Bill Text: HI HB1411 | 2010 | Regular Session | Introduced
Bill Title: Capital Improvements
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced - Dead) 2009-05-11 - Carried over to 2010 Regular Session. [HB1411 Detail]
Download: Hawaii-2010-HB1411-Introduced.html
Report Title:
Capital Improvements
Description:
Capital Improvements for the 32nd Representative District
HOUSE OF REPRESENTATIVES |
H.B. NO. |
1411 |
TWENTY-FIFTH LEGISLATURE, 2009 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of the thirty-second representative district.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $ or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2009-2010 for the purpose of capital improvement projects for the benefit of the thirty-second representative district, as follows:
I. To be expended by the Department of Education:
A. Aiea Elementary School, Oahu
(1) Design and construction of a covered walkway connecting Building C with the cafeteria.
Design 20,000
Construction 180,000
Total Funding 200,000
B. Aliamanu Middle School, Oahu
(1) Installation of 3 split-system air
conditioning units in multi-purpose meeting room, S-1.
Total Funding 35,000
C. Moanalua Elementary School, Oahu
(1) Plan, design and construction for
eight classrooms to replace existing portable classrooms.
Total Funding 4,000,000
(2) Plan, design, and construction to
expand library building to accommodate
technology center for students
Total Funding 300,000
(3) Construct roofing over existing
open walkways
Total Funding 30,000
(4) Resurface, repaint, and repair existing basketball/volleyball courts to meet the wellness initiative implemented by the department of education.
Total Funding 132,000
D. Moanalua Middle School, Oahu
(1) Plan, design, & construction of a campus-wide
electrical upgrade.
Total Funding 500,000
(2) Expansion of air conditioning to the
2nd floor of building D
Total Funding 585,000
E. Mokulele Elementary School, Oahu
(1) Design and install upgrade for electrical capacity for the school.
Total Funding 750,000
(2) Design and construction of an ADA compliant elevator in Building F.
Total Funding 1,000,000
(3) Design and construction of roofing for a walkway from Building F to Office.
Total Funding 50,000
F. Nimitz Elementary School, Oahu
(1) Design and construction for campus wide air conditioning; ground & site improvements; equipment and appurtenances.
Total Funding 7,223,000
(2) Design, construction, and equipment for a new library building, ground and site improvements; equipment and appurtenances.
Total Funding 7,156,000
G. Pearl Harbor Elementary School, Oahu
(1) Design and construction for a new library building; ground and site improvements; equipment and appurtenances.
Total Funding 7,156,000
(2) Design and construction for a parking expansion and improvements.
Total Funding 740,000
H. Radford High School, Oahu
(1) Replacement of gymnasium floor.
Total Funding 200,000
(2) Restoration of track.
Total Funding 1,400,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 3. The appropriation made for the capital improvement project authorized by this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2012, shall lapse as of that date.
SECTION 4. This Act shall take effect on July 1, 2009.
INTRODUCED BY: |
_____________________________ |
|
|