       Florida Senate - 2010                             CS for SB 1056 
        
       By the Committee on Community Affairs; and Senator Baker 
       578-04323-10                                          20101056c1 
    1                        A bill to be entitled                       
    2         An act relating to the Local Government Prompt Payment 
    3         Act; amending s. 218.72, F.S.; revising definitions; 
    4         amending s. 218.735, F.S.; revising provisions 
    5         relating to the timely payment for purchases of 
    6         construction services; requiring a local governmental 
    7         entity to identify in a construction contract the 
    8         agent or employee or facility or office to which a 
    9         contractor may submit its payment request or invoice; 
   10         requiring that an ordinance providing dispute 
   11         resolution procedures applicable to a construction 
   12         contract be referenced in the contract; requiring 
   13         construction contracts to specify a date for the 
   14         delivery of a list of items required to render 
   15         complete, satisfactory, and acceptable the 
   16         construction services purchased by a local 
   17         governmental entity; providing for the extension of 
   18         the contract if the list of items remaining to 
   19         complete is not timely provided to the contractor; 
   20         deleting provisions relating to the amount of 
   21         retainage that may be withheld by a local governmental 
   22         entity after 50 percent of construction services are 
   23         completed; providing a timeframe and procedure for 
   24         subcontractors to submit an invoice for the remainder 
   25         of unpaid constructions services; amending s. 218.76, 
   26         F.S.; revising provisions relating to the resolution 
   27         of disputes concerning an improper payment request or 
   28         invoice; providing that a local governmental entity 
   29         waives its objection in a payment dispute if it fails 
   30         to commence the dispute resolution procedure within 
   31         the time required; providing an effective date. 
   32   
   33  Be It Enacted by the Legislature of the State of Florida: 
   34   
   35         Section 1. Section 218.72, Florida Statutes, is reordered 
   36  and amended to read: 
   37         218.72 Definitions.—As used in this part, the term: 
   38         (8)(1) “Proper invoice” means an invoice that which 
   39  conforms with all statutory requirements and with all 
   40  requirements that have been specified by the local governmental 
   41  entity to which the invoice is submitted. 
   42         (5)(2) “Local governmental entity” means a county or 
   43  municipal government, school board, school district, authority, 
   44  special taxing district, other political subdivision, or any 
   45  office, board, bureau, commission, department, branch, division, 
   46  or institution thereof. 
   47         (4)(3) “County” means a political subdivision of the state 
   48  established pursuant to s. 1, Art. VIII of the State 
   49  Constitution. 
   50         (6)(4) “Municipality” means a municipality created pursuant 
   51  to general or special law and metropolitan and consolidated 
   52  governments as provided in s. 6(e) and (f), Art. VIII of the 
   53  State Constitution. 
   54         (9)(5) “Purchase” means the purchase of goods, services, or 
   55  construction services; the purchase or lease of personal 
   56  property; or the lease of real property by a local governmental 
   57  entity. 
   58         (10)(6) “Vendor” means any person who sells goods or 
   59  services, sells or leases personal property, or leases real 
   60  property directly to a local governmental entity. The term 
   61  includes any person who provides waste hauling services to 
   62  residents or businesses located within the boundaries of a local 
   63  government pursuant to a contract or local ordinance. 
   64         (2)(7) “Construction services” means all labor, services, 
   65  and materials provided in connection with the construction, 
   66  alteration, repair, demolition, reconstruction, or any other 
   67  improvements to real property. 
   68         (7)(8) “Payment request” means a request for payment for 
   69  construction services which conforms with all statutory 
   70  requirements and with all requirements specified by the local 
   71  governmental entity to which the payment request is submitted. 
   72  Such requirements must be included in the invitation to bid or 
   73  request for proposal for the project for which payment is 
   74  requested. 
   75         (1)(9) “Agent” means the project architect, project 
   76  engineer, or any other agency or person acting on behalf of the 
   77  local governmental entity. The agent who is required to review 
   78  invoices or payment requests must be identified in the 
   79  invitation to bid or request for proposal for the project for 
   80  which payment requests or invoices are submitted. 
   81         (3)(10) “Contractor” or “provider of construction services” 
   82  means the any person who contracts directly with a local 
   83  governmental entity to provide construction services. 
   84         Section 2. Section 218.735, Florida Statutes, is amended to 
   85  read: 
   86         218.735 Timely payment for purchases of construction 
   87  services.— 
   88         (1) The due date for payment for the purchase of 
   89  construction services by a local governmental entity is 
   90  determined as follows: 
   91         (a) If an agent must approve the payment request or invoice 
   92  before prior to the payment request or invoice is being 
   93  submitted to the local governmental entity, payment is due 25 
   94  business days after the date on which the payment request or 
   95  invoice is stamped as received as provided in s. 218.74(1). If 
   96  the payment request or invoice is not rejected before the due 
   97  date, it shall be deemed accepted. 
   98         (b) If an agent need not approve the payment request or 
   99  invoice which is submitted by the contractor, payment is due 20 
  100  business days after the date on which the payment request or 
  101  invoice is stamped as received as provided in s. 218.74(1). 
  102   
  103  A local governmental entity shall identify the agent or employee 
  104  of the local governmental entity, or the facility or office, to 
  105  which the contractor may submit its payment request or invoice. 
  106  This information shall be included in the contract between the 
  107  local governmental entity and contractor, or shall be provided 
  108  by the local governmental entity through a separate written 
  109  notice, as required under the contract, within 10 days after the 
  110  contract award. A contractor’s submission of a payment request 
  111  or invoice to the identified agent, employee, facility, or 
  112  office of the local governmental entity shall be stamped as 
  113  received as provided in s. 218.74(1).Upon the submission of the 
  114  payment request or invoice, the time periods commence for 
  115  payment or rejection of a payment request or invoice as provided 
  116  in subsection (1) or subsection (2). 
  117         (2) If a payment request or invoice does not meet the 
  118  contract requirements, the local governmental entity must may 
  119  reject the payment request or invoice within 20 business days 
  120  after the date on which the payment request or invoice is 
  121  stamped as received as provided in s. 218.74(1). The rejection 
  122  must be written and must specify the deficiency in the payment 
  123  request or invoice and the action necessary to make the payment 
  124  request or invoice proper. 
  125         (3) If a payment request or an invoice is rejected under 
  126  subsection (2) and the contractor submits a corrected payment 
  127  request or invoice that which corrects the deficiency specified 
  128  in writing by the local governmental entity, the corrected 
  129  payment request or invoice must be paid or rejected on the later 
  130  of: 
  131         (a) Ten business days after the date the corrected payment 
  132  request or invoice is stamped as received as provided in s. 
  133  218.74(1); or 
  134         (b) If the local governmental entity governing body is 
  135  required by ordinance, charter, or other law to approve or 
  136  reject the corrected payment request or invoice, the first 
  137  business day after the next regularly scheduled meeting of the 
  138  local governmental entity governing body held after the 
  139  corrected payment request or invoice is stamped as received as 
  140  provided in s. 218.74(1). 
  141         (4) If a dispute between the local governmental entity and 
  142  the contractor cannot be resolved by the procedure in subsection 
  143  (3), the dispute must be resolved in accordance with the dispute 
  144  resolution procedure prescribed in the construction contract or 
  145  in any applicable ordinance. Such ordinance shall be referenced 
  146  in the contract. In the absence of a prescribed procedure, the 
  147  dispute must be resolved by the procedure specified in s. 
  148  218.76(2). 
  149         (5) If a local governmental entity disputes a portion of a 
  150  payment request or an invoice, the undisputed portion shall be 
  151  paid timely, in accordance with subsection (1). 
  152         (6) If When a contractor receives payment from a local 
  153  governmental entity for labor, services, or materials furnished 
  154  by subcontractors and suppliers hired by the contractor, the 
  155  contractor must shall remit payment due to those subcontractors 
  156  and suppliers within 10 days after the contractor’s receipt of 
  157  payment. If When a subcontractor receives payment from a 
  158  contractor for labor, services, or materials furnished by 
  159  subcontractors and suppliers hired by the subcontractor, the 
  160  subcontractor must shall remit payment due to those 
  161  subcontractors and suppliers within 7 days after the 
  162  subcontractor’s receipt of payment. This subsection does not 
  163  Nothing herein shall prohibit a contractor or subcontractor from 
  164  disputing, pursuant to the terms of the relevant contract, all 
  165  or any portion of a payment alleged to be due to another party 
  166  if the contractor or subcontractor notifies the party whose 
  167  payment is disputed, in writing, of the amount in dispute and 
  168  the actions required to cure the dispute. The contractor or 
  169  subcontractor must pay all undisputed amounts due within the 
  170  time limits imposed by this section. 
  171         (7)(a) Each contract for construction services between a 
  172  local governmental entity and a contractor must provide for the 
  173  development of a single list of items required to render 
  174  complete, satisfactory, and acceptable the construction services 
  175  purchased by the local governmental entity. 
  176         (a) The contract must specify the process for developing 
  177  the development of the list, including the responsibilities of 
  178  the local governmental entity and the contractor in developing 
  179  and reviewing the list and a reasonable time for developing the 
  180  list, as follows: 
  181         1. For construction projects having an estimated cost of 
  182  Less than $10 million, within 30 calendar days after reaching 
  183  substantial completion of the construction services purchased as 
  184  defined in the contract, or, if not defined in the contract, 
  185  upon reaching beneficial occupancy or use; or 
  186         2. For construction projects having an estimated cost of 
  187  $10 million or more, within 30 calendar days, or, if unless 
  188  otherwise extended by contract, up to not to exceed 60 calendar 
  189  days, after reaching substantial completion of the construction 
  190  services purchased as defined in the contract, or, if not 
  191  defined in the contract, upon reaching beneficial occupancy or 
  192  use. 
  193   
  194  The contract must also specify a date for the delivery of the 
  195  list of items, not to exceed 10 days after the list of items has 
  196  been developed and reviewed within the time periods set forth in 
  197  subparagraph 1. or subparagraph 2. 
  198         (b) If the contract between the local governmental entity 
  199  and the contractor relates to the purchase of construction 
  200  services on more than one building or structure, or involves a 
  201  multiphased project, the contract must provide for the 
  202  development of a list of items required to render complete, 
  203  satisfactory, and acceptable all the construction services 
  204  purchased pursuant to the contract for each building, structure, 
  205  or phase of the project within the time limitations provided in 
  206  paragraph (a). 
  207         (c) The final contract completion date must be at least 30 
  208  days after the delivery of the list of items. If the list is not 
  209  provided to the contractor by the agreed to date for the 
  210  delivery of the list, the contract time for completion shall be 
  211  extended by the number of days the local governmental entity 
  212  exceeded the delivery date. Damages may not be assessed against 
  213  a contractor for failing to complete a project within the time 
  214  required by the contract, unless the contractor failed to 
  215  complete the project within the contract period as extended 
  216  pursuant to this paragraph. 
  217         (d)(c) The failure to include any corrective work or 
  218  pending items not yet completed on the list developed pursuant 
  219  to this subsection does not alter the responsibility of the 
  220  contractor to complete all the construction services purchased 
  221  pursuant to the contract. 
  222         (e)(d) Upon completion of all items on the list, the 
  223  contractor may submit a payment request for all remaining 
  224  retainage withheld by the local governmental entity pursuant to 
  225  this section. If a good faith dispute exists as to whether one 
  226  or more items identified on the list have been completed 
  227  pursuant to the contract, the local governmental entity may 
  228  continue to withhold up to an amount not to exceed 150 percent 
  229  of the total costs to complete such items. 
  230         (f)(e) All items that require correction under the contract 
  231  and that are identified after the preparation and delivery of 
  232  the list remain the obligation of the contractor as defined by 
  233  the contract. 
  234         (g)(f) Warranty items or items not included in the list of 
  235  items required under paragraph (a) may not affect the final 
  236  payment of retainage as provided in this section or as provided 
  237  in the contract between the contractor and its subcontractors 
  238  and suppliers. 
  239         (h)(g) Retainage may not be held by a local governmental 
  240  entity or a contractor to secure payment of insurance premiums 
  241  under a consolidated insurance program or series of insurance 
  242  policies issued to a local governmental entity or a contractor 
  243  for a project or group of projects, and the final payment of 
  244  retainage as provided in this section may not be delayed pending 
  245  a final audit by the local governmental entity’s or contractor’s 
  246  insurance provider. 
  247         (i)(h) If a local governmental entity fails to comply with 
  248  its responsibilities to develop the list required under 
  249  paragraph (a) or paragraph (b), as defined in the contract, 
  250  within the time limitations provided in paragraph (a), the 
  251  contractor may submit a payment request for all remaining 
  252  retainage withheld by the local governmental entity pursuant to 
  253  this section. The payment of any remaining undisputed contract 
  254  amount, less any amount withheld pursuant to the contract for 
  255  incomplete or uncorrected work, must be paid within 20 business 
  256  days after receipt of a proper invoice or payment request. If 
  257  the local governmental entity need not pay or process any 
  258  payment request for retainage if the contractor has, in whole or 
  259  in part, failed to cooperate with the local governmental entity 
  260  in the development of the list or failed to perform its 
  261  contractual responsibilities, if any, with regard to the 
  262  development of the list, or if paragraph (8)(c) (8)(f) applies. 
  263         (8)(a)With regard to any contract for construction 
  264  services, A local governmental entity may withhold from each 
  265  progress payment for construction services made to the 
  266  contractor an amount not exceeding 10 percent of the payment as 
  267  retainage until 50 percent 50-percent completion of such 
  268  services. 
  269         (b)After 50-percent completion of the construction 
  270  services purchased pursuant to the contract, the local 
  271  governmental entity must reduce to 5 percent the amount of 
  272  retainage withheld from each subsequent progress payment made to 
  273  the contractor. For purposes of this subsection, the term “50 
  274  percent completion” has the meaning set forth in the contract 
  275  between the local governmental entity and the contractor or, if 
  276  not defined in the contract, the point at which the local 
  277  governmental entity has expended 50 percent of the total cost of 
  278  the construction services purchased as identified in the 
  279  contract together with all costs associated with existing change 
  280  orders and other additions or modifications to the construction 
  281  services provided for in the contract. However, notwithstanding 
  282  this subsection, a municipality having a population of 25,000 or 
  283  fewer, or a county having a population of 100,000 or fewer, may 
  284  withhold retainage in an amount not exceeding 10 percent of each 
  285  progress payment made to the contractor until final completion 
  286  and acceptance of the project by the local governmental entity. 
  287         (c)After 50-percent completion of the construction 
  288  services purchased pursuant to the contract, the contractor may 
  289  elect to withhold retainage from payments to its subcontractors 
  290  at a rate higher than 5 percent. The specific amount to be 
  291  withheld must be determined on a case-by-case basis and must be 
  292  based on the contractor’s assessment of the subcontractor’s past 
  293  performance, the likelihood that such performance will continue, 
  294  and the contractor’s ability to rely on other safeguards. The 
  295  contractor shall notify the subcontractor, in writing, of its 
  296  determination to withhold more than 5 percent of the progress 
  297  payment and the reasons for making that determination, and the 
  298  contractor may not request the release of such retained funds 
  299  from the local governmental entity. 
  300         (d)After 50-percent completion of the construction 
  301  services purchased pursuant to the contract, the contractor may 
  302  present to the local governmental entity a payment request for 
  303  up to one-half of the retainage held by the local governmental 
  304  entity. The local governmental entity shall promptly make 
  305  payment to the contractor, unless the local governmental entity 
  306  has grounds, pursuant to paragraph (f), for withholding the 
  307  payment of retainage. If the local governmental entity makes 
  308  payment of retainage to the contractor under this paragraph 
  309  which is attributable to the labor, services, or materials 
  310  supplied by one or more subcontractors or suppliers, the 
  311  contractor shall timely remit payment of such retainage to those 
  312  subcontractors and suppliers. 
  313         (e) This limitation section does not prohibit a local 
  314  governmental entity from withholding retainage at a rate less 
  315  than 10 percent of each progress payment or, from incrementally 
  316  reducing the rate of retainage pursuant to a schedule provided 
  317  for in the contract, or from releasing at any point all or a 
  318  portion of any retainage withheld by the local governmental 
  319  entity which is attributable to the labor, services, or 
  320  materials supplied by the contractor or by one or more 
  321  subcontractors or suppliers. 
  322         (a) If a local governmental entity makes any payment of 
  323  retainage to the contractor which is attributable to the 
  324  construction labor, services, or materials supplied by one or 
  325  more subcontractors or suppliers, the contractor shall timely 
  326  remit payment of such retainage to those subcontractors and 
  327  suppliers. 
  328         (b) A subcontractor may submit an invoice to the contractor 
  329  for the remainder of unpaid construction services 45 days after 
  330  the completion of such services, including an invoice for the 
  331  full value of the retainage related to the services. The 
  332  subcontractor shall include a conditional release of lien and 
  333  all appropriate warranties and closeout documentation with the 
  334  final payment invoice to the contractor. The contractor must 
  335  include the payment request in the next payment application 
  336  cycle to the agent following the receipt of the subcontractor’s 
  337  payment request. 
  338         (c)(f) This subsection section does not require the local 
  339  governmental entity to pay or release any amounts that are the 
  340  subject of a good faith dispute, the subject of a claim brought 
  341  pursuant to s. 255.05, or otherwise the subject of a claim or 
  342  demand by the local governmental entity or contractor. 
  343         (d)(g) The time limitations set forth in this subsection 
  344  section for payment of payment requests apply to any payment 
  345  request for retainage made pursuant to this section. 
  346         (e)(h)This subsection does Paragraphs (a)-(d) do not apply 
  347  to construction services purchased by a local governmental 
  348  entity which are paid for, in whole or in part, with federal 
  349  funds and are subject to federal grantor laws and regulations or 
  350  requirements that are contrary to any provision of the Local 
  351  Government Prompt Payment Act. 
  352         (f)(i) This subsection does not apply to any construction 
  353  services purchased by a local governmental entity if the total 
  354  cost of the construction services purchased as identified in the 
  355  contract is $200,000 or less. 
  356         (9) All payments due under this section and not made within 
  357  the time periods specified by this section shall bear interest 
  358  at the rate of 1 percent per month, or the rate specified by 
  359  contract, whichever is greater. 
  360         Section 3. Section 218.76, Florida Statutes, is amended to 
  361  read: 
  362         218.76 Improper payment request or invoice; resolution of 
  363  disputes.— 
  364         (1) If In any case in which an improper payment request or 
  365  invoice is submitted by a vendor, the local governmental entity 
  366  shall, within 10 days after the improper payment request or 
  367  invoice is received by it, notify the vendor, in writing, that 
  368  the payment request or invoice is improper and indicate what 
  369  corrective action on the part of the vendor is needed to make 
  370  the payment request or invoice proper. 
  371         (2) If In the event a dispute arises occurs between a 
  372  vendor and a local governmental entity concerning payment of a 
  373  payment request or an invoice, the dispute such disagreement 
  374  shall be finally determined by the local governmental entity 
  375  pursuant to as provided in this section. Each local governmental 
  376  entity shall establish a dispute resolution procedure 
  377  established to be followed by the local governmental entity in 
  378  cases of such disputes. Such procedure must shall provide that 
  379  proceedings to resolve the dispute are shall be commenced within 
  380  not later than 45 days after the date on which the payment 
  381  request or proper invoice was received by the local governmental 
  382  entity and shall be concluded by final decision of the local 
  383  governmental entity within not later than 60 days after the date 
  384  on which the payment request or proper invoice was received by 
  385  the local governmental entity. Such procedures are shall not be 
  386  subject to chapter 120, and do such procedures shall not 
  387  constitute an administrative proceeding that which prohibits a 
  388  court from deciding de novo any action arising out of the 
  389  dispute. If the dispute is resolved in favor of the local 
  390  governmental entity, then interest charges shall begin to accrue 
  391  15 days after the local governmental entity’s final decision. If 
  392  the dispute is resolved in favor of the vendor, then interest 
  393  begins shall begin to accrue as of the original date the payment 
  394  became due. If the local governmental entity does not commence 
  395  the dispute resolution procedure within the time required, the 
  396  objection to payment shall be deemed to have been waived. The 
  397  time for dispute resolution may be extended upon the written 
  398  agreement of the affected parties. 
  399         (3) In an action to recover amounts due under this part ss. 
  400  218.70-218.80, the court shall award court costs and reasonable 
  401  attorney’s fees, including fees incurred through any appeal, to 
  402  the prevailing party, if the court finds that the nonprevailing 
  403  party withheld any portion of the payment that is the subject of 
  404  the action without any reasonable basis in law or fact to 
  405  dispute the prevailing party’s claim to those amounts. 
  406         Section 4. This act shall take effect July 1, 2010. 