCH, AND KAAWALII GULCH.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                          2,000

          CONSTRUCTION                                    17,500

            TOTAL FUNDING           TRN              E      3,900 E

                                    TRN              N     15,600 N

 


 

66. T146   HAWAII BELT ROAD, REHABILITATION OF UMAUMA STREAM BRIDGE, HAWAII

 

          CONSTRUCTION FOR THE REHABILITATION OF UMAUMA STREAM BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                          20,000         

            TOTAL FUNDING           TRN          4,000 E           E

                                    TRN          16,000 N           N

 

67. T144   HAWAII BELT ROAD, REPLACEMENT OF PAHOEHOE STREAM BRIDGE, HAWAII

 

          LAND ACQUISITION AND DESIGN FOR THE REPLACEMENT OF A CONCRETE ARCH-DECK BRIDGE ON HAWAII BELT ROAD (ROUTE 19) ON THE BIG ISLAND IN THE VICINITY OF PAPAIKOU.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                            1,100

            DESIGN                                50

               TOTAL FUNDING           TRN             10 E         220 E

                                    TRN             40 N       880 N

 


 

68. T147   HAWAII BELT ROAD, KAALAU BRIDGE REPLACEMENT, HAWAII

 

          LAND ACQUISITION AND DESIGN FOR THE REPLACEMENT OF KAALAU BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                             600

          DESIGN                                          1,200

            TOTAL FUNDING           TRN               E       360 E

                                    TRN               N      1,440 N

 

69. T148   HAWAII BELT ROAD, KAPEHU BRIDGE REPLACEMENT, HAWAII

 

          LAND ACQUISITION AND DESIGN FOR THE REPLACEMENT OF KAPEHU BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                             700

          DESIGN                                          1,200

            TOTAL FUNDING           TRN               E       380 E

                                    TRN               N      1,520 N

 

70. T126   KUAKINI HWY ROADWAY AND DRAINAGE IMPROVEMENTS, VICINITY OF KAMEHAMEHA III ROAD, HAWAII

 

          CONSTRUCTION FOR BUILDING UP PAVEMENT CROSS SLOPE TO IMPROVE DRAINAGE AND OTHER INCIDENTAL IMPROVEMENTS.

          CONSTRUCTION                           3,400         

            TOTAL FUNDING           TRN          3,400 E           E

 


 

[71. T149  KOHALA MOUNTAIN ROAD DRAINAGE IMPROVEMENTS, HAWAII

 

          CONSTRUCTION FOR DRAINAGE IMPROVEMENTS IN THE VICINITY OF M.P. 10.60.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                     3,000

            TOTAL FUNDING           TRN              E       600 E

                                    TRN              N      2,400 N]

 

71. T149   KOHALA MOUNTAIN ROAD DRAINAGE IMPROVEMENTS, HAWAII

 

          CONSTRUCTION FOR DRAINAGE IMPROVEMENTS IN THE VICINITY OF M.P. 10.60.

          CONSTRUCTION                                     3,600

            TOTAL FUNDING           TRN              E      3,600 E

 

[72. T136  HAWAII BELT ROAD DRAINAGE IMPROVEMENTS, VICINITY OF HAKALAU BRIDGE, HAWAII

 

          CONSTRUCTION FOR DRAINAGE IMPROVEMENTS, INCLUDING INSTALLING A DRAINAGE SPILLWAY AND BOX CULVERTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                           2,000         

            TOTAL FUNDING           TRN            400 E           E

                                    TRN          1,600 N           N]

 


 

72. T136   HAWAII BELT ROAD DRAINAGE IMPROVEMENTS, VICINITY OF HAKALAU BRIDGE, HAWAII

 

          CONSTRUCTION FOR DRAINAGE IMPROVEMENTS, INCLUDING INSTALLING A DRAINAGE SPILLWAY AND BOX CULVERTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                           2,000       400

            TOTAL FUNDING           TRN            400 E        80 E

                                    TRN          1,600 N       320 N

 

73. T132   VOLCANO ROAD INTERSECTION AND DRAINAGE IMPROVEMENTS, VICINITY OF KULANI ROAD, HAWAII

 

          CONSTRUCTION FOR LEFT TURN LANES AND DRAINAGE IMPROVEMENTS AT THE KULANI ROAD INTERSECTION.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                           2,800         

            TOTAL FUNDING           TRN            560 E           E

                                    TRN          2,240 N           N

 


 

73.01. T137 VOLCANO ROAD WIDENING, KEAAU TO PAAHANA, HAWAII

 

          CONSTRUCTION FOR THE WIDENING OF VOLCANO ROAD FROM KEAAU TO PAAHANA INCLUDING INSTALLATION OF SIGNS, PAVEMENT MARKINGS, DRAINAGE, GUARDRAILS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                     4,000

            TOTAL FUNDING           TRN              E       800 E

                                    TRN              N      3,200 N

 

[74. T118  TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES, HAWAII

 

          CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION, INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS.

          CONSTRUCTION                             200         

            TOTAL FUNDING           TRN            200 E           E]

 


 

74. T118   TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES, HAWAII

 

          CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION, INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS FOR MORE EFFICIENT TRAFFIC FLOW.

          CONSTRUCTION                             200         

            TOTAL FUNDING           TRN            200 E          E

 

75. T141   QUEEN KAAHUMANU HIGHWAY IMPROVEMENTS, KEAHOLE AIRPORT TO KAWAIHAE HARBOR, HAWAII

 

          PLANS FOR IMPROVEMENTS TO QUEEN KAAHUMANU HIGHWAY.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                            400

            TOTAL FUNDING           TRN               E        80 E

                                    TRN               N       320 N

 

76.       KUPULAU ROAD EXTENSION, HAWAII

 

          PLANS, DESIGN AND CONSTRUCTION TO REDUCE CONGESTION OF TRAFFIC ON KOMOHANA STREET.

          PLANS                                  250         

          DESIGN                                  500         

          CONSTRUCTION                           2,000         

            TOTAL FUNDING           TRN          2,750 E           E

 


 

76.01. T127 KEAAU-PAHOA RD SHOULDER LN CONVERSION, KEAAU BYPASS RD. TO VIC. OF SHOWER DR., HAWAII

 

          CONSTRUCTION FOR RECONSTRUCTING AND WIDENING THE EXISTING SHOULDER AND CONSTRUCTING NEW SHOULDERS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                     2,000

            TOTAL FUNDING           TRN              E       400 E

                                    TRN              N      1,600 N

 

76.02. T077 GUARDRAIL AND SHOULDER IMPROVEMENTS ON STATE HIGHWAYS, HAWAII

 

          DESIGN FOR INSTALLING AND/OR UPGRADING EXISTING GUARDRAILS, END TERMINALS, TRANSITIONS, BRIDGE RAILING, BRIDGE END POSTS AND CRASH ATTENUATOR, AND RECONSTRUCTING AND PAVING SHOULDERS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                           170

            TOTAL FUNDING           TRN              E       170 E

 

TRN531 - MAUI HIGHWAYS

 

77. V075   HANA HIGHWAY ROCKFALL MITIGATION, HUELO TO HANA, MAUI

 

          CONSTRUCTION TO MITIGATE ROCKFALLS AND POTENTIAL LANDSLIDE AREAS ALONG THE SLOPES OF ROUTE 360 HANA HIGHWAY AT VARIOUS LOCATIONS.

          CONSTRUCTION                           4,382         

            TOTAL FUNDING           TRN          4,382 E           E

 


 

78. W0008  GUARDRAIL AND SHOULDER IMPROVEMENTS ON STATE HIGHWAYS, MOLOKAI

 

          DESIGN AND CONSTRUCTION TO BUILD ASPHALT CONCRETE PAVED SHOULDERS AND INSTALLING AND/OR UPGRADING EXISTING GUARDRAILS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  75         

          CONSTRUCTION                             750       750

            TOTAL FUNDING           TRN            225 E       150 E

                                    TRN            600 N       600 N

 

[79. V084  HANA HIGHWAY IMPROVEMENTS, HUELO TO HANA, MAUI

 

          CONSTRUCTION FOR IMPROVING, UPGRADING, AND/OR REPAIRING ROADWAYS, BRIDGES, WALLS, DRAINAGE STRUCTURES, GUARDRAILS, AND OTHER FACILITIES ON ROUTE 360 HANA HIGHWAY.

          CONSTRUCTION                             840         

            TOTAL FUNDING           TRN            840 E           E]

 

79. V084   HANA HIGHWAY IMPROVEMENTS, HUELO TO HANA, MAUI

 

          CONSTRUCTION FOR IMPROVING, UPGRADING, AND/OR REPAIRING ROADWAYS, BRIDGES, WALLS, DRAINAGE STRUCTURES, GUARDRAILS, AND OTHER FACILITIES ON ROUTE 360 HANA HIGHWAY.

          CONSTRUCTION                             840      1,500

            TOTAL FUNDING           TRN            840 E      1,500 E

 


 

80. V094   HONOAPIILANI HIGHWAY, REPLACEMENT OF HONOLUA BRIDGE, MAUI

 

          LAND ACQUISITION FOR REPLACEMENT OF A CONCRETE TEE-BEAM BRIDGE ON HONOAPIILANI HIGHWAY IN THE VICINITY OF HONOLUA BAY TO INCLUDE BRIDGE RAILINGS AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                   425         

            TOTAL FUNDING           TRN             85 E           E

                                    TRN            340 N           N

 

81. W014   KAMEHAMEHA V HIGHWAY, DRAINAGE IMPROVEMENTS, VICINITY OF MILE POST 12.5, MOLOKAI

 

          CONSTRUCTION TO UPGRADE THE EXISTING CULVERT, OTHER DRAINAGE FACILITIES, SHOULDERS, AND OTHER IMPROVEMENTS IN THE VICINITY OF MILE POST 12.5.

          CONSTRUCTION                             450         

            TOTAL FUNDING           TRN            450 E           E

 

82. V099   HANA HIGHWAY, DRAINAGE IMPROVEMENTS, VICINITY OF HOOLAWA BRIDGE, MAUI

 

          DESIGN AND CONSTRUCTION TO REGRADE THE ROADWAY TO REDIRECT RUNOFF FROM THE TRAVEL LANES AND SHOULDERS AND TOWARDS THE EXISTING CULVERT.

          DESIGN                                  80         

          CONSTRUCTION                                     1,200

            TOTAL FUNDING           TRN             80 E      1,200 E

 


 

83. V098   KAHEKILI HIGHWAY DRAINAGE IMPROVEMENTS AT WAIHEE TOWN, MAUI

 

          CONSTRUCTION OF A DRAINAGE FACILITY ON KAHEKILI HIGHWAY NEAR WAIHEE TOWN.

          CONSTRUCTION                              75         

            TOTAL FUNDING           TRN             75 E           E

 

84. V103   HANA HIGHWAY BRIDGE PRESERVATION PLAN, MAUI

 

          PLANS FOR DEVELOPING A BRIDGE PRESERVATION PLAN FOR HANA HIGHWAY IN THE VICINITY OF THE HANA PRESERVATION DISTRICT.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AND FINANCING AND/OR REIMBURSEMENT.

          PLANS                                 1,600         

            TOTAL FUNDING           TRN            320 E           E

                                    TRN          1,280 N           N

 

85. V107   KAHULUI BASEYARD IMPROVEMENTS, MAUI

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR KAHULUI BASEYARD IMPROVEMENTS.

          DESIGN                                  75         

          CONSTRUCTION                                      700

          EQUIPMENT                                         100

            TOTAL FUNDING           TRN             75 E       800 E

 


 

86. V051   HONOAPIILANI HIGHWAY WIDENING AND/OR REALIGNMENT, HONOKOWAI TO LAUNIUPOKO, MAUI

 

          LAND ACQUISITION AND CONSTRUCTION FOR A NEW ALIGNMENT OF HONOAPIILANI HIGHWAY FROM LAHAINALUNA ROAD TO THE VICINITY OF LAUNIUPOKO.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                              50

          CONSTRUCTION                          32,000         

            TOTAL FUNDING           TRN          13,000 E        10 E

                                    TRN          17,500 N        40 N

                                    TRN          1,500 S           S

 

87. V100   HANA HIGHWAY IMPROVEMENTS, VICINITY OF MILEPOST 28.1, MAUI

 

          LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR ROADWAY WIDENING AND/OR REALIGNMENT AND OTHER IMPROVEMENTS ALONG HANA HIGHWAY IN THE VICINITY OF MILEPOST 28.1.

          LAND                                    50         

          DESIGN                                  105         

          CONSTRUCTION                                      675

            TOTAL FUNDING           TRN            155 E       675 E

 

88. V089   HANA HIGHWAY IMPROVEMENTS, UAKEA ROAD TO KEAWA PLACE, MAUI

 

          CONSTRUCTION FOR WIDENING THE EXISTING ROADWAY AND CONSTRUCT SAFETY IMPROVEMENTS.

          CONSTRUCTION                             290         

            TOTAL FUNDING           TRN            290 E           E

 


 

89. V083   TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES, MAUI

 

          DESIGN AND CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION, INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS.

          DESIGN                                  125         

          CONSTRUCTION                           2,690      1,000

            TOTAL FUNDING           TRN          2,815 E      1,000 E

 

90. V063   KAHULUI AIRPORT ACCESS ROAD, MAUI

 

          CONSTRUCTION FOR A PORTION OF THE NEW ACCESS ROAD TO KAHULUI AIRPORT FROM THE VICINITY OF PUUNENE AVENUE TO HANA HIGHWAY.  INCLUDES AN AT-GRADE INTERSECTION AT HANA HIGHWAY, STRIPING, LANDSCAPING, DRAINAGE, HIGHWAY LIGHTING, UTILITIES, AND OTHER MISCELLANEOUS IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                     9,525

            TOTAL FUNDING           TRN               E      1,905 E

                                    TRN               N      7,620 N

 


 

91.       HALEAKALA HIGHWAY IMPROVEMENTS, MAUI

 

          CONSTRUCTION TO INSTALL RIGHT TURN LANE ON WEST-BOUND HALEAKALA HIGHWAY, INSTALL WALKWAYS AND PAVED SHOULDERS AND/OR SIDEWALKS FROM INTERSECTION TO KING KEKAULIKE HIGH SCHOOL ENTRANCES, AND TO MAKE TRAFFIC SIGNAL IMPROVEMENTS, SIGNAGE, MARKINGS, AND OTHER RELATED IMPROVEMENTS.

          CONSTRUCTION                           1,500         

            TOTAL FUNDING           TRN          1,500 E           E

 

TRN561 - KAUAI HIGHWAYS

 

92. X051   GUARDRAIL AND SHOULDER IMPROVEMENTS ON STATE HIGHWAYS, KAUAI

 

          CONSTRUCTION FOR INSTALLING AND/OR UPGRADING OF GUARDRAILS, END TERMINALS, TRANSITIONS, BRIDGE RAILINGS, BRIDGE ENDPOSTS AND CRASH ATTENUATORS; AND RECONSTRUCTING AND PAVING OF SHOULDERS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                      400

            TOTAL FUNDING           TRN               E        80 E

                                    TRN               N       320 N

 


 

93. X134   KUHIO HIGHWAY, SLOPE STABILIZATION AT LUMAHAI HILLSIDE, KAUAI

 

          LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR SLOPE STABILIZATION AT LUMAHAI HILLSIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                   150         

          DESIGN                                  400         

          CONSTRUCTION                                     2,000

            TOTAL FUNDING           TRN            550 E       400 E

                                    TRN               N      1,600 N

 

94. X128   KUHIO HIGHWAY, REPLACEMENT OF WAIOLI, WAIPA, AND WAIKOKO STREAM BRIDGES, KAUAI

 

          LAND ACQUISITION FOR THE REPLACEMENT OF WAIOLI STREAM BRIDGE, WAIPA STREAM BRIDGE, AND WAIKOKO STREAM BRIDGE ON KUHIO HIGHWAY, ROUTE 560.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                             250

            TOTAL FUNDING           TRN               E        50 E

                                    TRN               N       200 N

 


 

95. X127   KAPULE HWY/RICE ST/WAAPA RD IMPROVEMENTS AND STRENGTHENING/WIDENING OF NAWILIWILI BRIDGE, KAUAI

 

          LAND ACQUISITION FOR THE IMPROVEMENT OF KAPULE HIGHWAY, RICE STREET AND WAAPA ROAD; AND STRENGTHENING/WIDENING OF NAWILIWILI BRIDGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          LAND                                             150

            TOTAL FUNDING           TRN               E        30 E

                                    TRN               N       120 N

 

96. X124   KUHIO HIGHWAY, KAPAIA BRIDGE REPLACEMENT, KAUAI

 

          CONSTRUCTION FOR REPLACEMENT OF A MULTI-TEE BEAM REINFORCED CONCRETE GIRDER BRIDGE ON KUHIO HIGHWAY IN THE VICINITY OF KAPAIA TO INCLUDE PEDESTRIAN WALKWAYS, BRIDGE RAILINGS AND APPROACHES, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                     8,650

            TOTAL FUNDING           TRN               E      1,730 E

                                    TRN               N      6,920 N

 


 

[97. X123  WAIMEA CANYON DRIVE/KOKEE ROAD IMPROVEMENTS, MILE POST 0 TO MILE POST 14, KAUAI

 

          CONSTRUCTION FOR PAVED SHOULDERS, INSTALLING GUARDRAILS, PAVEMENT MARKINGS AND SIGNS, AND OTHER IMPROVEMENTS IN THE VICINITY OF MILE POST 0 TO MILE POST 14.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                           6,000         

            TOTAL FUNDING           TRN          1,200 E           E

                                    TRN          4,800 N           N]

 

97. X123   WAIMEA CANYON DRIVE/KOKEE ROAD IMPROVEMENTS, MILE POST 0 TO MILE POST 14, KAUAI

 

          CONSTRUCTION FOR PAVED SHOULDERS, INSTALLING GUARDRAILS, PAVEMENT MARKINGS AND SIGNS, AND OTHER IMPROVEMENTS IN THE VICINITY OF MILE POST 0 TO MILE POST 14.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                           6,000      4,800

            TOTAL FUNDING           TRN          1,200 E      4,800 E

                                    TRN          4,800 N          N

 


 

98. X007   KUHIO HIGHWAY IMPROVEMENTS, HANAMAULU TO KAPAA, KAUAI

 

          PLANS AND CONSTRUCTION FOR A NEW KAPAA BYPASS AND/OR WIDEN SECTIONS OF KUHIO HIGHWAY.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                 1,000         

          CONSTRUCTION                          22,900         

            TOTAL FUNDING           TRN          7,500 E           E

                                    TRN          16,400 N           N

 

99. X006   KAUMUALII HIGHWAY IMPROVEMENTS, LIHUE TO WEST OF MALUHIA ROAD, KAUAI

 

          CONSTRUCTION FOR WIDENING OF KAUMUALII HIGHWAY, LIHUE TO WEST OF MALUHIA ROAD, FROM TWO TO FOUR LANES.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                           6,900         

            TOTAL FUNDING           TRN            800 E           E

                                    TRN          1,600 N           N

                                    TRN          4,500 S           S

 


 

100. X121  KUHIO HIGHWAY, REPLACEMENT OF WAINIHA BRIDGES NOS. 1, 2, AND 3, KAUAI

 

          DESIGN FOR REPLACEMENT OF WAINIHA BRIDGES NOS. 1, 2, AND 3.  PROJECT WILL CONSTRUCT BRIDGE APPROACHES, DETOUR ROADS, AND OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                1,000         

            TOTAL FUNDING           TRN          1,000 E           E

 

101. X112  TRAFFIC OPERATIONAL IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAYS, KAUAI

 

          CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR IMPROVED TRAFFIC OPERATION, INCLUDING ELIMINATING CONSTRICTIONS, MODIFYING AND/OR INSTALLING TRAFFIC SIGNALS, CONSTRUCTING TURNING LANES, ACCELERATION AND/OR DECELERATION LANES, AND OTHER IMPROVEMENTS.

          CONSTRUCTION                           2,380      2,500

            TOTAL FUNDING           TRN          2,380 E      2,500 E

 


 

[102. X135  NAWILIWILI ROAD IMPROVEMENTS, KANANI STREET TO KAUMUALII HIGHWAY, KAUAI

 

          DESIGN AND CONSTRUCTION FOR NAWILIWILI ROAD IMPROVEMENTS, INCLUDING PAVEMENT RECONSTRUCTION, SIDEWALKS, AND TRAFFIC SIGNALS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  400         

          CONSTRUCTION                                     7,500

            TOTAL FUNDING           TRN             80 E      1,500 E

                                    TRN            320 N      6,000 N]

 

102. X135  NAWILIWILI ROAD IMPROVEMENTS, KANANI STREET TO KAUMUALII HIGHWAY, KAUAI

 

          DESIGN AND CONSTRUCTION FOR NAWILIWILI ROAD IMPROVEMENTS, INCLUDING PAVEMENT RECONSTRUCTION, SIDEWALKS, AND TRAFFIC SIGNALS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  400         

          CONSTRUCTION                                     7,820

            TOTAL FUNDING           TRN             80 E      1,820 E

                                    TRN            320 N      6,000 N

 


 

103.       ROADWAY RECONSTRUCTION, MILE MARKER 18 TO KALALAU LOOKOUT, KAUAI

 

          DESIGN AND CONSTRUCTION TO RENOVATE AND RESURFACE ROADWAY, INCLUDING DRAINAGE IMPROVEMENTS.

          DESIGN                                           800

          CONSTRUCTION                                     7,200

            TOTAL FUNDING           TRN               E      8,000 E

 

104.       WAINIHA BRIDGE REPLACEMENT PROJECT, KAUAI

 

          CONSTRUCTION FOR THE BRIDGE REPLACEMENT PROJECT.

          CONSTRUCTION                          10,000         

            TOTAL FUNDING           TRN          10,000 E           E

 


 

TRN595 - HIGHWAYS ADMINISTRATION

 

105. X225  HIGHWAY DIVISION CAPITAL IMPROVEMENTS PROGRAM PROJECT STAFF COSTS, STATEWIDE

 

          PLANS, LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR COSTS RELATED TO WAGES & FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR IMPLEMENTATION OF CIP PROJECTS FOR DEPARTMENT OF TRANSPORTATION'S HIGHWAYS DIVISION.  PROJECTS MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CIP PROJECT RELATED POSITIONS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                    1         1

          LAND                                     1         1

          DESIGN                                   1         1

          CONSTRUCTION                          17,997     17,997

            TOTAL FUNDING           TRN          12,000 B     12,000 B

                                    TRN          6,000 N      6,000 N

 

106. X227  ROCKFALL PROTECTIONS/SLOPE STABILIZATION AT VARIOUS LOCATIONS, STATEWIDE

 

          CONSTRUCTION FOR ROCKFALL/SLOPE PROTECTION AND SLOPE STABILIZATION MITIGATION MEASURES AT VARIOUS LOCATIONS STATEWIDE.  THIS PRACTICE IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                    21,000

            TOTAL FUNDING           TRN               E      4,200 E

                                    TRN               N     16,800 N

 


 

107. X224  HIGHWAY SHORELINE PROTECTION, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR SHORELINE PROTECTION IMPROVEMENTS OF EXISTING STATE HIGHWAY FACILITIES, INCLUDING SHORELINE PROTECTION STRUCTURES, RELOCATION AND REALIGNMENT OF THE HIGHWAY AND BEACH FILL/NOURISHMENT.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                3,065       350

          CONSTRUCTION                           5,650      5,300

            TOTAL FUNDING           TRN          4,195 E      1,410 E

                                    TRN          4,520 N      4,240 N

 

[108. X097  MISCELLANEOUS DRAINAGE IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR DRAINAGE IMPROVEMENTS TO EXISTING HIGHWAY FACILITIES INCLUDING INSTALLATION OF DRAINAGE FACILITIES, CATCH BASINS, GRATED DROP INLETS, LINED SWALES, HEADWALLS, AND CULVERTS AT VARIOUS LOCATIONS.

          DESIGN                                           200

          CONSTRUCTION                           1,360      1,150

            TOTAL FUNDING           TRN          1,360 E      1,350 E]

 


 

108. X097  MISCELLANEOUS DRAINAGE IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR DRAINAGE IMPROVEMENTS TO EXISTING HIGHWAY FACILITIES INCLUDING INSTALLATION OF DRAINAGE FACILITIES, CATCH BASINS, GRATED DROP INLETS, LINED SWALES, HEADWALLS, AND CULVERTS AT VARIOUS LOCATIONS.

          DESIGN                                           400

          CONSTRUCTION                           1,360      2,645

            TOTAL FUNDING           TRN          1,360 E      3,045 E

 

109. X241  MAJOR PAVEMENT IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR MAJOR PAVEMENT RECONSTRUCTION, RESURFACING, RESTORATION AND/OR REHABILITATION ALONG STATE ROUTES.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  500         

          CONSTRUCTION                          12,500     13,000

            TOTAL FUNDING           TRN          12,000 E     12,000 E

                                    TRN          1,000 N      1,000 N

 

110. X235  MOTOR CARRIER SAFETY AND HIGHWAY SAFETY OFFICE FACILITY, STATEWIDE

 

          CONSTRUCTION TO RENOVATE AND REFURBISH EXISTING BUILDING STRUCTURES AND INSTALL MISCELLANEOUS SITE IMPROVEMENTS UNDER THE WAIMALU VIADUCT.

          CONSTRUCTION                           1,100         

            TOTAL FUNDING           TRN          1,100 E           E

 


 

111. X099  HIGHWAY PLANNING, STATEWIDE

 

          PLANS FOR FEDERAL AID AND NON-FEDERAL AID PROGRAMS AND PROJECTS THAT INCLUDE ROADWAY CLASSIFICATION, DATA COLLECTION, LONG- AND MID-RANGE PLANNING, TRANSPORTATION NEEDS STUDIES, RESEARCH, HRS 343/NEPA STUDIES, CORRIDOR STUDIES, AND SCOPING.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                 4,525      7,875

            TOTAL FUNDING           TRN            905 E      1,575 E

                                    TRN          3,620 N      6,300 N

 

112. X098  IMPROVEMENTS TO INTERSECTIONS AND HIGHWAY FACILITIES, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR MISCELLANEOUS IMPROVEMENTS TO EXISTING INTERSECTIONS AND HIGHWAY FACILITIES NECESSARY FOR TRAFFIC SAFETY.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  100       250

          CONSTRUCTION                           1,350      4,700

            TOTAL FUNDING           TRN            450 E      1,190 E

                                    TRN          1,000 N      3,760 N

 


 

113. X242  STATEWIDE INTELLIGENT TRANSPORTATION SYSTEM (ITS) ARCHITECTURE PLAN, STATEWIDE

 

          PLANS FOR DEVELOPING A STATEWIDE INTELLIGENT TRANSPORTATION SYSTEM.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                 1,000         

            TOTAL FUNDING           TRN            200 E           E

                                    TRN            800 N           N

 

114. X200  TRAFFIC COUNTING STATIONS AT VARIOUS LOCATIONS, STATEWIDE

 

          CONSTRUCTION FOR INSTALLING TRAFFIC DETECTOR LOOPS, ASSOCIATED WIRING, JUNCTION BOXES, CABINETS AND TELEMETRY STATIONS AT VARIOUS LOCATIONS ON STATE ROADWAYS, INCLUDING AUTOMATIC TRAFFIC RECORDERS AND OTHER DATA PROCESSING IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                                       75

            TOTAL FUNDING           TRN               E        15 E

                                    TRN               N        60 N

 


 

115.       STUDY ON ALTERNATIVE ACCESS ROAD INTO AND OUT OF LEEWARD COAST, OAHU

 

          PLANS FOR AN ALTERNATIVE ACCESS ROAD MAUKA OF FARRINGTON HIGHWAY BEGINNING AT LUALUALEI NAVAL MAGAZINE ROAD TO PROVIDE ACCESS INTO AND OUT OF THE LEEWARD COAST, OAHU.

          PLANS                                 1,000         

            TOTAL FUNDING           TRN            200 E           E

                                    TRN            800 N           N

 

116.       ALTERNATIVE ACCESS AND TRAFFIC MITIGATION STUDY FROM MILILANI ON TO THE H-2 FREEWAY, OAHU

 

          PLANS FOR AN ALTERNATE ACCESS OR MODIFICATION OF EXISTING ACCESS, AS WELL AS TRAFFIC MITIGATION MEASURES TO PROVIDE ACCESS FROM MILILANI ON TO THE H-2 FREEWAY.

          PLANS                                  350         

            TOTAL FUNDING           TRN            350 E           E

 

116.01. X231     HIGHWAYS DIVISION MATERIALS TESTING AND RESEARCH FACILITY RENOVATION, STATEWIDE

 

          PLANS AND CONSTRUCTION FOR THE RENOVATION AND IMPROVEMENTS TO THE HIGHWAYS DIVISION MATERIALS TESTING AND RESEARCH FACILITY.

          PLANS                                            150

          CONSTRUCTION                                      200

            TOTAL FUNDING           TRN              E       350  E

 


 

116.02. X243     ALIIAIMOKU BUILDING IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR VARIOUS IMPROVEMENTS FOR THE DEPARTMENT OF TRANSPORTATION'S MAIN OFFICE BUILDING.

          DESIGN                                           200

          CONSTRUCTION                                     1,600

            TOTAL FUNDING           TRN              E      1,800  E

 


 

D. ENVIRONMENTAL PROTECTION

HTH840 - ENVIRONMENTAL MANAGEMENT

 

1. 840121  WASTEWATER TREATMENT REVOLVING FUND FOR POLLUTION CONTROL, STATEWIDE

 

          CONSTRUCTION FUNDS TO PROVIDE STATE MATCH (20%) FOR FEDERAL CAPITALIZATION GRANTS FOR WASTEWATER PROJECTS.  FUNDS TO BE TRANSFERRED TO THE WATER POLLUTION CONTROL REVOLVING FUND PURSUANT TO CHAPTER 342D, HRS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                          18,938     18,938

            TOTAL FUNDING           HTH          3,157 C      3,157 C

                                    HTH          15,781 N     15,781 N

 

2. 840122  SAFE DRINKING WATER REVOLVING FUND, STATEWIDE

 

          CONSTRUCTION FUNDS TO PROVIDE STATE MATCH (20%) FOR FEDERAL CAPITALIZATION GRANTS FOR DRINKING WATER PROJECTS.  FUNDS TO BE TRANSFERRED TO THE DRINKING WATER TREATMENT REVOLVING FUND LOAN, PURSUANT TO CHAPTER 340E, HRS.  THIS PROJECT IS DEEMED NECESSARY TO QUALITY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                          16,288     16,288

            TOTAL FUNDING           HTH          2,715 C      2,715 C

                                    HTH          13,573 N     13,573 N

 


 

LNR401 - AQUATIC RESOURCES

 

3.        HANALEI RIVER, KAUAI

 

          PLANS, DESIGN AND CONSTRUCTION TO UPGRADE, REPAIR AND REINFORCE THE HANALEI RIVER BREACH. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             998         

            TOTAL FUNDING           LNR          1,000 C           C

 

LNR402 - NATIVE RESOURCES AND FIRE PROTECTION PROGRAM

 

4.        LUMP SUM IMPROVEMENTS AT DOFAW FACILITIES FOR NATIVE RESOURCES AND/OR FIRE PROTECTION, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS AT DOFAW FACILITIES FOR NATIVE RESOURCES AND/OR FIRE PROTECTION, STATEWIDE.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           1,178      2,498

            TOTAL FUNDING           LNR          1,180 C      2,500 C

 


 

LNR405 - CONSERVATION AND RESOURCES ENFORCEMENT

 

5.        LUMP SUM IMPROVEMENTS AT DOCARE OFFICE AND/OR BASEYARD FACILITIES, STATEWIDE

 

          CONSTRUCTION FOR VARIOUS IMPROVEMENTS AT DOCARE OFFICE AND/OR BASEYARD FACILITIES, STATEWIDE.

          CONSTRUCTION                             280       120

            TOTAL FUNDING           LNR            280 C       120 C

 

LNR407 - NATURAL AREA RESERVES AND WATERSHED MANAGEMENT

 

5.01.      KAWAINUI MARSH, OAHU

 

          CONSTRUCTION AND EQUIPMENT FOR THE RESTORATION OF ENDANGERED HABITAT AND WETLANDS IN KAWAINUI MARSH.

          CONSTRUCTION                                     1,054

          EQUIPMENT                                          1

            TOTAL FUNDING           LNR              C      1,055  C

 

5.02.      NATURAL AREA RESERVES AND WATERSHED MANAGEMENT, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT TO PROTECT AND RESTORE FORESTED WATERSHEDS AND WATER SUPPLIES, STATEWIDE; EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                     4,997

          EQUIPMENT                                          1

            TOTAL FUNDING           LNR               C     5,000  C

 


 

LNR906 - LNR - NATURAL AND PHYSICAL ENVIRONMENT

 

[6. G01B   CAPITAL IMPROVEMENTS PROGRAM STAFF COSTS, STATEWIDE

 

          PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENTS PROGRAM PROJECTS FOR THE DEPARTMENT OF LAND AND NATURAL RESOURCES.  PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

          PLANS                                 2,540      2,540

            TOTAL FUNDING           LNR          2,540 C      2,540 C]

 

6. G01CS00A CAPITAL IMPROVEMENTS PROGRAM STAFF COSTS, STATEWIDE

 

          PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT PROJECT FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENTS PROGRAM PROJECTS FOR THE DEPARTMENT OF LAND AND NATURAL RESOURCES.  PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

          PLANS                                 2,540      2,597

            TOTAL FUNDING           LNR          2,540 C      2,597  C

 


 

7. G01C    TSUNAMI DAMAGE RESPONSE AT DLNR FACILITIES, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO ADDRESS, REPAIR AND/OR RECONSTRUCT DLNR FACILITIES DAMAGED IN THE MARCH 2011 TSUNAMI RESULTING FROM THE PACIFIC EARTHQUAKE.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           7,798         

            TOTAL FUNDING           LNR          7,800 C           C

 

7.01.      ADA PUBLIC ACCESSIBILITY AT DLNR FACILITIES, STATEWIDE

 

          DESIGN AND CONSTRUCTION TO PROVIDE PUBLIC ACCESSIBILITY AT DLNR FACILITIES.

          DESIGN                                           400

          CONSTRUCTION                                      600

            TOTAL FUNDING           LNR              C      1,000 C

 


 

E. HEALTH

HTH100 - COMMUNICABLE DISEASE SERVICES

 

0.02. 100131     KALAUPAPA SETTLEMENT IMPROVEMENTS, MOLOKAI

 

          DESIGN AND CONSTRUCTION TO CLOSE MUNICIPAL SOLID WASTE LANDFILL, REROOF BUILDINGS AND OTHER IMPROVEMENTS.

          DESIGN                                             1

          CONSTRUCTION                                      929

            TOTAL FUNDING           AGS              C       930 C

 

HTH595 - HEALTH RESOURCES ADMINISTRATION

 

1.        HALE HOOLUOLU HOSPICE FACILITY, MAUI

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT OF A 12-BED HOSPICE CENTER ON THE ISLAND OF MAUI. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          LAND                                     1         

          DESIGN                                   1         

          CONSTRUCTION                             496         

          EQUIPMENT                                 1         

            TOTAL FUNDING           HTH            500 C           C

 


 

2.        MOLOKAI OHANA HEALTH CENTER, MOLOKAI

 

          DESIGN AND CONSTRUCTION FOR RENOVATION AND RELOCATION OF THE MOLOKAI COMMUNITY HEALTH CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          DESIGN                                   1         

          CONSTRUCTION                             499         

            TOTAL FUNDING           HTH            500 C          C

 

3.        REHABILITATION HOSPITAL OF THE PACIFIC FOUNDATION, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE REHAB HOSPITAL OF THE PACIFIC FOR HEALTH AND SAFETY. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           2,498         

            TOTAL FUNDING           HTH          2,500 C           C

 

4.        WAHIAWA GENERAL HOSPITAL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR MODERNIZATION AND EXPANSION OF EMERGENCY DEPARTMENT. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           2,498         

            TOTAL FUNDING           HTH          2,500 C           C

 


 

4.01.      WEST HAWAII COMMUNITY HEALTH CENTER, HAWAII

 

          PLANS, DESIGN AND CONSTRUCTION TO RENOVATE, EXPAND AND UPGRADE CURRENT FACILITIES. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                     1,998

            TOTAL FUNDING           HTH              C      2,000  C

 

4.02.      WAI'ANAE COAST COMPREHENSIVE HEALTH CENTER (WCCHC), OAHU

 

          CONSTRUCTION TO UPGRADE AND EXPAND EMERGENCY SERVICES BUILDING FOR THE WAI'ANAE COAST COMPREHENSIVE HEALTH CENTER. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          CONSTRUCTION                                     2,000

            TOTAL FUNDING           HTH              C      2,000 C

 

4.03.      HAWAII ISLAND COMMUNITY DEVELOPMENT CORPORATION, HAWAII

 

          PLANS, LAND ACQUISITION AND DESIGN FOR AN ADULT CARE CENTER FACILITY IN HILO, HAWAII. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                              1

          LAND                                             383

          DESIGN                                             1

            TOTAL FUNDING           HTH              C       385 C

 


 

HTH210 - HAWAII HEALTH SYSTEMS CORPORATION – CORPORATE OFFICE

 

5.        LANAI COMMUNITY HOSPITAL, LANAI

 

          PLANS AND DESIGN FOR EMERGENCY ROOM EXPANSION; FIRE SUPPRESSION & EXHAUST VENTILATION SYSTEM; REPAIRS, INSTALLATION OF HURRICANE WINDOW UPGRADE; MASTER PLANNING.

          PLANS                                    1         

          DESIGN                                1,339         

            TOTAL FUNDING           HTH          1,340 C           C

 

HTH212 - HAWAII HEALTH SYSTEMS CORPORATION –  REGIONS

 

6.        HAWAII HEALTH SYSTEMS CORPORATION, HEALTH AND SAFETY PROJECTS, STATEWIDE

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR PROJECTS THAT ARE OF HEALTH AND SAFETY TO THE FACILITIES IN THE HAWAII HEALTH SYSTEMS CORPORATION.

          DESIGN                                   1         1

          CONSTRUCTION                          14,998     14,998

          EQUIPMENT                                 1         1

            TOTAL FUNDING           HTH          15,000 C     15,000 C

 

7.        KONA COMMUNITY HOSPITAL UPGRADE, HAWAII

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT TO REPAIR AND UPGRADE THE EMERGENCY/ DISASTER INFRASTRUCTURE.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           4,997         

          EQUIPMENT                                 1         

            TOTAL FUNDING           HTH          5,000 C           C

 


 

8.        KAHUKU MEDICAL CENTER, OAHU

 

          PLANS, DESIGN, AND CONSTRUCTION TO UPGRADE AND RENOVATE HOSPITAL FACILITIES. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS, INFRASTRUCTURE, EQUIPMENT AND APPURTENANCES, AND ALL RELATED PROJECT COSTS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           4,998         

            TOTAL FUNDING           HTH          5,000 C           C

 

8.01. 242135     LEAHI HOSPITAL, INSTALL PHOTOVOLTAIC PANELS, OAHU

 

          DESIGN AND CONSTRUCTION TO INSTALL PHOTOVOLTAIC PANELS THROUGHOUT THE HOSPITAL GROUNDS.

          DESIGN                                            90

          CONSTRUCTION                                      910

            TOTAL FUNDING           HTH              C      1,000 C

 

8.02. 242102     LEAHI HOSPITAL, SPALLING REPAIRS AND PAINTING, OAHU

 

          DESIGN AND CONSTRUCTION TO REPAIR ALL CONCRETE CRACKS AND SPALLING, REPAIR WINDOWS, AND REPAINT EXTERIOR.

          DESIGN                                            40

          CONSTRUCTION                                      550

            TOTAL FUNDING           HTH              C       590 C

 


 

8.03.      KOHALA HOSPITAL, HAWAII

 

          PLANS, DESIGN AND CONSTRUCTION TO RENOVATE AND UPGRADE HOSPITAL INFRASTRUCTURE. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      998

            TOTAL FUNDING           HTH              C      1,000 C

 

8.4.       KAHUKU MEDICAL CENTER, OAHU

 

          CONSTRUCTION AND EQUIPMENT FOR VARIOUS IMPROVEMENTS TO INCLUDE KAHUKU MEDICAL CENTER TO INCLUDE; REPLACE SLIDING DOORS, WINDOWS IN PATIENT ROOMS; REPLACE EXIT AND AUTOMATIC DOORS AND EXTERIOR PAINTING OF HOSPITAL.

          CONSTRUCTION                                      312

          EQUIPMENT                                          1

            TOTAL FUNDING           HTH              C       313 C

 

HTH430 - ADULT MENTAL HEALTH - INPATIENT

 

[9. 430122  HAWAII STATE HOSPITAL, REPAIRS AND IMPROVEMENTS, OAHU

 

          DESIGN AND CONSTRUCTION FOR VARIOUS REPAIRS AND IMPROVEMENTS.

          DESIGN                                1,430         

          CONSTRUCTION                          10,184         

            TOTAL FUNDING           AGS          11,614 C           C]

 


 

9. 430122  HAWAII STATE HOSPITAL, REPAIRS AND IMPROVEMENTS, OAHU

 

          DESIGN AND CONSTRUCTION FOR VARIOUS REPAIRS AND IMPROVEMENTS.

          DESIGN                                1,430       300

          CONSTRUCTION                          10,184      2,500

            TOTAL FUNDING           AGS          11,614 C      2,800 C

 

HTH907 - GENERAL ADMINISTRATION

 

[10. 907121 DEPARTMENT OF HEALTH, HEALTH AND SAFETY, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO HEALTH FACILITIES STATEWIDE.  PROJECTS ARE NECESSARY TO MAINTAIN HEALTH AND SAFETY FOR CLIENTS AND STAFF.

          DESIGN                                  495       620

          CONSTRUCTION                           3,633      3,508

            TOTAL FUNDING           AGS          4,128 C      4,128 C]

 

10. 907121  DEPARTMENT OF HEALTH, HEALTH AND SAFETY, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO HEALTH FACILITIES STATEWIDE.  PROJECTS ARE NECESSARY TO MAINTAIN HEALTH AND SAFETY FOR CLIENTS AND STAFF.

          DESIGN                                  495       350

          CONSTRUCTION                           3,633      9,778

            TOTAL FUNDING           AGS          4,128 C     10,128 C

 


 

11. 907122  DEPARTMENT OF HEALTH, ENERGY EFFICIENCY IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO HEALTH FACILITIES STATEWIDE TO PROVIDE FOR ENERGY SAVINGS.

          DESIGN                                  466         

          CONSTRUCTION                           1,751         

            TOTAL FUNDING           AGS          2,217 C           C

 

12.       DEPARTMENT OF HEALTH, REPAIRS AND IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR REPAIRS AND IMPROVEMENTS TO HEALTH FACILITIES, STATEWIDE

          DESIGN                                  827       191

          CONSTRUCTION                           6,338      1,112

            TOTAL FUNDING           AGS          7,165 C      1,303 C

 

12.01. 907131    DEPARTMENT OF HEALTH, RENOVATE HALAWA VECTOR CONTROL AND WAIMANO RIDGE BUILDINGS, OAHU

 

          DESIGN AND CONSTRUCTION TO RENOVATE VACANT HEALTH BUILDINGS FOR ENVIRONMENTAL HEALTH PROGRAMS BEING DISPLACED FROM ALA MOANA HEALTH CENTER AND AAFES BUILDING.

          DESIGN                                           218

          CONSTRUCTION                                     2,000

            TOTAL FUNDING           AGS              C      2,218  C

 


 

F. SOCIAL SERVICES

DEF112 - SERVICES TO VETERANS

 

[1. P90037  VETERANS CEMETERY IMPROVEMENTS, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR MISCELLANEOUS UPGRADES AND IMPROVEMENTS TO VETERANS CEMETERIES STATEWIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           6,760      3,033

            TOTAL FUNDING           DEF          6,761 C      3,034 C

                                    DEF              1 N         1 N]

 

1. P90037  VETERANS CEMETERY IMPROVEMENTS, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR MISCELLANEOUS UPGRADES AND IMPROVEMENTS TO VETERANS CEMETERIES STATEWIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           6,760      3,543

            TOTAL FUNDING           DEF          6,761 C      3,544 C

                                    DEF              1 N         1 N

 


[2. P70036  COLUMBARIA NICHES, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR ADDITIONAL COLUMBARIA NICHES STATEWIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  200         

          CONSTRUCTION                           1,000         

            TOTAL FUNDING           DEF          1,199 C           C

                                    DEF              1 N           N]

 

2. P70036  COLUMBARIA NICHES, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR ADDITIONAL COLUMBARIA NICHES STATEWIDE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                   1         

          CONSTRUCTION                              1         

            TOTAL FUNDING           DEF              2 N            N

 

3. OVS004  AIEA BAY PUMPHOUSE PROPERTY ENVIRONMENTAL REMEDIATION, OAHU

 

          DESIGN AND CONSTRUCTION FOR REMEDIATION ACTION FOR ENVIRONMENTAL CLEANUP.  SITE ASSESSMENT WILL INCLUDE A PRIORITY FOCUS ON THE MERCURY CONTAMINATION ISSUES.  MAY ALSO INCLUDE MISCELLANEOUS WORK RELATING TO SITE CLEANUP, SECURITY OF PROPERTY, AND VARIOUS CLOSE OUT ACTIONS REQUIRED BY OTHER STATE AND FEDERAL GOVERNMENT AGENCIES.

          DESIGN                                  100         

          CONSTRUCTION                                      500

            TOTAL FUNDING           DEF            100 C       500 C

 


 

4.        USS MISSOURI MEMORIAL ASSOCIATION, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION TO REPLACE AIR CONDITIONING. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             158         

            TOTAL FUNDING           DEF            160 C           C

 

HMS220 - RENTAL HOUSING SERVICES

 

[5.       KUHIO PARK TERRACE IMPROVEMENTS, OAHU

 

          CONSTRUCTION FOR DRY STANDPIPE, RAISED CROSSWALK AND SITE IMPROVEMENTS.

          CONSTRUCTION                           9,200      7,000

            TOTAL FUNDING           HMS          9,200 C      7,000 C]

 

5.        KUHIO PARK TERRACE IMPROVEMENTS, OAHU

 

          DESIGN AND CONSTRUCTION FOR SITE IMPROVEMENTS.

          DESIGN                                  200         

          CONSTRUCTION                           2,550         

            TOTAL FUNDING           HMS          2,750 C            C

 


 

6. HPHA02  MAYOR WRIGHT HOMES, RENOVATIONS AND IMPROVEMENTS, OAHU

 

          DESIGN AND CONSTRUCTION FOR MAYOR WRIGHT HOMES, TO INCLUDE THE REMOVAL OF SOLAR WATER HEATERS, ROOF REPLACEMENT, INSTALLATION OF INSTANT HOT WATER SYSTEM, PAINTING, AND OTHER IMPROVEMENTS.

          DESIGN                                   1         

          CONSTRUCTION                           5,599         

            TOTAL FUNDING           HMS          5,600 C           C

 

[7. HPHA03  PALOLO VALLEY HOMES PHYSICAL IMPROVEMENTS PHASE 2, OAHU

 

          CONSTRUCTION FOR PALOLO VALLEY HOMES, PHYSICAL IMPROVEMENTS PHASE 2.

          CONSTRUCTION                           5,000         

            TOTAL FUNDING           HMS          5,000 C           C]

 

7. HPHA03  PALOLO VALLEY HOMES PHYSICAL IMPROVEMENTS PHASE 2, OAHU

 

          DESIGN AND CONSTRUCTION FOR PALOLO VALLEY HOMES, PHYSICAL IMPROVEMENTS PHASE 2.

          DESIGN                                  500         

          CONSTRUCTION                           4,500         

            TOTAL FUNDING           HMS          5,000 C          C

 


 

[8. HPHA05  LANAKILA HOMES, MASTER PLAN FOR DEMOLITION OF REMAINING PARCELS, HAWAII

 

          PLANS FOR LANAKILA HOMES, MASTER PLAN FOR THE DEMOLITION OF REMAINING PARCELS.

          PLANS                                  100         

            TOTAL FUNDING           HMS            100 C           C]

 

9. HPHA06  LANAKILA HOMES, RENOVATION OF EXISTING BUILDINGS, HAWAII

 

          DESIGN AND CONSTRUCTION FOR LANAKILA HOMES, RENOVATION OF EXISTING BUILDINGS.

          DESIGN                                  750         

          CONSTRUCTION                                     7,500

            TOTAL FUNDING           HMS            750 C      7,500 C

 

[10. HPHA07 HALE LAULIMA, MAJOR MODERNIZATION, ROOF REPLACEMENT, TERMITE DAMAGE, OAHU

 

          CONSTRUCTION FOR HALE LAULIMA, TO INCLUDE MAJOR MODERNIZATION, ROOF REPLACEMENT, AND EXTENSIVE TERMITE DAMAGE REPAIR.

          CONSTRUCTION                                     5,000

            TOTAL FUNDING           HMS               C      5,000 C]

 


 

10. HPHA07  HALE LAULIMA, MAJOR MODERNIZATION, ROOF REPLACEMENT, TERMITE DAMAGE, OAHU

 

          DESIGN AND CONSTRUCTION FOR HALE LAULIMA, TO INCLUDE MAJOR MODERNIZATION, ROOF REPLACEMENT, AND EXTENSIVE TERMITE DAMAGE REPAIR.

          DESIGN                                           500

          CONSTRUCTION                                     4,500

            TOTAL FUNDING           HMS              C      5,000 C

 

[11. HPHA08 ADA COMPLIANCE FOR VARIOUS STATE AND FEDERAL PROJECTS, STATEWIDE

 

          CONSTRUCTION FOR RENOVATIONS FOR ADA COMPLIANCE FOR VARIOUS STATE AND FEDERAL PROJECTS.

          CONSTRUCTION                          10,000     10,000

            TOTAL FUNDING           HMS          10,000 C     10,000 C]

 

11. HPHA08  ADA COMPLIANCE FOR VARIOUS STATE AND FEDERAL PROJECTS, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR RENOVATIONS FOR ADA COMPLIANCE FOR VARIOUS STATE AND FEDERAL PROJECTS.

          PLANS                                  100       100

          DESIGN                                  100       100

          CONSTRUCTION                           9,800      9,800

            TOTAL FUNDING           HMS          10,000 C     10,000 C

 


 

12. HPHA09  PUAHALA HOMES, PHASE 1B ABATEMENT AND MODERNIZATION BUILDINGS 4, 5, 6, OAHU

 

          DESIGN AND CONSTRUCTION FOR PUAHALA HOMES, TO INCLUDE PHASE 1B ABATEMENT AND MODERNIZATION OF BUILDINGS 4, 5, AND 6.

          DESIGN                                  105         

          CONSTRUCTION                                     1,900

            TOTAL FUNDING           HMS            105 C      1,900 C

 

13. HPHA10  KALIHI VALLEY HOMES, SITE AND DWELLING IMPROVEMENTS PHASE IV, OAHU

 

          DESIGN AND CONSTRUCTION FOR KALIHI VALLEY HOMES, TO INCLUDE SITE AND DWELLING IMPROVEMENTS PHASE IV.

          DESIGN                                  700         

          CONSTRUCTION                                     7,000

            TOTAL FUNDING           HMS            700 C      7,000 C

 

14. HPHA11  HAUIKI HOMES, SITE WORK AND ROOF REPAIRS, OAHU

 

          DESIGN AND CONSTRUCTION FOR HAUIKI HOMES, SITE WORK AND ROOF REPAIRS.

          DESIGN                                  65         

          CONSTRUCTION                                      600

            TOTAL FUNDING           HMS             65 C       600 C

 


 

15. HPHA12  KAAHUMANU HOMES, SPALL REPAIR AND PAINTING FOR 19 BUILDINGS, SITE IMPROVEMENTS, OAHU

 

          DESIGN AND CONSTRUCTION FOR KAAHUMANU HOMES, TO INCLUDE SPALL REPAIR AND PAINTING FOR 19 BUILDINGS, SITE IMPROVEMENTS, AND INTERIOR RENOVATIONS.

          DESIGN                                  550         

          CONSTRUCTION                           1,800      1,800

            TOTAL FUNDING           HMS          2,350 C      1,800 C

 

[16. HPHA13 POMAIKAI, MAJOR RENOVATIONS AND SITE IMPROVEMENTS, HAWAII

 

          CONSTRUCTION FOR POMAIKAI, TO INCLUDE MAJOR RENOVATIONS, ROOF REPLACEMENT, INTERIOR REPAIRS, EXTERIOR AND SITE IMPROVEMENTS.

          CONSTRUCTION                           2,000         

            TOTAL FUNDING           HMS          2,000 C           C]

 

16. HPHA13  POMAIKAI, MAJOR RENOVATIONS AND SITE IMPROVEMENTS, HAWAII

 

          DESIGN AND CONSTRUCTION FOR POMAIKAI, TO INCLUDE MAJOR RENOVATIONS, ROOF REPLACEMENT, INTERIOR REPAIRS, EXTERIOR AND SITE IMPROVEMENTS.

          DESIGN                                  200         

          CONSTRUCTION                           1,800         

            TOTAL FUNDING           HMS          2,000 C          C

 


 

[17. HPHA14 DAVID MALO CIRCLE, EXTERIOR IMPROVEMENTS AND SITE WORK, MAUI

 

          DESIGN FOR DAVID MALO CIRCLE, TO INCLUDE EXTERIOR IMPROVEMENTS, PAINTING, ROOF REPAIRS, AND SITE WORK.

          DESIGN                                1,800         

            TOTAL FUNDING           HMS          1,800 C           C]

 

17. HPHA14  DAVID MALO CIRCLE, EXTERIOR IMPROVEMENTS AND SITE WORK, MAUI

 

          DESIGN AND CONSTRUCTION FOR DAVID MALO CIRCLE, TO INCLUDE EXTERIOR IMPROVEMENTS, PAINTING, ROOF REPAIRS, AND SITE WORK.

          DESIGN                                  200         

          CONSTRUCTION                           1,600         

            TOTAL FUNDING           HMS          1,800 C           C

 

17.01. HPHA20    SECURITY IMPROVEMENTS AT VARIOUS STATE AND FEDERAL PROJECTS, STATEWIDE

 

          PLANS FOR SECURITY IMPROVEMENTS AT VARIOUS STATE AND FEDERAL PROJECTS.

          PLANS                                            200

            TOTAL FUNDING           HMS              C       200 C

 


 

HHL602 - PLANNING AND DEVELOPMENT FOR HAWAIIAN HOMESTEADS

 

18. P11013  NAHASDA DEVELOPMENT PROJECTS, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR VARIOUS HAWAIIAN HOMESTEAD PROJECTS AND IMPROVEMENTS STATEWIDE, PURSUANT TO THE NATIVE AMERICAN HOUSING ASSISTANCE AND SELF-DETERMINATION ACT, PUBLIC LAW 107-73, 107TH CONGRESS.  FUNDS NOT NEEDED IN A COST ELEMENT MAY BE USED IN ANOTHER.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                          19,998     19,998

            TOTAL FUNDING           HHL          20,000 N     20,000 N

 

19. P11002  PAPAKOLEA SEWER SYSTEM UPGRADES, PAPAKOLEA, OAHU

 

          DESIGN AND CONSTRUCTION TO REBUILD EXISTING SEWER SYSTEM IN DHHL PAPAKOLEA SUBDIVISION.

          DESIGN                                   1         

          CONSTRUCTION                           4,999         

            TOTAL FUNDING           HHL          5,000 C           C

 


 

HTH904 - EXECUTIVE OFFICE ON AGING

 

20.       PALOLO CHINESE HOME, OAHU

 

          CONSTRUCTION FOR RENOVATION OF THE DINING HALL IN THE CARE HOME BUILDING. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          CONSTRUCTION                             500         

            TOTAL FUNDING           HTH            500 C           C

 


 

G. FORMAL EDUCATION

EDN100 - SCHOOL-BASED BUDGETING

 

[1. 20     LUMP SUM CIP -- SCHOOL BUILDING IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR THE IMPROVEMENTS OF PUBLIC SCHOOL FACILITIES, STATEWIDE.  MAY INCLUDE PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES, ROOFING AND ROOF MAINTENANCE AGREEMENTS, AIR CONDITIONING, PAINTING, PLUMBING, FURNITURE AND REPLACEMENT FURNITURE, AND OTHER REPAIRS AND IMPROVEMENTS TO PUBLIC SCHOOL FACILITIES.

          DESIGN                                2,000     10,000

          CONSTRUCTION                           8,288     51,500

            TOTAL FUNDING           EDN          10,288 B     61,500 B]

 

1. 20      LUMP SUM CIP -- SCHOOL BUILDING IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR THE IMPROVEMENTS OF PUBLIC SCHOOL FACILITIES, STATEWIDE.  MAY INCLUDE PROJECT MANAGEMENT AND CONSTRUCTION MANAGEMENT SERVICES, ROOFING AND ROOF MAINTENANCE AGREEMENTS, AIR CONDITIONING, PAINTING, PLUMBING, FURNITURE AND REPLACEMENT FURNITURE, AND OTHER REPAIRS AND IMPROVEMENTS TO PUBLIC SCHOOL FACILITIES.

          DESIGN                                2,000        10

          CONSTRUCTION                           8,288     61,490

            TOTAL FUNDING           EDN          10,288 B     61,500 B

 


 

2. 10      LUMP SUM CIP -- PROJECT ADJUSTMENT FUND, STATEWIDE

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A CONTINGENCY FUND FOR PROJECT ADJUSTMENT PURPOSES SUBJECT TO THE PROVISIONS OF THE APPROPRIATIONS ACT.  OTHER DEPARTMENT OF EDUCATION PROJECTS WITHIN THIS ACT WITH UNREQUIRED BALANCES MAY BE TRANSFERRED INTO THIS PROJECT.

          PLANS                                    1         1

          LAND                                     1         1

          DESIGN                                  600       600

          CONSTRUCTION                           1,397      1,397

          EQUIPMENT                                 1         1

            TOTAL FUNDING           EDN          2,000 B      2,000 B

 

3. 001001  LUMP SUM CIP -- RELOCATE/CONSTRUCT TEMPORARY FACILITIES, STATEWIDE

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR RELOCATION OR CONSTRUCTION OF TEMPORARY FACILITIES (INCLUDING RESTROOMS) AND RELATED SITE IMPROVEMENTS, EACH SCHOOL YEAR TO MEET ENROLLMENT SHIFTS, UNFORESEEN EMERGENCIES, AND TO PROVIDE TEMPORARY FACILITIES WHILE NEW SCHOOLS ARE BEING PLANNED AND/OR CONSTRUCTED; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                2,000       964

          CONSTRUCTION                           5,676      3,880

          EQUIPMENT                               324       156

            TOTAL FUNDING           EDN          8,000 B      5,000 B

 


 

4. 006     LUMP SUM CIP -- ADA COMPLIANCE, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR THE PROVISION OF RAMPS, ELEVATORS, AND OTHER CORRECTIVE MEASURES FOR ACCESSIBILITY TO SCHOOL FACILITIES FOR HANDICAPPED PERSONS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  900       500

          CONSTRUCTION                           4,100      2,000

            TOTAL FUNDING           EDN          5,000 B      2,500 B

 

5. 009     LUMP SUM CIP -- HEALTH AND SAFETY, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO SCHOOL FACILITIES AND GROUNDS TO MEET HEALTH AND SAFETY REQUIREMENTS INCLUDING FIRE PROTECTION PROVISIONS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  400       400

          CONSTRUCTION                           1,100      1,100

            TOTAL FUNDING           EDN          1,500 B      1,500 B

 


 

6. 008009  LUMP SUM CIP -- HAZARDOUS MATERIALS REMOVAL, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR THE CORRECTION, AND RENOVATION OF ALL EXISTING SCHOOL BUILDINGS AND CAMPUSES RELATED TO THE IDENTIFICATION AND/OR REMOVAL OF HAZARDOUS MATERIALS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                  100        50

          DESIGN                                  200       150

          CONSTRUCTION                             700       800

            TOTAL FUNDING           EDN          1,000 B      1,000 B

 

[7. 012    LUMP SUM CIP -- ELECTRICAL/INFRASTRUCTURE IMPROVEMENTS, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR ELECTRICAL, TELECOMMUNICATIONS, PROGRAM BELL AND OTHER INFRASTRUCTURE IMPROVEMENTS AT VARIOUS SCHOOLS.

          PLANS                                    1         1

          DESIGN                                   1       498

          CONSTRUCTION                          10,797      1,500

          EQUIPMENT                                 1         1

            TOTAL FUNDING           EDN          10,800 B      2,000 B]

 


 

7. 012     LUMP SUM CIP -- ELECTRICAL/INFRASTRUCTURE IMPROVEMENTS, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR ELECTRICAL, TELECOMMUNICATIONS, PROGRAM BELL AND OTHER INFRASTRUCTURE IMPROVEMENTS AT VARIOUS SCHOOLS.

          PLANS                                    1         2

          DESIGN                                   1       796

          CONSTRUCTION                          10,797      1,200

          EQUIPMENT                                 1         2

            TOTAL FUNDING           EDN          10,800 B      2,000  B

 

[8. 031    LUMP SUM CIP -- HIGH SCHOOL SCIENCE FACILITIES UPGRADES, STATEWIDE

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE IMPROVEMENT OF EXISTING OR NEW HIGH SCHOOL SCIENCE FACILITIES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                2,000       200

          CONSTRUCTION                          12,500      4,800

          EQUIPMENT                               500         

            TOTAL FUNDING           EDN          15,000 B      5,000 B]

 

8. 031     LUMP SUM CIP -- HIGH SCHOOL SCIENCE FACILITIES UPGRADES, STATEWIDE

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE IMPROVEMENT OF EXISTING OR NEW HIGH SCHOOL SCIENCE FACILITIES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                2,000       300

          CONSTRUCTION                          12,500      4,700

          EQUIPMENT                               500         

            TOTAL FUNDING           EDN          15,000 B      5,000 B

 


 

9. 000007  LUMP SUM CIP -- SPECIAL EDUCATION RENOVATIONS, STATEWIDE

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO RENOVATE CLASSROOMS TO ADDRESS SPECIAL EDUCATION NEEDS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  200       200

          CONSTRUCTION                             799       799

          EQUIPMENT                                 1         1

            TOTAL FUNDING           EDN          1,000 B      1,000 B

 

10. 19     LUMP SUM CIP -- GENDER EQUITY, STATEWIDE

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR GENDER EQUITY PROJECTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  450       450

          CONSTRUCTION                           1,500      1,500

          EQUIPMENT                                50        50

            TOTAL FUNDING           EDN          2,000 B      2,000 B

 

11. 004004  LUMP SUM CIP -- NOISE/HEAT ABATEMENT, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR CORRECTIVE MEASURES TO SCHOOLS AFFECTED BY EXCESSIVE NOISE AND VENTILATION PROBLEMS.

          DESIGN                                  500       400

          CONSTRUCTION                           2,500      1,600

            TOTAL FUNDING           EDN          3,000 B      2,000 B

 


 

12. 002002  LUMP SUM CIP -- MINOR RENOVATIONS AND IMPROVEMENTS, STATEWIDE

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR MINOR ADDITIONS, RENOVATIONS AND IMPROVEMENTS TO BUILDINGS AND SCHOOL SITES TO IMPROVE THE EDUCATIONAL PROGRAM AND TO CORRECT EDUCATIONAL SPECIFICATIONS DEFICIENCIES, INCLUDING STATE AND DISTRICT OFFICE IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  300       400

          CONSTRUCTION                           1,625      1,000

          EQUIPMENT                                75       100

            TOTAL FUNDING           EDN          2,000 B      1,500 B

 

13. 18     LUMP SUM CIP -- MASTER PLAN/LAND ACQUISITION, STATEWIDE

 

          PLANS AND LAND ACQUISITION FOR MASTER PLANNING, SITE SELECTION, PRE-LAND ACQUISITION STUDIES, ACQUISITION OF PARCELS, ACQUISITION SERVICES, FEASIBILITY STUDIES TO UPGRADE EXISTING FACILITIES, AND OTHER SERVICES NEEDED TO MEET FUTURE AND UNFORESEEN NEEDS.

          PLANS                                  500       500

          LAND                                   500       500

            TOTAL FUNDING           EDN          1,000 B      1,000 B

 


 

14. 031    LUMP SUM CIP -- ENERGY IMPROVEMENTS, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR ENERGY IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                  200       200

          DESIGN                                  300       300

          CONSTRUCTION                           1,499      1,499

          EQUIPMENT                                 1         1

            TOTAL FUNDING           EDN          2,000 B      2,000 B

 

15.       LUMP SUM CIP -- PLAYGROUND EQUIPMENT AND ACCESSIBILITY, STATEWIDE

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO REPLACE PLAYGROUND EQUIPMENT WHICH DO NOT MEET SAFETY STANDARDS, PROVIDE APPROPRIATE PADDING IN THE AREA OF PLAYGROUND EQUIPMENT, PROVIDE ACCESSIBILITY TO THE PLAY AREAS/EQUIPMENT PER AMERICAN WITH DISABILITIES ACT ACCESSIBILITY GUIDELINES (ADAAG); GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  50        50

          CONSTRUCTION                             449       449

          EQUIPMENT                                 1         1

            TOTAL FUNDING           EDN            500 B       500 B

 


 

15.01.     LUMP SUM CIP-STATE/DISTRICT RELOCATIONS IMPROVEMENTS, STATEWIDE

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR SCHOOL CONSOLIDATION IMPROVEMENTS AND RELOCATION OF STATE AND DISTRICT OFFICES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                             1

          CONSTRUCTION                                      998

          EQUIPMENT                                          1

            TOTAL FUNDING           EDN              B      1,000 B

 

15.02.     LUMP SUM CIP-TECHNOLOGY, STATEWIDE

 

          DESIGN, CONSTRUCTION, AND EQUIPMENT FOR IMPROVEMENTS TO THE DEPARTMENT OF EDUCATION'S INFORMATIONAL TECHNOLOGY SYSTEMS.

          DESIGN                                          1,000

          CONSTRUCTION                                     3,800

          EQUIPMENT                                         200

            TOTAL FUNDING           EDN              B      5,000 B

 

[16.       AIEA ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO REPLACE AIR CONDITIONING. GROUND AND SITE IMPROVEMENTS, EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                             199         

            TOTAL FUNDING           EDN            200 B           B]

 


 

16.       AIEA ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO INSTALL AIR CONDITIONING. GROUND AND SITE IMPROVEMENTS, EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                             199         

            TOTAL FUNDING           EDN            200 B          B

 

16.01.     AIEA INTERMEDIATE SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR A RETAINING WALL, PERIMETER FENCE AND GATE. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                             1

          CONSTRUCTION                                      949

            TOTAL FUNDING           EDN              B       950  B

 

17.       AIEA HIGH SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO COMPLETE THE EXPANSION AND RENOVATION FOR THE ADMINISTRATION BUILDING, AND GROUND AND SITE APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                             228         

          EQUIPMENT                                 1         

            TOTAL FUNDING           EDN            230 B           B

 


 

18.       AINA HAINA ELEMENTARY SCHOOL, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR VARIOUS PROJECTS AT THE SCHOOL; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             252         

          EQUIPMENT                                 1         

            TOTAL FUNDING           EDN            255 B           B

 

19.       ALA WAI ELEMENTARY SCHOOL, OAHU

 

          CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES.

          CONSTRUCTION                           1,000         

            TOTAL FUNDING           EDN          1,000 B           B

 

19.01.     CENTRAL MAUI MIDDLE SCHOOL, MAUI

 

          PLANS AND LAND ACQUISITION FOR A NEW MIDDLE SCHOOL CAMPUS.

          PLANS                                              2

          LAND                                             498

            TOTAL FUNDING           EDN              B       500  B

 

20. 120028  DOE DATA CENTER, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR BACKUP GENERATOR FOR EXISTING DATA CENTER OR NEW DATA CENTER AT A DIFFERENT SITE; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  300         

          CONSTRUCTION                           1,800         

          EQUIPMENT                               100         

            TOTAL FUNDING           EDN          2,200 B           B

 


 

21. 120024  EAST KAPOLEI HIGH SCHOOL, OAHU

 

          PLANS, LAND ACQUISITION AND DESIGN FOR A NEW HIGH SCHOOL CAMPUS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                  900         

          LAND                                   100         

          DESIGN                                          2,300

            TOTAL FUNDING           EDN          1,000 B      2,300 B

 

22. 120026  EAST KAPOLEI MIDDLE SCHOOL, OAHU

 

          DESIGN FOR A NEW MIDDLE SCHOOL CAMPUS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                2,500         

            TOTAL FUNDING           EDN          2,500 B           B

 

23.       ENCHANTED LAKE ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR CAMPUS WIDE ELECTRICAL UPGRADE.

          DESIGN                                   1         

          CONSTRUCTION                           1,399         

            TOTAL FUNDING           EDN          1,400 B           B

 

23.01.     EWA BEACH ELEMENTARY SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                     1,478

            TOTAL FUNDING           EDN              B      1,480  B

 


 

[24.       EWA ELEMENTARY SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO CONSTRCUT AN EIGHT-CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  700         

          CONSTRUCTION                                     9,500

          EQUIPMENT                                         100

            TOTAL FUNDING           EDN            700 B      9,600 B]

 

24.       EWA ELEMENTARY SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO CONSTRUCT AN EIGHT-CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  700         

          CONSTRUCTION                                     9,500

          EQUIPMENT                                         100

            TOTAL FUNDING           EDN            700 B      9,600 B

 

24.01. 20051     EWA MAKAI MIDDLE SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW MIDDLE SCHOOL IN THE EWA REGION; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                           100

          CONSTRUCTION                                    16,100

          EQUIPMENT                                         200

            TOTAL FUNDING           EDN              B     16,400 B

 


 

24.02.     EWA MAKAI MIDDLE SCHOOL, OAHU

 

          PLANS AND DESIGN FOR A COVERED AMPHITHEATER. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                           249

            TOTAL FUNDING           EDN              B       250 B

 

25. P10128  FARRINGTON HIGH SCHOOL, OAHU

 

          PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR THE REHABILITATION OF THE CAMPUS FACILITIES, INCLUDING SWIMMING POOL AND LOCKER ROOM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                     4,997

          EQUIPMENT                                          1

            TOTAL FUNDING           EDN               B      5,000 B

 

25.01.     HALE KULA ELEMENTARY SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO UPGRADE AND EXPAND THE CAMPUS FACILITIES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                            20

          CONSTRUCTION                                    27,960

          EQUIPMENT                                          20

            TOTAL FUNDING           EDN              B      6,000 B

                                    EDN              N     22,000 N

 


 

[26.       HAUULA ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION OF FACULTY PARKING FACILITY, NEW DRAINAGE SYSTEM AND FLOOD CONTROL MEASURES, AND RETROFIT BUILDINGS FOR SOLAR PANELING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  50         

          CONSTRUCTION                             100         

            TOTAL FUNDING           EDN            150 B           B]

 

27.       HELEMANO ELEMENTARY SCHOOL, OAHU

 

          PLANS AND DESIGN FOR A NEW LIBRARY AT HELEMANO ELEMENTARY SCHOOL. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                  499         

            TOTAL FUNDING           EDN            500 B           B

 

28.       HIGHLANDS INTERMEDIATE SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO RENOVATE THE CHORUS CLASSROOM, INCLUDING ASBESTOS REMOVAL; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  80         

          CONSTRUCTION                             400         

            TOTAL FUNDING           EDN            480 B           B

 


 

28.01.     HONOWAI ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR THE REMOVAL AND REPLACEMENT OF THE STAIRWAYS FOR BUILDING H.

          DESIGN                                             1

          CONSTRUCTION                                      189

            TOTAL FUNDING           EDN              B       190 B

 

29.       ILIAHI ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR INSTALLATION OF COVERING FOR PLAY COURT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                           1,499         

            TOTAL FUNDING           EDN          1,500 B           B

 

[30.       JAMES CAMPBELL HIGH SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR UPGRADES AND RENOVATION TO THE ATHLETIC FIELD. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             998         

            TOTAL FUNDING           EDN          1,000 B           B]

 


 

30.       JAMES CAMPBELL HIGH SCHOOL, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR IMPROVEMENTS AND UPGRADES FOR THE ATHLETIC TRACK AND FIELD COMPLEX. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             998      4,199

          EQUIPMENT                                          1

            TOTAL FUNDING           EDN          1,000 B      4,200 B

 

31.       JAMES B. CASTLE HIGH SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION TO REPLACE THE LIGHTING SYSTEM AND SOUND SYSTEM IN THE RONALD BRIGHT AUDITORIUM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                   20         

          DESIGN                                  80         

          CONSTRUCTION                             485         

            TOTAL FUNDING           EDN            585 B           B

 

[32.       KAILUA ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL SYTEM UPGRADE. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  100         

          CONSTRUCTION                           1,300         

            TOTAL FUNDING           EDN          1,400 B           B]

 


 

32.       KAILUA ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL SYSTEM UPGRADE. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  100         

          CONSTRUCTION                           1,300         

            TOTAL FUNDING           EDN          1,400 B          B

 

33.       KAILUA HIGH SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR REMOVAL AND REPLACEMENT OF SOCCER/FOOTBALL FIELD BLEACHERS/STORAGE ROOMS. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                   50         

          DESIGN                                  500         

          CONSTRUCTION                           1,950         

            TOTAL FUNDING           EDN          2,500 B           B

 

33.01.     KAILUA HIGH SCHOOL, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT TO UPGRADE THE EXISTING FOUR (4) TENNIS COURTS. PROJECT TO INCLUDE REPLACEMENT OF CURRENT EQUIPMENT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      357

          EQUIPMENT                                          1

            TOTAL FUNDING           EDN              B       360  B

 


 

34.       KAISER HIGH SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR A GIRLS ATHLETIC LOCKER ROOM. PROJECTS TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                  699         

          CONSTRUCTION                                     6,500

            TOTAL FUNDING           EDN            700 B      6,500 B

 

35.       KALAHEO HIGH SCHOOL, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR IMPROVEMENTS TO THE ATHLETIC FIELD. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           1,497         

          EQUIPMENT                                 1         

            TOTAL FUNDING           EDN          1,500 B           B

 

35.01.     KALAHEO HIGH SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION OF BLEACHERS FOR ATHLETIC FIELD AND TENNIS COURTS. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      408

            TOTAL FUNDING           EDN              B       410  B

 


 

36.       KALANI HIGH SCHOOL, OAHU

 

          DESIGN FOR GIRLS' LOCKER ROOM/SHOWER BUILDING PER TITLE IX REQUIREMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  800         

            TOTAL FUNDING           EDN            800 B           B

 

37.       KALEIOPUU ELEMENTARY SCHOOL, OAHU

 

          CONSTRUCTION FOR ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          CONSTRUCTION                                      550

            TOTAL FUNDING           EDN               B       550 B

 

37.01.     KALEIOPUU ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR A SECOND RAMP FOR CAMPUS EVACUATION; GROUND AND SITE IMPROVEMENTS; AND EQUIPMENT AND APPURTENANCES.

          DESIGN                                             1

          CONSTRUCTION                                      624

            TOTAL FUNDING           EDN              B       625  B

 

37.02.     KALIHI UKA ELEMENTARY SCHOOL, OAHU

 

          CONSTRUCTION TO RE-ROOF AND REPAIR WATER DAMAGED INFRASTRUCTURE. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          CONSTRUCTION                                      300

            TOTAL FUNDING           EDN              B       300 B

 


 

38.       KAMAILE ELEMENTARY SCHOOL, OAHU

 

          CONSTRUCTION FOR ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          CONSTRUCTION                                      800

            TOTAL FUNDING           EDN               B       800 B

 

[39.       KANEOHE ELEMENTARY SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR ADA TRANSITION PLAN; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                   30         

          DESIGN                                  150         

          CONSTRUCTION                             600         

            TOTAL FUNDING           EDN            780 B           B]

 

39.       KANEOHE ELEMENTARY SCHOOL, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR ADA TRANSITION PLAN; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                   30         

          DESIGN                                  150         

          CONSTRUCTION                             600       300

          EQUIPMENT                                         480

            TOTAL FUNDING           EDN            780 B       780 B

 


 

[40.       KANEOHE ELEMENTARY SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW PORTABLE CLASSROOM BUILDING.

          DESIGN                                   1         

          CONSTRUCTION                             398         

          EQUIPMENT                                 1         

            TOTAL FUNDING           EDN            400 B           B]

 

41.       KANOELANI ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL SYSTEM UPGRADE.

          DESIGN                                   1         

          CONSTRUCTION                             949         

            TOTAL FUNDING           EDN            950 B           B

 

41.01.     KANOELANI ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR SIX WALKWAY AWNINGS; GROUND & SITE IMPROVEMENTS; EQUIPMENT & APPURTENANCES.

          DESIGN                                            75

          CONSTRUCTION                                      675

            TOTAL FUNDING           EDN              B       750 B

 

42. 454051  KAPAA ELEMENTARY SCHOOL, KAUAI

 

          DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A NEW LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  75         

          CONSTRUCTION                           5,850         

          EQUIPMENT                                75         

            TOTAL FUNDING           EDN          6,000 B           B

 


 

43. P90080  KAPOLEI II ELEMENTARY SCHOOL, OAHU

 

          LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW ELEMENTARY SCHOOL IN THE KAPOLEI REGION; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          LAND                                              1

          DESIGN                                             1

          CONSTRUCTION                                    39,398

          EQUIPMENT                                         600

            TOTAL FUNDING           EDN               B     40,000 B

 

43.01.     KAPUNAHALA ELEMENTARY SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR COVERED WALKWAYS BETWEEN BUILDINGS A, B AND C. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      398

            TOTAL FUNDING           EDN              B       400  B

 

[44.       KAUAI HIGH SCHOOL, KAUAI

 

          PLANS, DESIGN AND CONSTRUCTION FOR A NEW GYMNATORIUM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                  100         

          CONSTRUCTION                          10,835         

            TOTAL FUNDING           EDN          10,936 B           B]

 


 

44.01.     KAWANANAKOA MIDDLE SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE PERFORMING ARTS CENTER AND AUDITORIUM RENOVATION. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                            10

          CONSTRUCTION                                     4,980

          EQUIPMENT                                          10

            TOTAL FUNDING           EDN              B      5,000  B

 

45. 370051  KEAAU MIDDLE SCHOOL, HAWAII

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  200         

          CONSTRUCTION                           2,200         

          EQUIPMENT                               100         

            TOTAL FUNDING           EDN          2,500 B           B

 

46.       KEONEULA ELEMENTARY SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR 4 NEW PORTABLE CLASSROOMS. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                           1,373         

          EQUIPMENT                                 1         

            TOTAL FUNDING           EDN          1,375 B           B

 


 

46.01.     KIHEI HIGH SCHOOL, MAUI

 

          PLANS, DESIGN AND CONSTRUCTION FOR ON AND OFF SITE INFRASTRUCTURE FOR A NEW HIGH SCHOOL IN KIHEI, MAUI. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                             10

          DESIGN                                            10

          CONSTRUCTION                                    19,980

            TOTAL FUNDING           EDN              B     20,000  B

 

[47.       KING KEKAULIKE HIGH SCHOOL, MAUI

 

          DESIGN AND CONSTRUCTION FOR A NEW AUDITORIUM; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                           1,949         

            TOTAL FUNDING           EDN          1,950 B           B]

 

48.       KING LUNALILO ELEMENTARY, OAHU

 

          PLANS, CONSTRUCTION AND EQUIPMENT FOR RESURFACING OF BASKETBALL COURTS AND PURCHASE OF HOOPS. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          CONSTRUCTION                             198         

          EQUIPMENT                                 1         

            TOTAL FUNDING           EDN            200 B           B

 


 

49.       KIPAPA ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO REPLACE AIR CONDITIONING.

          DESIGN                                             1

          CONSTRUCTION                                      199

            TOTAL FUNDING           EDN               B       200 B

 

50.       KOHALA HIGH SCHOOL, HAWAII

 

          PLANS AND DESIGN FOR A STEM/SCIENCE BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                  799         

            TOTAL FUNDING           EDN            800 B           B

 

51. 120020  KUALAPUU ELEMENTARY SCHOOL, MOLOKAI

 

          DESIGN AND CONSTRUCTION FOR A NEW WATERLINE AND/OR OTHER PROVISIONS FOR FIRE SUPPRESSION; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                           2,749         

            TOTAL FUNDING           EDN          2,750 B           B

 

[52.       LAHAINA INTERMEDIATE SCHOOL, MAUI

 

          DESIGN AND CONSTRUCTION FOR RENOVATION OF STUDENT RESTROOMS; GROUND AND SITE IMPROVEMENTS.

          DESIGN                                            85

          CONSTRUCTION                                      855

            TOTAL FUNDING           EDN               B       940 B]

 


 

52.       LAHAINA INTERMEDIATE SCHOOL, MAUI

 

          DESIGN AND CONSTRUCTION FOR RENOVATION OF STUDENT RESTROOMS; GROUND AND SITE IMPROVEMENTS. EQUIPMENT AND APPURTENANCES.

          DESIGN                                            85

          CONSTRUCTION                                      855

            TOTAL FUNDING           EDN              B       940  B

 

53. F12018  LAIE ELEMENTARY SCHOOL, OAHU

 

          CONSTRUCTION FOR THE EXPANSION OF THE CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          CONSTRUCTION                              62         

            TOTAL FUNDING           EDN             62 B           B

 

54.       LEHUA ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO EXPAND THE SCHOOL PARKING LOT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  100         

          CONSTRUCTION                             500         

            TOTAL FUNDING           EDN            600 B           B

 

55.       LINCOLN ELEMENTARY SCHOOL, OAHU

 

          DESIGN FOR AIR CONDITIONING UPGRADES FOR BUILDING C AND D IN ORDER OF PRIORITY. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  200         

            TOTAL FUNDING           EDN            200 B           B

 


 

56.       MANOA ELEMENTARY SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR THE RESURFACING OF THE BLACKTOP PLAY AREA FOR THE STUDENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                   10         

          DESIGN                                  10         

          CONSTRUCTION                             480         

            TOTAL FUNDING           EDN            500 B           B

 

[57.       MCKINLEY HIGH SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR A NEW SYNTHETIC TRACK AND FIELD; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           4,998         

            TOTAL FUNDING           EDN          5,000 B           B]

 

57.       MCKINLEY HIGH SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR A NEW SYNTHETIC TRACK AND FIELD, DEMOLITION AND CONSTRUCTION OF EXISTING STRUCTURES AND OTHER NECESSARY IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           4,998      3,000

            TOTAL FUNDING           EDN          5,000 B      3,000  B

 


 

[58.       MILILANI HIGH SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO RESURFACE TENNIS COURTS, PARKING LOT, AND DRIVEWAY.

          DESIGN                                             1

          CONSTRUCTION                                      469

            TOTAL FUNDING           EDN               B       470 B]

 

58.       MILILANI HIGH SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO RECONSTRUCT AND RESURFACE TENNIS COURTS, PARKING LOT, AND DRIVEWAY.

          DESIGN                                             1

          CONSTRUCTION                                      899

            TOTAL FUNDING           EDN              B       900 B

 

59.       MILILANI HIGH SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO REPLACE AND UPGRADE FIBER-OPTIC BACKBONE AND BUILDING NETWORK CABLING.

          DESIGN                                   1         

          CONSTRUCTION                             999         

            TOTAL FUNDING           EDN          1,000 B           B

 

59.01.     MILILANI HIGH SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO RESURFACE THE LOWER PARKING LOT AND DRIVEWAY; GROUND & SITE IMPROVEMENTS; EQUIPMENT & APPURTENANCES.

          DESIGN                                            25

          CONSTRUCTION                                      325

            TOTAL FUNDING           EDN              B       350 B

 


 

59.02.     MILILANI HIGH SCHOOL, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR ADDITIONAL RESTROOMS AND UPGRADE OF CONCESSION STAND FOR ATHLETIC FIELD; GROUND & SITE IMPROVEMENTS; EQUIPMENT & APPURTENANCES.

          PLANS                                             10

          DESIGN                                            10

          CONSTRUCTION                                     1,070

          EQUIPMENT                                          10

            TOTAL FUNDING           EDN              B      1,100 B

 

60.       MILILANI MAUKA ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR INSTALLATION OF COVERED WALKWAYS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                             500         

            TOTAL FUNDING           EDN            501 B           B

 

60.01.     MILILANI MAUKA ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR RESURFACING OF PARKING LOT; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                             1

          CONSTRUCTION                                      248

          EQUIPMENT                                          1

            TOTAL FUNDING           EDN              B       250  B

 


 

61.       MILILANI MIDDLE SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR INSTALLATION OF A COVERING FOR OUTDOOR PLAY COURT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                             500         

            TOTAL FUNDING           EDN            501 B           B

 

62.       MILILANI MIDDLE SCHOOL, OAHU

 

          CONSTRUCTION TO REPAIR AND REPLACE ROOFS ON BUILDINGS G AND F.

          CONSTRUCTION                             750         

            TOTAL FUNDING           EDN            750 B           B

 

63.       MILILANI IKE ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR REPAIR AND RENOVATION OF COVERED PLAY COURT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                             149         

            TOTAL FUNDING           EDN            150 B           B

 


 

64.       MILILANI UKA ELEMENTARY SCHOOL, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR INSTALLATION OF NEW PLAYGROUND EQUIPMENT. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                              72         

          EQUIPMENT                                 1         

            TOTAL FUNDING           EDN             75 B           B

 

65.       MOANALUA HIGH SCHOOL, OAHU

 

          CONSTRUCTION AND EQUIPMENT FOR SCHOOL AUDITORIUM/PERFORMING ARTS CENTER TO COMPLETE PHASE 1. GROUND AND SITE IMPROVEMENTS, INFRASTRUCTURE, EQUIPMENT AND APPURTENANCES, AND ALL RELATED PROJECT COSTS.

          CONSTRUCTION                             599         

          EQUIPMENT                                 1         

            TOTAL FUNDING           EDN            600 B           B

 

65.01.     MOANALUA MIDDLE SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO RE-ROOF BUILDINGS C AND D; GROUND & SITE IMPROVEMENTS; EQUIPMENT & APPURTENANCES.

          DESIGN                                             1

          CONSTRUCTION                                      449

            TOTAL FUNDING           EDN              B       450 B

 


 

66.       MOMILANI ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                             599         

            TOTAL FUNDING           EDN            600 B           B

 

67.       NOELANI ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO EXPAND THE CURRENT SCHOOL LIBRARY SPACE FOR AN EXPANDED LIBRARY COLLECTION, WORK SPACE, AND INCLUSION OF A TECHNOLOGY/MEDIA CENTER WITHIN THE LIBRARY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  100         

          CONSTRUCTION                             900         

            TOTAL FUNDING           EDN          1,000 B           B

 

67.01.     NUUANU ELEMENTARY SCHOOL, OAHU

 

          PLANS, CONSTRUCTION AND EQUIPMENT TO RECOAT WALKWAY ROOF LOCATED IN THE FRONT OF THE SCHOOL. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          CONSTRUCTION                                        8

          EQUIPMENT                                          1

            TOTAL FUNDING           EDN              B        10 B

 


 

68.       OLOMANA SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION OF A TWELVE-FOOT EXTENSION TO THE EXISTING PHYSICAL EDUCATION PORTABLE TO ACCOMMODATE INCREASING NUMBERS OF "AT-RISK" STUDENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    5         

          DESIGN                                   8         

          CONSTRUCTION                              75         

            TOTAL FUNDING           EDN             88 B           B

 

69.       PAHOA ELEMENTARY SCHOOL, HAWAII

 

          PLANS AND DESIGN FOR A NEW CAFETERIA; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                  999         

            TOTAL FUNDING           EDN          1,000 B           B

 

70.       PEARL CITY HIGHLANDS, OAHU

 

          DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                             949         

            TOTAL FUNDING           EDN            950 B           B

 


 

70.01.     PEARL CITY HIGH SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION TO INSTALL A SYNTHETIC TRACK AND FIELD AT THE BINO NEVES STADIUM; GROUND & SITE IMPROVEMENTS; EQUIPMENT & APPURTENANCES.

          PLANS                                            275

          DESIGN                                           275

          CONSTRUCTION                                     4,950

            TOTAL FUNDING           EDN              B      5,500 B

 

71.       PEARLRIDGE ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                           1,149         

            TOTAL FUNDING           EDN          1,150 B           B

 

71.01.     PRESIDENT THEODORE ROOSEVELT HIGH SCHOOL, OAHU

 

          PLANS AND DESIGN FOR A MASTER PLAN; GROUND & SITE IMPROVEMENTS; EQUIPMENT & APPURTENANCES.

          PLANS                                            125

          DESIGN                                           125

            TOTAL FUNDING           EDN              B       250 B

 


 

71.02.     PEARLRIDGE ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR COVERED WALKWAYS; GROUND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                             1

          CONSTRUCTION                                      649

            TOTAL FUNDING           EDN              B       650 B

 

[72.       PRINCESS NAHIENAENA ELEMENTARY SCHOOL, MAUI

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR TWO PORTABLE CLASSROOMS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  60         

          CONSTRUCTION                             656         

          EQUIPMENT                                24         

            TOTAL FUNDING           EDN            740 B           B]

 

73.       PUOHALA ELEMENTARY SCHOOL, OAHU

 

          PLANS AND DESIGN FOR A STRUCTURAL ASSESSMENT TO ADDRESS THE SEPARATION OF WALLS IN BUILDINGS ON CAMPUS.

          PLANS                                    1         

          DESIGN                                  249         

            TOTAL FUNDING           EDN            250 B           B

 


 

73.01.     PUUHALE ELEMENTARY SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW ADMINISTRATION ANNEX BUILDING. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                            10

          CONSTRUCTION                                     6,680

          EQUIPMENT                                          10

            TOTAL FUNDING           EDN              B      6,700 B

 

73.02.     RADFORD HIGH SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO UPGRADE ALL-WEATHER TRACK FROM SIX TO EIGHT LANES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                            10

          CONSTRUCTION                                      580

          EQUIPMENT                                          10

            TOTAL FUNDING           EDN              B       600 B

 

74.       ROYAL ELEMENTARY SCHOOL, OAHU

 

          PLANS AND DESIGN FOR BUILDING C. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                  199         

            TOTAL FUNDING           EDN            200 B           B

 


 

74.01.     ROYAL KUNIA ELEMENTARY SCHOOL, OAHU

 

          PLANS FOR A NEW ELEMENTARY SCHOOL CAMPUS IN ROYAL KUNIA. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                            150

            TOTAL FUNDING           EDN              B       150 B

 

75.       SALT LAKE ELEMENTARY SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO RENOVATE INTERIOR CLASSROOMS OF C-1; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  200         

          CONSTRUCTION                             500         

          EQUIPMENT                               300         

            TOTAL FUNDING           EDN          1,000 B           B

 

76.       SEAGULL SCHOOLS PRESCHOOL, OAHU

 

          CONSTRUCTION OF A NEW CLASSROOM BUILDING LOCATED AT KAPOLEI ELEMENTARY SCHOOL. THIS PROJECT QUALIFIES AS A GRANT PURSUANT TO CHAPTER 42F, HRS.

          CONSTRUCTION                             300         

            TOTAL FUNDING           EDN            300 C           C

 


 

77.       STEVENSON MIDDLE SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION OF BUILDING A, MULTI-PURPOSE SCIENCE LEARNING CENTER; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                  225         

          DESIGN                                  225         

          CONSTRUCTION                                     6,750

            TOTAL FUNDING           EDN            450 B      6,750 B

 

78.       WAIAKEA HIGH SCHOOL, HAWAII

 

          CONSTRUCTION AND EQUIPMENT FOR THE SCHOOL'S NEW ALL-WEATHER TRACK AND FIELD FACILITY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          CONSTRUCTION                           3,000         

          EQUIPMENT                                         500

            TOTAL FUNDING           EDN          3,000 B       500 B

 

79.       WAIAKEAWAENA ELEMENTARY SCHOOL, HAWAII

 

          CONSTRUCTION FOR ADDITIONAL PARKING ON KINOOLE STREET; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          CONSTRUCTION                                      450

            TOTAL FUNDING           EDN               B       450 B

 


 

80.       WAIAU ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR CAMPUS-WIDE ELECTRICAL UPGRADES; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                             1

          CONSTRUCTION                                     1,199

            TOTAL FUNDING           EDN               B      1,200 B

 

80.01.     WAIKELE ELEMENTARY SCHOOL, OAHU

 

          PLANS AND DESIGN FOR EXPANSION OF EXISTING CAFETERIA TO INCLUDE A PERFORMING ARTS STAGE; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                           793

            TOTAL FUNDING           EDN              B       794  B

 

81.       WAIMANALO ELEMENTARY AND INTERMEDIATE SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION TO INSTALL CAMPUS-WIDE IRRIGATION SYSTEM. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                             499         

            TOTAL FUNDING           EDN            500 B           B

 


 

81.01.     WAIMANALO ELEMENTARY AND INTERMEDIATE SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR SCHOOL-WIDE ELECTRICAL UPGRADE; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      348

            TOTAL FUNDING           EDN              B       350  B

 

82. P90122  WAIPAHU ELEMENTARY SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR A CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                           8,099         

            TOTAL FUNDING           EDN          8,100 B           B

 

83.       WAIPAHU HIGH SCHOOL, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR ELECTRICAL UPGRADES IN BUILDINGS H, G, AND Q; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                              58         

            TOTAL FUNDING           EDN             60 B           B

 


 

83.01.     WAIPAHU HIGH SCHOOL, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT  FOR SYNTHETIC FIELD TURF AND TRACK IMPROVEMENTS. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                             25

          DESIGN                                            25

          CONSTRUCTION                                     4,175

          EQUIPMENT                                          25

            TOTAL FUNDING           EDN              B      4,250 B

 

84.       WAIPAHU INTERMEDIATE SCHOOL, OAHU

 

          DESIGN FOR AN EIGHT CLASSROOM BUILDING; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                  800         

            TOTAL FUNDING           EDN            800 B           B

 

85.       WASHINGTON MIDDLE SCHOOL, OAHU

 

          DESIGN AND CONSTRUCTION FOR ELECTRICAL UPGRADES FOR THE SCHOOL KITCHEN, CAFETERIA, AND BUILDING B; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                   1         

          CONSTRUCTION                             179         

            TOTAL FUNDING           EDN            180 B           B

 


 

85.01.     WASHINGTON MIDDLE SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO RENOVATE A CLASSROOM IN BUILDING H. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                            25

          CONSTRUCTION                                      425

          EQUIPMENT                                          25

            TOTAL FUNDING           EDN              B       475 B

 

85.02.     WASHINGTON MIDDLE SCHOOL, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT TO RENOVATE COMPUTER CLASSROOM IN BUILDING C. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          DESIGN                                             1

          CONSTRUCTION                                      193

          EQUIPMENT                                          1

            TOTAL FUNDING           EDN              B       195 B

 

EDN400 - SCHOOL SUPPORT

 

86. 000014  LUMP SUM CIP -- PROJECT POSITIONS, STATEWIDE

 

          PLANS FOR COSTS RELATED TO WAGES AND FRINGES FOR PERMANENT, PROJECT-FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENTS PROGRAM PROJECTS FOR THE DEPARTMENT OF EDUCATION.  PROJECT MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

          PLANS                                 5,200      5,200

            TOTAL FUNDING           EDN          5,200 B      5,200 B

 


 

EDN600 - CHARTER SCHOOLS

 

[87.       WEST HAWAII EXPLORATIONS ACADEMY, HAWAII

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR RELOCATION OF CAMPUS FACILITIES.  THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          LAND                                     1         

          DESIGN                                   1         

          CONSTRUCTION                           1,496         

          EQUIPMENT                                 1         

            TOTAL FUNDING           EDN          1,500 C           C]

 

87.       THE EXPLORATION FOUNDATION, HAWAII

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR RELOCATION OF THE EXPLORATION ACADEMY PCS CAMPUS FACILITIES.  THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          LAND                                     1         

          DESIGN                                   1         

          CONSTRUCTION                           1,496         

          EQUIPMENT                                 1         

            TOTAL FUNDING           EDN          1,500 C           C

 


 

[88.       VOLCANO SCHOOL OF ARTS AND SCIENCES, HAWAII

 

          PLANS AND DESIGN TO RELOCATE VOLCANO SCHOOL OF ARTS AND SCIENCES TO KEAKEALANI SCHOOL IN VOLCANO VILLAGE ON THE ISLAND OF HAWAII.  THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                  309         

          DESIGN                                  309         

            TOTAL FUNDING           EDN            618 C           C]

 

88.       FRIENDS OF THE VOLCANO SCHOOL OF ARTS AND SCIENCES, HAWAII

 

          PLANS AND DESIGN TO RELOCATE VOLCANO SCHOOL OF ARTS AND SCIENCES TO KEAKEALANI SCHOOL IN VOLCANO VILLAGE ON THE ISLAND OF HAWAII.  THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                  309         

          DESIGN                                  309         

            TOTAL FUNDING           EDN            618 C           C

 

88.01.     AHA PUNANA LEO, INC, KAUAI

 

          PLANS, DESIGN AND CONSTRUCTION FOR A PHOTOVOLTAIC SYSTEM FOR KE KULA NIIHAU O KEKAHA CHARTER SCHOOL. THIS PROJECT QUALIFIES AS A GRANT PURSUANT TO CHAPTER 42F, HRS

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      179

            TOTAL FUNDING           EDN              C       181 C

 


 

EDN407 - PUBLIC LIBRARIES

 

[89. 01-H S HEALTH AND SAFETY, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR HEALTH, SAFETY, ACCESSIBILITY, AND OTHER CODE REQUIREMENTS.  PROJECTS MAY INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL OF HAZARDOUS MATERIALS, RENOVATIONS FOR LIBRARY PATRONS AND EMPLOYEES, ENVIRONMENTAL CONTROLS, FIRE PROTECTION, IMPROVEMENTS TO BUILDINGS AND GROUNDS, AND OTHERS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                  200       200

          DESIGN                                  600       600

          CONSTRUCTION                           1,200      1,200

            TOTAL FUNDING           EDN          2,000 C     2,000  C]

 

89. 01-H S  HEALTH AND SAFETY, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR HEALTH, SAFETY, ACCESSIBILITY, AND OTHER CODE REQUIREMENTS.  PROJECTS MAY INCLUDE, BUT NOT BE LIMITED TO, THE REMOVAL OF HAZARDOUS MATERIALS, RENOVATIONS FOR LIBRARY PATRONS AND EMPLOYEES, ENVIRONMENTAL CONTROLS, FIRE PROTECTION, IMPROVEMENTS TO BUILDINGS AND GROUNDS, AND OTHERS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                  200       200

          DESIGN                                  600       700

          CONSTRUCTION                           1,200      1,000

          EQUIPMENT                                         100

            TOTAL FUNDING           AGS          2,000 C      2,000 C

 


 

89.01. P90124    AIEA PUBLIC LIBRARY, OAHU

 

          CONSTRUCTION AND EQUIPMENT TO RELOCATE AIEA PUBLIC LIBRARY FROM ITS CURRENT LOCATION TO A PARCEL OF LAND ALREADY OWNED BY THE STATE NEAR THE OLD SUGAR MILL PROPERTY; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          CONSTRUCTION                                     1,525

          EQUIPMENT                                         225

            TOTAL FUNDING           AGS              C      1,750  C

 

[90.       KANEOHE PUBLIC LIBRARY, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION OF NEW, ADA COMPLIANT CIRCULATION DESK.

          PLANS                                              5

          DESIGN                                             5

          CONSTRUCTION                                       10

            TOTAL FUNDING           EDN               C       20  C]

 

90.       KANEOHE PUBLIC LIBRARY, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION OF NEW, ADA COMPLIANT CIRCULATION DESK.

          PLANS                                              5

          DESIGN                                             5

          CONSTRUCTION                                       10

            TOTAL FUNDING           AGS              C        20 C

 

[91.       NEW NANAKULI PUBLIC LIBRARY, OAHU

 

          DESIGN FOR A NEW NANAKULI PUBLIC LIBRARY.

          DESIGN                                1,075         

            TOTAL FUNDING           EDN          1,075 C           C]

 


 

91.       NEW NANAKULI PUBLIC LIBRARY, OAHU

 

          DESIGN FOR A NEW NANAKULI PUBLIC LIBRARY.

          DESIGN                                1,075         

            TOTAL FUNDING           AGS          1,075 C            C

 

UOH100 - UNIVERSITY OF HAWAII, MANOA

 

[92.       MOKU O LO'E  (COCONUT ISLAND), OAHU

 

          PLANS, CONSTRUCTION AND EQUIPMENT TO DEMOLISH THE OLD AND DILIPIDATED STRUCTURE THAT WAS ONCE PART OF THE PAULEY GUEST HOUSE AND RESIDENCE ON THE ISLAND. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS, INFRASTRUCTURE, EQUIPMENT AND APPURTENANCES, AND ALL RELATED PROJECT COSTS.

          PLANS                                    1         

          CONSTRUCTION                             698         

          EQUIPMENT                                 1         

            TOTAL FUNDING           UOH            700 C           C]

 


 

92.01. R15  UHM, COCONUT ISLAND IMPROVEMENTS, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR IMPROVEMENTS TO COCONUT ISLAND FOR THE INSTITUTE OF MARINE BIOLOGY. PROJECT MAY INCLUDE THE REPAIR, RENOVATION AND MODERNIZATION OF EXISTING FACILITIES; INFRASTRUCTURE; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES; DEVELOPMENT OF RENEWABLE ENERGY; IMPROVEMENTS TO MAILE POINT AND LILIPUNA PIER; AND ALL PROJECT RELATED COSTS.

          PLANS                                            500

          DESIGN                                          4,365

          CONSTRUCTION                                     4,049

          EQUIPMENT                                          1

            TOTAL FUNDING           UOH              C      8,915  C

 

92.02.     UHM, URBAN AGRICULTURAL CENTER, OAHU

 

          PLANS FOR AN URBAN AGRICULTURAL CENTER ON THE MAGOON PROPERTY FOR THE UNIVERSITY OF HAWAII MANOA, OAHU.

          PLANS                                            500

            TOTAL FUNDING           UOH              C       500 C

 


 

92.03.     UHM, HEMINGWAY HALL AND STUDENT CAMPUS CENTER, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR IMPROVEMENTS AND UPGRADES FOR HEMINGWAY HALL AND CAMPUS CENTER FACILITIES.

          DESIGN                                           400

          CONSTRUCTION                                     2,600

          EQUIPMENT                                       1,000

            TOTAL FUNDING           UOH              C      4,000  C

 

92.04.     UHM, RICHARDSON LAW SCHOOL, EXPANSION AND MODERNIZATION, OAHU

 

          DESIGN FOR THE EXPANSION AND MODERNIZATION OF THE WEST WING OF THE WILLIAM S. RICHARDSON SCHOOL OF LAW.  PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS, DEVELOPMENT OF NEW FACILITY, AND ALL PROJECT EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

          DESIGN                                           825

            TOTAL FUNDING           UOH              C       825 C

 


 

UOH210 - UNIVERSITY OF HAWAII, HILO

 

93.       UHH, STUDENT HOUSING DEVELOPMENTS, PHASE 1, HAWAII

 

          PLANS, DESIGN AND CONSTRUCTION FOR THE DEVELOPMENT OF STUDENT HOUSING FACILITIES FOR THE UNIVERSITY OF HAWAII AT HILO; GROUND AND SITE IMPROVEMENTS, EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                          31,998         

            TOTAL FUNDING           UOH          16,000 C           C

                                    UOH          16,000 E           E

 

94.       LIVING LEARNING COMMUNITY, UNIVERSITY OF HAWAII AT HILO, HAWAII

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE RENOVATION OF EXISTING FACILITIES AND DEVELOPMENT OF AN ADDITION TO UNIVERSITY OF HAWAII AT HILO STUDENT HOUSING.PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS, EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                  700         

          CONSTRUCTION                           7,100         

          EQUIPMENT                               200         

            TOTAL FUNDING           UOH          4,000 C           C

                                    UOH          4,000 N           N

 


 

94.01.     UHH, COLLEGE OF PHARMACY AND HEALTH SCIENCES, PHASE I, HAWAII

 

          CONSTRUCTION AND EQUIPMENT FOR THE UNIVERSITY OF HAWAII AT HILO COLLEGE OF PHARMACY BUILDING.  PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

          CONSTRUCTION                                    33,000

          EQUIPMENT                                       5,000

            TOTAL FUNDING           UOH              C     33,000  C

                                    UOH              E      5,000 E

 

UOH700 - UNIVERSITY OF HAWAII, WEST OAHU

 

95.       UNIVERSITY OF HAWAII - WEST OAHU, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A PHOTOVOLTAIC PANEL ARRAY TO GENERATE POWER FOR THE NEW UH WEST OAHU CAMPUS IN KAPOLEI.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           2,497         

          EQUIPMENT                                 1         

            TOTAL FUNDING           UOH          2,500 C           C

 


 

95.01.     UNIVERSITY OF HAWAII - WEST OAHU, OAHU

 

          DESIGN AND CONSTRUCTION OF ROAD A ON THE CAMPUS OF UHWO TO CONNECT TO FARRINGTON HIGHWAY; PROJECT TO INCLUDE NECESSARY INTERSECTION IMPROVEMENTS.

          DESIGN                                           250

          CONSTRUCTION                                     2,250

            TOTAL FUNDING           UOH              C      2,500  C

 

95.02.     UNIVERSITY OF HAWAII - WEST OAHU, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR CAMPUS-WIDE SITEWORK AND IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                            100

          DESIGN                                           200

          CONSTRUCTION                                     4,074

          EQUIPMENT                                          1

            TOTAL FUNDING           UOH              C      4,375 C

 

95.03.     UNIVERSITY OF HAWAII - WEST OAHU, OAHU

 

          PLANS AND DESIGN FOR AN ACADEMY OF CREATIVE MEDIA FACILITY TO BE LOCATED ON THE CAMPUS OF UHWO.  PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

          PLANS                                            200

          DESIGN                                           700

            TOTAL FUNDING           UOH              C       900  C

 


 

95.04.     UNIVERSITY OF HAWAII - WEST OAHU, OAHU

 

          PLANS AND DESIGN FOR THE ALLIED HEALTH BUILDING. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

          PLANS                                            200

          DESIGN                                           795

            TOTAL FUNDING           UOH              C       995 C

 

UOH800 - UNIVERSITY OF HAWAII, COMMUNITY COLLEGES

 

96. L28    LEE, EDUCATION AND INNOVATION FACILITY, OAHU

 

          DESIGN, CONSTRUCTION, AND EQUIPMENT FOR A NEW EDUCATION AND INNOVATION INSTRUCTIONAL FACILITY AT LEEWARD COMMUNITY COLLEGE.

          DESIGN                                  332         

          CONSTRUCTION                          16,810         

          EQUIPMENT                              1,871         

            TOTAL FUNDING           UOH          19,013 C           C

 


 

97.       MAU, RENOVATION OF THE ORIGINAL SCIENCE BUILDING, MAUI

 

          CONSTRUCTION AND EQUIPMENT FOR THE RENOVATION OF THE EXISTING SCIENCE BUILDING TO HOUSE ALLIED HEALTH PROGRAMS AT UNIVERSITY OF HAWAII MAUI COLLEGE. PROJECT INCLUDES RENOVATION OF EXISTING FACILITY, EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

          CONSTRUCTION                                     4,000

          EQUIPMENT                                         501

            TOTAL FUNDING           UOH               C      4,501 C

 

98.       HAW, HAWAII COMMUNITY COLLEGE, HAWAII

 

          PLANS TO UPDATE THE LONG RANGE DEVELOPMENT PLAN FOR THE HAWAII COMMUNITY COLLEGE CAMPUS.

          PLANS                                            500

            TOTAL FUNDING           UOH               C       500 C

 

99.       LEE, WAIANAE EDUCATION CENTER, OAHU

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE WAIANAE EDUCATION CENTER.

          PLANS                                    1         

          LAND                                   500         

          DESIGN                                  500         

          CONSTRUCTION                           1,998         

          EQUIPMENT                                 1         

            TOTAL FUNDING           UOH          3,000 C           C

 


 

[100.      SYS, MINOR CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR CAMPUSES OF THE COMMUNITY COLLEGE SYSTEM, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR MINOR CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR CAMPUS FACILITIES WITHIN THE UNIVERSITY OF HAWAII, COMMUNITY COLLEGE SYSTEM.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           9,997         

          EQUIPMENT                                 1         

            TOTAL FUNDING           UOH          10,000 C           C]

 

100.       SYS, MINOR CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR CAMPUSES OF THE COMMUNITY COLLEGE SYSTEM, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR MINOR CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR CAMPUS FACILITIES WITHIN THE UNIVERSITY OF HAWAII, COMMUNITY COLLEGE SYSTEM.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           9,997      9,997

          EQUIPMENT                                 1         1

            TOTAL FUNDING           UOH          10,000 C     10,000  C

 


 

100.01. B42 KAP, CULINARY INSTITUTE OF THE PACIFIC - DIAMOND HEAD, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE DEVELOPMENT OF THE CULINARY INSTITUTE OF THE PACIFIC. PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS, DEVELOPMENT OF NEW FACILITY, AND ALL PROJECT EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

          DESIGN                                             1

          CONSTRUCTION                                     9,998

          EQUIPMENT                                          1

            TOTAL FUNDING           UOH              C     10,000 C

 

100.02.    HCC-HONOLULU COMMUNITY COLLEGE - ADVANCED TECHNOLOGY AND TRAINING CENTER, OAHU

 

          CONSTRUCTION AND EQUIPMENT FOR NEW SCIENCE AND TECHNOLOGY FACILITY FOR HONOLULU COMMUNITY COLLEGE.

          CONSTRUCTION                                    36,109

          EQUIPMENT                                          1

            TOTAL FUNDING           UOH              C     36,110  C

 

100.03.    WEST HAWAII COMMUNITY COLLEGE AT PALAMANUI, HAWAII

 

          CONSTRUCTION AND EQUIPMENT FOR PHASE 2 AT HAWAII COMMUNITY COLLEGE AT PALAMANUI.  PROJECT TO INCLUDE GROUND AND SITE IMPROVEMENTS AND ALL PROJECT EQUIPMENT AND APPURTENANCES, AND ALL PROJECT RELATED COSTS.

          CONSTRUCTION                                     7,499

          EQUIPMENT                                          1

            TOTAL FUNDING           UOH              C      7,500 C

 


 

UOH900 - UNIVERSITY OF HAWAII, SYSTEMWIDE SUPPORT

 

[101. 536  SYS, HEALTH, SAFETY, AND CODE REQUIREMENTS, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR MODIFICATIONS TO EXISTING FACILITIES AND/OR CONSTRUCTION OF NEW FACILITIES FOR HEALTH, SAFETY, AND CODE REQUIREMENTS.

          PLANS                                  301         

          DESIGN                                1,255         

          CONSTRUCTION                          28,444      3,977

            TOTAL FUNDING           UOH          30,000 C      3,977 C]

 

101. 536   SYS, HEALTH, SAFETY, AND CODE REQUIREMENTS, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR MODIFICATIONS TO EXISTING FACILITIES AND/OR CONSTRUCTION OF NEW FACILITIES FOR HEALTH, SAFETY, AND CODE REQUIREMENTS.

          PLANS                                  301         1

          DESIGN                                1,255         1

          CONSTRUCTION                          28,444      3,974

          EQUIPMENT                                          1

            TOTAL FUNDING           UOH          30,000 C      3,977 C

 


 

102. 541   SYS, CAPITAL RENEWAL AND DEFERRED MAINTENANCE, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR IMPROVEMENTS TO UNIVERSITY OF HAWAII FACILITIES.  PROJECTS TO INCLUDE CAPITAL RENEWAL, REDUCTION OF MAINTENANCE BACKLOG, MAJOR AND MINOR RENOVATIONS, MODERNIZATION OF FACILITIES, REROOFING, MECHANICAL AND ELECTRICAL SYSTEMS, RESURFACING, REPAINTING, AND OTHER REPAIRS AND PROJECT COSTS TO UPGRADE FACILITIES AT ALL UNIVERSITY CAMPUSES.

          PLANS                                    1         1

          DESIGN                                3,000         1

          CONSTRUCTION                          46,998      9,997

          EQUIPMENT                                 1         1

            TOTAL FUNDING           UOH          50,000 C     10,000 C

 

103. 548   SYS, UNIVERSITY OF HAWAII PROJECT ADJUSTMENT FUND, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A PROJECT ADJUSTMENT FUND FOR THE UNIVERSITY OF HAWAII.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                              1         

          EQUIPMENT                                 1         

            TOTAL FUNDING           UOH              4 C           C

 


 

H. CULTURE AND RECREATION

LNR804 - FOREST AND OUTDOOR RECREATION

 

1. D00K    LUMP SUM IMPROVEMENTS AT DOFAW FACILITIES FOR FORESTS AND/OR OUTDOOR RECREATION, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION AT DOFAW FACILITIES FOR FORESTS AND/OR OUTDOOR RECREATION.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           3,323         

            TOTAL FUNDING           LNR          3,325 C           C

 

1.01.      MOANALUA GARDENS FOUNDATION, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR KAMANANUI VALLEY ROAD IMPROVEMENTS; TO INCLUDE LEVELING, GRADING AND OTHER SITE IMPROVEMENTS. THIS PROJECT QUALIFIES AS A GRANT PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      607

          EQUIPMENT                                          1

            TOTAL FUNDING           LNR              C       610 C

 

LNR806 - PARKS ADMINISTRATION AND OPERATION

 

2.        STATE PARKS ENERGY AND WATER EFFICIENCY IMPROVEMENTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION OF ENERGY AND WATER EFFICIENCY AND RELATED IMPROVEMENTS.

          DESIGN                                  500         

          CONSTRUCTION                             500      1,000

            TOTAL FUNDING           LNR          1,000 C      1,000 C

 


 

3.        LUMP SUM CIP, STATE PARKS IMPROVEMENTS, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION OF REPAIR AND MAINTENANCE IMPROVEMENTS AND OTHER RELATED IMPROVEMENTS AT STATE PARKS FACILITIES. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                    1         1

          DESIGN                                2,029       899

          CONSTRUCTION                          16,245     17,820

            TOTAL FUNDING           LNR          18,075 C     18,520 C

                                    LNR            200 N       200 N

 

[4.       CENTRAL MAUI REGIONAL PARK, MAUI

 

          PLANS, LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR ESTABLISHMENT OF A REGIONAL PARK IN THE AREA OF CENTRAL MAUI; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          LAND                                     1         

          DESIGN                                   1         

          CONSTRUCTION                           8,997         

            TOTAL FUNDING           LNR          9,000 C           C]

 


 

4.        CENTRAL MAUI REGIONAL PARK, MAUI

 

          PLANS, LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR ESTABLISHMENT OF A REGIONAL PARK IN THE AREA OF CENTRAL MAUI; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         1

          LAND                                     1         1

          DESIGN                                   1         1

          CONSTRUCTION                           8,997      4,997

            TOTAL FUNDING           LNR          9,000 C      5,000 C

 

5.        LUALUALEI FLATS/PUHAWAI STREAM, OAHU

 

          CONSTRUCTION FOR FLOOD MITIGATION.

          CONSTRUCTION                           2,000         

            TOTAL FUNDING           LNR          2,000 C           C

 

[6.       MANA DRAG RACING STRIP, KAUAI

 

          PLANS, DESIGN AND CONSTRUCTION TO UPGRADE AND RESURFACE MANA DRAG RACING STRIP. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             498         

            TOTAL FUNDING           LNR            500 C           C]

 


 

6.        MANA DRAG RACING STRIP, KAUAI

 

          PLANS, DESIGN AND CONSTRUCTION TO UPGRADE AND RESURFACE MANA DRAG RACING STRIP. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                             498       998

            TOTAL FUNDING           LNR            500 C      1,000 C

 

7.        FRIENDS OF IOLANI PALACE, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR CONTINUING RENOVATIONS, REPAIRS AND RESTORATION WITHIN THE PALACE COMPLEX. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                             498         

            TOTAL FUNDING           LNR            500 C           C

 

7.01.      PUHAWAI CULVERT, OAHU

 

          DESIGN AND CONSTRUCTION FOR THE PUHAWAI CULVERT REPLACEMENT.

          DESIGN                                             5

          CONSTRUCTION                                     1,995

            TOTAL FUNDING           LNR              S      2,000 S

 


 

LNR801 - OCEAN-BASED RECREATION

 

8.        MALA BOAT RAMP AND LOADING DOCK, LAHAINA, MAUI

 

          CONSTRUCTION FOR NEW LOADING DOCKS, IMPROVEMENTS TO BOAT RAMP, PARKING LOT AND RELATED IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                             800         

            TOTAL FUNDING           LNR            200 C           C

                                    LNR            600 N           N

 

9.        KIKIAOLA SMALL BOAT HARBOR SAND BY-PASS PROGRAM, KEKAHA, KAUAI

 

          PLANS, DESIGN AND CONSTRUCTION FOR A SAND BY-PASS PROJECT TO MOVE SAND FROM THE EAST SIDE OF THE HARBOR TO THE WEST SIDE OF THE HARBOR.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                  200         

          DESIGN                                  200         

          CONSTRUCTION                                     1,000

            TOTAL FUNDING           LNR            400 N      1,000 N

 


 

10. B99    LUMP SUM IMPROVEMENTS AT BOATING AND OCEAN RECREATION FACILITIES, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS AT VARIOUS BOATING FACILITIES TO INCLUDE PIERS, LOADING DOCKS, UTILITIES, BOAT RAMPS, RESTROOMS, PARKING AREAS, STRUCTURES, DREDGING, SEWER SYSTEMS, BUILDING, FENCING, RENDERING, MOORINGS, LANDSCAPING AND OTHER RELATED WORK.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           7,498      3,998

            TOTAL FUNDING           LNR          7,000 C      4,000 C

                                    LNR            500 N           N

 

11.       MAUNALUA BAY LAUNCH RAMP FACILITY, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT TO RENOVATE THE MAUNALUA BAY LAUNCH RAMP FACILITY.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           1,997         

          EQUIPMENT                                 1         

            TOTAL FUNDING           LNR          2,000 E           E

 


 

12.       HALEIWA SMALL BOAT HARBOR, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION OF NEW PIERS, CATWALKS, APPROACHES, AND FLOATING DOCK SYSTEM AT THE HALEIWA SMALL BOAT HARBOR.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           1,998         

            TOTAL FUNDING           LNR          2,000 C           C

 

13.       HANA BOAT RAMP AND WHARF IMPROVEMENTS, MAUI

 

          PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE BOAT RAMP, REVETMENT, APPROACH AREA, AND OTHER RELATED WORK.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           3,123         

            TOTAL FUNDING           LNR          3,125 C           C

 

14.       WAIANAE BOAT HARBOR IMPROVEMENTS, OAHU

 

          PLANS AND DESIGN FOR IMPROVEMENTS AT WAIANAE BOAT HARBOR. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                    1         

          DESIGN                                  499         

            TOTAL FUNDING           LNR            500 C           C

 


 

15.       WAILOA SMALL BOAT HARBOR DREDGING, HAWAII

 

          CONSTRUCTION FOR REMOVAL OF SAND AT THE ENTRANCE TO THE WAILOA SMALL BOAT HARBOR.

          CONSTRUCTION                           1,000         

            TOTAL FUNDING           LNR          1,000 C           C

 

15.01.     HONOKOHAU SMALL BOAT HARBOR IMPROVEMENTS, PHASE II, HAWAII

 

          DESIGN AND CONSTRUCTION OF A PARKING LOT, ROAD, WATER SYSTEM, ELECTRICAL AND MISCELLANEOUS WORK. ADDITIONAL DESIGN AND CONSTRUCTION MONEY IS NEEDED TO IMPLEMENT THIS PROJECT.

          DESIGN                                           150

          CONSTRUCTION                                      500

            TOTAL FUNDING           LNR              C       650  C

 

15.02.     MILOLII LANDING, HAWAII

 

          PLANS, DESIGN AND CONSTRUCTION FOR IMPROVEMENTS TO THE MILOLII LANDING TO ADDRESS HEALTH AND SAFETY ISSUES AND PROVIDE ADEQUATE SERVICE TO USERS.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      248

            TOTAL FUNDING           LNR              C       250 C

 


 

AGS889 - SPECTATOR EVENTS AND SHOWS - ALOHA STADIUM

 

[16. Q104  LUMP SUM HEALTH AND SAFETY, ALOHA STADIUM, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR THE MITIGATION/ELIMINATION OF CONDITIONS THAT MAY BECOME HAZARDOUS TO HEALTH AND SAFETY, INCLUDING REPAIRS, ALTERATIONS, AND IMPROVEMENTS TO THE ALOHA STADIUM TO MEET CODE, SAFETY, AND/OR OPERATIONAL REQUIREMENTS.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           5,148      5,148

            TOTAL FUNDING           AGS          5,150 C      5,150 C]

 

16. Q104   LUMP SUM HEALTH AND SAFETY, ALOHA STADIUM, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR THE MITIGATION/ELIMINATION OF CONDITIONS THAT MAY BECOME HAZARDOUS TO HEALTH AND SAFETY, INCLUDING REPAIRS, ALTERATIONS, AND IMPROVEMENTS TO THE ALOHA STADIUM TO MEET CODE, SAFETY, AND/OR OPERATIONAL REQUIREMENTS.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           5,148     10,148

            TOTAL FUNDING           AGS          5,150 C     10,150 C

 


 

I.   PUBLIC SAFETY

PSD900 - GENERAL ADMINISTRATION

 

1. P-20110  LUMP SUM CIP, RENOVATION, REPLACEMENT AND IMPROVEMENT PROJECTS, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR VARIOUS RENOVATIONS, REPLACEMENTS AND OTHER IMPROVEMENTS TO ANY PSD PROGRAM, STATEWIDE.  SAID ACTIONS MAY INCLUDE, BUT NOT BE LIMITED TO, BUILDINGS AND BUILDINGS OPERATING SYSTEMS; SITE UTILITIES AND/OR OTHER IMPROVEMENTS.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           7,998      7,998

            TOTAL FUNDING           PSD          8,000 C      8,000 C

 

2. P20112  PLANNING FOR THE ORDERLY DEVELOPMENT OF NEW CORRECTIONAL FACILITIES, STATEWIDE

 

          PLANS, LAND ACQUISITION, DESIGN AND CONSTRUCTION FOR THE ORDERLY DEVELOPMENT OF NEW AND/OR REPLACEMENT CORRECTIONAL FACILITIES BY THE DEPARTMENT OF PUBLIC SAFETY, STATEWIDE.

          PLANS                                    1         

          LAND                                     1         

          DESIGN                                   1         

          CONSTRUCTION                             997         

            TOTAL FUNDING           PSD          1,000 C           C

 


 

DEF110 - AMELIORATION OF PHYSICAL DISASTERS

 

3. A0201   RETROFIT PUBLIC BUILDINGS WITH HURRICANE PROTECTIVE MEASURES, STATEWIDE

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT TO RETROFIT PUBLIC BUILDINGS WITH HURRICANE PROTECTIVE MEASURES AND INCREASE THE NUMBER OF PUBLIC SHELTERS STATEWIDE.

          PLANS                                    2         1

          LAND                                     2         1

          DESIGN                                  46        98

          CONSTRUCTION                           1,200      1,050

          EQUIPMENT                               750       500

            TOTAL FUNDING           DEF          2,000 C      1,650 C

 

4. A40     DISASTER WARNING AND COMMUNICATIONS DEVICES, STATEWIDE

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE INCREMENTAL ADDITION, REPLACEMENT AND UPGRADE OF STATE CIVIL DEFENSE WARNING AND COMMUNICATIONS EQUIPMENT.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                    1         1

          LAND                                     1         1

          DESIGN                                  158       158

          CONSTRUCTION                           1,200      1,200

          EQUIPMENT                               240       240

            TOTAL FUNDING           DEF          1,500 C      1,500 C

                                    DEF            100 N       100 N

 


 

5. A45     AMERICANS WITH DISABILITIES ACT (ADA) AND INFRASTRUCTURE IMPROVEMENTS, STATEWIDE

 

          CONSTRUCTION FOR MODIFICATIONS FOR PERSONS WITH DISABILITIES AND TO IDENTIFY AND CORRECT EXISTING DEFICIENCIES FOR THE DEPARTMENT OF DEFENSE (DOD) FACILITIES.  THIS PROJECT IS NECESSARY TO MEET REQUIREMENTS IN ACCORDANCE WITH STATE AND FEDERAL LAWS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          CONSTRUCTION                           1,753         

            TOTAL FUNDING           AGS            707 C           C

                                    AGS          1,046 N           N

 


 

6. A46     HEALTH AND SAFETY REQUIREMENTS FOR BIRKHIMER TUNNEL AND SUPPORT FACILITIES, OAHU

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR HEALTH AND SAFETY IMPROVEMENTS TO THE STATE EMERGENCY OPERATING CENTER, BIRKHIMER TUNNEL & SUPPORT FACILITIES TO INCLUDE ADA COMPLIANCE, SPRINKLER SYSTEM, AND ADDITIONAL INSTALLATION OF CONDUITS, REMOVAL OF OVERHEAD UTILITY LINES, & OTHER IMPROVEMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                    1         1

          LAND                                     1         1

          DESIGN                                  23        23

          CONSTRUCTION                             395       400

          EQUIPMENT                               123       175

            TOTAL FUNDING           DEF            543 C       600 C

 


 

7. AD2071  ENERGY SAVINGS IMPROVEMENTS AND RENEWABLE ENERGY PROJECTS, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR REPLACEMENT OF ENERGY EFFICIENT STATE OF THE ART BLDG AC SYSTEMS TO REPLACE FAILING AND INEFFICIENT EQUIPMENT.  IMPLEMENT EXT CONTROLS TO PROVIDE SET BACKS AND REDUCE ENERGY CONSUMPTION STATEWIDE.  DESIGN AND CONSTRUCT RENEWABLE ENERGY TECHNOLOGIES TO REDUCE USE OF FOSSIL FUELS AND PROVIDE CLEAN AND RELIABLE ENERGY FOR HIGH CONSUMPTION ON FACILITIES.

          DESIGN                                  100       200

          CONSTRUCTION                           3,395      6,300

            TOTAL FUNDING           DEF            250 C      1,250 C

                                    DEF          3,245 N      5,250 N

 

8. A44     RENOVATION OF BLDG 117, KALAELOA, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR AN ARMY NATIONAL GUARD CONSOLIDATED FACILITY OF PERMANENT STEEL AND MASONRY TYPE CONSTRUCTION, UTILITIES, ACCESS ROAD, PARKING AREAS, SECURITY FENCING, INTERIM RENOVATIONS AND OTHER RELATED WORK.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                1,581         

          CONSTRUCTION                          39,500         

          EQUIPMENT                                50       745

            TOTAL FUNDING           DEF          1,650 C        50 C

                                    DEF          39,481 N       695 N

 


 

9. AB2073  29TH INFANTRY BRIGADE COMBAT TEAM READINESS CENTER, KALAELOA, OAHU

 

          PLANS, DESIGN AND CONSTRUCTION FOR THE NEW 29TH BRIGADE COMBAT TEAM READINESS CENTER WILL BE BUILT TO NATIONAL GUARD BUREAU STANDARDS AND WILL MEET LEED SILVER USAGE LEVEL REQUIREMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                    1         

          DESIGN                                  449       450

          CONSTRUCTION                                    33,000

            TOTAL FUNDING           DEF            450 C       450 C

                                    DEF               N     33,000 N

 

10. A42    MINOR MILITARY CONSTRUCTION AND RENOVATIONS AT ARMY GUARD FACILITIES, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR REPLACEMENT OF EXISTING HAWAII ARMY NATIONAL GUARD KALAELOA AND RTI CAMPUS UTILITIES INFRASTRUCTURE, LARGER REPAIR PROJECTS, AND FEDERAL ENERGY PROJECTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          PLANS                                  300         

          DESIGN                                1,500         

          CONSTRUCTION                           1,000       500

          EQUIPMENT                                      16,500

            TOTAL FUNDING           DEF          1,800 C       500 C

                                    DEF          1,000 N     16,500 N

 


 

[11.       UPGRADE AND IMPROVEMENTS TO NATIONAL GUARD FACILITIES, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS AND UPGRADES TO NATIONAL GUARD ARMORIES TO CONFORM TO CURRENT NATIONAL GUARD BUREAU STANDARDS AND CRITERIA, AND TO MEET UNANTICIPATED HEALTH, SAFETY, AND BUILDING CODE REQUIREMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                           700

          CONSTRUCTION                           4,600       840

            TOTAL FUNDING           DEF          1,400 C       700 C

                                    DEF          3,200 N       840 N]

 

11.       UPGRADE AND IMPROVEMENTS TO NATIONAL GUARD FACILITIES, STATEWIDE

 

          DESIGN AND CONSTRUCTION FOR IMPROVEMENTS AND UPGRADES TO NATIONAL GUARD ARMORIES TO CONFORM TO CURRENT NATIONAL GUARD BUREAU STANDARDS AND CRITERIA, AND TO MEET UNANTICIPATED HEALTH, SAFETY, AND BUILDING CODE REQUIREMENTS.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

          DESIGN                                           700

          CONSTRUCTION                           4,600     10,740

            TOTAL FUNDING           DEF          1,400 C      4,050 C

                                    DEF          3,200 N      7,390 N

 


 

K. GOVERNMENT-WIDE SUPPORT

GOV100 - OFFICE OF THE GOVERNOR

 

1. G01     PROJECT ADJUSTMENT FUND, STATEWIDE

 

          PLANS FOR THE ESTABLISHMENT OF A CONTINGENCY FUND FOR PROJECT ADJUSTMENT PURPOSES SUBJECT TO THE PROVISIONS OF THE APPROPRIATIONS ACT.

          PLANS                                    1         1

            TOTAL FUNDING           GOV              1 C         1 C

 

BUF101 - DEPARTMENTAL ADMINISTRATION AND BUDGET DIVISION

 

2. 00-01   HAWAIIAN HOME LANDS TRUST FUND, STATEWIDE

 

          CONSTRUCTION TO AUTHORIZE THE TRANSFER OF GENERAL OBLIGATION BOND FUNDS TO THE HAWAIIAN HOME LANDS TRUST FUND TO SATISFY THE PROVISIONS OF ACT 14, SPSLH 1995.

          CONSTRUCTION                          30,000     30,000

            TOTAL FUNDING           BUF          30,000 C     30,000 C

 

[3. 00-02  STATE EDUCATIONAL FACILITIES IMPROVEMENT FUND, STATEWIDE

 

          CONSTRUCTION TO AUTHORIZE THE TRANSFER OF GENERAL OBLIGATION BOND FUNDS TO THE STATE EDUCATIONAL FACILITIES IMPROVEMENT SPECIAL FUND.

          CONSTRUCTION                          539,836    170,960

            TOTAL FUNDING           BUF         539,836 C    170,960 C]

 


 

3. 00-02   STATE EDUCATIONAL FACILITIES IMPROVEMENT FUND, STATEWIDE

 

          CONSTRUCTION TO AUTHORIZE THE TRANSFER OF GENERAL OBLIGATION BOND FUNDS TO THE STATE EDUCATIONAL FACILITIES IMPROVEMENT SPECIAL FUND.

          CONSTRUCTION                          520,160    255,664

            TOTAL FUNDING           BUF         520,160 C    255,664 C

 

3.01.      CAPITAL IMPROVEMENTS PROGRAM STAFF COSTS, DWLOP, STATEWIDE

 

          PLANS TO ADD FUNDS DUE TO THE IMPLEMENTATION OF A DIRECTED LEAVE WITHOUT PAY (DWLOP) PROGRAM AND THE EXEMPTION OF CERTAIN NON-GENERAL FUNDS FROM THE DWLOP PROGRAM FOR BARGAINING UNIT 1.

          PLANS                                   22        24

            TOTAL FUNDING           BUF             22 B        24 B

 

TAX107 - SUPPORTING SERVICES - REVENUE COLLECTION

 

4. 1      KEELIKOLANI BLDG, AIR CONDITIONING UPGRADE FOR THE TAX DEPARTMENT'S COMPUTER ROOM, OAHU

 

          DESIGN AND CONSTRUCTION TO UPGRADE THE 24/7 AC THAT COOLS MULTIPLE DOTAX COMPUTER EQUIPMENT INCLUDING THE MULTI-MILLION DOLLAR ITIMS IMAGING SYSTEMS (IIS).

          DESIGN                                  33         

          CONSTRUCTION                             300         

            TOTAL FUNDING           TAX            333 C           C

 


 

AGS131 - INFORMATION PROCESSING AND COMMUNICATION SERVICES

 

5. Q102    LUMP SUM HEALTH AND SAFETY, INFORMATION AND COMMUNICATION SERVICE DIVISION, STATEWIDE

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR REPAIRS, UPGRADES AND EXPANSION OF CRITICAL COMMUNICATIONS BACKBONE SYSTEMS, INCLUDING THE STATEWIDE ANUENUE AND HAWAIIAN MICROWAVE SYSTEMS AND THE WINDWARD, NORTH SHORE AND CENTRAL OAHU RADIO SITES.  EFFORTS INCLUDE WORK THAT ALSO SUPPORTS FUTURE BROADBAND AIR INTERFACE DEVELOPMENT AND IMPLEMENTATION.

          PLANS                                  150       150

          LAND                                    50        50

          DESIGN                                  300       300

          CONSTRUCTION                           7,035      6,935

          EQUIPMENT                               600       600

            TOTAL FUNDING           AGS          8,135 C      8,035 C

 

6. S101    ICSD KALANIMOKU BUILDING DATA CENTER OPTIMIZATION AND ENERGY EFFICIENCY, OAHU

 

          PLANS AND DESIGN FOR REPAIRS, UPGRADES AND EXPANSION OF CRITICAL DATA CENTER SYSTEMS AND SUPPORT INFRASTRUCTURE WITHIN THE KALANIMOKU BUILDING, OAHU.  WORK WILL OPTIMIZE NECESSARY STATEWIDE FUNCTIONALITY AND INCREASE ENERGY EFFICIENCY WITHIN THE FACILITY.

          PLANS                                   50         

          DESIGN                                  50       100

            TOTAL FUNDING           AGS            100 C       100 C

 


 

6.01. U101  STATEWIDE FINANCIAL SYSTEM ENTERPRISE REENGINEERING (ERP), STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR DEVELOPMENT AND IMPLEMENTATION OF AN INTEGRATED FINANCIAL MANAGEMENT SYSTEM FOR THE STATE OF HAWAII.

          PLANS                                          14,997

          DESIGN                                             1

          CONSTRUCTION                                        1

          EQUIPMENT                                          1

            TOTAL FUNDING           AGS              C     15,000 C

 

LNR101 - PUBLIC LANDS MANAGEMENT

 

[7. J42A   DAM ASSESSMENTS, MAINTENANCE AND REMEDIATION, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR ASSESSMENTS, MAINTENANCE AND REMEDIATION OF DAMS UNDER THE JURISDICTION OF THE DEPARTMENT OF LAND AND NATURAL RESOURCES.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           2,498         

            TOTAL FUNDING           LNR          2,500 S           S]

 


 

7. J42A    DAM ASSESSMENTS, MAINTENANCE AND REMEDIATION, STATEWIDE

 

          PLANS, DESIGN AND CONSTRUCTION FOR ASSESSMENTS, MAINTENANCE AND REMEDIATION OF DAMS UNDER THE JURISDICTION OF THE DEPARTMENT OF LAND AND NATURAL RESOURCES.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           2,498      9,498

            TOTAL FUNDING           LNR              C      7,000 C

                                    LNR          2,500 S      2,500 S

 

AGS221 - PUBLIC WORKS - PLANNING, DESIGN, AND CONSTRUCTION

 

8. E109    CAPITAL IMPROVEMENTS PROGRAM STAFF COSTS, STATEWIDE

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION AND EQUIPMENT FOR COSTS RELATING TO WAGES AND FRINGES FOR PERMANENT, PROJECT-FUNDED STAFF POSITIONS FOR THE IMPLEMENTATION OF CAPITAL IMPROVEMENT PROGRAM PROJECTS FOR THE DEPARTMENT OF ACCOUNTING AND GENERAL SERVICES.  PROJECTS MAY ALSO INCLUDE FUNDS FOR NON-PERMANENT CAPITAL IMPROVEMENT PROGRAM RELATED POSITIONS.

          PLANS                                 7,361      7,361

          LAND                                     1         1

          DESIGN                                   1         1

          CONSTRUCTION                              1         1

          EQUIPMENT                                 1         1

            TOTAL FUNDING           AGS          7,365 C      7,365 C

 


 

9. Q101    LUMP SUM MAINTENANCE OF EXISTING FACILITIES, PUBLIC WORKS DIVISION, STATEWIDE

 

          PLANS, LAND ACQUISITION, DESIGN, CONSTRUCTION, AND EQUIPMENT FOR IMPROVEMENTS AND MAINTENANCE OF PUBLIC FACILITIES AND SITES, STATEWIDE.  PROJECTS MAY INCLUDE ROOFING, OTHER REPAIRS, AND IMPROVEMENTS.

          PLANS                                   50        50

          LAND                                     1         1

          DESIGN                                  200       200

          CONSTRUCTION                          16,240     13,740

          EQUIPMENT                                 9         9

            TOTAL FUNDING           AGS          16,500 C     14,000 C

 

10. P60131  ENERGY CONSERVATION AND SUSTAINABLE DESIGN IMPROVEMENTS, STATEWIDE

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR DEVELOPMENT AND IMPLEMENTATION OF A COMPREHENSIVE ENERGY CONSERVATION PLAN TO MAXIMIZE ENERGY EFFICIENCY IN PUBLIC FACILITIES AND OPERATIONS.  EFFORTS WILL INCLUDE CONSIDERATION FOR SUSTAINABLE DESIGN TO THE FULLEST EXTENT POSSIBLE.

          PLANS                                    1         1

          DESIGN                                   1         1

          CONSTRUCTION                           3,436      1,997

          EQUIPMENT                                 1         1

            TOTAL FUNDING           AGS          3,439 C      2,000 C

 


 

[11. L102  KAMAMALU BUILDING, ASBESTOS REMOVAL AND BUILDING RENOVATION, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR ASBESTOS MITIGATION AND RENOVATION OF THE APPROXIMATELY 75,000 GROSS SQUARE FOOT KAMAMALU BUILDING.

          PLANS                                  150         

          DESIGN                                2,000         

          CONSTRUCTION                          10,849         

          EQUIPMENT                                 1         

            TOTAL FUNDING           AGS          13,000 C           C]

 

11. L102   KAMAMALU BUILDING, ASBESTOS REMOVAL AND BUILDING RENOVATION, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR ASBESTOS MITIGATION AND RENOVATION OF THE APPROXIMATELY 75,000 GROSS SQUARE FOOT KAMAMALU BUILDING.

          PLANS                                  150         1

          DESIGN                                2,000       152

          CONSTRUCTION                          10,849     16,846

          EQUIPMENT                                 1         1

            TOTAL FUNDING           AGS          13,000 C     17,000  C

 


 

12. P104   WASHINGTON PLACE, HEALTH AND SAFETY AND QUEEN'S GALLERY RENOVATION, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT TO ADDRESS IMMEDIATE HEALTH AND SAFETY NEEDS AT WASHINGTON PLACE, PROJECT INCLUDES LEAD BASED PAINT ABATEMENT/ENCAPSULATION, BLDG CODE REQUIREMENTS (STRUCTURAL, ELECTRICAL, PLUMBING, AND VENTILATION) AND ADAAG REQUIREMENTS.  ASSOCIATED TO THIS WORK IS RENOVATION FOR BUILDING PRESERVATION WITH THE RETENTION OF EXISTING HISTORIC MATERIAL.

          PLANS                                    1         

          DESIGN                                   1         

          CONSTRUCTION                           4,758         

          EQUIPMENT                                 1         

            TOTAL FUNDING           AGS          1,500 C           C

                                    AGS          3,261 R           R

 

12.01. T101 STATE CAPITOL BUILDING, RESEAL FIFTH FLOOR ROOF DECK AND RELATED IMPROVEMENTS, OAHU

 

          CONSTRUCTION TO UPGRADE WATERPROOFING AND RESEAL THE FIFTH FLOOR ROOF DECK, AND RELATED IMPROVEMENTS, AT THE STATE CAPITOL BUILDING.

          CONSTRUCTION                                     8,000

            TOTAL FUNDING           AGS              C      8,000 C

 


 

12.02. T105 LUMP SUM ADVANCE PLANNING, STATEWIDE

 

          PLANS FOR THE DEVELOPMENT AND IMPLEMENTATION OF STATEWIDE SPACE NEEDS AND BUILDING ASSET MANAGEMENT PROGRAM TO MORE EFFECTIVELY PLAN FOR STATE OCCUPIED FACILITIES. TARGET AREAS INCLUDE WORKFORCE SPACE NEEDS PLANNING, CIVIC CENTER MASTER PLAN DEVELOPMENT, AND STATE OFFICE BUILDING ASSET MANAGEMENT AND DEVELOPMENT.

          PLANS                                          1,000

            TOTAL FUNDING           AGS              C      1,000 C

 

13.       BISHOP MUSEUM, RENOVATION OF PLANETARIUM, OAHU

 

          DESIGN, CONSTRUCTION AND EQUIPMENT FOR THE RENOVATION AND IMPROVEMENT TO BISHOP MUSEUM PLANETARIUM. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          DESIGN                                   1         

          CONSTRUCTION                           1,498         

          EQUIPMENT                                 1         

            TOTAL FUNDING           AGS          1,500 C           C

 

14.       BISHOP MUSEUM, RENOVATION OF POLYNESIAN HALL, OAHU

 

          CONSTRUCTION AND EQUIPMENT FOR THE RENOVATION AND IMPROVEMENT OF THE POLYNESIAN HALL. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          CONSTRUCTION                             999         

          EQUIPMENT                                 1         

            TOTAL FUNDING           AGS          1,000 C           C

 


 

15.       LAHAINALUNA HIGH SCHOOL FOUNDATION, MAUI

 

          DESIGN AND CONSTRUCTION FOR STADIUM PROJECT, PHASE 2. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          DESIGN                                   1         

          CONSTRUCTION                           1,699         

            TOTAL FUNDING           AGS          1,700 C           C

 

SUB201 - CITY AND COUNTY OF HONOLULU

 

16.       MAINTENANCE AND REPAIR OF PUBLIC ROADS, OAHU

 

          DESIGN AND CONSTRUCTION FOR MAINTENANCE, IMPROVEMENT, AND REPAIR OF PUBLIC ROADS IN THE TWENTIETH REPRESENTATIVE DISTRICT; PROVIDED THAT THE SUMS NOT LAPSE AT THE END OF THE FISCAL BIENNIUM FOR WHICH THE APPROPRIATION IS MADE; PROVIDED THAT ALL MONEYS FROM THE APPROPRIATION THAT ARE ENCUMBERED AS OF JUNE 30, 2014 SHALL LAPSE AS OF THAT DATE.

          DESIGN                                   1         1

          CONSTRUCTION                           1,999      1,999

            TOTAL FUNDING           CCH          2,000 C      2,000 C

 


 

16.01.     WAIPIO NEIGHBORHOOD PARK, OAHU

 

          PLANS, DESIGN, CONSTRUCTION AND EQUIPMENT FOR A NEW BATTING CAGE LOCATED AT WAIPIO NEIGHBORHOOD PARK. GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                       22

          EQUIPMENT                                          1

            TOTAL FUNDING           CCH              C        25 C

 

SUB401 - COUNTY OF MAUI

 

17.       OLD HALEAKALA HIGHWAY SIDEWALK, MAUI

 

          PLANS, DESIGN AND CONSTRUCTION OF SIDEWALK ALONG ONE SIDE OF OLD HALEAKALA HIGHWAY FROM KULA HIGHWAY TO PUKALANI STREET; PROVIDED THAT PARTIAL MATCHING FUNDS BE PROVIDED BY THE COUNTY OF MAUI.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      998

            TOTAL FUNDING           COM               C      1,000 C

 

17.01.     WAR MEMORIAL GYMNASIUM, MAUI

 

          PLANS, DESIGN, AND CONSTRUCTION FOR AIR CONDITIONING IMPROVEMENTS; GROUND AND SITE IMPROVEMENTS; EQUIPMENT AND APPURTENANCES.

          PLANS                                              1

          DESIGN                                             1

          CONSTRUCTION                                      918

            TOTAL FUNDING           COM              C       920  C

 


 

SUB501 - COUNTY OF KAUAI

 

18.       FILIPINO COMMUNITY CENTER, KAUAI

 

          PLANS TO CONSTRUCT THE FILIPINO COMMUNITY CENTER ON KAUAI. THIS PROJECT QUALIFIES AS A GRANT, PURSUANT TO CHAPTER 42F, HRS.

          PLANS                                             30

            TOTAL FUNDING           COK               C       30 C"



SECTION 6.  Act 164, Session Laws of Hawaii 2011, is amended by amending part V as follows:

(1)  By adding a new section to read as follows:

"SECTION 46.1.  Provided that position #10179 as authorized under section 46 for Maui Highways (TRN531) shall be transferred to Honolulu Harbors (TRN301) and shall be authorized under section 44 on September 1, 2012."

     (2)  By amending section 48 to read:

     "SECTION 48.  Provided that of the general obligation fund appropriation for Hawaii health systems corporation (HTH 212), the sum of $15,000,000 or so much thereof as may be necessary for fiscal year 2011-2012 and the same sum or so much thereof as may be necessary for fiscal year 2012-2013 shall be expended by the Hawaii health systems corporation to correct health and safety deficiencies; provided further that of the total sum:

(1)  $1,050,000 shall be used to upgrade the emergency power generators at Kona community hospital;

(2)  $3,000,000 shall be used for facility expansion for imaging, laboratory, pharmacy, and other departments at Maui memorial medical center;

(3)  $1,345,000 shall be used to upgrade the dietary plumbing and flooring at Maluhia health center;

(4)  $1,680,000 shall be used for fire sprinklers, smoke detectors, and signage at Maui memorial medical center;

(5)  $820,000 shall be used to upgrade the dietary electrical system and emergency generator at [Leahi hospital;] Maluhia health center;

(6)  $1,600,000 shall be used for air conditioning upgrades at Maui memorial medical center;

(7)  $2,000,000 shall be used for plumbing improvements at Maui memorial medical center;

(8)  $1,000,000 shall be used for dietary equipment upgrades at Maui memorial medical center;

(9)  $1,000,000 shall be used for elevator upgrades at Kula hospital; and

(10)  $1,505,000 shall be used for a new nurse call system at Kula hospital."

(3)  By adding a new section to read as follows:

     "SECTION 51.1.  Provided that of the general obligation fund appropriation for information processing and communication services (AGS 131), the sum of $15,000,000 or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for the planning and design phase of the statewide enterprise resource planning (ERP) project; provided further that the department of accounting and general services shall report on its progress in implementing phase 1 of the project at least twenty days prior to the 2013 regular session and as of June 30, 2013, to apprise the legislature of recommendations of the available options for ERP systems and other solutions that best meet the needs of the State of Hawaii."

(4)  By adding a new section to read as follows:

"SECTION 52.1.  Provided that of the special funds appropriated or authorized for departmental administration and budget division (BUF 101), the sum of $21,261 or so much thereof as may be necessary for fiscal year 2011-2012 and the sum of $23,206 or so much thereof as may be necessary for fiscal year 2012-2013 shall be used for the implementation of a directed leave without pay (DLWOP) program and the exemption of certain non-general funds from the DLWOP program for collective bargaining unit 1; provided that this appropriation shall be allotted by the director of finance to the appropriate state departments for expenditure in the respective fiscal year for the purposes of this section."

 (5)  By adding two new sections to read:

"SECTION 53.1.  Any law to the contrary notwithstanding, the appropriations under Act 316, Session Laws of Hawaii 1989, section 222, as amended and renumbered by Act 299, Session Laws of Hawaii 1990, section 6, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     Item No.         Amount (MOF)

       G-170A          $    5,775 C

     SECTION 53.2.  Any law to the contrary notwithstanding, the appropriations under Act 296, Session Laws of Hawaii 1991, section 165, as amended and renumbered by Act 300, Session Laws of Hawaii 1992, section 6, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     Item No.         Amount (MOF)

       G-142          $      956 C

       G-143              23,168 C

       H-1                11,670 C"

 

     (6)  By amending section 54 to read:

     "SECTION 54.  Any law to the contrary notwithstanding, the appropriations under Act 289, Session Laws of Hawaii 1993, section 127, as amended and renumbered by Act 252, Session Laws of Hawaii 1994, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:


     Item No.         Amount (MOF)

       C-01          $   46,824 E

       C-02           3,986,198 B

       C-02               2,926 E

       C-03              17,175 B

       C-03              14,898 E

       C-04             139,487 E

       C-06             455,551 E

       C-10              39,606 B

       C-10              21,314 E

       C-11             260,079 B

       C-11           2,012,635 E

       C-12             325,452 B

       C-13              91,464 B

       C-14           1,627,377 B

       C-14             131,435 E

       C-15           2,644,754 B

       C-16           2,217,398 B

       C-18           2,208,106 B

       C-19               1,063 B

       C-19              10,887 E

       C-21           1,577,737 B

       C-21             236,062 E

       G-120             17,922 C"


     (7)  By amending section 55 to read:

     "SECTION 55.  Any law to the contrary notwithstanding, the appropriations under Act 218, Session Laws of Hawaii 1995, section 99, as amended and renumbered by Act 287, Session Laws of Hawaii 1996, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     Item No.         Amount (MOF)

       C-01         $ 2,356,749 B

       C-01             205,883 E

       C-02             654,500 B

       C-02           1,000,000 E

       C-04D            281,250 B

       C-06          16,385,029 B

       C-06B             72,665 B

       C-08             135,541 B

       C-10             172,730 B

       C-10              60,216 E

       G-97              10,368 C

       G-98              27,848 C

       K-31A              6,046 C"

 

     (8)  By amending section 56 to read:

"SECTION 56.  Any law to the contrary notwithstanding, the appropriations under Act 328, Session Laws of Hawaii 1997, section 140A, as amended and renumbered by Act 116, Session Laws of Hawaii 1998, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     Item No.         Amount (MOF)

       C-03          $  134,298 B

       C-10A            794,861 B

       C-37A            295,898 B

       C-42           2,163,815 B

       C-48           7,336,453 B

       C-67              79,000 B

       C-73              29,037 B

       C-75               2,895 B

       C-76               3,649 B

       G-118              1,279 C

       G-120             26,214 C"

 

(9)  By amending section 58 to read:

     "SECTION 58.  Any law to the contrary notwithstanding, the appropriations under Act 259, Session Laws of Hawaii 2001, section 91, as amended and renumbered by Act 177, Session Laws of Hawaii 2002, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     Item No.           Amount (MOF)

       C-04          $  927,443 B

       C-05           2,460,595 B

       C-07B              2,500 B

       C-08              88,132 B

       C-11C             64,878 B

       C-11F            642,418 B

       C-14             487,632 B

       C-39             450,000 B

       C-49             325,000 B"

     (10)  By amending section 59 to read:

"SECTION 59.  Any law to the contrary notwithstanding, the appropriations under Act 200, Session Laws of Hawaii 2003, section 77, as amended and renumbered by Act 41, Session Laws of Hawaii 2004, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     Item No.         Amount (MOF)

       C-01             $  252,700 B

       C-03             443,162 B

       C-06                   1 E

       C-07.01           30,764 B

       C-09.01          182,080 E

       C-09.02          306,924 B

       C-13           1,000,000 B

       C-25             400,000 B

       C-36             250,000 B

       C-36           1,000,000 E

       K-11.01          319,640 C"

 

(11)  By amending section 60 to read:

"SECTION 60.  Any law to the contrary notwithstanding, the appropriations under Act 178, Session Laws of Hawaii 2005, section 85, as amended and renumbered by Act 160, Session Laws of Hawaii 2006, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     Item No.         Amount (MOF)

       C-03            $156,895 B

       C-11             180,200 B

       C-12             260,078 B

       C-15               5,191 B

       C-15             121,539 X

       C-16               5,000 B

       C-20             570,046 X

       C-23             304,388 B

       C-26             329,822 B

       C-29               4,120 B

       C-53             375,000 B

       C-54             500,000 B

       C-64              41,000 D

       C-89             120,000 E

       C-89             480,000 N"

(12)  By amending section 61 to read:

"SECTION 61.  Any law to the contrary notwithstanding, the appropriations under Act 213, Session Laws of Hawaii 2007, section 125, as amended and renumbered by Act 158, Session Laws of Hawaii 2008, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     Item No.         Amount (MOF)

       C-24         $   148,948 R

       C-35           1,500,000 B

       C-36           3,950,000 B

       C-38.01       26,525,000 E

       C-41           1,500,000 B

       C-41               1,000 N

       C-42           5,000,000 B

       C-42               1,000 N

       C-44             700,000 B

       C-49             500,000 B

       C-52             796,000 B

       C-68              95,000 E

       C-68             380,000 N"

     (13)  By amending section 62 to read:

"SECTION 62.  Any law to the contrary notwithstanding, the appropriations under Act 162, Session Laws of Hawaii 2009, section 62, as amended and renumbered by Act 180, Session Laws of Hawaii 2010, section 5, in the amounts indicated or balances thereof, unallotted, allotted, unencumbered, or encumbered and unrequired, are hereby lapsed:

     Item No.         Amount (MOF)

       A-8.03      $  1,300,000 C

       A-13           2,301,000 C

       A-17           6,500,000 C

       B-2              851,000 C

       B-3              120,000 C

       B-7              226,000 C

       B-9              200,000 C

       C-23          33,585,000 E

       C-49         130,200,000 E

       C-53             300,000 B

       C-91             550,000 E

       D-3.01           100,000 C

       D-4              944,100 C

       E-1            3,600,000 C

       E-2              450,000 C

       E-6            3,300,000 C

       E-8.01           750,000 C

       E-8.02           180,000 C

       F-10           1,500,000 C

       G-14              50,000 B

       G-17             380,000 B

       G-22.01          300,000 B

       G-23             195,000 B

       G-35             775,000 B

       G-36.02          375,000 B

       G-43             100,000 B

       G-51              50,000 B

       G-52             375,000 B

       G-61             500,000 B

       G-71.01          500,000 B

       G-71.03           39,000 B

       G-85.01          750,000 B

       G-87.01          500,000 B

       G-93             110,000 C

       G-93.01          345,000 C

       G-94          70,000,000 E

       G-102         23,825,000 C

       G-105          3,000,000 C

       H-1.03            25,000 C

       I-2              250,000 C

       K-3            4,889,000 C

       K-7              234,000 C

       K-11.03        1,300,000 C"

    SECTION 7.  Act 213, Session Laws of Hawaii 2007, section 125, as amended by Act 158, Session Laws of Hawaii 2008, section 5, is amended by amending Item C‑75 to read as follows:

     "C-75 SP0303 KAHEKILI HIGHWAY, OAHU

PLANS AND DESIGN FOR HIGHWAY WIDENING AND OTHER

IMPROVEMENTS TO [ACCOMMODATE A CONTRAFLOW LANE FROM

THE VICINITY OF HAIKU ROAD TO HUI IWA STREET] PROVIDE CORRIDOR CAPACITY AND OPERATIONAL IMPROVEMENTS FROM LIKELIKE HIGHWAY TO KAMEHAMEHA HIGHWAY. THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT.

 

PLANS                       1,000E        1N

DESIGN                              1,000E

          TOTAL FUNDING TRN     1,000E     1000E

                             TRN          N        1N"

    SECTION 8.  Act 162, Session Laws of Hawaii 2009, section 62, as amended by Act 180, Session Laws of Hawaii 2010, section 5, is amended by amending Item C-75 to read as follows:

     "C-75 S271 INTERSTATE ROUTE H-1 AND MOANALUA FREEWAYS IMPROVEMENTS, PUULOA INTERCHANGE TO KAPIOLANI INTERCHANGE, OAHU

CONSTRUCTION FOR ADDITIONAL LANES ON THE H-1 FREEWAY

[EASTBOUND LANES FROM THE VICINITY OF MIDDLE STREET TO THE

VICINITY OF VINEYARD BOULEVARD] FROM THE VICINITY OF THE

PUULOA INTERCHANGE TO THE VICINITY OF THE KAPIOLANI

INTERCHANGE.  THIS PROJECT IS DEEMED NECESSARY TO QUALIFY FOR FEDERAL AID FINANCING AND/OR REIMBURSEMENT

 

CONSTRUCTION                        100,000

          TOTAL FUNDING TRN          E   20,000E

                             TRN          N    80,000N"

 

SECTION 9.  Part VII, Act 164, Session Laws of Hawaii 2011, is amended as follows:

(1)  By amending section 96 to read:

"SECTION 96.  Notwithstanding any provision to the contrary, the director of finance, with the approval of the governor, shall transfer into retirement benefit ‑ state (BUF 741) $88,200,000 for fiscal year 2011‑2012 [and $88,200,000 for fiscal year 2012 ‑ 2013] for labor savings attributable to collective bargaining agreements for all bargaining units and pursuant to any executive memoranda that results in salary savings for all employees not included under collective bargaining in respective state agencies; provided further that the governor shall submit a report to the legislature within five days of each transfer that shall include the date of the transfer, the amount of the transfer, the program ID from which funds are transferred, and the collective bargaining unit for which the transfer was made; and provided further that the governor shall submit to the legislature a summary report for all transfers by December 1 for the previous twelve‑month period."

(2)  By amending section 97 to read:

"SECTION 97.  Notwithstanding any provision to the contrary, the director of finance, with the approval of the governor, shall transfer into health premium payments ‑ state (BUF 761) $50,000,000 for fiscal year 2011‑2012 [and $50,000,000 for fiscal year 2012 – 2013]; provided further that in making each transfer, the governor shall consider the legislature's intent that the administration assess state needs and make appropriate reductions to programs that are consistent with an effort to reprioritize state government; provided further that the governor shall submit a report to the legislature within five days of each use of this authority that shall include the date of the assessment, the amount of the assessment, the program ID from which funds were assessed, a detailed explanation of the reason for which funds were transferred from a particular program ID, including a detailed report of any performance measurements or standards used in evaluating such assessment, and the impact to the program ID from which funds are transferred; from and provided further that the governor shall submit to the legislature a summary report for all transfers by December 1 for the previous twelve‑month period."

     (3)  By adding a new section to read:

"SECTION 125.1.  Provided that the department of land and natural resources shall prepare a report detailing the implementation of the watershed initiative to include the following:

(1)  Progress on the implementation of the program with the use of state funds, including general obligation bond funds and special funds;

(2)  Information on obtaining and using other available funding sources and efforts to obtain additional funds to match state appropriations;

(3)  An updated expenditure and implementation plan; and

(4)  Discussion of achievements and challenges encountered in advancing the initiative;

provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2013 regular session."

     (4)  By adding a new section to read:

"SECTION 128.1  Provided that the department of human services shall transmit an interim assistance reimbursement agreement to the Social Security Administration in all cases where a general assistance recipient has filed for the federal supplemental security income assistance; provided further that the department shall prepare a report that shall include, but not limited to, the following:

(1)  The number of general assistance recipients who applied for supplemental security income;

(2)  The number of general assistance recipients who signed the interim assistance reimbursement agreement;

(3)  The number of interim assistance reimbursement agreements transmitted to the Social Security Administration;

(4)  The number of general assistance cases that were denied supplemental security income benefits;

(5)  The number of cases where the department of human services was not reimbursed due to the missing interim assistance reimbursement agreement;

(6)  The total amount of funds not reimbursed to the department of human services due to the missing interim assistance reimbursement agreement; and

(7)  The total number of overpayment claims established for the amount of funds not reimbursed;

provided further that the report shall include actual data for fiscal year 2011-2012, actual and projected data for fiscal year 2012-2013, and other appropriate historic data that is available; provided further that the department shall submit the report to the legislature no later than twenty days prior to the convening of the 2013 regular session."

(5)  By amending section 129 to read:

     "SECTION 129.  Provided that the department of Hawaiian home lands shall prepare a financial plan for the ensuing six years that shall include projected amounts and sources of revenue, details of projected expenditures, projected fund balances, and descriptions of major projects and methods of financing; and provided further that the department shall submit the plan to the legislature no later than thirty days prior to the convening of the 2012 and 2013 regular [session.] sessions."

(6)  By amending section 131 to read:

     "SECTION 131.  Provided that [of the general fund appropriation for] the department of education[, excluding charter schools, no funds for fiscal year 2012-2013 shall be expended for home-to-school transportation costs not mandated by state or federal law; provided further that the department] shall prepare a report that includes:

(1)  A comprehensive analysis of alternatives for providing student transportation, including mandated student transportation services, including but not limited to the elimination of transportation services not mandated by law, route consolidation and reduction scenarios, methods of reducing contracted costs, implementation of transportation services with state personnel and/or buses, partnerships with county agencies, and the use of tripper service as defined in 49 CFR 605.3;

(2)  A cost benefit analysis of each alternative identified;

(3)  A prioritized listing of student transportation routes, the reason the route is a priority, the projected number of students serviced, and the projected cost of providing transportation service for the route;

(4)  An examination of fee schedules and evaluation of various pricing strategies;

(5)  An evaluation of how student transportation is successfully administered and costs are managed and paid for in at least four other jurisdictions;

(6)  Recommendations on the options identified in the report; and

(7)  Identification of the actual costs for all student transportation services, including mandated, for the prior two fiscal years and projected costs for the current fiscal year by means of financing, contract, and route and identification of those costs;

provided further that the department shall submit the report to the legislature no later than forty days prior to the convening of the 2012 regular session; and provided further that the legislature may appropriate funds for student transportation services not mandated by state or federal law upon receipt and evaluation of the report."

     (7)  By adding a new section to read:

     "SECTION 131.1.  Provided that the department of education shall prepare a report on section 302A-1301, Hawaii Revised Statutes, that includes the following:

     (1)  Information and calculations for fiscal year 2011-2012 on the amount and proportion of the department's operating budget that was expended for administrative costs and the amount and proportion of the department's operating budget that was expended by principals; and

     (2)  The department's plan that will enable it to comply with the requirements of section 302A-1301(b), Hawaii Revised Statutes, for fiscal year 2012-2013;

provided further that the department submit the report to the legislature no later than thirty days prior to the convening of the 2013 regular session."

 

     (8)  By adding a new section to read:

     "SECTION 131.2.  Provided that the director of finance shall ensure that non-facility per-pupil general fund amounts allocated for department of education and charter school students are equal on an annualized fiscal year basis; provided further that, notwithstanding any other law to the contrary, for fiscal year 2012-2013, the director of finance shall:

     (1)  Determine the sum of general fund appropriations made for the department of education and charter school student non-facility costs;

     (2)  Determine the sum of department of education and charter school student enrollment based upon verified actual student enrollment counts;

     (3)  Determine a per-pupil amount by dividing the sum of general fund appropriations determined under paragraph (1) by the sum of student enrollment determined under paragraph (2);

     (4)  Transfer a general fund amount between the department of education and charter schools prior to November 1, 2012, that will provide each with a per-pupil allocation equal to the amount determined on an annualized fiscal year basis under paragraph (3); and

     (5)  Account for all calculations and transfers made pursuant to this section in a report to the legislature, governor, department, and charter schools within ten days of any transfer made pursuant to this section."

     (9)  By adding a new section to read:

     "SECTION 132.1.  Provided that the University of Hawaii shall prepare a plan to prevent growth in the university's repair and maintenance backlog, systemwide, through the use of its special fund revenues; provided further that the plan shall include but is not limited to the following:

     (1)  The estimated value of the university's repair and maintenance backlog, categorized by campus and types of projects;

     (2)  Amounts that must be expended each year to prevent the repair and maintenance backlog from growing, categorized by campus and types of projects;

     (3)  Planned expenditures, by campus, types of projects, and funding sources; and

     (4)  An update on current staffing authorized to implement the university's capital renewal, including status of positions;

provided further that the plan shall cover the six-year planning period following fiscal year 2012-2013; provided further that the plan shall not rely on the use of general funds or general obligation bond funds to fund repair and maintenance projects after fiscal year 2012-2013; provided further that the University of Hawaii shall submit the plan to the legislature no later than thirty days prior to the convening of the 2013 regular session."

     (10)  By adding a new section to read:

     "SECTION 132.2.  Provided that the University of Hawaii shall prepare a report on all of its revenue sources that includes the following:

     (1)  A description of each source of revenue to include identification of the source and amounts;

     (2)  The actual and projected uses for each source of revenue identified by specific categories for expenditure and amounts; and

     (3)  Identification of all obligations, projected obligations, and amounts placed on each source of revenue in excess of those identified in paragraph (2), including but not limited to revenues and reserves required to issue and pay the debt service on bonds, fund other debt instruments, fund projected collective bargaining increases, and initiate or expand programs;

provided further that the report shall cover actual and projected data for fiscal year 2012-2013 and projections for the subsequent six-year planning period; provided further that the University of Hawaii shall submit the report to the legislature no later than thirty days prior to the convening of the 2013 regular session."

     (11)  By adding a new section to read:

     "SECTION 133.1.  Provided that the department of public safety shall prepare a report on the justice reinvestment initiative that shall include the following:

     (1)  Information on the change in status of inmates affected by the initiative, including the number returned to the State from non-state facilities, number enrolled in reentry programs, and number released from custody;

     (2)  Detail of all actual and projected savings and costs; and

     (3)  Discussion of successes and challenges of the initiative;

provided further that the report shall include to-date and projected data for the current fiscal year to fiscal year 2015-2016; provided further that the department shall submit the report to the legislature no later than thirty days prior to the convening of the 2013 regular session."

     (12)  By adding a new section to read:

     "SECTION 133.2.  Provided that every executive department and agency shall prepare a report on overtime use in a format prescribed by the director of finance that shall include but not be limited to:

     (1)  Amounts budgeted and expended, or projected to be expended, for overtime, by program ID and means of financing, for each year, from fiscal year 2009-2010 to 2014-2015;

     (2)  Amounts and values of compensatory time awarded and used, or projected to be awarded and used, by program ID and means of financing, for each year, from fiscal year 2009-2010 to 2014-2015;

     (3)  Amounts and values of compensatory time balances held by employees, by program ID and means of financing, as of June 30, 2012;

     (4)  A listing of all positions whereby the sum of the value of overtime paid and compensatory time awarded for fiscal year 2011-2012 exceeds twenty per cent of the position's base salary, to include the program ID, position number, means of financing, position title, bargaining unit, salary range level, salary, number of overtime hours worked, amount of overtime paid, amount and value of compensatory time received, and total amount and value of compensatory time accumulated;

     (5)  Identification of the source and amount of funds used for overtime expenditures that exceed amounts budgeted for overtime in paragraph (1), by program ID and means of financing;

     (6)  Comparative data, by program ID and means of financing, including amounts budgeted and expended for salaries, number of positions authorized, number of positions filled, number of positions vacant, and relevant ratios and percentages;

     (7)  An analysis of whether the amounts described in paragraphs (1) through (4) are appropriate; identification and discussion of significant circumstances that require the use of overtime; identification and discussion of specific divisions and programs that use significant amounts of overtime; and identification and discussion of all instances in which there is suspected abuse of overtime use; and

     (8)  Specific strategies the department or agency intends to implement to reduce overtime use, goals for reducing amounts expended for overtime and for compensatory time awarded by program ID and means of financing, and a timeline for implementation;

provided further that the director of finance shall require the submission of the reports to the department of budget and finance for review and compilation, as appropriate, and that all data be as current as practicable; provided further that the director of finance shall consider the information contained in the reports in the development of the fiscal biennium 2013-2015 executive budget request; provided further that the department of budget and finance shall submit the compiled report and a statement documenting any actions taken in consideration of the report to the legislature no later than thirty days prior to the convening of the 2013 regular session; provided further that any agency or department that does not provide the information required under this section to the department of budget and finance shall not expend any funds for overtime after the date the report is due to the legislature."

     (13)  By adding a new section to read:

     "SECTION 133.3.  Provided that every executive department and agency shall prepare a report on overpayments in a format prescribed by the director of finance that shall include but not be limited to:

     (1)  Names, dates of overpayments, number of incidents, gross amount overpaid, amount recovered, balance, category of the balance, reason for overpayment, status of recovery, and balances referred to the department of the attorney general;

     (2)  Procedures implemented to prevent overpayments, information on challenges in adhering to the procedures, and an assessment of whether the procedures are appropriate and sufficient; and

     (3)  Detailed explanations for each overpayment that occurred during the preceding one year period and descriptions of efforts taken to recover each overpayment balance;

provided further that the department of the attorney general shall prepare an additional report providing information on the status of all overpayments it has been referred; provided further that the director of finance shall require the submission of the reports to the department of budget and finance for review and compilation, as appropriate, and that the information provided be as current as practicable; provided further that the department of budget and finance shall submit the compiled report to the legislature no later than thirty days prior to the convening of the 2013 regular session."

     (14)  By adding a new section to read:

     "SECTION 133.4.  Provided that, to the extent practicable, the director of finance shall require that, except for labor savings adjustments assumed for collective bargaining savings, the personal services budget journal details developed for fiscal year 2012-2013 appropriations under this Act and developed for the fiscal biennium 2013-2015 executive appropriations request not contain any negative amounts; provided further that the negative personal services amounts shall be allocated to positive personal services amounts; provided further that the budget journal details shall reflect planned expenditures for fiscal year 2012-2013 and fiscal biennium 2013-2015, as applicable."

SECTION 10.  MISCELLANEOUS.  If any portion of this Act or its application to any person, entity, or circumstance is held to be invalid for any reason, then the legislature declares that the remainder of the Act and each and every other provision thereof shall not be affected thereby.  If any portion of a specific appropriation is held to be invalid for any reason, the remaining portion shall be expended to fulfill the objective of such appropriation to the extent possible.

SECTION 11.  If any manifest clerical, typographical, or other mechanical errors are found in this Act, the governor is hereby authorized to correct such errors.

SECTION 12.  Material to be repealed is bracketed and stricken.  New statutory material is underscored.  In printing this Act, the revisor of statutes need not include the bracketed material or the underscoring.

SECTION 13.  Nothing in this Act shall affect the validity or continuing effectiveness of any provisions of Act 164, Session Laws of Hawaii 2011, not repealed or modified by this Act.

SECTION 14.  EFFECTIVE DATE.  This Act shall take effect upon its approval.


 


 

Report Title:

State Budget

 

Description:

Makes new and adjusts existing appropriations for fiscal biennium 2011‑2013 for operations and capital improvement projects of executive branch agencies and programs.  (SD1)

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback