Bill Text: CT SB00001 | 2011 | General Assembly | Comm Sub


Bill Title: An Act Concerning Connecticut's Energy Future.

Spectrum: Slight Partisan Bill (Democrat 7-2-1)

Status: (Introduced - Dead) 2011-05-27 - Favorable Report, Tabled for the Calendar, Senate [SB00001 Detail]

Download: Connecticut-2011-SB00001-Comm_Sub.html

General Assembly

 

Substitute Bill No. 1

    January Session, 2011

 

*_____SB00001APP___052711____*

AN ACT CONCERNING CONNECTICUT'S ENERGY FUTURE.

Be it enacted by the Senate and House of Representatives in General Assembly convened:

Section 1. (NEW) (Effective July 1, 2011) (a) There is established a Department of Energy and Environmental Protection, which shall, for the purposes of energy policy and regulation, have the following goals: (1) Reducing rates and decreasing costs for Connecticut's ratepayers, (2) ensuring the reliability and safety of our state's energy supply, (3) increasing the state's use of clean energy, and (4) creating jobs and developing the state's energy related economy. The department head shall be the Commissioner of Energy and Environmental Protection who shall be appointed by the Governor in accordance with the provisions of sections 4-5 to 4-8, inclusive, of the general statutes, as amended by this act, with the powers and duties therein prescribed.

(b) The Department of Energy and Environmental Protection shall constitute a successor department to the Department of Environmental Protection and the Department of Public Utility Control in accordance with the provisions of sections 4-38d, 4-38e and 4-39 of the general statutes. The Department of Energy and Environmental Protection shall be divided into three bureaus, which shall include the Bureau of Energy, the Bureau of Environmental Protection and the Bureau of Public Utility Control. The bureaus shall further be divided into units or divisions, as the commissioner deems appropriate, which shall include, but not be limited to, the following units or divisions: (1) Energy research, (2) telecommunications and technology policy, and (3) conservation and renewable energy. The Bureau of Energy head shall be the energy bureau chief who shall have a background in energy conservation, generation and renewable energy and shall have no industry conflicts. The Bureau of Public Utility Control shall include a procurement manager whose duties shall include, but not be limited to, overseeing the procurement of electricity for standard service. There shall also be, within the department, an Office of the Ombudsman for the purpose of programmatic oversight. Said ombudsman shall communicate with policymakers, stakeholders and individuals affected by the department's implementation of energy policy. The ombudsman shall make findings and recommendations to the Commissioner of Energy and Environmental Protection who may implement such recommendations as appropriate. Annually, the ombudsman shall report in accordance with the provisions of section 11-4a of the general statutes to the joint standing committee of the General Assembly having cognizance of matters relating to energy.

(c) Wherever the words "Commissioner of Environmental Protection" are used or referenced to in the following sections of the general statutes, the words "Commissioner of Energy and Environmental Protection" shall be substituted in lieu thereof: 3-7, 3-100, 4-5, as amended by this act, 4-168, 4a-57, 4a-67d, 4b-15, 4b-15a, 4b-21, 5-238a, 7-121d, 7-131, 7-131a, 7-131d, 7-131e, 7-131f, 7-131g, 7-131i, 7-131l, 7-131t, 7-131u, 7-136h, 7-137c, 7-147, 7-151a, 7-151b, 7-245, 7-246, 7-246f, 7-247, 7-249a, 7-323o, 7-374, 7-487, 8-336f, 10-231b, 10-231c, 10-231d, 10-231g, 10-382, 10-388, 10-389, 10-391, 12-81, 12-81r, 12-107d, 12-217mm, 12-263m, 12-407, 12-412, 13a-80i, 13a-94, 13a-142a, 13a-142b, 13a-142e, 13a-175j, 13b-11a, 13b-31c, 13b-31e, 13b-38x, 13b-51, 13b-56, 13b-57, 13b-329, 14-21e, 14-21i, 14-21s, 14-65a, 14-67l, 14-80a, 14-100b, 14-164c, 14-164h, 14-164i, 14-164k, 14-164o, 15-11a, 15-121, 15-125, 15-127, 15-130, 15-133a, 15-133c, 15-140a, 15-140c, 15-140d, 15-140e, 15-140f, 15-140j, 15-140o, 15-140u, 15-140v, 15-141, 15-142, 15-143, 15-144, 15-145, 15-149a, 15-149b, 15-150a, 15-151, 15-154, 15-154a, 15-155, 15-155d, 15-156, 15-174, 16-2, 16-11a, 16-19e, 16-19g, 16-50c, 16-50d, 16-50j, 16-245, as amended by this act, 16a-21a, 16a-27, 16a-35h, 16a-38k, 16a-103, 16a-106, 19a-35a, 19a-47, 19a-102a, 19a-330, 19a-341, 21-84b, 22-6c, 22-11h, 22-26cc, 22-81a, 22-91c, 22-350a, 22-358, 22a-1g, 22a-2a, 22a-5b, 22a-5c, 22a-6, 22a-6a, 22a-6b, 22a-6e, 22a-6f, 22a-6g, 22a-6h, 22a-6i, 22a-6j, 22a-6k, 22a-6l, 22a-6m, 22a-6n, 22a-6p, 22a-6s, 22a-6u, 22a-6v, 22a-6w, 22a-6y, 22a-6z, 22a-6aa, 22a-6bb, 22a-6cc, 22a-7a, 22a-7b, 22a-8a, 22a-10, 22a-13, 22a-16a, 22a-21, 22a-21b, 22a-21c, 22a-21d, 22a-21h, 22a-21j, 22a-22, 22a-25, 22a-26, 22a-27, 22a-27f, 22a-27l, 22a-27p, 22a-27r, 22a-27s, 22a-27t, 22a-27u, 22a-27v, 22a-27w, 22a-29, 22a-35a, 22a-38, 22a-42a, 22a-44, 22a-45a, 22a-45b, 22a-45c, 22a-45d, 22a-47, 22a-54, 22a-54a, 22a-56a, 22a-66a, 22a-66c, 22a-66j, 22a-66k, 22a-66l, 22a-66y, 22a-66z, 22a-68, 22a-93, 22a-106a, 22a-109, 22a-113m, 22a-113n, 22a-113t, 22a-114, 22a-115, 22a-118, 22a-122, 22a-133a, 22a-133b, 22a-133k, 22a-133l, 22a-133m, 22a-133n, 22a-133u, 22a-133v, 22a-133w, 22a-133y, 22a-133z, 22a-133aa, 22a-133bb, 22a-133ee, 22a-134, 22a-134e, 22a-134f, 22a-134g, 22a-134h, 22a-134i, 22a-134k, 22a-134l, 22a-134m, 22a-134n, 22a-134p, 22a-134q, 22a-134s, 22a-135, 22a-136, 22a-137, 22a-148, 22a-149, 22a-150, 22a-151, 22a-153, 22a-154, 22a-155, 22a-156, 22a-158, 22a-160, 22a-162, 22a-170, 22a-171, 22a-173, 22a-174c, 22a-174d, 22a-174e, 22a-174f, 22a-174g, 22a-174h, 22a-174i, 22a-174j, 22a-174k, 22a-174l, 22a-174m, 22a-180, 22a-182a, 22a-183, 22a-186, 22a-188, 22a-188a, 22a-191, 22a-191a, 22a-192, 22a-193, 22a-194a, 22a-194c, 22a-194f, 22a-198, 22a-199, 22a-200, 22a-200a, 22a-200b, 22a-200c, 22a-201a, 22a-201b, 22a-207, 22a-208a, 22a-208b, 22a-208d, 22a-208e, 22a-208f, 22a-208g, 22a-208h, 22a-208j, 22a-208o, 22a-208p, 22a-208q, 22a-208v, 22a-208w, 22a-208x, 22a-208y, 22a-208aa, 22a-208bb, 22a-209a, 22a-209b, 22a-209d, 22a-209f, 22a-209g, 22a-209h, 22a-209i, 22a-213a, 22a-214, 22a-219b, 22a-219c, 22a-219e, 22a-220, 22a-220a, 22a-220d, 22a-222, 22a-223, 22a-225, 22a-227, 22a-228, 22a-230, 22a-231, 22a-233a, 22a-235, 22a-235a, 22a-237, 22a-238, 22a-239, 22a-240, 22a-240a, 22a-241, 22a-241a, 22a-241b, 22a-241g, 22a-241h, 22a-241j, 22a-245, 22a-245a, 22a-245b, 22a-245d, 22a-248, 22a-250, 22a-250a, 22a-250b, 22a-250c, 22a-252, 22a-255b, 22a-255c, 22a-255d, 22a-255f, 22a-255h, 22a-256b, 22a-256c, 22a-256i, 22a-256m, 22a-256o, 22a-256q, 22a-256r, 22a-256v, 22a-256y, 22a-256aa, 22a-260, 22a-264, 22a-283, 22a-285a, 22a-285d, 22a-285e, 22a-285g, 22a-285h, 22a-285j, 22a-295, 22a-300, 22a-308, 22a-309, 22a-314, 22a-315, 22a-316, 22a-317, 22a-318, 22a-319, 22a-320, 22a-321, 22a-322, 22a-324, 22a-326, 22a-328, 22a-336, 22a-337, 22a-339a, 22a-339b, 22a-339c, 22a-339d, 22a-339f, 22a-339g, 22a-339h, 22a-342a, 22a-349, 22a-349a, 22a-351, 22a-352, 22a-354b, 22a-354c, 22a-354d, 22a-354e, 22a-354f, 22a-354h, 22a-354i, 22a-354j, 22a-354k, 22a-354l, 22a-354m, 22a-354p, 22a-354q, 22a-354t, 22a-354u, 22a-354v, 22a-354w, 22a-354x, 22a-354z, 22a-354aa, 22a-354bb, 22a-354cc, 22a-355, 22a-357, 22a-359, 22a-361, 22a-361a, 22a-363b, 22a-364, 22a-367, 22a-368a, 22a-378a, 22a-381, 22a-401, 22a-402, 22a-406, 22a-409, 22a-416, 22a-423, 22a-426, 22a-430b, 22a-430c, 22a-434a, 22a-439, 22a-439a, 22a-444, 22a-445, 22a-449, 22a-449d, 22a-449e, 22a-449f, 22a-449g, 22a-449h, 22a-449i, 22a-449j, 22a-449k, 22a-449l, 22a-449n, 22a-449p, 22a-449q, 22a-450a, 22a-452a, 22a-452e, 22a-453a, 22a-454c, 22a-457a, 22a-457b, 22a-458, 22a-459, 22a-461, 22a-462, 22a-463, 22a-471, 22a-472, 22a-474, 22a-475, 22a-482, 22a-485, 22a-497, 22a-500, 22a-501, 22a-517, 22a-521, 22a-522, 22a-523, 22a-524, 22a-525, 22a-526, 22a-527, 22a-601, 22a-602, 22a-604, 22a-605, 22a-613, 22a-616, 22a-626, 22a-627, 22a-629, 22a-630, 22a-634, 22a-637, 22a-638, 22a-902, 23-4, 23-5, 23-5b, 23-6, 23-7, 23-8, 23-8b, 23-9a, 23-9b, 23-10, 23-10b, 23-10c, 23-10e, 23-10i, 23-11, 23-12, 23-13, 23-14, 23-15a, 23-15b, 23-16, 23-16a, 23-17, 23-18, 23-20, 23-21, 23-22, 23-23, 23-24, 23-24a, 23-25, 23-26b, 23-26c, 23-26d, 23-26f, 23-26g, 23-30, 23-31, 23-32, 23-32a, 23-33, 23-37a, 23-37b, 23-41, 23-61a, 23-61b, 23-61f, 23-65, 23-65f, 23-65g, 23-65h, 23-65i, 23-65j, 23-65l, 23-65m, 23-65n, 23-65o, 23-65p, 23-65q, 23-73, 23-75, 23-77, 23-101, 23-102, 24-2, 25-32b, 25-32d, 25-32i, 25-33e, 25-33g, 25-33h, 25-33k, 25-33m, 25-33o, 25-34, 25-68b, 25-68i, 25-68k, 25-68l, 25-68m, 25-68n, 25-71, 25-72, 25-74, 25-76, 25-80, 25-83a, 25-94, 25-95, 25-97, 25-102a, 25-102d, 25-102e, 25-102f, 25-102m, 25-102t, 25-102ii, 25-102qq, 25-102xx, 25-109e, 25-109q, 25-131, 25-139, 25-155, 25-157, 25-178, 25-199, 25-199a, 25-201, 25-231, 26-1, 26-3, 26-3a, 26-3b, 26-3c, 26-5, 26-6, 26-6a, 26-7, 26-15, 26-17a, 26-18, 26-25a, 26-25b, 26-27, 26-27b, 26-27c, 26-27d, 26-28b, 26-29c, 26-30, 26-31, 26-31a, 26-40a, 26-40c, 26-46, 26-55, 26-65, 26-65a, 26-67b, 26-67c, 26-67e, 26-74, 26-80a, 26-86a, 26-86c, 26-86e, 26-91, 26-103, 26-107f, 26-107h, 26-107i, 26-115, 26-119, 26-141a, 26-141b, 26-141c, 26-142a, 26-142b, 26-157c, 26-157d, 26-157e, 26-157f, 26-157h, 26-157i, 26-159a, 26-186a, 26-192j, 26-297, 26-313, 26-314, 26-315, 26-316, 28-1b, 28-31, 29-32b, 32-1e, 32-1o, 32-9cc, 32-9dd, 32-9kk, 32-9ll, 32-11a, 32-23x, 32-242, 32-242a, 32-664, 38a-684, 47-46a, 47-59b, 47-65, 47-65a, 47-66, 47-66d, 47-66g, 51-164n, 52-192, 52-473a, 53-190, 53a-44a, 53a-54b and 53a-217e.

(d) Wherever the words "Department of Environmental Protection" are used or referred to in the following sections of the general statutes, the words "Department of Energy and Environmental Protection" shall be substituted in lieu thereof: 1-84, 1-206, 1-217, 2-20a, 4-38c, as amended by this act, 4-66c, 4-66aa, 4-89, 4a-53, 4b-15, 5-142, 7-131e, 7-151a, 7-151b, 7-252, 8-387, 10-282, 10-291, 10-413, 10a-119e, 12-63e, 12-263m, 13a-142b, 13a-142c, 13a-142d, 13b-38a, 14-386, 15-129, 15-130a, 15-140e, 15-140f, 15-140j, 15-154, 15-155, 16-19h, 16-19o, 16-50j, 16-50k, 16-50p, 16-243q, 16-244d, 16-244j, 16-245l, 16-245y, 16-262m, 16-262n, 19a-197b, 19a-320, 20-420, 21-84b, 22-11f, 22-11g, 22-11h, 22-26cc, 22-81, 22-91e, 22-455, 22a-1d, 22a-2, 22a-2a, 22a-2c, 22a-5b, 22a-6, 22a-6f, 22a-6g, 22a-6l, 22a-6p, 22a-6r, 22a-6u, 22a-6x, 22a-6cc, 22a-10, 22a-11, 22a-20a, 22a-21, 22a-21a, 22a-21b, 22a-21c, 22a-21i, 22a-21j, 22a-21k, 22a-22, 22a-25, 22a-26, 22a-26a, 22a-27j, 22a-27l, 22a-27s, 22a-29, 22a-33, 22a-40, 22a-47a, 22a-58, 22a-61, 22a-66z, 22a-68, 22a-115, 22a-118, 22a-119, 22a-122, 22a-123, 22a-126, 22a-132, 22a-133v, 22a-133w, 22a-134i, 22a-135, 22a-170, 22a-174, 22a-174l, 22a-186, 22a-188a, 22a-196, 22a-198, 22a-200b, 22a-200c, 22a-200d, 22a-207, 22a-208a, 22a-209f, 22a-223, 22a-233a, 22a-239a, 22a-244, 22a-245a, 22a-247, 22a-248, 22a-250, 22a-255h, 22a-256m, 22a-256y, 22a-259, 22a-260, 22a-264, 22a-275, 22a-314, 22a-315, 22a-336, 22a-352, 22a-355, 22a-361, 22a-363b, 22a-416, 22a-426, 22a-446, 22a-449f, 22a-449l, 22a-449n, 22a-454a, 22a-475, 22a-477, 22a-509, 22a-521, 22a-601, 22a-629, 22a-630, 22a-635, 23-5c, 23-8, 23-8b, 23-10b, 23-10d, 23-15, 23-15b, 23-19, 23-20, 23-24a, 23-32a, 23-61a, 23-65f, 23-65h, 23-65i, 23-65k, 23-67, 23-68, 23-72, 23-73, 23-101, 23-102, 23-103, 25-32d, 25-33o, 25-33p, 25-37d, 25-37e, 25-37i, 25-43c, 25-102e, 25-102f, 25-128, 25-131, 25-157, 25-157a, 25-157b, 25-157n, 25-175, 25-201, 25-203, 25-206, 25-231, 26-6a, 26-15, 26-15a, 26-15b, 26-17a, 26-27b, 26-31, 26-40a, 26-55, 26-55a, 26-59, 26-66a, 26-66b, 26-72, 26-86f, 26-105, 26-142a, 26-157d, 26-192k, 26-300, 26-304, 26-314, 28-31, 29-28, 29-36f, 30-55a, 32-1e, 32-9t, 32-9cc, 32-9dd, 32-9kk, 32-9ll, 32-11a, 32-23d, 32-23x, 32-242, 32-242a, 32-726, 46b-220, 47-46a, 47-64, 52-557b, 53-204, 53-205, 53-206d, 53a-44a, 53a-217e, 54-56g and 54-143.

(e) Wherever the words "Department of Public Utility Control" are used or referred to in the following sections of the general statutes, the words "Department of Energy and Environmental Protection" shall be substituted in lieu thereof: 1-84, 1-84b, 2-20a, 2-71p, 4-38c, as amended by this act, 4a-57, 4a-74, 4d-2, 4d-80, 7-223, 7-233t, 7-233ii, 8-387, 12-81q, 12-94d, 12-264, 12-265, 12-408b, 12-412, 12-491, 13a-82, 13a-126, 13a-126a, 13b-10a, 13b-37, 13b-43, 13b-44, 13b-387a, 15-96, 16-1, 16-2, 16-2a, 16-4, 16-6, 16-6a, 16-6b, 16-7, 16-8, 16-8a, 16-8b, 16-8c, 16-8d, 16-9, 16-9a, 16-10, 16-10a, 16-11, 16-12, 16-13, 16-14, 16-15, 16-16, 16-17, 16-18, 16-18a, 16-19, 16-19a, 16-19b, 16-19d, 16-19e, 16-19f, 16-19h, 16-19k, 16-19n, 16-19o, 16-19u, 16-19w, 16-19x, 16-19z, 16-19aa, 16-19bb, 16-19cc, 16-19dd, 16-19ee, 16-19ff, 16-19gg, 16-19jj, 16-19kk, 16-19mm, 16-19nn, 16-19oo, 16-19pp, 16-19qq, 16-19ss, 16-19tt, 16-19uu, 16-19vv, 16-20, 16-21, 16-23, 16-24, 16-25, 16-25a, 16-26, 16-27, 16-28, 16-29, 16-32, 16-32a, 16-32b, 16-32c, 16-32e, 16-32g, 16-33, 16-35, 16-41, 16-42, 16-43, 16-43a, 16-43d, 16-44, 16-44a, 16-45, 16-46, 16-47, 16-47a, 16-48, 16-49e, 16-50c, 16-50d, 16-50f, 16-50k, 16-50aa, 16-216, 16-227, 16-231, 16-233, 16-234, 16-235, 16-238, 16-243, 16-243a, 16-243b, 16-243c, 16-243f, 16-243j, 16-243k, 16-243m, 16-243n, 16-243p, 16-243q, 16-243r, 16-243s, 16-243t, 16-243u, 16-243w, 16-244a, 16-244b, 16-244c, as amended by this act, 16-244d, 16-244e, 16-244f, 16-244g, 16-244h, 16-244i, 16-244k, 16-244l, 16-245, as amended by this act, 16-245a, 16-245b, 16-245c, 16-245d, 16-245e, 16-245g, 16-245l, 16-245o, as amended by this act, 16-245p, 16-245q, 16-245s, 16-245t, 16-245u, 16-245v, 16-245w, 16-245x, 16-245y, 16-246, 16-246e, 16-246g, 16-247c, 16-247j, 16-247l, 16-247m, 16-247o, 16-247p, 16-247q, 16-247t, 16-249, 16-250, 16-250a, 16-250b, 16-256b, 16-256c, 16-256g, 16-256h, 16-256k, 16-258a, 16-258b, 16-258c, 16-259, 16-261, 16-262a, 16-262c, 16-262d, 16-262i, 16-262j, 16-262k, 16-262l, 16-262m, 16-262n, 16-262o, 16-262q, 16-262r, 16-262s, 16-262v, 16-262w, 16-262x, 16-265, 16-269, 16-271, 16-272, 16-273, 16-274, 16-275, 16-276, 16-278, 16-280a, 16-280b, 16-280d, 16-280e, 16-280f, 16-280h, 16-281a, 16-331, 16-331c, 16-331e, 16-331f, 16-331g, 16-331h, 16-331i, 16-331j, 16-331k, 16-331n, 16-331o, 16-331p, 16-331q, 16-331r, 16-331t, 16-331u, 16-331v, 16-331y, 16-331z, 16-331aa, 16-331cc, 16-331dd, 16-331ff, 16-331gg, 16-332, 16-333, 16-333a, 16-333b, 16-333e, 16-333f, 16-333g, 16-333h, 16-333i, 16-333l, 16-333n, 16-333o, 16-333p, 16-347, 16-348, 16-356, 16-357, 16-358, 16-359, 16a-3, 16a-3a, as amended by this act, 16a-3b, 16a-3c, 16a-7b, 16a-7c, 16a-13b, 16a-37c, 16a-38n, 16a-38o, 16a-40b, 16a-40k, 16a-41, 16a-46, 16a-46b, 16a-46c, 16a-47a, 16a-47b, 16a-47c, 16a-47d, 16a-47e, 16a-49, 16a-103, 20-298, 20-309, 20-340, 20-340a, 20-341k, 20-341z, 20-357, 20-541, 22a-174j, 22a-174l, 22a-200c, 22a-256dd, 22a-266, 22a-358, 22a-475, 22a-478, 22a-479, 23-8b, 23-65, 25-32d, 25-33a, 25-33e, 25-33g, 25-33h, 25-33k, 25-33l, 25-33p, 25-37d, 25-37e, 26-141b, 28-1b, 28-24, 28-26, 28-27, 28-31, 29-282, 29-415, 32-80a, 32-222, 33-219, 33-221, 33-241, 33-951, 42-287, 43-44, 49-4c and 52-259a.

(f) Wherever the words "Secretary of the Office of Policy and Management" are used or referred to in the following sections of title 16a of the general statutes, the words "Commissioner of Energy and Environmental Protection" shall be substituted in lieu thereof: 16a-3, 16a-4d, 16a-6, 16a-14, 16a-22, 16a-22c, 16a-22h, 16a-22i, 16a-22j, 16a-23t, 16a-35c, 16a-35d, 16a-35h, 16a-37c, 16a-37f, 16a-37u, 16a-38, 16a-38a, 16a-38b, 16a-38i, 16a-38j, 16a-38k, 16a-38m, 16a-38o, 16a-39b, 16a-40b, 16a-41a, 16a-44b, 16a-46a, 16a-46c, 16a-46e, 16a-46f, 16a-102 and 16a-106.

(g) Wherever the words "Office of Policy and Management" are used or referred to in the following sections of title 16a of the general statutes, the words "Department of Energy and Environmental Protection" shall be substituted in lieu thereof: 16a-2, 16a-3, 16a-4d, 16a-6, 16a-7b, 16a-14, 16a-14e, 16a-20, 16a-22, 16a-22c, 16a-22h, 16a-22i, 16a-22j, 16a-23t, 16a-35c, 16a-35d, 16a-35g, 16a-35h, 16a-37c, 16a-37f, 16a-37u, 16a-37v, 16a-37w, 16a-38, 16a-38a, 16a-38b, 16a-38i, 16a-38j, 16a-38k, 16a-38l, 16a-38m, 16a-38n, 16a-38o, 16a-39b, 16a-40b, 16a-40f, 16a-41a, 16a-44b, 16a-46a, 16a-46c, 16a-46e, 16a-46f, 16a-46g, 16a-102 and 16a-106.

(h) Wherever the word "secretary" is used or referred to in the following sections of title 16a of the general statutes, the word "commissioner" shall be substituted in lieu thereof: 16a-2, 16a-3, 16a-4d, 16a-6, 16a-9, 16a-11, 16a-12, 16a-13, 16a-13a, 16a-13b, 16a-14, 16a-14a, 16a-14b, 16a-22, 16a-22c, 16a-22d, 16a-22e, 16a-22f, 16a-22h, 16a-22i, 16a-22j, 16a-23t, 16a-35c, 16a-35d, 16a-35h, 16a-37c, 16a-37f, 16a-37u, 16a-38, 16a-38a, 16a-38b, 16a-38i, 16a-38j, 16a-38k, 16a-38m, 16a-38o, 16a-39b, 16a-40b, 16a-41a, 16a-44b, 16a-45a, 16a-46a, 16a-46b, 16a-46c, 16a-46e, 16a-46f, 16a-102, 16a-106 and 16a-111.

(i) If the term "Department of Environmental Protection" or "Department of Public Utility Control" is used or referred to in any public or special act of 2011, or in any section of the general statutes which is amended in 2011, it shall be deemed to refer to the Department of Energy and Environmental Protection.

(j) If the term "Commissioner of Environmental Protection" is used or referred to in any public or special act of 2011, or in any section of the general statutes which is amended in 2011, it shall be deemed to refer to the Commissioner of Energy and Environmental Protection.

Sec. 2. Section 4-5 of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

As used in sections 4-6, 4-7 and 4-8, the term "department head" means Secretary of the Office of Policy and Management, Commissioner of Administrative Services, Commissioner of Revenue Services, Banking Commissioner, Commissioner of Children and Families, Commissioner of Consumer Protection, Commissioner of Correction, Commissioner of Economic and Community Development, State Board of Education, Commissioner of Emergency Management and Homeland Security, Commissioner of Energy and Environmental Protection, Commissioner of Agriculture, Commissioner of Public Health, Insurance Commissioner, Labor Commissioner, Liquor Control Commission, Commissioner of Mental Health and Addiction Services, Commissioner of Public Safety, Commissioner of Social Services, Commissioner of Developmental Services, Commissioner of Motor Vehicles, Commissioner of Transportation, Commissioner of Public Works, Commissioner of Veterans' Affairs, Chief Information Officer, [the chairperson of the Public Utilities Control Authority,] the executive director of the Board of Education and Services for the Blind, the executive director of the Connecticut Commission on Culture and Tourism, and the executive director of the Office of Military Affairs. As used in sections 4-6 and 4-7, "department head" also means the Commissioner of Education.

Sec. 3. Section 4-38c of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

There shall be within the executive branch of state government the following departments: Office of Policy and Management, Department of Administrative Services, Department of Revenue Services, Department of Banking, Department of Agriculture, Department of Children and Families, Department of Consumer Protection, Department of Correction, Department of Economic and Community Development, State Board of Education, Department of Emergency Management and Homeland Security, Department of Energy and Environmental Protection, Department of Public Health, Board of Governors of Higher Education, Insurance Department, Labor Department, Department of Mental Health and Addiction Services, Department of Developmental Services, Department of Public Safety, Department of Social Services, Department of Transportation, Department of Motor Vehicles, Department of Veterans' Affairs [,] and Department of Public Works. [and Department of Public Utility Control.]

Sec. 4. Section 16a-3a of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

(a) The [electric distribution companies, in consultation with the Connecticut Energy Advisory Board, established pursuant to section 16a-3,] Department of Energy and Environmental Protection, in consultation with the Connecticut Energy Advisory Board, shall review the state's energy and capacity resource assessment and develop a comprehensive plan for the procurement of energy resources, including, but not limited to, conventional and renewable generating facilities, energy efficiency, load management, demand response, combined heat and power facilities, distributed generation and other emerging energy technologies to meet the projected requirements of their customers in a manner that minimizes the cost of such resources to customers over time and maximizes consumer benefits consistent with the state's environmental goals and standards. Such plan shall seek to lower the cost of electricity.

(b) On or before January 1, [2008] 2012, and biennially thereafter, the Department of Energy and Environmental Protection, in consultation with the Connecticut Energy Advisory Board and the companies, shall [submit to the Connecticut Energy Advisory Board] prepare an assessment of (1) the energy and capacity requirements of customers for the next three, five and ten years, (2) the manner of how best to eliminate growth in electric demand, (3) how best to level electric demand in the state by reducing peak demand and shifting demand to off-peak periods, (4) the impact of current and projected environmental standards, including, but not limited to, those related to greenhouse gas emissions and the federal Clean Air Act goals and how different resources could help achieve those standards and goals, (5) energy security and economic risks associated with potential energy resources, and (6) the estimated lifetime cost and availability of potential energy resources.

(c) Resource needs shall first be met through all available energy efficiency and demand reduction resources that are cost-effective for the general class of consumers, reliable and feasible. The projected customer cost impact of any demand-side resources considered pursuant to this subsection shall be reviewed on an equitable bases with nondemand-side resources. The procurement plan shall specify (1) the total amount of energy and capacity resources needed to meet the requirements of all customers, (2) the extent to which demand-side measures, including efficiency, conservation, demand response and load management can cost-effectively meet these needs from the perspective of the general class of consumers, (3) needs for generating capacity and transmission and distribution improvements, (4) how the development of such resources will reduce and stabilize the costs of electricity to the general class of consumers, and (5) the manner in which each of the proposed resources should be procured, including the optimal contract periods for various resources.

(d) The procurement plan shall consider: (1) Approaches to maximizing the impact of demand-side measures; (2) the extent to which generation needs can be met by renewable and combined heat and power facilities; (3) the optimization of the use of generation sites and generation portfolio existing within the state; (4) fuel types, diversity, availability, firmness of supply and security and environmental impacts thereof, including impacts on meeting the state's greenhouse gas emission goals; (5) reliability, peak load and energy forecasts, system contingencies and existing resource availabilities; (6) import limitations and the appropriate reliance on such imports; and (7) the impact of the procurement plan on the costs of electric customers. Such plan shall include options for lowering the cost of electricity.

(e) The [board, in consultation with the regional independent system operator, shall review and approve or review, modify and approve] Department of Energy and Environmental Protection, in consultation with the electric distribution companies, the regional independent system operator, and the Connecticut Energy Advisory Board, shall develop a procurement plan and hold public hearings on the proposed procurement plan. [as submitted not later than one hundred twenty days after receipt. For calendar years 2009 and thereafter, the board shall conduct such review not later than sixty days after receipt. For the purpose of reviewing the plan, the Commissioners of Transportation and Agriculture and the chairperson of the Public Utilities Control Authority, or their respective designees, shall not participate as members of the board. The electric distribution companies shall provide any additional information requested by the board that is relevant to the consideration of the procurement plan. In the course of conducting such review, the board shall conduct a public hearing, may retain the services of a third-party entity with experience in the area of energy procurement and may consult with the regional independent system operator. The board shall submit the reviewed procurement plan, together with a statement of any unresolved issues, to the Department of Public Utility Control. The department shall consider the procurement plan in an uncontested proceeding and shall conduct a hearing and provide an opportunity for interested parties to submit comments regarding the procurement plan. Not later than one hundred twenty days after submission of the procurement plan, the department shall approve, or modify and approve, the procurement plan.] The department's Bureau of Energy shall, after the public hearing, make recommendations to the Commissioner of Energy and Environmental Protection regarding plan modifications. Said commissioner shall approve, modify or reject the plan.

(f) On or before September 30, [2009] 2011, and every two years thereafter, the Department of [Public Utility Control] Energy and Environmental Protection shall report to the joint standing committees of the General Assembly having cognizance of matters relating to energy and the environment regarding goals established and progress toward implementation of the procurement plan established pursuant to this section, as well as any recommendations for the process.

(g) All electric distribution companies' costs associated with the development of the resource assessment and the development of the procurement plan shall be recoverable through the systems benefits charge.

Sec. 5. (NEW) (Effective July 1, 2011) (a) The plan developed, pursuant to section 16a-3a of the general statutes, as amended by this act, to be adopted in 2012 shall (1) indicate specific options to reduce the price of electricity. Such options may include the procurement of new sources of generation. In reviewing new sources of generation, the plan shall determine whether the private wholesale market can supply such additional sources or whether state financial assistance, long-term purchasing of electricity contracts or other interventions are needed to achieve the goal; (2) analyze in-state renewable sources of electricity in comparison to transmission line upgrades or new projects and out-of-state renewable energy sources, provided such analysis also considers the benefits of additional jobs and other economic impacts; (3) include an examination of other states' best practices to determine why electricity rates are lower elsewhere in the region; (4) assess and compare the cost of transmission line projects, new power sources, renewable sources of electricity, conservation and distributed generation projects to ensure the state pursues only the least-cost alternative projects; (5) continually monitor supply and distribution systems to identify potential need for transmission line projects early enough to identify alternatives; and (6) assess the least cost alternative to address reliability concerns, including, but not limited to, lowering electricity demand through conservation and distributed generation projects before an electric distribution company submits a proposal for transmission lines or transmission line upgrades to the independent system operator or the Federal Energy Regulatory Commission.

(b) If, on and after July 1, 2012, the 2012 plan contains an option to procure new sources of generation, the Department of Energy and Environmental Protection shall pursue the most cost-effective approach. If the department seeks new sources of generation, it shall issue a notice of interest for generation without any financial assistance, including, but not limited to, long-term contract financing or ratepayer guarantees. If the department fails to receive any responsive proposal, it shall issue a request for proposals that may include such financial assistance.

(c) On or before February 1, 2012, the department shall report to the joint standing committee of the General Assembly having cognizance of matters relating to energy regarding state policy and legislative changes the department feels would most likely lower the state's electricity rates.

Sec. 6. Section 16-244c of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

(a) (1) On and after January 1, 2000, each electric distribution company shall make available to all customers in its service area, the provision of electric generation and distribution services through a standard offer. Under the standard offer, a customer shall receive electric services at a rate established by the Department of [Public Utility Control] Energy and Environmental Protection pursuant to subdivision (2) of this subsection. Each electric distribution company shall provide electric generation services in accordance with such option to any customer who affirmatively chooses to receive electric generation services pursuant to the standard offer or does not or is unable to arrange for or maintain electric generation services with an electric supplier. The standard offer shall automatically terminate on January 1, 2004. While providing electric generation services under the standard offer, an electric distribution company may provide electric generation services through any of its generation entities or affiliates, provided such entities or affiliates are licensed pursuant to section 16-245, as amended by this act.

(2) Not later than October 1, 1999, the Department of [Public Utility Control] Energy and Environmental Protection shall establish the standard offer for each electric distribution company, effective January 1, 2000, which shall allocate the costs of such company among electric transmission and distribution services, electric generation services, the competitive transition assessment and the systems benefits charge. The department shall hold a hearing that shall be conducted as a contested case in accordance with chapter 54 to establish the standard offer. The standard offer shall provide that the total rate charged under the standard offer, including electric transmission and distribution services, the conservation and load management program charge described in section 16-245m, the renewable energy investment charge described in section 16-245n, electric generation services, the competitive transition assessment and the systems benefits charge shall be at least ten per cent less than the base rates, as defined in section 16-244a, in effect on December 31, 1996. The standard offer shall be adjusted to the extent of any increase or decrease in state taxes attributable to sections 12-264 and 12-265 and any other increase or decrease in state or federal taxes resulting from a change in state or federal law and shall continue to be adjusted during such period pursuant to section 16-19b. Notwithstanding the provisions of section 16-19b, the provisions of said section 16-19b shall apply to electric distribution companies. The standard offer may be adjusted, by an increase or decrease, to the extent approved by the department, in the event that (A) the revenue requirements of the company are affected as the result of changes in (i) legislative enactments other than public act 98-28, (ii) administrative requirements, or (iii) accounting standards occurring after July 1, 1998, provided such accounting standards are adopted by entities independent of the company that have authority to issue such standards, or (B) an electric distribution company incurs extraordinary and unanticipated expenses required for the provision of safe and reliable electric service to the extent necessary to provide such service. Savings attributable to a reduction in taxes shall not be shifted between customer classes.

(3) The price reduction provided in subdivision (2) of this subsection shall not apply to customers who, on or after July 1, 1998, are purchasing electric services from an electric company or electric distribution company, as the case may be, under a special contract or flexible rate tariff, and the company's filed standard offer tariffs shall reflect that such customers shall not receive the standard offer price reduction.

(b) (1) (A) On and after January 1, 2004, each electric distribution company shall make available to all customers in its service area, the provision of electric generation and distribution services through a transitional standard offer. Under the transitional standard offer, a customer shall receive electric services at a rate established by the Department of [Public Utility Control] Energy and Environmental Protection pursuant to subdivision (2) of this subsection. Each electric distribution company shall provide electric generation services in accordance with such option to any customer who affirmatively chooses to receive electric generation services pursuant to the transitional standard offer or does not or is unable to arrange for or maintain electric generation services with an electric supplier. The transitional standard offer shall terminate on December 31, 2006. While providing electric generation services under the transitional standard offer, an electric distribution company may provide electric generation services through any of its generation entities or affiliates, provided such entities or affiliates are licensed pursuant to section 16-245, as amended by this act.

(B) The department shall conduct a proceeding to determine whether a practical, effective, and cost-effective process exists under which an electric customer, when initiating electric service, may receive information regarding selecting electric generating services from a qualified entity. The department shall complete such proceeding on or before December 1, 2005, and shall implement the resulting decision on or before March 1, 2006, or on such later date that the department considers appropriate. An electric distribution company's costs of participating in the proceeding and implementing the results of the department's decision shall be recoverable by the company as generation services costs through an adjustment mechanism as approved by the department.

(2) (A) Not later than December 15, 2003, the Department of [Public Utility Control] Energy and Environmental Protection shall establish the transitional standard offer for each electric distribution company, effective January 1, 2004.

(B) The department shall hold a hearing that shall be conducted as a contested case in accordance with chapter 54 to establish the transitional standard offer. The transitional standard offer shall provide that the total rate charged under the transitional standard offer, including electric transmission and distribution services, the conservation and load management program charge described in section 16-245m, the renewable energy investment charge described in section 16-245n, electric generation services, the competitive transition assessment and the systems benefits charge, and excluding federally mandated congestion costs, shall not exceed the base rates, as defined in section 16-244a, in effect on December 31, 1996, excluding any rate reduction ordered by the department on September 26, 2002.

(C) (i) Each electric distribution company shall, on or before January 1, 2004, file with the department an application for an amendment of rates pursuant to section 16-19, which application shall include a four-year plan for the provision of electric transmission and distribution services. The department shall conduct a contested case proceeding pursuant to sections 16-19 and 16-19e to approve, reject or modify the application and plan. Upon the approval of such plan, as filed or as modified by the department, the department shall order that such plan shall establish the electric transmission and distribution services component of the transitional standard offer.

(ii) Notwithstanding the provisions of this subparagraph, an electric distribution company that, on or after September 1, 2002, completed a proceeding pursuant to sections 16-19 and 16-19e, shall not be required to file an application for an amendment of rates as required by this subparagraph. The department shall establish the electric transmission and distribution services component of the transitional standard offer for any such company equal to the electric transmission and distribution services component of the standard offer established pursuant to subsection (a) of this section in effect on July 1, 2003, for such company. If such electric distribution company applies to the department, pursuant to section 16-19, for an amendment of its rates on or before December 31, 2006, the application of the electric distribution company shall include a four-year plan.

(D) The transitional standard offer (i) shall be adjusted to the extent of any increase or decrease in state taxes attributable to sections 12-264 and 12-265 and any other increase or decrease in state or federal taxes resulting from a change in state or federal law, (ii) shall be adjusted to provide for the cost of contracts under subdivision (2) of subsection (j) of this section and the administrative costs for the procurement of such contracts, and (iii) shall continue to be adjusted during such period pursuant to section 16-19b. Savings attributable to a reduction in taxes shall not be shifted between customer classes. Notwithstanding the provisions of section 16-19b, the provisions of section 16-19b shall apply to electric distribution companies.

(E) The transitional standard offer may be adjusted, by an increase or decrease, to the extent approved by the department, in the event that (i) the revenue requirements of the company are affected as the result of changes in (I) legislative enactments other than public act 03-135 or public act 98-28, (II) administrative requirements, or (III) accounting standards adopted after July 1, 2003, provided such accounting standards are adopted by entities that are independent of the company and have authority to issue such standards, or (ii) an electric distribution company incurs extraordinary and unanticipated expenses required for the provision of safe and reliable electric service to the extent necessary to provide such service.

(3) The price provided in subdivision (2) of this subsection shall not apply to customers who, on or after July 1, 2003, purchase electric services from an electric company or electric distribution company, as the case may be, under a special contract or flexible rate tariff, provided the company's filed transitional standard offer tariffs shall reflect that such customers shall not receive the transitional standard offer price during the term of said contract or tariff.

(4) (A) In addition to its costs received pursuant to subsection (h) of this section, as compensation for providing transitional standard offer service, each electric distribution company shall receive an amount equal to five-tenths of one mill per kilowatt hour. Revenues from such compensation shall not be included in calculating the electric distribution company's earnings for purposes of, or in determining whether its rates are just and reasonable under, sections 16-19, 16-19a and 16-19e, including an earnings sharing mechanism. In addition, each electric distribution company may earn compensation for mitigating the prices of the contracts for the provision of electric generation services, as provided in subdivision (2) of this subsection.

(B) The department shall conduct a contested case proceeding pursuant to the provisions of chapter 54 to establish an incentive plan for the procurement of long-term contracts for transitional standard offer service by an electric distribution company. The incentive plan shall be based upon a comparison of the actual average firm full requirements service contract price for electricity obtained by the electric distribution company compared to the regional average firm full requirements service contract price for electricity, adjusted for such variables as the department deems appropriate, including, but not limited to, differences in locational marginal pricing. If the actual average firm full requirements service contract price obtained by the electric distribution company is less than the actual regional average firm full requirements service contract price for the previous year, the department shall split five-tenths of one mill per kilowatt hour equally between ratepayers and the company. Revenues from such incentive plan shall not be included in calculating the electric distribution company's earnings for purposes of, or in determining whether its rates are just and reasonable under sections 16-19, 16-19a and 16-19e. The department may, as it deems necessary, retain a third party entity with expertise in energy procurement to assist with the development of such incentive plan.

(c) (1) On and after January 1, 2007, each electric distribution company shall provide electric generation services through standard service to any customer who (A) does not arrange for or is not receiving electric generation services from an electric supplier, and (B) does not use a demand meter or has a maximum demand of less than five hundred kilowatts.

(2) Not later than October 1, 2006, and periodically as required by subdivision (3) of this subsection, but not more often than every calendar quarter, the Department of Public Utility Control shall establish the standard service price for such customers pursuant to subdivision (3) of this subsection. Each electric distribution company shall recover the actual net costs of procuring and providing electric generation services pursuant to this subsection, provided such company mitigates the costs it incurs for the procurement of electric generation services for customers who are no longer receiving service pursuant to this subsection.

(3) An electric distribution company providing electric generation services pursuant to this subsection shall [mitigate the variation of the price of the service offered to its customers by procuring] cooperate with the procurement officer of the Department of Energy and Environmental Protection and comply with the procurement plan for electric generation services contracts in the manner prescribed in [a plan approved by the department. Such plan shall require the procurement of a portfolio of service contracts sufficient to meet the projected load of the electric distribution company. Such plan shall require that the portfolio of service contracts be procured in an overlapping pattern of fixed periods at such times and in such manner and duration as the department determines to be most likely to produce just, reasonable and reasonably stable retail rates while reflecting underlying wholesale market prices over time. The portfolio of contracts shall be assembled in such manner as to invite competition; guard against favoritism, improvidence, extravagance, fraud and corruption; and secure a reliable electricity supply while avoiding unusual, anomalous or excessive pricing. The portfolio of contracts procured under such plan shall be for terms of not less than six months, provided contracts for shorter periods may be procured under such conditions as the department shall prescribe to (A) ensure the lowest rates possible for end-use customers; (B) ensure reliable service under extraordinary circumstances; and (C) ensure the prudent management of the contract portfolio] section 7 of this act. An affiliate of an electric distribution company may [receive a] bid for an electric generation services contract, [from any of its generation entities or affiliates,] provided such [generation entity or affiliate submits its bid the business day preceding the first day on which an unaffiliated electric supplier may submit its bid and further provided the] electric distribution company and [the generation entity or] affiliate are in compliance with the code of conduct established in section 16-244h.

(4) [The department, in consultation with the Office of Consumer Counsel, shall] The procurement officer of the Department of Energy and Environmental Protection may retain the services of [a] third-party [entity with expertise in the area of energy procurement to oversee the initial development of the request for proposals and the procurement of contracts by an electric distribution company for the provision] entities as it sees fit to assist with the procurement of electric generation services [offered pursuant to this subsection] for standard service. Costs associated with the retention of such third-party entity shall be included in the cost of [electric generation services that is included in such price] standard service.

(5) [Each] For standard service contracts procured prior to department approval of the plan developed pursuant to section 7 of this act, each bidder for a standard service contract shall submit its bid to the electric distribution company and the third-party entity who shall jointly review the bids and submit an overview of all bids together with a joint recommendation to the department as to the preferred bidders. The department may, within ten business days of submission of the overview, reject the recommendation regarding preferred bidders. In the event that the department rejects the preferred bids, the electric distribution company and the third-party entity shall rebid the service pursuant to this subdivision. The department shall review each bid in an uncontested proceeding that shall include a public hearing and in which the Consumer Counsel and Attorney General may participate.

(d) (1) Notwithstanding the provisions of this section regarding the electric generation services component of the transitional standard offer or the procurement of electric generation services under standard service, section 16-244h or 16-245o, as amended by this act, the Department of [Public Utility Control] Energy and Environmental Protection may, from time to time, direct an electric distribution company to offer, through an electric supplier or electric suppliers, before January 1, 2007, one or more alternative transitional standard offer options or, on or after January 1, 2007, one or more alternative standard service options. Such alternative options shall include, but not be limited to, an option that consists of the provision of electric generation services that exceed the renewable portfolio standards established in section 16-245a and may include an option that utilizes strategies or technologies that reduce the overall consumption of electricity of the customer.

(2) (A) The department shall develop such alternative option or options in a contested case conducted in accordance with the provisions of chapter 54. The department shall determine the terms and conditions of such alternative option or options, including, but not limited to, (i) the minimum contract terms, including pricing, length and termination of the contract, and (ii) the minimum percentage of electricity derived from Class I or Class II renewable energy sources, if applicable. The electric distribution company shall, under the supervision of the department, subsequently conduct a bidding process in order to solicit electric suppliers to provide such alternative option or options.

(B) The department may reject some or all of the bids received pursuant to the bidding process.

(3) The department may require an electric supplier to provide forms of assurance to satisfy the department that the contracts resulting from the bidding process will be fulfilled.

(4) An electric supplier who fails to fulfill its contractual obligations resulting from this subdivision shall be subject to civil penalties, in accordance with the provisions of section 16-41, or the suspension or revocation of such supplier's license or a prohibition on the acceptance of new customers, following a hearing that is conducted as a contested case, in accordance with the provisions of chapter 54.

(e) (1) On and after January 1, 2007, an electric distribution company shall serve customers that are not eligible to receive standard service pursuant to subsection (c) of this section as the supplier of last resort. This subsection shall not apply to customers purchasing power under contracts entered into pursuant to section 16-19hh.

(2) An electric distribution company shall procure electricity at least every calendar quarter to provide electric generation services to customers pursuant to this subsection. The Department of [Public Utility Control] Energy and Environmental Protection shall determine a price for such customers that reflects the full cost of providing the electricity on a monthly basis. Each electric distribution company shall recover the actual net costs of procuring and providing electric generation services pursuant to this subsection, provided such company mitigates the costs it incurs for the procurement of electric generation services for customers that are no longer receiving service pursuant to this subsection.

(f) On and after January 1, 2000, and until such time the regional independent system operator implements procedures for the provision of back-up power to the satisfaction of the Department of [Public Utility Control] Energy and Environmental Protection, each electric distribution company shall provide electric generation services to any customer who has entered into a service contract with an electric supplier that fails to provide electric generation services for reasons other than the customer's failure to pay for such services. Between January 1, 2000, and December 31, 2006, an electric distribution company may procure electric generation services through a competitive bidding process or through any of its generation entities or affiliates. On and after January 1, 2007, such company shall procure electric generation services through a competitive bidding process pursuant to a plan submitted by the electric distribution company and approved by the department. Such company may procure electric generation services through any of its generation entities or affiliates, provided such entity or affiliate is the lowest qualified bidder and provided further any such entity or affiliate is licensed pursuant to section 16-245, as amended by this act.

(g) An electric distribution company is not required to be licensed pursuant to section 16-245, as amended by this act, to provide standard offer electric generation services in accordance with subsection (a) of this section, transitional standard offer service pursuant to subsection (b) of this section, standard service pursuant to subsection (c) of this section, supplier of last resort service pursuant to subsection (e) of this section or back-up electric generation service pursuant to subsection (f) of this section.

(h) The electric distribution company shall be entitled to recover reasonable costs incurred as a result of providing standard offer electric generation services pursuant to the provisions of subsection (a) of this section, transitional standard offer service pursuant to subsection (b) of this section, standard service pursuant to subsection (c) of this section or back-up electric generation service pursuant to subsection (f) of this section. The provisions of this section and section 16-244a shall satisfy the requirements of section 16-19a until January 1, 2007.

(i) The Department of [Public Utility Control] Energy and Environmental Protection shall establish, by regulations adopted pursuant to chapter 54, procedures for when and how a customer is notified that his electric supplier has defaulted and of the need for the customer to choose a new electric supplier within a reasonable period of time.

(j) (1) Notwithstanding the provisions of subsection (d) of this section regarding an alternative transitional standard offer option or an alternative standard service option, an electric distribution company providing transitional standard offer service, standard service, supplier of last resort service or back-up electric generation service in accordance with this section shall contract with its wholesale suppliers to comply with the renewable portfolio standards. The Department of [Public Utility Control] Energy and Environmental Protection shall annually conduct a contested case, in accordance with the provisions of chapter 54, in order to determine whether the electric distribution company's wholesale suppliers met the renewable portfolio standards during the preceding year. An electric distribution company shall include a provision in its contract with each wholesale supplier that requires the wholesale supplier to pay the electric distribution company an amount of five and one-half cents per kilowatt hour if the wholesale supplier fails to comply with the renewable portfolio standards during the subject annual period. The electric distribution company shall promptly transfer any payment received from the wholesale supplier for the failure to meet the renewable portfolio standards to the Renewable Energy Investment Fund for the development of Class I renewable energy sources. Any payment made pursuant to this section shall not be considered revenue or income to the electric distribution company.

(2) Notwithstanding the provisions of subsection (d) of this section regarding an alternative transitional standard offer option or an alternative standard service option, an electric distribution company providing transitional standard offer service, standard service, supplier of last resort service or back-up electric generation service in accordance with this section shall, not later than July 1, 2008, file with the Department of [Public Utility Control] Energy and Environmental Protection for its approval one or more long-term power purchase contracts from Class I renewable energy source projects located in Connecticut that receive funding from the Renewable Energy Investment Fund and that are not less than one megawatt in size, at a price that is either, at the determination of the project owner, (A) not more than the total of the comparable wholesale market price for generation plus five and one-half cents per kilowatt hour, or (B) fifty per cent of the wholesale market electricity cost at the point at which transmission lines intersect with each other or interface with the distribution system, plus the project cost of fuel indexed to natural gas futures contracts on the New York Mercantile Exchange at the natural gas pipeline interchange located in Vermillion Parish, Louisiana that serves as the delivery point for such futures contracts, plus the fuel delivery charge for transporting fuel to the project, plus five and one-half cents per kilowatt hour. In its approval of such contracts, the department shall give preference to purchase contracts from those projects that would provide a financial benefit to ratepayers [or] and would enhance the reliability of the electric transmission system of the state. Such projects shall be located in this state. The owner of a fuel cell project principally manufactured in this state shall be allocated all available air emissions credits and tax credits attributable to the project and no less than fifty per cent of the energy credits in the Class I renewable energy credits program established in section 16-245a attributable to the project. On and after October 1, 2007, and until September 30, 2008, such contracts shall be comprised of not less than a total, apportioned among each electric distribution company, of one hundred twenty-five megawatts; and on and after October 1, 2008, such contracts shall be comprised of not less than a total, apportioned among each electrical distribution company, of one hundred fifty megawatts. The cost of such contracts and the administrative costs for the procurement of such contracts directly incurred shall be eligible for inclusion in the adjustment to the transitional standard offer as provided in this section and any subsequent rates for standard service, provided such contracts are for a period of time sufficient to provide financing for such projects, but not less than ten years, and are for projects which began operation on or after July 1, 2003. Except as provided in this subdivision, the amount from Class I renewable energy sources contracted under such contracts shall be applied to reduce the applicable Class I renewable energy source portfolio standards. For purposes of this subdivision, the department's determination of the comparable wholesale market price for generation shall be based upon a reasonable estimate. On or before September 1, [2007] 2011, the department, in consultation with the Office of Consumer Counsel and the Renewable Energy Investments [Advisory Council] Board, shall study the operation of such renewable energy contracts and report its findings and recommendations to the joint standing committee of the General Assembly having cognizance of matters relating to energy.

(k) (1) As used in this section:

(A) "Participating electric supplier" means an electric supplier that is licensed by the department to provide electric service, pursuant to this subsection, to residential or small commercial customers.

(B) "Residential customer" means a customer who is eligible for standard service and who takes electric distribution-related service from an electric distribution company pursuant to a residential tariff.

(C) "Small commercial customer" means a customer who is eligible for standard service and who takes electric distribution-related service from an electric distribution company pursuant to a small commercial tariff.

(D) "Qualifying electric offer" means an offer to provide full requirements commodity electric service and all other generation-related service to a residential or small commercial customer at a fixed price per kilowatt hour for a term of no less than one year.

(2) In the manner determined by the department, residential or small commercial service customers (A) initiating new utility service, (B) reinitiating service following a change of residence or business location, (C) making an inquiry regarding their utility rates, or (D) seeking information regarding energy efficiency shall be offered the option to learn about their ability to enroll with a participating electric supplier. Customers expressing an interest to learn about their electric supply options shall be informed of the qualifying electric offers then available from participating electric suppliers. The electric distribution companies shall describe then available qualifying electric offers through a method reviewed and approved by the department. The information conveyed to customers expressing an interest to learn about their electric supply options shall include, at a minimum, the price and term of the available electric supply option. Customers expressing an interest in a particular qualifying electric offer shall be immediately transferred to a call center operated by that participating electric supplier.

(3) Not later than September 1, 2007, the department shall establish terms and conditions under which a participating electric supplier can be included in the referral program described in subdivision (2) of this subsection. Such terms shall include, but not be limited to, requiring participating electrical suppliers to offer time-of-use and real-time use rates to residential customers.

(4) Each calendar quarter, participating electric suppliers shall be allowed to list qualifying offers to provide electric generation service to residential and small commercial customers with each customer's utility bill. The department shall determine the manner such information is presented in customers' utility bills.

(5) Any customer that receives electric generation service from a participating electric supplier may return to standard service or may choose another participating electric supplier at any time, including during the qualifying electric offer, without the imposition of any additional charges. Any customer that is receiving electric generation service from an electric distribution company pursuant to standard service can switch to another participating electric supplier at any time without the imposition of additional charges.

(l) Each electric distribution company shall offer to bill customers on behalf of participating electric suppliers and to pay such suppliers in a timely manner the amounts due such suppliers from customers for generation services, less a percentage of such amounts that reflects uncollectible bills and overdue payments as approved by the Department of [Public Utility Control] Energy and Environmental Protection.

(m) On or before July 1, 2007, the Department of [Public Utility Control] Energy and Environmental Protection shall initiate a proceeding to examine whether electric supplier bills rendered pursuant to section 16-245d, as amended by this act, and any regulations adopted thereunder sufficiently enable customers to compare pricing policies and charges among electric suppliers.

(n) The department shall conduct a proceeding to determine the cost of billing, collection and other services provided by the electric distribution companies or the department solely for the benefit of participating electric suppliers and aggregators. The department shall order an equitable allocation of such costs among electric suppliers and aggregators. As part of this same proceeding, the department shall also determine the costs that the electric distribution companies incur solely for the benefit of standard service and last resort service customers. The department shall allocate and provide for the equitable recovery of such costs from standard service or last resort service customers.

[(n)] (o) Nothing in the provisions of this section shall preclude an electric distribution company from entering into standard service supply contracts or standard service supply components with electric generating facilities.

Sec. 7. (NEW) (Effective July 1, 2011) (a) On or before January 1, 2012, and annually thereafter, the procurement officer of the Department of Energy and Environmental Protection, in consultation with each electric distribution company and in consultation with others at the procurement officer's discretion, shall develop a plan for the procurement of electric generation services and related wholesale electricity market products that will enable each electric distribution company to manage a portfolio of contracts to reduce the average cost of standard service while maintaining standard service cost volatility within reasonable levels. Each procurement plan shall provide for the competitive solicitation for load-following electric service and may include a provision for the use of other contracts, including, but not limited to, contracts for generation or other electricity market products and financial contracts, and may provide for the use of varying lengths of contracts. If such plan includes the purchase of full requirements contracts, it shall include an explanation of why such purchases are in the best interests of standard service customers.

(b) An electric distribution company shall recover all reasonable and prudent costs incurred in connection with the development and implementation of the approved procurement plan, including costs of contracts entered into in accordance with the plan.

(c) The procurement officer shall, not less than quarterly, meet with the Commissioner of Energy and Environmental Protection and prepare a written report on the implementation of the plan and recommend any necessary adjustments to the plan to address market conditions or to otherwise reduce the costs of standard service. Such quarterly reports shall be public documents. After considering such report and recommendation, the commissioner may amend the plan by written order.

(d) The costs of procurement for standard service shall be borne solely by the standard service customers.

(e) (1) The Department of Energy and Environmental Protection shall conduct an uncontested proceeding to approve, with any amendments it determines necessary, a procurement plan submitted pursuant to subsection (a) of this section.

(2) The Department of Energy and Environmental Protection shall report annually in accordance with the provisions of section 11-4a to the joint standing committee of the General Assembly having cognizance of matters relating to energy regarding the procurement plan and its implementation.

Sec. 8. (NEW) (Effective July 1, 2011) The Department of Energy and Environmental Protection Bureau of Public Utility Control shall initiate a docket to consider the buy down of an electric distribution company's current standard service contract to reduce ratepayer bills and conduct a cost benefit analysis of such a buy down. If the department, as a result of such docket, determines such a buy down is in the best interest of ratepayers, the company shall proceed with such buy down.

Sec. 9. Subsection (b) of section 7-233e of the general statutes is amended by adding subdivision (30) as follows (Effective July 1, 2011):

(NEW) (30) To bid on standard service pursuant to section 16-244c, as amended by this act.

Sec. 10. (NEW) (Effective July 1, 2011) On or before September 1, 2011, the Department of Energy and Environmental Protection shall initiate a request for proposals to consider bilateral purchasing contracts for electricity from existing or new generators, provided such contracts shall be for a term of not less than five years and not more than fifteen years, shall reduce electricity rates by pricing such electricity on a cost-of-service basis, power purchase agreement or other mechanism the department determines to be in the best interest of Connecticut's customers and shall directly, or in combination with other initiatives, provide electricity at lower rates for Connecticut consumers.

Sec. 11. (NEW) (Effective from passage) The Department of Energy and Environmental Protection shall prepare a study on the potential costs savings and benefits to ratepayers, including, but not limited to, emissions reductions and repowering some or all of the state's coal-fired and oil-fired generation facilities built before 1990. On or before February 1, 2012, the Department of Energy and Environmental Protection shall submit the study, in accordance with the provisions of section 11-4a of the general statutes, to the joint standing committee of the General Assembly having cognizance of matters relating to energy.

Sec. 12. (NEW) (Effective July 1, 2011) On or before September 1, 2011, the Department of Energy and Environmental Protection shall review any proposed commercial transmission line project (1) in which a Connecticut electric distribution company may have a financial interest, or (2) that may be constructed in whole or in part in this state to determine whether to obtain electricity from such transmission lines at a rate that will lower electricity rates for Connecticut consumers.

Sec. 13. (NEW) (Effective July 1, 2011) On and after July 1, 2011, an electric distribution company, as defined in section 16-1 of the general statutes, shall notify the Department of Energy and Environmental Protection and the joint standing committee of the General Assembly having cognizance of matters relating to energy before such company expresses concerns to the regional independent system operator, as defined in said section 16-1, identifying any reliability issues concerning the system.

Sec. 14. (Effective from passage) On or before August 1, 2011, the Department of Energy and Environmental Protection shall initiate a study to identify the impact on Connecticut ratepayers and the New England and state wholesale electric power market of the operation of the regional independent system operator, as defined in section 16-1 of the general statutes, and of Market Rule 1 as promulgated by said regional independent system operator. Such study shall include, but not be limited to, (1) a review of the accountability of said independent system operator to Connecticut ratepayers and energy policymakers, (2) consideration of strategies and mechanisms that may mitigate any adverse impacts Market Rule 1 may have on wholesale generation prices in Connecticut and New England and may reduce Connecticut's reliance on the wholesale power market, including, but not limited to, long-term contracts, (3) consideration of the costs and benefits associated with participating in said independent system operator and any potential benefits of joining another independent system operator or operating outside of the existing independent operator systems, (4) an examination of the framework within the Federal Energy Regulatory Commission that has contributed to the state's high rates, and (5) consideration of methods to foster greater transparency in any such system. On or before January 1, 2012, the department shall report, in accordance with the provisions of section 11-4a of the general statutes, its findings to the joint standing committee of the General Assembly having cognizance of matters relating to energy.

Sec. 15. (NEW) (Effective July 1, 2011) (a) On or before January 1, 2012, the Department of Energy and Environmental Protection Bureau of Energy shall review available financing programs to determine what exists on the state and national levels and recommend how best to establish a state program of financing renewable energy and conservation. The department shall consider various sources of financing, including, but not limited to, mortgages, bonds and the establishment of loan loss reserves to leverage private capital, provided such sources of financing shall not include any ratepayer contribution.

(b) The department shall report, in accordance with the provisions of section 11-4a of the general statutes to the joint standing committee of the General Assembly having cognizance of matters relating to energy regarding its review conducted pursuant to subsection (a) of this section.

Sec. 16. (NEW) (Effective July 1, 2011) The Department of Energy and Environmental Protection shall develop with leading research and academic institutions a set of innovation hubs, including, but not limited to, electric vehicle infrastructure and electricity storage.

Sec. 17. (NEW) (Effective July 1, 2011) (a) As used in this section:

(1) "Energy improvements" means any renovation or retrofitting of qualifying real property to reduce energy consumption or installation of a renewable energy system to service qualifying real property, provided such renovation, retrofit or installation is permanently fixed to such qualifying real property;

(2) "Qualifying real property" means a single-family or multifamily residential dwelling or a nonresidential commercial or industrial building, regardless of ownership, that a municipality has determined can benefit from energy improvements;

(3) "Property owner" means an owner of qualifying real property who desires to install energy improvements and provides free and willing consent to the contractual assessment; and

(4) "Sustainable energy program" means a municipal program that authorizes a municipality to enter into contractual assessments on qualifying real property with property owners to finance the purchase and installation of energy improvements to qualifying real property within its municipal boundaries.

(b) Any municipality, that determines it is in the public interest, may establish a sustainable energy program to facilitate the increase of energy efficiency and renewable energy. A municipality shall make such a determination after issuing public notice and providing an opportunity for public comment regarding the establishment of a sustainable energy program.

(c) Notwithstanding the provisions of section 7-374 of the general statutes or any other public or special act that limits or imposes conditions on municipal bond issues, any municipality that establishes a sustainable energy program under this section may issue bonds, as necessary, for the purpose of financing (1) energy improvements; (2) related energy audits; and (3) renewable energy system feasibility studies and the verification of the installation of such improvements. Such financing shall be secured by special contractual assessments on the qualifying real property.

(d) (1) Any municipality that establishes a sustainable energy program pursuant to this section may partner with another municipality or a state agency to (A) maximize the opportunities for accessing public funds and private capital markets for long-term sustainable financing, and (B) secure state or federal funds available for this purpose.

(2) Any municipality that establishes a sustainable energy program and issues bonds pursuant to this section may supplement the security of such bonds with any other legally available funds solely at the municipality's discretion.

(3) Any municipality that establishes a sustainable energy program pursuant to this section may use the services of one or more private, public or quasi-public third-party administrators to provide support for the program.

(e) Before establishing a program under this section, the municipality shall provide notice to the electric distribution company, as defined in section 16-1 of the general statutes, that services the municipality.

(f) If the owner of record of qualifying real property requests financing for energy improvements under this section, the municipality implementing the sustainable energy program shall:

(1) Require performance of an energy audit or renewable energy system feasibility analysis on the qualifying real property before approving such financing;

(2) Enter into a contractual assessment on the qualifying real property with the property owner in a principal amount sufficient to pay the costs of energy improvements and any associated costs the municipality determines will benefit the qualifying real property and may cover any associated costs;

(3) Impose requirements and criteria to ensure that the proposed energy improvements are consistent with the purpose of the program; and

(4) Impose requirements and conditions on the financing to ensure timely repayment, including, but not limited to, procedures for placing a lien on a property for which an owner defaults on repayment.

(g) Any assessment levied pursuant to this section shall have a term not to exceed the calculated payback period for the installed energy improvements, as determined by the municipality, and shall have no prepayment penalty. The municipality shall set a fixed rate of interest for the repayment of the principal assessed amount at the time the assessment is made. Such interest rate, as may be supplemented with state or federal funding as may become available, shall be sufficient to pay the financing costs of the program, including delinquencies.

(h) Assessments levied pursuant to this section and the interest and any penalties thereon shall constitute a lien against the qualifying real property on which they are made until they are paid. Such lien shall be levied and collected in the same manner as the general taxes of the municipality on real property, including, in the event of default or delinquency, with respect to any penalties and remedies and lien priorities, provided such lien shall not have priority over any prior mortgages.

(i) The area encompassing the sustainable energy program in a municipality may be the entire municipal jurisdiction of the municipality or a subset of such.

Sec. 18. Subparagraph (B) of subdivision (6) of subsection (c) of section 7-148 of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

(B) (i) Lay out, construct, reconstruct, repair, maintain, operate, alter, extend and discontinue sewer and drainage systems and sewage disposal plants;

(ii) Enter into or upon any land for the purpose of correcting the flow of surface water through watercourses which prevent, or may tend to prevent, the free discharge of municipal highway surface water through said courses;

(iii) Regulate the laying, location and maintenance of gas pipes, water pipes, drains, sewers, poles, wires, conduits and other structures in the streets and public places of the municipality;

(iv) Prohibit and regulate the discharge of drains from roofs of buildings over or upon the sidewalks, streets or other public places of the municipality or into sanitary sewers;

(v) Enter into performance-based energy contracts;

Sec. 19. (NEW) (Effective July 1, 2011) The Department of Energy and Environmental Protection shall require the Energy Conservation Management Board, the Renewable Energy Investments Board and electric distribution companies, as defined in section 16-1 of the general statutes, to establish a program to provide financial assistance for energy conservation and load management projects to electric distribution company customers in underserved communities. The aggregate financial assistance such program shall provide shall be in an amount equal to at least three per cent of the moneys collected for the Energy Conservation and Load Management Fund and at least three per cent of the moneys collected for the Renewable Energy Investment Fund pursuant to sections 16-245m and 16-245n of the general statutes. Such funds shall be provided for programs directly benefiting residential or small business electric customers in underserved communities. The moneys for the program shall be derived (1) initially from, if available, the federal American Recovery and Reinvestment Act of 2009, and (2) for conservation projects from the Energy Conservation and Load Management Fund and renewable energy projects from the Renewable Energy Investment Fund. Such program shall include a job training component for existing or potential minority business enterprises, as defined in section 4a-60g of the general statutes. For the purposes of this section, "underserved communities" means municipalities meeting the criteria set forth in subsection (a) of section 32-70 of the general statutes. The department shall report, in accordance with the provisions of section 11-4a of the general statutes, to the joint standing committee of the General Assembly having cognizance of matters relating to energy on or before February 1, 2012, and annually thereafter, regarding the program established pursuant to this section.

Sec. 20. Section 16a-48 of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

(a) As used in this section:

(1) ["Office" means the Office of Policy and Management] "Department" means the Department of Energy and Environmental Protection;

(2) "Fluorescent lamp ballast" or "ballast" means a device designed to operate fluorescent lamps by providing a starting voltage and current and limiting the current during normal operation, but does not include such devices that have a dimming capability or are intended for use in ambient temperatures of zero degrees Fahrenheit or less or have a power factor of less than sixty-one hundredths for a single F40T12 lamp;

(3) "F40T12 lamp" means a tubular fluorescent lamp that is a nominal forty-watt lamp, with a forty-eight-inch tube length and one and one-half inches in diameter;

(4) "F96T12 lamp" means a tubular fluorescent lamp that is a nominal seventy-five-watt lamp with a ninety-six-inch tube length and one and one-half inches in diameter;

(5) "Luminaire" means a complete lighting unit consisting of a fluorescent lamp, or lamps, together with parts designed to distribute the light, to position and protect such lamps, and to connect such lamps to the power supply;

(6) "New product" means a product that is sold, offered for sale, or installed for the first time and specifically includes floor models and demonstration units;

(7) ["Secretary" means the Secretary of the Office of Policy and Management] "Commissioner" means the Commissioner of Energy and Environmental Protection;

(8) "State Building Code" means the building code adopted pursuant to section 29-252;

(9) "Torchiere lighting fixture" means a portable electric lighting fixture with a reflector bowl giving light directed upward so as to give indirect illumination;

(10) "Unit heater" means a self-contained, vented fan-type commercial space heater that uses natural gas or propane and that is designed to be installed without ducts within the heated space. "Unit heater" does not include a product regulated by federal standards pursuant to 42 USC 6291, as amended from time to time, a product that is a direct vent, forced flue heater with a sealed combustion burner, or any oil fired heating system;

(11) "Transformer" means a device consisting of two or more coils of insulated wire that transfers alternating current by electromagnetic induction from one coil to another in order to change the original voltage or current value;

(12) "Low-voltage dry-type transformer" means a transformer that: (A) Has an input voltage of six hundred volts or less; (B) is between fourteen kilovolt-amperes and two thousand five hundred one kilovolt-amperes in size; (C) is air-cooled; and (D) does not use oil as a coolant. "Low-voltage dry-type transformer" does not include such transformers excluded from the low-voltage dry-type distribution transformer definition contained in the California Code of Regulations, Title 20: Division 2, Chapter 4, Article 4: Appliance Efficiency Regulations;

(13) "Pass-through cabinet" means a refrigerator or freezer with hinged or sliding doors on both the front and rear of the refrigerator or freezer;

(14) "Reach-in cabinet" means a refrigerator, freezer, or combination thereof, with hinged or sliding doors or lids;

(15) "Roll-in" or "roll-through cabinet" means a refrigerator or freezer with hinged or sliding doors that allows wheeled racks of product to be rolled into or through the refrigerator or freezer;

(16) "Commercial refrigerators and freezers" means reach-in cabinets, pass-through cabinets, roll-in cabinets and roll-through cabinets that have less than eighty-five feet of capacity, which are designed for the refrigerated or frozen storage of food and food products;

(17) "Traffic signal module" means a standard eight-inch or twelve-inch round traffic signal indicator consisting of a light source, lens and all parts necessary for operation and communication of movement messages to drivers through red, amber and green colors;

(18) "Illuminated exit sign" means an internally illuminated sign that is designed to be permanently fixed in place and used to identify an exit by means of a light source that illuminates the sign or letters from within where the background of the exit sign is not transparent;

(19) "Packaged air-conditioning equipment" means air-conditioning equipment that is built as a package and shipped as a whole to end-user sites;

(20) "Large packaged air-conditioning equipment" means air-cooled packaged air-conditioning equipment having not less than two hundred forty thousand BTUs per hour of capacity;

(21) "Commercial clothes washer" means a soft mount front-loading or soft mount top-loading clothes washer that is designed for use in (A) applications where the occupants of more than one household will be using it, such as in multifamily housing common areas and coin laundries; or (B) other commercial applications, if the clothes container compartment is no greater than three and one-half cubic feet for horizontal-axis clothes washers or no greater than four cubic feet for vertical-axis clothes washers;

(22) "Energy efficiency ratio" means a measure of the relative efficiency of a heating or cooling appliance that is equal to the unit's output in BTUs per hour divided by its consumption of energy, measured in watts;

(23) "Electricity ratio" means the ratio of furnace electricity use to total furnace energy use;

(24) "Boiler" means a space heater that is a self-contained appliance for supplying steam or hot water primarily intended for space-heating. "Boiler" does not include hot water supply boilers;

(25) "Central furnace" means a self-contained space heater designed to supply heated air through ducts of more than ten inches in length;

(26) "Residential furnace or boiler" means a product that utilizes only single-phase electric current or single-phase electric current or DC current in conjunction with natural gas, propane or home heating oil and that (A) is designed to be the principal heating source for the living space of a residence; (B) is not contained within the same cabinet as a central air conditioner with a rated cooling capacity of not less than sixty-five thousand BTUs per hour; (C) is an electric central furnace, electric boiler, forced-air central furnace, gravity central furnace or low pressure steam or hot water boiler; and (D) has a heat input rate of less than three hundred thousand BTUs per hour for an electric boiler and low pressure steam or hot water boiler and less than two hundred twenty-five thousand BTUs per hour for a forced-air central furnace, gravity central furnace and electric central furnace;

(27) "Furnace air handler" means the section of the furnace that includes the fan, blower and housing, generally upstream of the burners and heat exchanger. The furnace air handler may include a filter and a cooling coil;

(28) "High-intensity discharge lamp" means a lamp in which light is produced by the passage of an electric current through a vapor or gas, the light-producing arc is stabilized by bulb wall temperature and the arc tube has a bulb wall loading in excess of three watts per square centimeter;

(29) "Metal halide lamp" means a high intensity discharge lamp in which the major portion of the light is produced by radiation of metal halides and their products of dissociation, possibly in combination with metallic vapors;

(30) "Metal halide lamp fixture" means a light fixture designed to be operated with a metal halide lamp and a ballast for a metal halide lamp;

(31) "Probe start metal halide ballast" means a ballast used to operate metal halide lamps that does not contain an ignitor and that instead starts lamps by using a third starting electrode probe in the arc tube;

(32) "Single voltage external AC to DC power supply" means a device that (A) is designed to convert line voltage AC input into lower voltage DC output; (B) is able to convert to only one DC output voltage at a time; (C) is sold with, or intended to be used with, a separate end-use product that constitutes the primary power load; (D) is contained within a separate physical enclosure from the end-use product; (E) is connected to the end-use product in a removable or hard-wired male and female electrical connection, cable, cord or other wiring; (F) does not have batteries or battery packs, including those that are removable or that physically attach directly to the power supply unit; (G) does not have a battery chemistry or type selector switch and indicator light or a battery chemistry or type selector switch and a state of charge meter; and (H) has a nameplate output power less than or equal to two hundred fifty watts;

(33) "State regulated incandescent reflector lamp" means a lamp that is not colored or designed for rough or vibration service applications, has an inner reflective coating on the outer bulb to direct the light, has an E26 medium screw base, a rated voltage or voltage range that lies at least partially within one hundred fifteen to one hundred thirty volts, and that falls into one of the following categories: (A) A bulged reflector or elliptical reflector or a blown PAR bulb shape and that has a diameter that equals or exceeds two and one-quarter inches, or (B) a reflector, parabolic aluminized reflector, bulged reflector or similar bulb shape and that has a diameter of two and one-quarter to two and three-quarters inches. "State regulated incandescent reflector lamp" does not include ER30, BR30, BR40 and ER40 lamps of not more than fifty watts, BR30, BR40 and ER40 lamps of sixty-five watts and R20 lamps of not more than forty-five watts;

(34) "Bottle-type water dispenser" means a water dispenser that uses a bottle or reservoir as the source of potable water;

(35) "Commercial hot food holding cabinet" means a heated, fully-enclosed compartment with one or more solid or partial glass doors that is designed to maintain the temperature of hot food that has been cooked in a separate appliance. "Commercial hot food holding cabinet" does not include heated glass merchandizing cabinets, drawer warmers or cook-and-hold appliances;

(36) "Pool heater" means an appliance designed for heating nonpotable water contained at atmospheric pressure for swimming pools, spas, hot tubs and similar applications, including natural gas, heat pump, oil and electric resistance pool heaters;

(37) "Portable electric spa" means a factory-built electric spa or hot tub supplied with equipment for heating and circulating water;

(38) "Residential pool pump" means a pump used to circulate and filter pool water to maintain clarity and sanitation;

(39) "Walk-in refrigerator" means a space refrigerated to temperatures at or above thirty-two degrees Fahrenheit that has a total chilled storage area of less than three thousand square feet, can be walked into and is designed for the refrigerated storage of food and food products. "Walk-in refrigerator" does not include refrigerated warehouses and products designed and marketed exclusively for medical, scientific or research purposes;

(40) "Walk-in freezer" means a space refrigerated to temperatures below thirty-two degrees Fahrenheit that has a total chilled storage area of less than three thousand square feet, can be walked into and is designed for the frozen storage of food and food products. "Walk-in freezer" does not include refrigerated warehouses and products designed and marketed exclusively for medical, scientific or research purposes;

(41) "Central air conditioner" means a central air conditioning model that consists of one or more factory-made assemblies, which normally include an evaporator or cooling coil, compressor and condenser. Central air conditioning models may provide the function of air cooling, air cleaning, dehumidifying or humidifying;

(42) "Combination television" means a system in which a television or television monitor and an additional device or devices, including, but not limited to, a digital versatile disk player or video cassette recorder, are combined into a single unit in which the additional devices are included in the television casing;

(43) "Compact audio player" means an integrated audio system encased in a single housing that includes an amplifier and radio tuner with attached or separable speakers and can reproduce audio from one or more of the following media: Magnetic tape, compact disk, digital versatile disk or flash memory. "Compact audio player" does not mean a product that can be independently powered by internal batteries, has a powered external satellite antenna or can provide a video output signal;

(44) "Component television" means a television composed of two or more separate components, such as a separate display device and tuner, marketed and sold as a television under one model or system designation, which may have more than one power cord;

(45) "Computer monitor" means an analog or digital device designed primarily for the display of computer generated signals and that is not marketed for use as a television;

(46) "Digital versatile disc" means a laser-encoded plastic medium capable of storing a large amount of digital audio, video and computer data;

(47) "Digital versatile disc player" means a commercially available electronic product encased in a single housing that includes an integral power supply and for which the sole purpose is the decoding of digitized video signals;

(48) "Digital versatile disc recorder" means a commercially available electronic product encased in a single housing that includes an integral power supply and for which the sole purpose is the production or recording of digitized audio, video and computer signals on a digital versatile disk. "Digital versatile disk recorder" does not include a model that has an electronic programming guide function;

(49) "Television" means an analog or digital device designed primarily for the display and reception of a terrestrial, satellite, cable, internet protocol television or other broadcast or recorded transmission of analog or digital video and audio signals. "Television" includes combination televisions, television monitors, component televisions and any unit that is marketed to consumers as a television but does not include a computer monitor;

(50) "Television monitor" means a television that does not have an internal tuner/receiver or playback device.

(b) The provisions of this section apply to the testing, certification and enforcement of efficiency standards for the following types of new products sold, offered for sale or installed in the state: (1) Commercial clothes washers; (2) commercial refrigerators and freezers; (3) illuminated exit signs; (4) large packaged air-conditioning equipment; (5) low voltage dry-type distribution transformers; (6) torchiere lighting fixtures; (7) traffic signal modules; (8) unit heaters; (9) residential furnaces and boilers; (10) residential pool pumps; (11) metal halide lamp fixtures; (12) single voltage external AC to DC power supplies; (13) state regulated incandescent reflector lamps; (14) bottle-type water dispensers; (15) commercial hot food holding cabinets; (16) portable electric spas; (17) walk-in refrigerators and walk-in freezers; (18) pool heaters; [and] (19) compact audio players; (20) televisions; (21) digital versatile disc players; (22) digital versatile disc recorders; and (23) any other products as may be designated by the office in accordance with subdivision (3) of subsection (d) of this section.

(c) The provisions of this section do not apply to (1) new products manufactured in the state and sold outside the state, (2) new products manufactured outside the state and sold at wholesale inside the state for final retail sale and installation outside the state, (3) products installed in mobile manufactured homes at the time of construction, or (4) products designed expressly for installation and use in recreational vehicles.

(d) (1) The [office, in consultation with the Department of Public Utility Control,] department shall adopt regulations, in accordance with the provisions of chapter 54, to implement the provisions of this section and to establish minimum energy efficiency standards for the types of new products set forth in subsection (b) of this section. The regulations shall provide for the following minimum energy efficiency standards:

(A) Commercial clothes washers shall meet the requirements shown in Table P-3 of section 1605.3 of the California Code of Regulations, Title 20: Division 2, Chapter 4, Article 4;

(B) Commercial refrigerators and freezers shall meet the August 1, 2004, requirements shown in Table A-6 of said California regulation;

(C) Illuminated exit signs shall meet the version 2.0 product specification of the "Energy Star Program Requirements for Exit Signs" developed by the United States Environmental Protection Agency;

(D) Large packaged air-conditioning equipment having not more than seven hundred sixty thousand BTUs per hour of capacity shall meet a minimum energy efficiency ratio of 10.0 for units using both electric heat and air conditioning or units solely using electric air conditioning, and 9.8 for units using both natural gas heat and electric air conditioning;

(E) Large packaged air-conditioning equipment having not less than seven hundred sixty-one thousand BTUs per hour of capacity shall meet a minimum energy efficiency ratio of 9.7 for units using both electric heat and air conditioning or units solely using electric air conditioning, and 9.5 for units using both natural gas heat and electric air conditioning;

(F) Low voltage dry-type distribution transformers shall meet or exceed the energy efficiency values shown in Table 4-2 of the National Electrical Manufacturers Association Standard TP-1-2002;

(G) Torchiere lighting fixtures shall not consume more than one hundred ninety watts and shall not be capable of operating with lamps that total more than one hundred ninety watts;

(H) Traffic signal modules shall meet the product specification of the "Energy Star Program Requirements for Traffic Signals" developed by the United States Environmental Protection Agency that took effect in February, 2001, except where the department, in consultation with the Commissioner of Transportation, determines that such specification would compromise safe signal operation;

(I) Unit heaters shall not have pilot lights and shall have either power venting or an automatic flue damper;

(J) On or after January 1, 2009, residential furnaces and boilers purchased by the state shall meet or exceed the following annual fuel utilization efficiency: (i) For gas and propane furnaces, ninety per cent annual fuel utilization efficiency, (ii) for oil furnaces, eighty-three per cent annual fuel utilization efficiency, (iii) for gas and propane hot water boilers, eighty-four per cent annual fuel utilization efficiency, (iv) for oil-fired hot water boilers, eighty-four per cent annual fuel utilization efficiency, (v) for gas and propane steam boilers, eighty-two per cent annual fuel utilization efficiency, (vi) for oil-fired steam boilers, eighty-two per cent annual fuel utilization efficiency, and (vii) for furnaces with furnace air handlers, an electricity ratio of not more than 2.0, except air handlers for oil furnaces with a capacity of less than ninety-four thousand BTUs per hour shall have an electricity ratio of 2.3 or less;

(K) On or after January 1, 2010, metal halide lamp fixtures designed to be operated with lamps rated greater than or equal to one hundred fifty watts but less than or equal to five hundred watts shall not contain a probe-start metal halide lamp ballast;

(L) Single-voltage external AC to DC power supplies manufactured on or after January 1, 2008, shall meet the energy efficiency standards of table U-1 of section 1605.3 of the January 2006 California Code of Regulations, Title 20, Division 2, Chapter 4, Article 4: Appliance Efficiency Regulations. This standard applies to single voltage AC to DC power supplies that are sold individually and to those that are sold as a component of or in conjunction with another product. This standard shall not apply to single voltage external AC to DC power supplies sold with products subject to certification by the United States Food and Drug Administration. A single-voltage external AC to DC power supply that is made available by a manufacturer directly to a consumer or to a service or repair facility after and separate from the original sale of the product requiring the power supply as a service part or spare part shall not be required to meet the standards in said table U-1 until five years after the effective dates indicated in the table;

(M) On or after January 1, 2009, state regulated incandescent reflector lamps shall be manufactured to meet the minimum average lamp efficacy requirements for federally-regulated incandescent reflector lamps contained in 42 USC 6295(i)(1)(A). Each lamp shall indicate the date of manufacture;

(N) On or after January 1, 2009, bottle-type water dispensers, commercial hot food holding cabinets, portable electric spas, walk-in refrigerators and walk-in freezers shall meet the efficiency requirements of section 1605.3 of the January 2006 California Code of Regulations, Title 20, Division 2, Chapter 4, Article 4: Appliance Efficiency Regulations. On or after January 1, 2010, residential pool pumps shall meet said efficiency requirements;

(O) On or after January 1, 2009, pool heaters shall meet the efficiency requirements of sections 1605.1 and 1605.3 of the January 2006 California Code of Regulations, Title 20, Division 2, Chapter 4, Article 4: Appliance Efficiency Regulations;

(P) On or after January 1, 2014, compact audio players, digital versatile disc players and digital versatile disc recorders shall meet the requirements shown in Table V-1 of Section 1605.3 of the November 2009 amendments to the California Code of Regulations, Title 20, Division 2, Chapter 4, Article 4;

(Q) On or after January 1, 2014, televisions manufactured on or after the effective date of this section shall meet the requirements shown in Table V-2 of Section 1605.3 of the November 2009 amendments to the California Code of Regulations, Title 20, Division 2, Chapter 4, Article 4;

(R) In addition to the requirements of subparagraph (Q) of this subdivision, televisions manufactured on or after January 1, 2014, shall meet the efficiency requirements of Sections 1605.3(v)(3)(A), 1605.3(v)(3)(B) and 1605.3(v)(3)(C) of the November 2009 amendments to the California Code of Regulations, Title 20, Division 2, Chapter 4, Article 4.

(2) Such efficiency standards, where in conflict with the State Building Code, shall take precedence over the standards contained in the Building Code. Not later than July 1, 2007, and biennially thereafter, the [office, in consultation with the Department of Public Utility Control,] department shall review and increase the level of such efficiency standards by adopting regulations in accordance with the provisions of chapter 54 upon a determination that increased efficiency standards would serve to promote energy conservation in the state and would be cost-effective for consumers who purchase and use such new products, provided no such increased efficiency standards shall become effective within one year following the adoption of any amended regulations providing for such increased efficiency standards.

(3) (A) The [office, in consultation with the Department of Public Utility Control,] department shall adopt regulations, in accordance with the provisions of chapter 54, to designate additional products to be subject to the provisions of this section and to establish efficiency standards for such products upon a determination that such efficiency standards [(A)] (i) would serve to promote energy conservation in the state, [(B)] (ii) would be cost-effective for consumers who purchase and use such new products, and [(C)] (iii) that multiple products are available which meet such standards, provided no such efficiency standards shall become effective within one year following their adoption pursuant to this subdivision.

(B) The department, in consultation with the Multi-State Appliance Standards Collaborative, shall identify additional appliance and equipment efficiency standards. Not later than six months after adoption of an efficiency standard by a cooperative member state regarding a product for which no equivalent Connecticut or federal standard currently exists, the department shall adopt regulations in accordance with the provisions of chapter 54 adopting such efficiency standard unless the department makes a specific finding that such standard does not meet the criteria in subparagraph (A) of this subdivision.

(e) On or after July 1, 2006, except for commercial clothes washers, for which the date shall be July 1, 2007, commercial refrigerators and freezers, for which the date shall be July 1, 2008, and large packaged air-conditioning equipment, for which the date shall be July 1, 2009, no new product of a type set forth in subsection (b) of this section or designated by the office may be sold, offered for sale, or installed in the state unless the energy efficiency of the new product meets or exceeds the efficiency standards set forth in such regulations adopted pursuant to subsection (d) of this section.

(f) The [office, in consultation with the Department of Public Utility Control,] department shall adopt procedures for testing the energy efficiency of the new products set forth in subsection (b) of this section or designated by the department if such procedures are not provided for in the State Building Code. The [office] department shall use United States Department of Energy approved test methods, or in the absence of such test methods, other appropriate nationally recognized test methods. The manufacturers of such products shall cause samples of such products to be tested in accordance with the test procedures adopted pursuant to this subsection or those specified in the State Building Code.

(g) Manufacturers of new products set forth in subsection (b) of this section or designated by the [office] department shall certify to the [secretary] commissioner that such products are in compliance with the provisions of this section, except that certification is not required for single voltage external AC to DC power supplies and walk-in refrigerators and walk-in freezers. All single voltage external AC to DC power supplies shall be labeled as described in the January 2006 California Code of Regulations, Title 20, Section 1607 (9). The [office, in consultation with the Department of Public Utility Control,] department shall promulgate regulations governing the certification of such products. The [secretary] commissioner shall publish an annual list of such products.

(h) The Attorney General may institute proceedings to enforce the provisions of this section. Any person who violates any provision of this section shall be subject to a civil penalty of not more than two hundred fifty dollars. Each violation of this section shall constitute a separate offense, and each day that such violation continues shall constitute a separate offense.

Sec. 21. Section 16-243i of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

(a) The Department of [Public Utility Control] Energy and Environmental Protection shall, not later than January 1, [2006] 2012, establish a program to [grant awards to retail end use customers of electric distribution companies to fund the capital costs of obtaining projects of customer-side distributed resources, as defined in section 16-1. Any project shall receive a one-time, nonrecurring award in an amount of not less than two hundred dollars and not more than five hundred dollars per kilowatt of capacity for such customer-side distributed resources, recoverable from federally mandated congestion charges, as defined in section 16-1. No such award may be made unless the projected reduction in federally mandated congestion charges attributed to the project for such distributed resources is greater than the amount of the award. The amount of an award shall depend on the impact that the customer-side distributed resources project has on reducing federally mandated congestion charges, as defined in section 16-1. Not later than October 1, 2005, the department shall conduct a contested case proceeding, in accordance with chapter 54, to establish additional standards for the amount of such awards and additional criteria and the process for making such awards.

(b) The Department of Public Utility Control shall, not later than January 1, 2006, establish a program to grant to an electric distribution company a one-time, nonrecurring award to educate, assist and promote investments in customer-side distributed resources developed in such company's service territory, which resources the department determines will reduce federally mandated congestion charges, in accordance with the following: (1) On or before January 1, 2008, two hundred dollars per kilowatt of such resources, (2) on or before January 1, 2009, one hundred fifty dollars per kilowatt of such resources, (3) on or before January 1, 2010, one hundred dollars per kilowatt of such resources, and (4) fifty dollars per kilowatt of such resources thereafter. Payment of the award shall be made at the time each such resource becomes operational. The cost of the award shall be recoverable from federally mandated congestion charges. Revenues from such awards shall not be included in calculating the electric distribution company's earnings for the purpose of determining whether its rates are just and reasonable under sections 16-19, 16-19a and 16-19e] promote the development of new combined heat and power projects in Connecticut through low-interest loans, grants or power purchase agreements. The amount of such loans, grants or power purchase agreements shall be determined by the department on an individualized basis for each proposed combined heat and power project with the goal of minimizing costs to the general class of ratepayers, ensuring that the project developer has a significant share of the financial burden and risk, while ensuring the development of projects that benefit Connecticut's economy, ratepayers or environment. The department shall determine if the benefits of any such project to Connecticut's ratepayers, economy or environment are sufficient to justify ratepayer investment. The program established pursuant to this subsection shall not exceed two hundred fifty megawatts, and the department shall review the program annually. If the department determines during an annual review that the net cost to ratepayers of this program exceeds twenty-five million dollars, the department shall not approve additional projects that require ratepayer subsidies. For purposes of department review of the net cost to ratepayers of the program, the department shall take into account both (1) the benefits of any power purchase agreements for ratepayers, any estimated benefits of avoided costs of building alternative electric infrastructure, or other benefits, and (2) the costs of all ratepayer subsidies, the cost of power purchase agreements, and other costs.

(b) (1) The Department of Energy and Environmental Protection shall on or before March 1, 2012, establish a program to promote the development of new combined heat and power projects in Connecticut that are below three megawatts in capacity size. The department shall set one or more standardized grant amounts, loan amounts and power purchase agreements for such projects to limit the administrative burden of project approvals for the department and the project proponent. Such standardized provisions shall seek to minimize costs for the general class of ratepayers, ensuring that the project developer has a significant share of the financial burden and risk, while ensuring the development of projects that benefit Connecticut's economy, ratepayers, or environment. The department may in its discretion decline to support a proposed project if the benefits of such project to Connecticut's ratepayers, economy or environment, including emissions reductions, are too meager to justify ratepayer or taxpayer investment.

(2) The program established pursuant to this subsection shall not exceed fifty megawatts, and the department shall review the program annually. If the department determines during an annual review that the net cost to ratepayers of this program exceeds fifteen million dollars, the department shall not approve additional projects that require ratepayer subsidies. For purposes of department review of the net cost to ratepayers of the program, the department shall take into account both (A) the benefits of any power purchase agreements for ratepayers, any estimated benefits of avoided costs of building alternative electric infrastructure, or other benefits, and (B) the costs of all ratepayer subsidies, the cost of power purchase agreements, and other costs.

Sec. 22. Subsection (g) of section 16-245 of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

(g) As conditions of continued licensure, in addition to the requirements of subsection (c) of this section: (1) The licensee shall comply with the National Labor Relations Act and regulations, if applicable; (2) the licensee shall comply with the Connecticut Unfair Trade Practices Act and applicable regulations; (3) each generating facility operated by or under long-term contract to the licensee shall comply with regulations adopted by the Commissioner of Energy and Environmental Protection, pursuant to section 22a-174j; (4) the licensee shall comply with the portfolio standards, pursuant to section 16-245a; (5) the licensee shall be a member of the New England Power Pool or its successor or have a contractual relationship with one or more entities who are members of the New England Power Pool or its successor and the licensee shall comply with the rules of the regional independent system operator and standards and any other reliability guidelines of the regional independent systems operator; (6) the licensee shall agree to cooperate with the department and other electric suppliers in the event of an emergency condition that may jeopardize the safety and reliability of electric service; (7) the licensee shall comply with the code of conduct established pursuant to section 16-244h; (8) for a license to a participating municipal electric utility, the licensee shall provide open and nondiscriminatory access to its distribution facilities to other licensed electric suppliers; (9) the licensee or the entity or entities with whom the licensee has a contractual relationship to purchase power shall be in compliance with all applicable licensing requirements of the Federal Energy Regulatory Commission; (10) each generating facility operated by or under long-term contract to the licensee shall be in compliance with chapter 277a and state environmental laws and regulations; (11) the licensee shall comply with the renewable portfolio standards established in section 16-245a; (12) the licensee shall offer a time-of-use rate option to customers that provides for a peak period use rate of at least a five hundred per cent increase in the standard nonpeak use rate. Such peak period shall be not more than four hours in any twenty-four-hour period. The standard nonpeak use rate under this option shall be less than the standard use rate offer by such supplier to the customer. Nothing in this subdivision shall preclude such supplier from offering other time of use options; and [(12)] (13) the licensee shall acknowledge that it is subject to chapters 208, 212, 212a and 219, as applicable, and the licensee shall pay all taxes it is subject to in this state. Also as a condition of licensure, the department shall prohibit each licensee from declining to provide service to customers for the reason that the customers are located in economically distressed areas. The department may establish additional reasonable conditions to assure that all retail customers will continue to have access to electric generation services.

Sec. 23. (NEW) (Effective July 1, 2011) The Department of Energy and Environmental Protection shall require each electric distribution company to notify its customers on an ongoing basis regarding the availability of time-of-use meters, if applicable.

Sec. 24. (NEW) (Effective July 1, 2011) (a) For the two-year period starting January 1, 2012, and ending June 30, 2014, the aggregate net annual cost recovered from electric ratepayers pursuant to sections 25 to 30, inclusive, of this act, shall not exceed one-half of one per cent of total retail electricity sales revenues of each electric distribution company. For the two-year period starting July 1, 2014, and ending June 30, 2016, the aggregate net annual cost recovered from electric ratepayers pursuant to sections 25 to 30, inclusive, of this act and subsection (i) of section 16-245n of the general statutes shall not exceed three-fourths of one per cent of total retail electricity sales revenues of each electric distribution company. For each twelve-month period starting July 1, 2016, and every July first thereafter for the duration of the solar programs established pursuant to sections 25 to 30, inclusive, of this act and subsection (i) of section 16-245n of the general statutes the aggregate net cost of such programs recovered from electric ratepayers shall not exceed one per cent of total retail electricity sales revenues of each electric distribution company.

(b) The Department of Energy and Environmental Protection shall net out the incentives paid by the Renewable Energy Investment Fund pursuant to section 16-245n of the general statutes for solar deployment programs against the aggregate annual costs identified in this section.

(c) The Department of Energy and Environmental Protection shall report to the joint standing committee of the General Assembly having cognizance of matters relating to energy when the annual cost cap is within twenty per cent of being exceeded. If the department projects that the annual cost cap of the solar programs established pursuant to sections 25 to 30, inclusive, of this act will be exceeded, the department shall take measures to ensure such cap will not be exceeded. Such measures may include: (1) Delay or modify the development of solar electric generating facilities by electric distribution companies pursuant to subsection (e) of section 28 of this act; (2) temporarily suspend the availability of production-based incentives to customers not already eligible to receive such incentives under section 28 of this act; and (3) extend the scheduled electric distribution company solar renewable energy credit procurement plans under subsection (i) of section 16-245n of the general statutes. If the department determines that cost mitigation measures are required, it shall reduce proportionally the annual funding for the programs identified in subdivisions (1) to (3), inclusive, of this subsection and only to the extent required to bring projected annual costs below the cost cap.

(d) On or before January 1, 2015, the Department of Energy and Environmental Protection shall report to the joint standing committee of the General Assembly having cognizance of matters relating to energy on the cost and charges involved in the implementation of this program, including a cost-benefit analysis.

Sec. 25. (NEW) (Effective July 1, 2011) (a) The Renewable Energy Investments Board, created in section 16-245n of the general statutes, shall structure and implement a residential solar investment program pursuant to this section, which shall result in a minimum of thirty megawatts of new residential solar photovoltaic installations located in this state on or before December 31, 2022. For the purposes of this section and sections 17 and 33 of this act, "residential" means dwellings with one to four units.

(b) The Renewable Energy Investments Board shall offer direct financial incentives, in the form of performance-based incentives or expected performance-based buydowns, for the purchase or lease of qualifying residential solar photovoltaic systems. For the purposes of this section, "performance-based incentives" means incentives paid out on a per kilowatt-hour basis, and "expected performance-based buydowns" means incentives paid out as a one-time upfront incentive based on expected system performance. The board shall consider willingness to pay studies and verified solar photovoltaic system characteristics, such as operational efficiency, size, location, shading and orientation, when determining the type and amount of incentive. Notwithstanding the provisions of subdivision (1) of subsection (j) of section 16-244c of the general statutes, as amended by this act, the amount of renewable energy produced from Class I renewable energy sources receiving tariff payments or included in utility rates under this section shall be applied to reduce the electric distribution company's Class I renewable energy source portfolio standard.

(c) Beginning with the comprehensive plan covering the period from July 1, 2011, to June 30, 2013, the Renewable Energy Investments Board shall develop and publish in each such plan a proposed schedule for the offering of performance-based incentives or expected performance-based buydowns over the duration of any such solar incentive program. Such schedule shall: (1) Provide for a series of solar capacity blocks the combined total of which shall be a minimum of thirty megawatts and projected incentive levels for each such block; (2) provide incentives that are sufficient to meet reasonable payback expectations of the residential consumer, taking into consideration the estimated cost of residential solar installations, the value of the energy offset by the system and the availability and estimated value of other incentives, including, but not limited to, federal and state tax incentives and revenues from the sale of solar renewable energy credits; (3) provide incentives that decline over time and will foster the sustained, orderly development of a state-based solar industry; (4) automatically adjust to the next block once the board has issued reservations for financial incentives provided pursuant to this section from the board fully committing the target solar capacity and available incentives in that block; and (5) provide comparable economic incentives for the purchase or lease of qualifying residential solar photovoltaic systems. The board may retain the services of a third-party entity with expertise in the area of solar energy program design to assist in the development of the incentive schedule or schedules. The department shall review and approve such schedule. Nothing in this subsection shall restrict the board from modifying the approved incentive schedule before the issuance of its next comprehensive plan to account for changes in federal or state law or regulation or developments in the solar market when such changes would affect the expected return on investment for a typical residential solar photovoltaic system by twenty per cent or more.

(d) The Renewable Energy Investments Board shall establish and periodically update program guidelines, including, but not limited to, requirements for systems and program participants related to: (1) Eligibility criteria; (2) standards for deployment of energy efficient equipment or building practices as a condition for receiving incentive funding; (3) procedures to provide reasonable assurance that such reservations are made and incentives are paid out only to qualifying residential solar photovoltaic systems demonstrating a high likelihood of being installed and operated as indicated in application materials; and (4) reasonable protocols for the measurement and verification of energy production.

(e) The Renewable Energy Investments Board shall maintain on its web site the schedule of incentives, solar capacity remaining in the current block and available funding and incentive estimators.

(f) Funding for the residential performance-based incentive program and expected performance-based buydowns shall be apportioned from the moneys collected under the surcharge specified in section 16-245n of the general statutes, provided such apportionment shall not exceed one-third of the total surcharge collected annually, and supplemented by federal funding as may become available.

(g) The Renewable Energy Investments Board shall identify barriers to the development of a permanent Connecticut-based solar workforce and shall make provision for comprehensive training, accreditation and certification programs through institutions and individuals accredited and certified to national standards.

(h) On or before January 1, 2014, and every two years thereafter for the duration of the program, the Renewable Energy Investments Board shall report to the joint standing committee of the General Assembly having cognizance of matters relating to energy on progress toward the goals identified in subsection (a) of this section.

Sec. 26. (NEW) (Effective July 1, 2011) (a) Commencing on January 1, 2012, and within the period established in subsection (a) of section 27 of this act, each electric distribution company shall solicit and file with the Department of Energy and Environmental Protection for its approval, one or more long-term power purchase contracts with owners or developers of customer-sited solar photovoltaic generation projects that are less than two thousand kilowatts in size, located on the customer side of the revenue meter and serve the distribution system of the electric distribution company.

(b) Solicitations conducted by the electric distribution company shall be for the purchase of solar renewable energy credits produced by eligible customer-sited solar photovoltaic generating projects over the duration of the long-term contract. For purposes of this section, a long-term contract is a contract for a minimum of fifteen years. The electric distribution company may solicit proposals for a combination of renewable energy and associated solar renewable energy credits.

(c) The aggregate procurement of solar renewable energy credits by electric distribution companies pursuant to this section shall be no less than four million three hundred fifty thousand. The production of a megawatt hour of electricity from a Class I solar renewable energy source first placed in service on or after the effective date of this section shall create one solar renewable energy credit. A solar renewable energy credit shall have an effective life covering the year in which the credit was created and the following calendar year. The obligation to purchase solar renewable energy credits shall be apportioned to electric distribution companies based on their respective distribution system loads at the commencement of the procurement period, as determined by the department. An electric distribution company shall not be required to enter into a contract that provides a payment of more than three hundred fifty dollars per megawatt hour over the term of the contract.

(d) Notwithstanding subdivision (1) of subsection (j) of section 16-244c of the general statutes, as amended by this act, an electric distribution company may retire the solar renewable energy credits it procures through long-term contracting to satisfy its obligation pursuant to section 16-245a of the general statutes.

(e) Nothing in this section shall preclude the resale or other disposition of energy or associated solar renewable energy credits purchased by the electric distribution company, provided the distribution company shall net the cost of payments made to projects under the long-term contracts against the proceeds of the sale of energy or solar renewable energy credits and the difference shall be credited or charged to distribution customers through a reconciling component of electric rates as determined by the department.

Sec. 27. (NEW) (Effective July 1, 2011) (a) Each electric distribution company shall, not later than one hundred eighty days after the effective date of this section, propose a five-year solar solicitation plan that shall include a timetable and methodology for soliciting proposals for long-term solar renewable energy credits or energy contracts from in-state generators and that shall end in calendar year 2022. The electric distribution company's solar solicitation plan shall be subject to the review and approval of the department, provided contracts comprising no less than twenty-five per cent of the electric distribution company's obligation shall be submitted for department approval on or before January 1, 2013, no less than fifty per cent of such obligation shall be submitted for such approval on or before July 1, 2015, and no less than seventy-five per cent of such obligation shall be submitted for such approval on or before July 1, 2017.

(b) The electric distribution company's approved solar solicitation plan shall be designed to foster a diversity of solar project sizes and participation among all eligible customer classes subject to cost-effectiveness considerations. Separate procurement processes shall be conducted for (1) systems up to fifty kilowatts; (2) systems greater than fifty kilowatts but less than two hundred kilowatts; and (3) systems between two hundred and two thousand kilowatts. The Department of Energy and Environmental Protection shall give preference to competitive bidding for resources of more than fifty kilowatts, unless the department determines that an alternative methodology is in the best interests of the electric distribution company's customers and the development of a competitive and self-sustaining solar market. Systems up to fifty kilowatts in size shall be eligible to receive, on an ongoing and continuous basis, a solar renewable energy credit offer price equivalent to the weighted average accepted bid price in the most recent solicitation for systems greater than fifty kilowatts but less than two hundred kilowatts, plus an additional incentive of ten per cent. The offer price shall remain open at least until the electric distribution company has satisfied its procurement requirement for solar renewable energy credits, as specified in section 26 of this act. Once the offer price is closed, the owner or holder of a residential solar renewable energy credit may bid any outstanding or future credits in a competitive solicitation conducted by the electric distribution company pursuant to this subsection.

(c) Each electric distribution company shall execute its approved five-year solicitation plan and submit to the Department of Energy and Environmental Protection for review and approval of its preferred solar procurement plan comprised of any proposed contract or contracts with independent solar developers.

(d) The Department of Energy and Environmental Protection shall hold a hearing that shall be conducted as an uncontested case, in accordance with the provisions of chapter 54 of the general statutes, to approve, reject or modify an application for approval of the electric distribution company's solar procurement plan. The department shall only approve such proposed plan if the department finds that (1) the solicitation and evaluation conducted by the electric distribution company was the result of a fair, open, competitive and transparent process; (2) approval of the solar procurement plan would result in the greatest expected ratepayer value from solar energy or solar renewable energy credits at the lowest reasonable cost; and (3) such procurement plan satisfies other criteria established in the approved solicitation plan. The department shall not approve any proposal made under such plan unless it determines that the plan and proposals encompass all foreseeable sources of revenue or benefits and that such proposals, together with such revenue or benefits, would result in the greatest expected ratepayer value from solar energy or solar renewable energy credits. The department may, in its discretion, retain the services of an independent consultant with expertise in the area of energy procurement to assist in such determination. The independent consultant shall be unaffiliated with the electric distribution company or its affiliates and shall not, directly or indirectly, have benefited from employment or contracts with the electric distribution company or its affiliates in the preceding five years, except as an independent consultant. The electric distribution company shall provide the independent consultant immediate and continuing access to all documents and data reviewed, used or produced by the electric distribution company in its bid solicitation and evaluation process. The electric distribution company shall make all its personnel, agents and contractors used in the bid solicitation and evaluation available for interview by the consultant. The electric distribution company shall conduct any additional modeling requested by the independent consultant to test the assumptions and results of the bid evaluation process. The independent consultant shall not participate in or advise the electric distribution company with respect to any decisions in the bid solicitation or bid evaluation process. The department's administrative costs in reviewing the electric distribution company's solar procurement plan and the costs of the consultant shall be recovered through a reconciling component of electric rates as determined by the department.

(e) The electric distribution company shall be entitled to recover its reasonable costs of complying with its approved solar procurement plan through a reconciling component of electric rates as determined by the department.

(f) If, by January 1, 2013, the department has not received proposed long-term solar renewable energy credit contracts consisting of at least twenty-five per cent of each electric distribution company's procurement obligation, by July 1, 2015, has not received proposed long-term solar renewable energy contracts consisting of at least fifty per cent of each electric distribution company's procurement obligation, or by July 1, 2017, has not received proposed long-term solar renewable energy contracts consisting of at least seventy-five per cent of each electric distribution company's procurement obligation, respectively, the department shall notify the electric distribution company of the shortfall. Unless, upon petition by the electric distribution company, the department grants the distribution company an extension not to exceed ninety days to correct this deficiency, the electric distribution company shall be assessed a noncompliance fee of five hundred dollars for each solar renewable energy credit shortfall in the initial year of the procurement, with the per credit fee declining by seven per cent annually over the duration of the ten-year solicitation plan. The noncompliance fees associated with the procurement shortfall shall be collected by the distribution company, maintained in a separate interest-bearing account and disbursed to the department on a quarterly basis. Funds collected by the department pursuant to this section shall be used to support the deployment of solar photovoltaic generating systems installed in the state with priority given to otherwise underserved market segments, including, but not limited to, low-income housing, schools and other public buildings and nonprofits.

(g) No project that receives funding pursuant to this section shall be eligible for funding pursuant to section 29 of this act.

(h) Not later than sixty days after its approval of the distribution company procurement plans submitted on or before January 1, 2013, the Department of Energy and Environmental Protection shall submit a report to the joint standing committee of the General Assembly having cognizance of matters relating to energy. The report shall document for each distribution company procurement plan: (1) The total number of solar renewable energy credits bid relative to the number of solar renewable energy credits requested by the distribution company; (2) the total number of bidders in each market segment; (3) the number of contracts awarded; and (4) the total weighted average price of the solar renewable energy credits or energy so purchased. The department shall not report individual bid information or other proprietary information.

Sec. 28. (NEW) (Effective July 1, 2011) (a) On or before July 1, 2012, the Department of Energy and Environmental Protection, in consultation with the Office of Policy and Management and the Department of Public Works, shall, within available funding, complete, or cause to be completed by private vendors, a comprehensive solar feasibility survey of facilities owned or operated by the state with a load of fifty kilowatts or more. The survey shall rank state-owned or operated facilities based on their technical feasibility to accommodate solar photovoltaic generating systems by considering such factors as: (1) On-site energy consumption; (2) building orientation; (3) roof age and condition; (4) shading and the potential for obstruction to sunlight over the life of the solar system; (5) structural load capacity; (6) availability of ancillary facilities, such as parking lots, walkways or maintenance areas; (7) nonenergy related amenities; and (8) other factors that the Department of Energy and Environmental Protection deems may bear on the technical feasibility of such solar deployment.

(b) The Department of Energy and Environmental Protection, shall, within available funding, issue one or more requests for proposals for the deployment of solar photovoltaic generating systems at state-owned or operated facilities. Any such request for proposals shall be structured to maximize the state's ability to secure incentives available from the federal government or other sources. The department may seek in any request for proposals the services of an entity to finance, design, construct, own or maintain such solar photovoltaic system under a long-term solar services agreement. Any such entity chosen to provide such services shall not be considered a public service company under section 16-1 of the general statutes.

Sec. 29. (NEW) (Effective July 1, 2011) (a) Each electric distribution company shall, not later than July 1, 2012, file with the Department of Energy and Environmental Protection for its approval a tariff for production-based payments to owners or operators of Class I solar renewable energy source projects located in this state that are not less than one megawatt and connected directly to the distribution system of an electric distribution company.

(b) Such tariffs shall provide production-based payments for a period not less than fifteen years from the in-service date of the Class I solar renewable energy source project at a price that is, at the determination of the Department of Energy and Environmental Protection, a cost-based payment consisting of the fully allocated cost of constructing and operating a Class I solar renewable energy source of from one megawatt to seven and one-half megawatts were such construction and operation to be undertaken or procured by the electric distribution company itself. In calculating the cost-based tariff, the department shall consider actual cost data for Class I solar energy sources constructed and operated by the electric distribution company pursuant to subsection (e) of this section taking into consideration all available state and federal incentives.

(c) Such tariffs shall include a per project eligibility cap of seven and one-half megawatts and an aggregate eligibility cap of fifty megawatts, apportioned among each electric distribution company in proportion to distribution load.

(d) The cost of such tariff payments shall be eligible for inclusion in any subsequent rates, provided such payments are for projects operational on or after the effective date of this section, and recovered through a reconciling component of electric rates as determined by the Department of Energy and Environmental Protection.

(e) On and after July 1, 2012, electric distribution companies may construct, own and operate solar electric generating facilities up to one-third of their proportional share of the total cap amounts specified under subsection (c) of this section, provided any such development shall be phased in over a period of no less than three years. Such projects shall be located on brownfields or other locations in a targeted investment community, as defined in section 32-222 of the general statutes. The Department of Energy and Environmental Protection, in a contested case, shall authorize the electric distribution company to recover in rates its costs to construct, own and operate solar electric generating facilities, including a reasonable return on its investment not to exceed eight per cent, if such approval would result in a reasonable cost of meeting the solar energy requirements pursuant to said subsection (c) of this section and that such investment will not restrict competition or restrict growth in the state's solar energy industry or unfairly employ in a manner which would restrict competition in the market for solar energy systems any financial, marketing, distributing or generating advantage that the electric distribution company may exercise as a result of its authority to operate as a public service company.

(f) Notwithstanding the provisions of subdivision (1) of subsection (j) of section 16-244c of the general statutes, as amended by this act, the amount of renewable energy produced from Class I renewable energy sources receiving tariff payments or included in utility rates under this section shall be applied to reduce the electric distribution company's Class I renewable energy source portfolio standard.

(g) No project that receives funding pursuant to this section shall be eligible for funding pursuant to section 27 of this act.

(h) On or before September 1, 2013, the department, in consultation with the Office of Consumer Counsel and the Renewable Energy Investments Board, shall study the operation of solar renewable energy tariffs and shall report, in accordance with the provisions of section 11-4a of the general statutes, its findings and recommendations to the joint standing committee of the General Assembly having cognizance of matters relating to energy.

(i) The department shall suspend the tariff established pursuant to this section upon the earlier of (1) an electric distribution company reaching its aggregate cap pursuant to subsection (c) of this section, or (2) three years from the effective date of the tariff.

Sec. 30. (NEW) (Effective July 1, 2011) The Department of Energy and Environmental Protection, in consultation with the Renewable Energy Investment Fund established in section 16-245n of the general statutes and the Conservation and Load Management Fund established in section 16-245m of the general statutes, shall develop coordinated programs to create a self-sustaining market for solar thermal systems for electricity, natural gas and fuel oil customers.

Sec. 31. (NEW) (Effective July 1, 2011) The Department of Energy and Environmental Protection shall provide an additional incentive of up to five per cent of the then-applicable incentive provided pursuant to sections 25 and 30 of this act for the use of major system components manufactured or assembled in Connecticut, and another additional incentive of up to five per cent of the then applicable incentive provided pursuant to sections 25 and 30 of this act for the use of major system components manufactured or assembled in a distressed municipality, as defined in section 32-9p of the general statutes, or a targeted investment community, as defined in section 32-222 of the general statutes.

Sec. 32. (NEW) (Effective July 1, 2011) (a) On or before January 1, 2012, the Department of Energy and Environmental Protection shall initiate an uncontested proceeding to establish a feed-in tariff that shall decline over time to include, but not be limited to, wind, fuel cells, biomass, geothermal and energy efficiency projects. As a result of such proceeding, the department shall establish the parameters of such program, which shall include, but not be limited to, a requirement that no ratepayer money fund such program.

(b) On or before January 1, 2012, and annually thereafter, the department shall report, in accordance with the provisions of section 11-4a of the general statutes, to the joint standing committee of the General Assembly having cognizance of matters relating to energy regarding the feed-in tariff established pursuant to this section.

Sec. 33. (NEW) (Effective October 1, 2011) The Renewable Energy Investments Board created pursuant to section 16-245n of the general statutes in consultation with the Department of Energy and Environmental Protection, may establish a program to be known as the "condominium renewable energy grant program". Under such program, the board may provide grants to residential condominium associations and residential condominium owners, within available funds, for purchasing renewable energy sources, including solar energy, geothermal energy and fuel cells or other energy-efficient hydrogen-fueled energy.

Sec. 34. (NEW) (Effective July 1, 2011) The Department of Energy and Environmental Protection shall establish a pilot program to support through loans, grants or power purchase agreements sustainable practices and economic prosperity of Connecticut farms by using agricultural waste with on-site anaerobic digestion facilities to generate electricity and heat. As part of the pilot program, the department may approve no more than five projects, each of which shall have a maximum size of five hundred kilowatts. On or before January 1, 2012, and annually thereafter, the department shall report, in accordance with the provisions of section 11-4a of the general statutes, to the joint standing committee of the General Assembly having cognizance of matters relating to energy regarding the program established pursuant to this section.

Sec. 35. (NEW) (Effective July 1, 2011) (a) On or before June 30, 2012, the Department of Energy and Environmental Protection shall conduct a proceeding regarding development of low-income discounted rates for service provided by electric distribution companies, as defined in section 16-1 of the general statutes, to low-income customers with an annual income that does not exceed sixty per cent of median income. Such proceeding shall include, but not be limited to, a review, for individuals who receive means-tested assistance administered by the state or federal governments, of the current and future availability of rate discounts through the department's electricity purchasing pool operated pursuant to section 16a-14e of the general statutes, energy assistance benefits available through any plan adopted pursuant to section 16a-41a of the general statutes, state funded or administered programs, conservation assistance available pursuant to section 16-245m of the general statutes assistance funded or administered by said department or the Department of Social Services, or matching payment program benefits available pursuant to subsection (b) of section 16-262c of the general statutes. Such proceeding shall also include an analysis of the cost of imposing a utility termination moratorium in households with a child two years of age or younger. The department shall (1) coordinate resources and programs, to the extent practicable; (2) develop rates that take into account the indigency of persons of poverty status and allow such persons' households to meet the costs of essential energy needs; (3) encourage the households to agree to have a home energy audit as a prerequisite to qualification; and (4) prepare an analysis of the benefits and anticipated costs of such low-income discounted rates.

(b) The department shall determine which, if any, of its programs shall be modified, terminated or have their funding reduced because such program beneficiaries would benefit more by the establishment of a low-income or discount rate. The department shall establish a rate reduction that is equal to the anticipated funds transferred from the programs modified, terminated or reduced by the department pursuant to this section and the reduced cost of providing service to those eligible for such discounted or low-income rates, any available energy assistance and other sources of coverage for such rates, including, but not limited to, generation available through the electricity purchasing pool operated by the department. The department may issue recommendations regarding programs administered by the Department of Social Services.

(c) The department shall order (1) filing by each electric distribution company of proposed rates consistent with the department's decision pursuant to subsection (a) of this section not later than sixty days after its issuance; and (2) appropriate modification of existing low-income programs. Each company shall conduct outreach to make its low-income or discounted rates available to eligible customers and report to the department at least annually regarding its outreach activities and the results of such activities.

(d) The cost of low-income and discounted rates and related outreach activities pursuant to this section shall be paid (1) through the normal rate-making procedures of the department, (2) on a semiannual basis through the systems benefits charge for an electric distribution company, and (3) solely from the funds of the programs modified, terminated or reduced by the department pursuant to this section and the reduced cost of providing service to those eligible for such discounted or low-income rates, any available energy assistance and other sources of coverage for such rates, including, but not limited to, generation available through the electricity purchasing pool operated by the department.

(e) On or before July 1, 2013, the department shall report, in accordance with section 11-4a of the general statutes, to the joint standing committee of the General Assembly having cognizance of matters relating to energy regarding the benefits and costs of the low-income or discounted rates established pursuant to subsection (a) of this section, including, but not limited to, possible impacts on existing customers who qualify for state assistance, and any recommended modifications. If the low-income rate is not less than ninety per cent of the standard service rate, the department shall include in its report steps to achieve that goal.

Sec. 36. Section 16-245o of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

(a) To protect a customer's right to privacy from unwanted solicitation, each electric company or electric distribution company, as the case may be, shall distribute to each customer a form approved by the Department of [Public Utility Control] Energy and Environmental Protection which the customer shall submit to the customer's electric or electric distribution company in a timely manner if the customer does not want the customer's name, address, telephone number and rate class to be released to electric suppliers. On and after July 1, 1999, each electric or electric distribution company, as the case may be, shall make available to all electric suppliers customer names, addresses, telephone numbers, if known, and rate class, unless the electric company or electric distribution company has received a form from a customer requesting that such information not be released. Additional information about a customer for marketing purposes shall not be released to any electric supplier unless a customer consents to a release by one of the following: (1) An independent third-party telephone verification; (2) receipt of a written confirmation received in the mail from the customer after the customer has received an information package confirming any telephone agreement; (3) the customer signs a document fully explaining the nature and effect of the release; or (4) the customer's consent is obtained through electronic means, including, but not limited to, a computer transaction.

(b) All electric suppliers shall have equal access to customer information required to be disclosed under subsection (a) of this section. No electric supplier shall have preferential access to historical distribution company customer usage data.

(c) No electric or electric distribution company shall include in any bill or bill insert anything that directly or indirectly promotes a generation entity or affiliate of the electric distribution company. No electric supplier shall include a bill insert in an electric bill of an electric distribution company.

(d) All marketing information provided pursuant to the provisions of this section shall be formatted electronically by the electric company or electric distribution company, as the case may be, in a form that is readily usable by standard commercial software packages. Updated lists shall be made available within a reasonable time, as determined by the department, following a request by an electric supplier. Each electric supplier seeking the information shall pay a fee to the electric company or electric distribution company, as the case may be, which reflects the incremental costs of formatting, sorting and distributing this information, together with related software changes. Customers shall be entitled to any available individual information about their loads or usage at no cost.

(e) Each electric supplier shall, prior to the initiation of electric generation services, provide the potential customer with a written notice describing the rates, information on air emissions and resource mix of generation facilities operated by and under long-term contract to the supplier, terms and conditions of the service, and a notice describing the customer's right to cancel the service, as provided in this section. No electric supplier shall provide electric generation services unless the customer has signed a service contract or consents to such services by one of the following: (1) An independent third-party telephone verification; (2) receipt of a written confirmation received in the mail from the customer after the customer has received an information package confirming any telephone agreement; (3) the customer signs a [document fully explaining the nature and effect of the initiation of the service] contract that conforms with the provisions of this section; or (4) the customer's consent is obtained through electronic means, including, but not limited to, a computer transaction. Each electric supplier shall provide each customer with a demand of less than one hundred kilowatts, a written contract that conforms with the provisions of this section and maintain records of such signed service contract or consent to service for a period of not less than two years from the date of expiration of such contract, which records shall be provided to the department or the customer upon request. Each contract for electric generation services shall contain all material terms of the agreement, a clear and conspicuous statement explaining the rates that such customer will be paying, including the circumstances under which the rates may change, a statement that provides specific directions to the customer as to how to compare the price term in the contract to the customer's existing electric generation service charge on the electric bill and how long those rates are guaranteed. Such contract shall also include a clear and conspicuous statement providing the customer's right to cancel such contract not later than three days after signature or receipt in accordance with the provisions of this subsection, describing under what circumstances, if any, the supplier may terminate the contract and describing any penalty for early termination of such contract. Each contract shall be signed by the customer, or otherwise agreed to in accordance with the provisions of this subsection. A customer who has a maximum demand of five hundred kilowatts or less shall, until midnight of the third business day after the latter of the day on which the customer enters into a service agreement or the day on which the customer receives the written contract from the electric supplier as provided in this section, have the right to cancel a contract for electric generation services entered into with an electric supplier.

[(f) An electric supplier shall not advertise or disclose the price of electricity in such a manner as to mislead a reasonable person into believing that the electric generation services portion of the bill will be the total bill amount for the delivery of electricity to the customer's location. When advertising or disclosing the price for electricity, the electric supplier shall also disclose the electric distribution company's average current charges, including the competitive transition assessment and the systems benefits charge, for that customer class.]

(f) (1) Any third-party agent who contracts with or is otherwise compensated by an electric supplier to sell electric generation services shall be a legal agent of the electric supplier. No third-party agent may sell electric generation services on behalf of an electric supplier unless (A) the third-party agent is an employee or independent contractor of such electric supplier, and (B) the third-party agent has received appropriate training directly from such electric supplier.

(2) On or after July 1, 2011, all sales and solicitations of electric generation services by an electric supplier, aggregator or agent of an electric supplier or aggregator to a customer with a maximum demand of one hundred kilowatts or less conducted and consummated entirely by mail, door-to-door sale, telephone or other electronic means, during a scheduled appointment at the premises of a customer or at a fair, trade or business show, convention or exposition in addition to complying with the provisions of subsection (e) of this section shall:

(A) For any sale or solicitation, including from any person representing such electric supplier, aggregator or agent of an electric supplier or aggregator (i) identify the person and the electric generation services company or companies the person represents; (ii) provide a statement that the person does not represent an electric distribution company; (iii) explain the purpose of the solicitation; and (iv) explain all rates, fees, variable charges and terms and conditions for the services provided; and

(B) For door-to-door sales to customers with a maximum demand of one hundred kilowatts, which shall include the sale of electric generation services in which the electric supplier, aggregator or agent of an electric supplier or aggregator solicits the sale and receives the customer's agreement or offer to purchase at a place other than the seller's place of business, be conducted (i) in accordance with any municipal and local ordinances regarding door-to-door solicitations, (ii) between the hours of ten o'clock a.m. and six o'clock p.m., and (iii) with both English and Spanish written materials available. Any representative of an electric supplier, aggregator or agent of an electric supplier or aggregator shall prominently display or wear a photo identification badge stating the name of such person's employer or the electric supplier the person represents. Each such supplier, aggregator or agent shall conduct a criminal background check on each person such entity employs to conduct such door-to-door sales.

(3) No electric supplier, aggregator or agent of an electric supplier or aggregator shall advertise or disclose the price of electricity to mislead a reasonable person into believing that the electric generation services portion of the bill will be the total bill amount for the delivery of electricity to the customer's location. When advertising or disclosing the price for electricity, the electric supplier, aggregator or agent of an electric supplier or aggregator shall also disclose the electric distribution company's current charges, including the competitive transition assessment and the systems benefits charge, for that customer class.

(4) No entity, including an aggregator or agent of an electric supplier or aggregator, who sells or offers for sale any electric generation services for or on behalf of an electric supplier, shall engage in any deceptive acts or practices in the marketing, sale or solicitation of electric generation services.

(5) Each electric supplier shall disclose to the Department of Energy and Environmental Protection in a standardized format (A) the amount of additional renewable energy credits such supplier will purchase beyond required credits, (B) where such additional credits are being sourced from, and (C) the types of renewable energy sources that will be purchased. Each electric supplier shall only advertise renewable energy credits purchased beyond those required pursuant to section 16-245a and shall report to the department the renewable energy sources of such credits and whenever the mix of such sources changes.

(6) No contract for electric generation services by an electric supplier shall require a residential customer to pay any fee for termination or early cancellation of a contract in excess of (A) one hundred dollars; or (B) twice the estimated bill for energy services for an average month, whichever is less, provided when an electric supplier offers a contract, it provides the residential customer an estimate of such customer's average monthly bill.

(7) An electric supplier shall not make a material change in the terms or duration of any contract for the provision of electric generation services by an electric supplier without the express consent of the customer. Nothing in this subdivision shall restrict an electric supplier from renewing a contract by clearly informing the customer, in writing, not less than thirty days nor more than sixty days before the renewal date, of the renewal terms and of the option not to accept the renewal offer, provided no fee pursuant to subdivision (6) of this section shall be charged to a customer who terminates or cancels such renewal not later than seven business days after receiving the first billing statement for the renewed contract.

(g) Each electric supplier, aggregator or agent of an electric supplier or aggregator shall comply with the provisions of the telemarketing regulations adopted pursuant to 15 USC 6102.

(h) Any violation of this section shall be deemed an unfair or deceptive trade practice under subsection (a) of section 42-110b. Any contract for electric generation services that the department finds to be the product of unfair or deceptive marketing practices or in material violation of the provisions of this section shall be void and unenforceable. Any waiver of the provisions of this section by a customer of electric generation services shall be deemed void and unenforceable by the electric supplier.

(i) Any violation or failure to comply with any provision of this section shall be subject to (1) civil penalties by the department in accordance with section 16-41, (2) the suspension or revocation of an electric supplier or aggregator's license, or (3) a prohibition on accepting new customers following a hearing that is conducted as a contested case in accordance with chapter 54.

(j) The department may adopt regulations, in accordance with the provisions of chapter 54, to include, but not be limited to, abusive switching practices, solicitations and renewals by electric suppliers.

Sec. 37. Section 16-245d of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

(a) The Department of [Public Utility Control] Energy and Environmental Protection shall, by regulations adopted pursuant to chapter 54, develop a standard billing format that enables customers to compare pricing policies and charges among electric suppliers. [Not later than January 1, 2006, the] The department shall adopt regulations, in accordance with the provisions of chapter 54, to provide that an electric supplier, until October 1, 2011, may provide direct billing and collection services for electric generation services and related federally mandated congestion charges that such supplier provides to its customers [that have] with a maximum demand of not less than one hundred kilowatts [and] that choose to receive a bill directly from such supplier and, on and after October 1, 2011, shall provide direct billing and collection services for electric generation services and related federally mandated congestion charges that such suppliers provide to their customers or may choose to obtain such billing and collection service through an electric distribution company and pay its pro rata share in accordance with the provisions of subsection (h) of section 16-244c, as amended by this act. Any customer of an electric supplier, which is choosing to provide direct billing, who paid for the cost of billing and other services to an electric distribution company shall receive a credit on their monthly bill.

(1) An electric supplier that chooses to provide billing and collection services shall, in accordance with the billing format developed by the department, include the following information in each customer's bill: (A) The total amount owed by the customer, which shall be itemized to show (i) the electric generation services component and any additional charges imposed by the electric supplier, and (ii) federally mandated congestion charges applicable to the generation services; (B) any unpaid amounts from previous bills, which shall be listed separately from current charges; (C) the rate and usage for the current month and each of the previous twelve months in bar graph form or other visual format; (D) the payment due date; (E) the interest rate applicable to any unpaid amount; (F) the toll-free telephone number of the Department of Public Utility Control for questions or complaints; and (G) the toll-free telephone number and address of the electric supplier.

(2) An [electric company,] electric distribution company [or electric supplier that provides direct billing of the electric generation service component and related federally mandated congestion charges, as the case may be,] shall, in accordance with the billing format developed by the department, include the following information in each customer's bill: [, as appropriate: (1)] (A) The total amount owed by the customer, which shall be itemized to show, [(A)] (i) the electric generation services component [and any additional charges imposed by the electric supplier, if applicable, (B)] if the customer obtains standard service or last resort service from the electric distribution company, (ii) the distribution charge, including all applicable taxes and the systems benefits charge, as provided in section 16-245l, [(C)] (iii) the transmission rate as adjusted pursuant to subsection (d) of section 16-19b, [(D)] (iv) the competitive transition assessment, as provided in section 16-245g, [(E)] (v) federally mandated congestion charges, and [(F)] (vi) the conservation and renewable energy charge, consisting of the conservation and load management program charge, as provided in section 16-245m, and the renewable energy investment charge, as provided in section 16-245n; [(2)] (B) any unpaid amounts from previous bills which shall be listed separately from current charges; [(3)] (C) except for customers subject to a demand charge, the rate and usage for the current month and each of the previous twelve months in the form of a bar graph or other visual form; [(4)] (D) the payment due date; [(5)] (E) the interest rate applicable to any unpaid amount; [(6)] (F) the toll-free telephone number of the electric distribution company to report power losses; [(7)] (G) the toll-free telephone number of the Department of Public Utility Control for questions or complaints; [(8) the toll-free telephone number and address of the electric supplier; and (9)] and (H) if a customer has a demand of five hundred kilowatts or less during the preceding twelve months, a statement about the availability of information concerning electric suppliers pursuant to section 16-245p.

(b) The regulations shall provide guidelines for determining until October 1, 2011, the billing relationship between the electric distribution company and electric suppliers, including, but not limited to, the allocation of partial bill payments and late payments between the electric distribution company and the electric supplier. An electric distribution company that provides billing services for an electric supplier shall be entitled to recover from the electric supplier all reasonable transaction costs to provide such billing services as well as a reasonable rate of return, in accordance with the principles in subsection (a) of section 16-19e.

Sec. 38. (NEW) (Effective July 1, 2011) The Commissioner of Energy and Environmental Protection shall administer a state-appropriated weatherization assistance program to provide, within available appropriations, weatherization assistance in accordance with the provisions of the state plan implementing the weatherization assistance block grant program authorized by the federal Low-Income Home Energy Assistance Act of 1981, and programs of fuel assistance and weatherization assistance with funds authorized by the federal Low-Income Home Energy Assistance Act of 1981 and by the United States Department of Energy in accordance with 10 CFR Part 440 promulgated under Title IV of the Energy Conservation and Production Act, as amended, and oil settlement funds in accordance with subsections (b) and (c) of section 4-28 of the general statutes. The commissioner shall adopt regulations in accordance with the provisions of chapter 54 of the general statutes, (1) establishing priorities for determining which households shall receive such weatherization assistance, (2) requiring that such weatherization assistance for energy conservation measures other than the retrofitting of heating systems be provided only for any dwelling unit for which an energy audit has been conducted in accordance with the provisions of sections 16a-45a to 16a-46c, inclusive, of the general statutes, (3) requiring that the only criterion for determining which energy conservation measures shall be implemented pursuant to this subsection in any such dwelling unit shall be the simple payback calculated for each energy conservation measure recommended in the energy audit conducted for such unit, (4) establishing the maximum allowable payback period for such energy conservation measures, and (5) establishing conditions for the waiver of the provisions of subdivisions (1) to (4), inclusive, of this subsection in the event of emergencies. The programs provided for under this subsection shall include a program of fuel and weatherization assistance for emergency shelters for homeless individuals and victims of domestic violence. The commissioner may adopt regulations, in accordance with the provisions of chapter 54 of the general statutes, to implement and administer the program of fuel and weatherization assistance for emergency shelters.

Sec. 39. (NEW) (Effective July 1, 2011) On or before October 1, 2011, the Department of Energy and Environmental Protection shall establish a natural gas conversion program to allow a gas company to finance the conversion to gas heat by potential residential customers who heat their homes with electricity. The department shall adopt regulations in accordance with the provisions of chapter 54 of the general statutes to establish procedures and terms for such program and shall, on or before January 1, 2012, and annually thereafter, report in accordance with the provisions of section 11-4a of the general statutes to the joint standing committees of the General Assembly having cognizance of matters relating to energy and the environment regarding the progress of said program.

Sec. 40. Section 16-245z of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

Not later than October 1, 2005, the Department of [Public Utility Control] Energy and Environmental Protection and the Energy Conservation Management Board, established in section 16-245m, shall establish links on their Internet web sites to the Energy Star program or successor program that promotes energy efficiency and each electric distribution company shall establish a link under its conservation programs on its Internet web site to the Energy Star program or such successor program.

Sec. 41. Section 17b-801 of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

(a) The Commissioner of Social Services shall administer a state-appropriated fuel assistance program to provide, within available appropriations, fuel assistance to elderly and disabled persons whose household gross income is above the income eligibility guidelines for the Connecticut energy assistance program but does not exceed two hundred per cent of federal poverty guidelines. The income eligibility guidelines for the state-appropriated fuel assistance program shall be determined, annually, by the Commissioner of Social Services, in conjunction with the Secretary of the Office of Policy and Management. The commissioner may adopt regulations, in accordance with the provisions of chapter 54, to implement the provisions of this subsection.

[(b) The commissioner shall administer a state-appropriated weatherization assistance program to provide, within available appropriations, weatherization assistance in accordance with the provisions of the state plan implementing the weatherization assistance block grant program authorized by the federal Low-Income Home Energy Assistance Act of 1981, and programs of fuel assistance and weatherization assistance with funds authorized by the federal Low-Income Home Energy Assistance Act of 1981 and by the U.S. Department of Energy in accordance with 10 CFR Part 440 promulgated under Title IV of the Energy Conservation and Production Act, as amended, and oil settlement funds in accordance with subsections (b) and (c) of section 4-28. The commissioner shall adopt regulations in accordance with the provisions of chapter 54, (1) establishing priorities for determining which households shall receive such weatherization assistance, (2) requiring that such weatherization assistance for energy conservation measures other than the retrofitting of heating systems be provided only for any dwelling unit for which an energy audit has been conducted in accordance with the provisions of sections 16a-45a to 16a-46c, inclusive, (3) requiring that the only criterion for determining which energy conservation measures shall be implemented pursuant to this subsection in any such dwelling unit shall be the simple payback calculated for each energy conservation measure recommended in the energy audit conducted for such unit, (4) establishing the maximum allowable payback period for such energy conservation measures and (5) establishing conditions for the waiver of the provisions of subdivisions (1) to (4), inclusive, of this subsection in the event of emergencies. The programs provided for under this subsection shall include a program of fuel and weatherization assistance for emergency shelters for homeless individuals and victims of domestic violence. The commissioner may adopt regulations, in accordance with the provisions of chapter 54, to implement and administer the program of fuel and weatherization assistance for emergency shelters.]

[(c)] (b) The Commissioner of Social Services shall administer, within available appropriations, a crime prevention and safety program for residences occupied by elderly and disabled persons who are eligible for the weatherization assistance block grant program authorized by the federal Low-Income Home Energy Assistance Act of 1981 or the state-appropriated weatherization assistance program. The program shall be operated through the community action agencies and the municipal agency responsible for said low income weatherization program. The program may provide for the purchase and installation, where necessary, of devices which allow a person inside a dwelling unit to view the area outside the door, or doors with windows, locks on windows and doors, and smoke detectors. The installation of devices under this program shall be done at the time weatherization is done.

Sec. 42. (NEW) (Effective July 1, 2011) (a) As used in this section:

(1) "Eligible entity" means (A) any residential, commercial, institutional or industrial customer of an electric distribution company or natural gas company, as defined in section 16-1 of the general statutes, who employs or installs an eligible in-state energy savings technology, (B) an energy service company certified as a Connecticut electric efficiency partner by the Department of Energy and Environmental Protection, or (C) an installer certified by the Renewable Energy Investments Fund; and

(2) "Energy savings infrastructure" means tangible equipment, installation, labor, cost of engineering, permits, application fees and other reasonable costs incurred by eligible entities for operating eligible in-state energy savings technologies designed to reduce electricity consumption, natural gas consumption or heating oil consumption.

(b) The Department of Energy and Environmental Protection shall establish an energy savings infrastructure pilot program consisting of financial incentives for the installation of energy efficient heating oil burners, boilers and furnaces and natural gas boilers and furnaces by eligible entities. On or before June 30, 2014, the department shall evaluate the efficacy of the program established pursuant to this section.

(c) On or before December 31, 2011, the department shall begin accepting applications for financial incentives for the installation of more efficient fuel oil and natural gas boilers and furnaces that replace existing boilers or furnaces that are not less than seven years old with an efficiency rating of not more than seventy-five per cent. A qualifying fuel oil furnace shall have an efficiency rating of not less than eighty-six per cent. A qualifying fuel oil boiler shall have an efficiency rating of not less than eighty-six per cent with thermal purge or temperature reset controls. A qualifying natural gas boiler shall have an annual fuel utilization efficiency rating of not less than ninety per cent and a qualifying natural gas furnace shall have an annual fuel utilization efficiency rating of not less than ninety-five per cent. The department shall review the current market conditions for such systems and equipment upgrades, including, but not limited to, any existing federal or state financial incentives, and establish the appropriate financial incentives under this program necessary to encourage such upgrades. Financial incentives shall provide private financial institutions with loan loss protection or grants to lower borrowing costs and, if the department deems it necessary, grants to the lending financial institution to lower borrowing costs and allow for a ten-year loan. Such financial incentive package shall ensure that the annual loan payment by the applicant shall be at not more than the projected annual energy savings less one hundred dollars. Any loan provided as a financial incentive pursuant to this subsection shall include the cost of any related incentives, as determined by the department. The department shall arrange with an electric distribution or gas company to provide for payment of any loan made as financial assistance under this subdivision through the loan recipient's monthly electric or gas bill, as applicable.

(d) Eligible entities seeking a loan under the loan program established in this section shall (1) contract with Connecticut-based licensed contractors, installers or tradesmen for the installation of an eligible in-state energy savings technology; (2) provide evidence of the cost of purchase and installation of the eligible in-state energy savings technology; and (3) periodically provide evidence of the operation and functionality of the eligible in-state energy savings technology to ensure that such technology is operating as intended during the term of the loan.

(e) The department shall develop a prescriptive one-page loan application. Such application shall include, but not be limited to: (1) Detailed information, specifications and documentation of the eligible in-state energy technology's installed costs and projected energy savings, and (2) for requests for loans in excess of one hundred thousand dollars, certification by a licensed professional engineer, licensed contractor, installer or tradesman with a state license held in good standing.

(f) On or before October 1, 2011, the department shall establish a plan that includes procedures and parameters for its energy savings infrastructure pilot program established pursuant to this section.

(g) On or before October 1, 2014, the department shall, in accordance with the provisions of section 11-4a of the general statutes, report to the joint standing committee of the General Assembly having cognizance of matters relating to energy with regard to the projects assisted by the energy savings infrastructure pilot program established pursuant to this section, the amount of public funding, the energy savings from the technologies installed and any recommendations for changes to the program, including, but not limited to, incentives that encourage consumers to install more efficient fuel oil and natural gas boilers and furnaces prior to failure or gross inefficiency of their current heating system.

Sec. 43. Section 16-49 of the general statutes is repealed and the following is substituted in lieu thereof (Effective July 1, 2011):

(a) As used in this section:

(1) "Company" means (A) any public service company other than a telephone company, that had more than one hundred thousand dollars of gross revenues in the state in the calendar year preceding the assessment year under this section, except any such company not providing service to retail customers in the state, (B) any telephone company that had more than one hundred thousand dollars of gross revenues in the state from telecommunications services in the calendar year preceding the assessment year under this section, except any such company not providing service to retail customers in the state, (C) any certified telecommunications provider that had more than one hundred thousand dollars of gross revenues in the state from telecommunications services in the calendar year preceding the assessment year under this section, except any such certified telecommunications provider not providing service to retail customers in the state, or (D) any electric supplier that had more than one hundred thousand dollars of gross revenues in the state in the calendar year preceding the assessment year under this section, except any such supplier not providing electric generation services to retail customers in the state;

(2) "Telecommunications services" means (A) in the case of telecommunications services provided by a telephone company, any service provided pursuant to a tariff approved by the [department] Department of Energy and Environmental Protection's Bureau of Energy and Bureau of Public Utility Control other than wholesale services and resold access and interconnections services, and (B) in the case of telecommunications services provided by a certified telecommunications provider other than a telephone company, any service provided pursuant to a tariff approved by the department and pursuant to a certificate of public convenience and necessity; and

(3) "Fiscal year" means the period beginning July first and ending June thirtieth.

(b) On or before July 15, 1999, and on or before May first, annually thereafter, each company shall report its intrastate gross revenues of the preceding calendar year to the department, which amount shall be subject to audit by the department. For each fiscal year, each company shall pay the [Department of Public Utility Control] department the company's share of all expenses of the department and the Office of Consumer Counsel for such fiscal year. On or before September first, annually, the department shall give to each company a statement which shall include: (1) The amount appropriated to the department and the Office of Consumer Counsel for the fiscal year beginning July first of the same year; (2) the total gross revenues of all companies; and (3) the proposed assessment against the company for the fiscal year beginning on July first of the same year, adjusted to reflect the estimated payment required under subdivision (1) of subsection (c) of this section. Such proposed assessment shall be calculated by multiplying the company's percentage share of the total gross revenues as specified in subdivision (2) of this subsection by the total revenue appropriated to the department and the Office of Consumer Counsel as specified in subdivision (1) of this subsection.

(c) Each company shall pay the department: (1) On or before June thirtieth, annually, an estimated payment for the expenses of the following year equal to twenty-five per cent of its assessment for the fiscal year ending on such June thirtieth, (2) on or before September thirtieth, annually, twenty-five per cent of its proposed assessment, adjusted to reflect any credit or amount due under the recalculated assessment for the preceding fiscal year, as determined by the department under subsection (d) of this section, provided if the company files an objection in accordance with subsection (e) of this section, it may withhold the amount stated in its objection, and (3) on or before the following December thirty-first and March thirty-first, annually, the remaining fifty per cent of its proposed assessment in two equal installments.

(d) Immediately following the close of each fiscal year, the department shall recalculate the proposed assessment of each company, based on the expenses, as determined by the Comptroller, of the department and the Office of Consumer Counsel for such fiscal year. On or before September first, annually, the department shall give to each company a statement showing the difference between its recalculated assessment and the amount previously paid by the company.

(e) Any company may object to a proposed or recalculated assessment by filing with the department, not later than September fifteenth of the year of said assessment, a petition stating the amount of the proposed or recalculated assessment to which it objects and the grounds upon which it claims such assessment is excessive, erroneous, unlawful or invalid. After a company has filed a petition, the department shall hold a hearing. After reviewing the company's petition and testimony, if any, the department shall issue an order in accordance with its findings. The company shall pay the department the amount indicated in the order not later than thirty days after the date of the order.

(f) The department shall remit all payments received under this section to the State Treasurer for deposit in the Consumer Counsel and Public Utility Control Fund established under section 16-48a. Such funds shall be accounted for as expenses recovered from public service companies and certified telecommunications providers. All payments made under this section shall be in addition to any taxes payable to the state under chapters 211, 212, 212a and 219.

(g) Any assessment unpaid on the due date or any portion of an assessment withheld after the due date under subsection (c) of this section shall be subject to interest at the rate of one and one-fourth per cent per month or fraction thereof, or fifty dollars, whichever is greater.

(h) Any company that fails to report in accordance with this section shall be subject to civil penalties in accordance with section 16-41.

Sec. 44. (NEW) (Effective from passage) Each state agency shall develop a plan to reduce its energy use by at least ten per cent and shall submit such plan to the Office of Policy and Management on or before October 1, 2011. On or before October 1, 2012, and annually thereafter, each state agency shall report, in accordance with the provisions of section 11-4a of the general statutes, to the joint standing committee of the General Assembly having cognizance of matters relating to energy regarding the plan and its implementation.

Sec. 45. (NEW) (Effective July 1, 2011) There is established within the Department of Energy and Environmental Protection an Office of Energy Efficient Businesses. The office shall provide in-state businesses (1) a single point of contact for any state business interested in energy efficiency, renewable energy or conservation projects, (2) information on loans and grants for energy efficiency, renewable energy projects and conservation, (3) audit and assessment services, including, but not limited to, outreach to businesses by qualified entities, and (4) any other service deemed relevant by said office.

Sec. 46. Sections 16-1b and 16-261a of the general statutes are repealed. (Effective July 1, 2011)

This act shall take effect as follows and shall amend the following sections:

Section 1

July 1, 2011

New section

Sec. 2

July 1, 2011

4-5

Sec. 3

July 1, 2011

4-38c

Sec. 4

July 1, 2011

16a-3a

Sec. 5

July 1, 2011

New section

Sec. 6

July 1, 2011

16-244c

Sec. 7

July 1, 2011

New section

Sec. 8

July 1, 2011

New section

Sec. 9

July 1, 2011

7-233e(b)

Sec. 10

July 1, 2011

New section

Sec. 11

from passage

New section

Sec. 12

July 1, 2011

New section

Sec. 13

July 1, 2011

New section

Sec. 14

from passage

New section

Sec. 15

July 1, 2011

New section

Sec. 16

July 1, 2011

New section

Sec. 17

July 1, 2011

New section

Sec. 18

July 1, 2011

7-148(c)(6)(B)

Sec. 19

July 1, 2011

New section

Sec. 20

July 1, 2011

16a-48

Sec. 21

July 1, 2011

16-243i

Sec. 22

July 1, 2011

16-245(g)

Sec. 23

July 1, 2011

New section

Sec. 24

July 1, 2011

New section

Sec. 25

July 1, 2011

New section

Sec. 26

July 1, 2011

New section

Sec. 27

July 1, 2011

New section

Sec. 28

July 1, 2011

New section

Sec. 29

July 1, 2011

New section

Sec. 30

July 1, 2011

New section

Sec. 31

July 1, 2011

New section

Sec. 32

July 1, 2011

New section

Sec. 33

October 1, 2011

New section

Sec. 34

July 1, 2011

New section

Sec. 35

July 1, 2011

New section

Sec. 36

July 1, 2011

16-245o

Sec. 37

July 1, 2011

16-245d

Sec. 38

July 1, 2011

New section

Sec. 39

July 1, 2011

New section

Sec. 40

July 1, 2011

16-245z

Sec. 41

July 1, 2011

17b-801

Sec. 42

July 1, 2011

New section

Sec. 43

July 1, 2011

16-49

Sec. 44

from passage

New section

Sec. 45

July 1, 2011

New section

Sec. 46

July 1, 2011

Repealer section

ET

Joint Favorable Subst.

 

PD

Joint Favorable

 

JUD

Joint Favorable

 

ENV

Joint Favorable

 

FIN

Joint Favorable

 

APP

Joint Favorable

 
feedback