Bill Text: CA SB155 | 2019-2020 | Regular Session | Amended

NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: California Renewables Portfolio Standard Program: integrated resource plans.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Passed) 2019-10-02 - Chaptered by Secretary of State. Chapter 401, Statutes of 2019. [SB155 Detail]

Download: California-2019-SB155-Amended.html

Amended  IN  Senate  May 01, 2019
Amended  IN  Senate  March 27, 2019

CALIFORNIA LEGISLATURE— 2019–2020 REGULAR SESSION

Senate Bill No. 155


Introduced by Senator Bradford

January 23, 2019


An act to amend Sections 399.15, 399.13, 399.16, 399.30, 454.5, 454.52, and 454.54 of the Public Utilities Code, relating to energy.


LEGISLATIVE COUNSEL'S DIGEST


SB 155, as amended, Bradford. California Renewables Portfolio Standard Program: integrated resource plans.
Under existing law, the Public Utilities Commission has regulatory authority over public utilities, including electrical corporations. The California Renewables Portfolio Standard Program requires the Public Utilities Commission to establish a renewables portfolio standard requiring all retail sellers, defined as including electrical corporations, electric service providers, and community choice aggregators, to procure a minimum quantity of electricity products from eligible renewable energy resources, as defined, so that the total kilowatthours of those products sold to their retail end-use customers achieves 25% of retail sales by December 31, 2016, 33% by December 31, 2020, 44% by December 31, 2024, 52% by December 31, 2027, and 60% by December 31, 2030. Existing law requires the commission to direct each retail seller to prepare and submit an annual report to the commission that includes specified information on the retail seller’s compliance with requirements related to eligible renewable energy resource procurement.
This bill would authorize the commission to audit any retail seller to assess its compliance with the program’s renewables portfolio standard procurement requirements for the current or any prior compliance period and to issue mandates and recommendations to ensure sufficient corrective action is taken to achieve full compliance with those procurement requirements. require the commission to review each annual compliance report filed by a retail seller, to notify a retail seller if the commission has determined, based upon its review, that the retail seller may be at risk of not satisfying the renewable procurement requirements for the then-current or future compliance period, and to provide recommendations in that circumstance regarding satisfying those requirements.
Existing law requires the commission to adopt a process for each load-serving entity, defined as an electrical corporation, electric service provider, or community choice aggregator serving end-use customers in the state, to file an integrated resource plan and a schedule for periodic updates to the plan to ensure that load-serving entities accomplish specified objectives. Existing law requires each load-serving entity to prepare and file an integrated resource plan consistent with those objectives on a time schedule directed by the commission and subject to commission review. Existing law additionally requires that the integrated resource plan of each load-serving entity contribute to a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy resources in a cost-effective manner, meets the emissions reduction targets for greenhouse gases established by the State Air Resources Board for the electricity sector, and prevents cost shifting among load-serving entities.
This bill would expressly require the commission to ensure that load-serving entities do what is required to be done by their integrated resource plans, and to enforce, as if it were a requirement in the plan, a ensure that load-serving entities comply with an existing requirement that at least 65% of the procurement that a retail seller counts toward the renewables portfolio standard requirement of each compliance period be from contracts of 10 years or more in duration or from its ownership or ownership agreements from eligible renewable energy resources.
Vote: MAJORITY   k:label="fractionType: LAW_SECTION" xlink:type="locator">Section 399.15 of the Public Utilities Code is amended to read:
399.15.

(a)In order to fulfill unmet long-term resource needs, the commission shall establish a renewables portfolio standard requiring all retail sellers to procure a minimum quantity of electricity products from eligible renewable energy resources as a specified percentage of total kilowatthours sold to their retail end-use customers each compliance period to achieve the targets established under this article. For any retail seller procuring at least 14 percent of retail sales from eligible renewable energy resources in 2010, the deficits associated with any previous renewables portfolio standard shall not be added to any procurement requirement pursuant to this article.

(b)The commission shall implement renewables portfolio standard procurement requirements only as follows:

(1)Each retail seller shall procure a minimum quantity of eligible renewable energy resources for each of the following compliance periods:

(A)January 1, 2011, to December 31, 2013, inclusive.

(B)January 1, 2014, to December 31, 2016, inclusive.

(C)January 1, 2017, to December 31, 2020, inclusive.

(D)January 1, 2021, to December 31, 2024, inclusive.

(E)January 1, 2025, to December 31, 2027, inclusive.

(F)January 1, 2028, to December 31, 2030, inclusive.

(2)(A)No later than January 1, 2017, the commission shall establish the quantity of electricity products from eligible renewable energy resources to be procured by the retail seller for each compliance period. These quantities shall be established in the same manner for all retail sellers and result in the same percentages used to establish compliance period quantities for all retail sellers.

(B)In establishing quantities for the compliance period from January 1, 2011, to December 31, 2013, inclusive, the commission shall require procurement for each retail seller equal to an average of 20 percent of retail sales. For the following compliance periods, the quantities shall reflect reasonable progress in each of the intervening years sufficient to ensure that the procurement of electricity products from eligible renewable energy resources achieves 25 percent of retail sales by December 31, 2016, 33 percent by December 31, 2020, 44 percent by December 31, 2024, 52 percent by December 31, 2027, and 60 percent by December 31, 2030. The commission shall establish appropriate three-year compliance periods for all subsequent years that require retail sellers to procure not less than 60 percent of retail sales of electricity products from eligible renewable energy resources.

(C)Retail sellers shall be obligated to procure no less than the quantities associated with all intervening years by the end of each compliance period. Retail sellers shall not be required to demonstrate a specific quantity of procurement for any individual intervening year.

(3)The commission may require the procurement of eligible renewable energy resources in excess of the quantities specified in paragraph (2).

(4)Only for purposes of establishing the renewables portfolio standard procurement requirements of paragraph (1) and determining the quantities pursuant to paragraph (2), the commission shall include all electricity sold to retail customers by the Department of Water Resources pursuant to Division 27 (commencing with Section 80000) of the Water Code in the calculation of retail sales by an electrical corporation.

(5)The commission shall waive enforcement of this section if it finds that the retail seller has demonstrated any of the following conditions are beyond the control of the retail seller and will prevent compliance:

(A)There is inadequate transmission capacity to allow for sufficient electricity to be delivered from proposed eligible renewable energy resource projects using the current operational protocols of the Independent System Operator. In making its findings relative to the existence of this condition with respect to a retail seller that owns transmission lines, the commission shall consider both of the following:

(i)Whether the retail seller has undertaken, in a timely fashion, reasonable measures under its control and consistent with its obligations under local, state, and federal laws and regulations, to develop and construct new transmission lines or upgrades to existing lines intended to transmit electricity generated by eligible renewable energy resources. In determining the reasonableness of a retail seller’s actions, the commission shall consider the retail seller’s expectations for full-cost recovery for these transmission lines and upgrades.

(ii)Whether the retail seller has taken all reasonable operational measures to maximize cost-effective deliveries of electricity from eligible renewable energy resources in advance of transmission availability.

(B)Permitting, interconnection, or other circumstances that delay procured eligible renewable energy resource projects, or there is an insufficient supply of eligible renewable energy resources available to the retail seller. In making a finding that this condition prevents timely compliance, the commission shall consider whether the retail seller has done all of the following:

(i)Prudently managed portfolio risks, including relying on a sufficient number of viable projects.

(ii)Sought to develop one of the following: its own eligible renewable energy resources, transmission to interconnect to eligible renewable energy resources, or energy storage used to integrate eligible renewable energy resources. This clause shall not require an electrical corporation to pursue development of eligible renewable energy resources pursuant to Section 399.14.

(iii)Procured an appropriate minimum margin of procurement above the minimum procurement level necessary to comply with the renewables portfolio standard to compensate for foreseeable delays or insufficient supply.

(iv)Taken reasonable measures, under the control of the retail seller, to procure cost-effective distributed generation and allowable unbundled renewable energy credits.

(C)Unanticipated curtailment of eligible renewable energy resources if the waiver would not result in an increase in greenhouse gas emissions.

(D)Unanticipated increase in retail sales due to transportation electrification. In making a finding that this condition prevents timely compliance, the commission shall consider both of the following:

(i)Whether transportation electrification significantly exceeded forecasts in that retail seller’s service territory based on the best and most recently available information filed with the State Air Resources Board, the Energy Commission, or another state agency.

(ii)Whether the retail seller has taken reasonable measures to procure sufficient resources to account for unanticipated increases in retail sales due to transportation electrification.

(6)If the commission waives the compliance requirements of this section, the commission shall establish additional reporting requirements on the retail seller to demonstrate that all reasonable actions under the control of the retail seller are taken in each of the intervening years sufficient to satisfy future procurement requirements.

(7)The commission shall not waive enforcement pursuant to this section, unless the retail seller demonstrates that it has taken all reasonable actions under its control, as set forth in paragraph (5), to achieve full compliance.

(8)If a retail seller fails to procure sufficient eligible renewable energy resources to comply with a procurement requirement pursuant to paragraphs (1) and (2) and fails to obtain an order from the commission waiving enforcement pursuant to paragraph (5), the commission shall assess penalties for noncompliance. A schedule of penalties shall be adopted by the commission that shall be comparable for electrical corporations and other retail sellers. For electrical corporations, the cost of any penalties shall not be collected in rates. Any penalties collected under this article shall be deposited into the Electric Program Investment Charge Fund and used for the purposes described in Chapter 8.1 (commencing with Section 25710) of Division 15 of the Public Resources Code.

(9)Deficits associated with the compliance period shall not be added to a future compliance period.

(10)The commission may audit any retail seller to assess its compliance with the renewables portfolio standard procurement requirements of this chapter for the current or any prior compliance period. The commission may issue mandates and recommendations to ensure sufficient corrective action is taken to achieve full compliance with the renewables portfolio standard procurement requirements.

(c)The commission shall establish a limitation for each electrical corporation on the procurement expenditures for all eligible renewable energy resources used to comply with the renewables portfolio standard. This limitation shall be set at a level that prevents disproportionate rate impacts.

(d)If the cost limitation for an electrical corporation is insufficient to support the projected costs of meeting the renewables portfolio standard procurement requirements, the electrical corporation may refrain from entering into new contracts or constructing facilities beyond the quantity that can be procured within the limitation, unless eligible renewable energy resources can be procured without exceeding a de minimis increase in rates, consistent with the long-term procurement plan established for the electrical corporation pursuant to Section 454.5.

(e)(1)The commission shall monitor the status of the cost limitation for each electrical corporation in order to ensure compliance with this article.

(2)If the commission determines that an electrical corporation may exceed its cost limitation prior to achieving the renewables portfolio standard procurement requirements, the commission shall do both of the following within 60 days of making that determination:

(A)Investigate and identify the reasons why the electrical corporation may exceed its annual cost limitation.

(B)Notify the appropriate policy and fiscal committees of the Legislature that the electrical corporation may exceed its cost limitation, and include the reasons why the electrical corporation may exceed its cost limitation.

(f)The establishment of a renewables portfolio standard shall not constitute implementation by the commission of the federal Public Utility Regulatory Policies Act of 1978 (Public Law 95-617).

SECTION 1.

 Section 399.13 of the Public Utilities Code is amended to read:

399.13.
 (a) (1) The commission shall direct each electrical corporation to annually prepare a renewable energy procurement plan that includes the elements specified in paragraph (5), (6), to satisfy its obligations under the renewables portfolio standard. To the extent feasible, this procurement plan shall be proposed, reviewed, and adopted by the commission as part of, and pursuant to, a general procurement plan process. The commission shall require each electrical corporation to review and update its renewable energy procurement plan as it determines to be necessary. The commission shall require all other retail sellers to prepare and submit renewable energy procurement plans that address the requirements identified in paragraph (5). (6).
(2) Every electrical corporation that owns electrical transmission facilities shall annually prepare, as part of the Federal Energy Regulatory Commission Order 890 process, and submit to the commission, a report identifying any electrical transmission facility, upgrade, or enhancement that is reasonably necessary to achieve the renewables portfolio standard procurement requirements of this article. Each report shall look forward at least five years and, to ensure that adequate investments are made in a timely manner, shall include a preliminary schedule when an application for a certificate of public convenience and necessity will be made, pursuant to Chapter 5 (commencing with Section 1001), for any electrical transmission facility identified as being reasonably necessary to achieve the renewable energy resources procurement requirements of this article. Each electrical corporation that owns electrical transmission facilities shall ensure that project-specific interconnection studies are completed in a timely manner.
(3) The commission shall direct each retail seller to prepare and submit an annual compliance report that includes all of the following:
(A) The current status and progress made during the prior year toward procurement of eligible renewable energy resources as a percentage of retail sales, including, if applicable, the status of any necessary siting and permitting approvals from federal, state, and local agencies for those eligible renewable energy resources procured by the retail seller, and the current status of compliance with the portfolio content requirements of subdivision (c) of Section 399.16, including procurement of eligible renewable energy resources located outside the state and within the WECC and unbundled renewable energy credits.
(B) If the retail seller is an electrical corporation, the current status and progress made during the prior year toward construction of, and upgrades to, transmission and distribution facilities and other electrical system components it owns to interconnect eligible renewable energy resources and to supply the electricity generated by those resources to load, including the status of planning, siting, and permitting transmission facilities by federal, state, and local agencies.
(C) Recommendations to remove impediments to making progress toward achieving the renewable energy resources procurement requirements established pursuant to this article.
(4) The commission shall review each annual compliance report filed by a retail seller. The commission shall notify a retail seller if the commission has determined, based upon its review, that the retail seller may be at risk of not satisfying the renewable energy procurement requirements for the then-current or a future compliance period and shall provide recommendations in that circumstance regarding satisfying those requirements.

(4)

(5) The commission shall adopt, by rulemaking, all of the following:
(A) A process that provides criteria for the rank ordering and selection of least-cost and best-fit eligible renewable energy resources to comply with the California Renewables Portfolio Standard Program obligations on a total cost and best-fit basis. This process shall take into account all of the following:
(i) Estimates of indirect costs associated with needed transmission investments.
(ii) The cost impact of procuring the eligible renewable energy resources on the electrical corporation’s electricity portfolio.
(iii) The viability of the project to construct and reliably operate the eligible renewable energy resource, including the developer’s experience, the feasibility of the technology used to generate electricity, and the risk that the facility will not be built, or that construction will be delayed, with the result that electricity will not be supplied as required by the contract.
(iv) Workforce recruitment, training, and retention efforts, including the employment growth associated with the construction and operation of eligible renewable energy resources and goals for recruitment and training of women, minorities, and disabled veterans.
(v) (I) Estimates of electrical corporation expenses resulting from integrating and operating eligible renewable energy resources, including, but not limited to, any additional wholesale energy and capacity costs associated with integrating each eligible renewable resource.
(II) No later than December 31, 2015, the commission shall approve a methodology for determining the integration costs described in subclause (I).
(vi) Consideration of any statewide greenhouse gas emissions limit established pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code).
(vii) Consideration of capacity and system reliability of the eligible renewable energy resource to ensure grid reliability.
(B) Rules permitting retail sellers to accumulate, beginning January 1, 2011, excess procurement in one compliance period to be applied to any subsequent compliance period. The rules shall apply equally to all retail sellers. In determining the quantity of excess procurement for the applicable compliance period, the commission shall retain the rules adopted by the commission and in effect as of January 1, 2015, for the compliance period specified in subparagraphs (A) to (C), inclusive, of paragraph (1) of subdivision (b) of Section 399.15. For any subsequent compliance period, the rules shall allow the following:
(i) For electricity products meeting the portfolio content requirements of paragraph (1) of subdivision (b) of Section 399.16, contracts of any duration may count as excess procurement.
(ii) Electricity products meeting the portfolio content requirements of paragraph (2) or (3) of subdivision (b) of Section 399.16 shall not be counted as excess procurement. Contracts of any duration for electricity products meeting the portfolio content requirements of paragraph (2) or (3) of subdivision (b) of Section 399.16 that are credited towards a compliance period shall not be deducted from a retail seller’s procurement for purposes of calculating excess procurement.
(iii) If a retail seller notifies the commission that it will comply with the provisions of subdivision (b) for the compliance period beginning January 1, 2017, the provisions of clauses (i) and (ii) shall take effect for that retail seller for that compliance period.
(C) Standard terms and conditions to be used by all electrical corporations in contracting for eligible renewable energy resources, including performance requirements for renewable generators. A contract for the purchase of electricity generated by an eligible renewable energy resource, at a minimum, shall include the renewable energy credits associated with all electricity generation specified under the contract. The standard terms and conditions shall include the requirement that, no later than six months after the commission’s approval of an electricity purchase agreement entered into pursuant to this article, the following information about the agreement shall be disclosed by the commission: party names, resource type, project location, and project capacity.
(D) An appropriate minimum margin of procurement above the minimum procurement level necessary to comply with the renewables portfolio standard to mitigate the risk that renewable projects planned or under contract are delayed or canceled. This paragraph does not preclude an electrical corporation from voluntarily proposing a margin of procurement above the appropriate minimum margin established by the commission.

(5)

(6) Consistent with the goal of increasing California’s reliance on eligible renewable energy resources, the renewable energy procurement plan shall include all of the following:
(A) An assessment of annual or multiyear portfolio supplies and demand to determine the optimal mix of eligible renewable energy resources with deliverability characteristics that may include peaking, dispatchable, baseload, firm, and as-available capacity.
(B) Potential compliance delays related to the conditions described in paragraph (5) of subdivision (b) of Section 399.15.
(C) A bid solicitation setting forth the need for eligible renewable energy resources of each deliverability characteristic, required online dates, and locational preferences, if any.
(D) A status update on the development schedule of all eligible renewable energy resources currently under contract.
(E) Consideration of mechanisms for price adjustments associated with the costs of key components for eligible renewable energy resource projects with online dates more than 24 months after the date of contract execution.
(F) An assessment of the risk that an eligible renewable energy resource will not be built, or that construction will be delayed, with the result that electricity will not be delivered as required by the contract.

(6)

(7) In soliciting and procuring eligible renewable energy resources, each electrical corporation shall offer contracts of no less than 10 years duration, unless the commission approves of a contract of shorter duration.

(7)

(8) (A) In soliciting and procuring eligible renewable energy resources for California-based projects, each electrical corporation shall give preference to renewable energy projects that provide environmental and economic benefits to communities afflicted with poverty or high unemployment, or that suffer from high emission levels of toxic air contaminants, criteria air pollutants, and greenhouse gases.
(B) Subparagraph (A) applies to all procurement of eligible renewable energy resources for California-based projects, whether the procurement occurs through all-source requests for offers, eligible renewable resources only requests for offers, or other procurement mechanisms. This subparagraph is declaratory of existing law.

(8)

(9) In soliciting and procuring eligible renewable energy resources, each retail seller shall consider the best-fit attributes of resource types that ensure a balanced resource mix to maintain the reliability of the electrical grid.
(b) A retail seller may enter into a combination of long- and short-term contracts for electricity and associated renewable energy credits. Beginning January 1, 2021, at least 65 percent of the procurement a retail seller counts toward the renewables portfolio standard requirement of each compliance period shall be from its contracts of 10 years or more in duration or in its ownership or ownership agreements for eligible renewable energy resources.
(c) The commission shall review and accept, modify, or reject each electrical corporation’s renewable energy resource procurement plan prior to the commencement of renewable energy procurement pursuant to this article by an electrical corporation. The commission shall assess adherence to the approved renewable energy resource procurement plans in determining compliance with the obligations of this article.
(d) Unless previously preapproved by the commission, an electrical corporation shall submit a contract for the generation of an eligible renewable energy resource to the commission for review and approval consistent with an approved renewable energy resource procurement plan. If the commission determines that the bid prices are elevated due to a lack of effective competition among the bidders, the commission shall direct the electrical corporation to renegotiate the contracts or conduct a new solicitation.
(e) If an electrical corporation fails to comply with a commission order adopting a renewable energy resource procurement plan, the commission shall exercise its authority to require compliance.
(f) (1) The commission may authorize a procurement entity to enter into contracts on behalf of customers of a retail seller for electricity products from eligible renewable energy resources to satisfy the retail seller’s renewables portfolio standard procurement requirements. The commission shall not require any person or corporation to act as a procurement entity or require any party to purchase eligible renewable energy resources from a procurement entity.
(2) Subject to review and approval by the commission, the procurement entity shall be permitted to recover reasonable administrative and procurement costs through the retail rates of end-use customers that are served by the procurement entity and are directly benefiting from the procurement of eligible renewable energy resources.
(g) Procurement and administrative costs associated with contracts entered into by an electrical corporation for eligible renewable energy resources pursuant to this article and approved by the commission are reasonable and prudent and shall be recoverable in rates.
(h) Construction, alteration, demolition, installation, and repair work on an eligible renewable energy resource that receives production incentives pursuant to Section 25742 of the Public Resources Code, including work performed to qualify, receive, or maintain production incentives, are “public works” for the purposes of Chapter 1 (commencing with Section 1720) of Part 7 of Division 2 of the Labor Code.

SEC. 2.

 Section 399.16 of the Public Utilities Code is amended to read:

399.16.
 (a) Various electricity products from eligible renewable energy resources located within the WECC transmission network service area shall be eligible to comply with the renewables portfolio standard procurement requirements in Section 399.15. These electricity products may be differentiated by their impacts on the operation of the grid in supplying electricity, as well as meeting the requirements of this article.
(b) Consistent with the goals of procuring the least-cost and best-fit electricity products from eligible renewable energy resources that meet project viability principles adopted by the commission pursuant to paragraph (4) (5) of subdivision (a) of Section 399.13 and that provide the benefits set forth in Section 399.11, a balanced portfolio of eligible renewable energy resources shall be procured consisting of the following portfolio content categories:
(1) Eligible renewable energy resource electricity products that meet either of the following criteria:
(A) Have a first point of interconnection with a California balancing authority, have a first point of interconnection with distribution facilities used to serve end users within a California balancing authority area, or are scheduled from the eligible renewable energy resource into a California balancing authority without substituting electricity from another source. The use of another source to provide real-time ancillary services required to maintain an hourly or subhourly import schedule into a California balancing authority shall be permitted, but only the fraction of the schedule actually generated by the eligible renewable energy resource shall count toward this portfolio content category.
(B) Have an agreement to dynamically transfer electricity to a California balancing authority.
(2) Firmed and shaped eligible renewable energy resource electricity products providing incremental electricity and scheduled into a California balancing authority.
(3) Eligible renewable energy resource electricity products, or any fraction of the electricity generated, including unbundled renewable energy credits, that do not qualify under the criteria of paragraph (1) or (2).
(c) In order to achieve a balanced portfolio, all retail sellers shall meet the following requirements for all procurement credited toward each compliance period:
(1) Not less than 50 percent for the compliance period ending December 31, 2013, 65 percent for the compliance period ending December 31, 2016, and 75 percent for each compliance period thereafter, of the eligible renewable energy resource electricity products associated with contracts executed after June 1, 2010, shall meet the product content requirements of paragraph (1) of subdivision (b).
(2) Not more than 25 percent for the compliance period ending December 31, 2013, 15 percent for the compliance period ending December 31, 2016, and 10 percent for each compliance period thereafter, of the eligible renewable energy resource electricity products associated with contracts executed after June 1, 2010, shall meet the product content requirements of paragraph (3) of subdivision (b).
(3) Any renewable energy resources contracts executed on or after June 1, 2010, not subject to the limitations of paragraph (1) or (2), shall meet the product content requirements of paragraph (2) of subdivision (b).
(4) For purposes of electric service providers only, the restrictions in this subdivision on crediting eligible renewable energy resource electricity products to each compliance period shall apply to contracts executed after January 13, 2011.
(d) Any contract or ownership agreement originally executed prior to June 1, 2010, shall count in full toward the procurement requirements established pursuant to this article, if all of the following conditions are met:
(1) The renewable energy resource was eligible under the rules in place as of the date when the contract was executed.
(2) For an electrical corporation, the contract has been approved by the commission, even if that approval occurs after June 1, 2010.
(3) Any contract amendments or modifications occurring after June 1, 2010, do not increase the nameplate capacity or expected quantities of annual generation, or substitute a different renewable energy resource. The duration of the contract may be extended if the original contract specified a procurement commitment of 15 or more years.
(e) A retail seller may apply to the commission for a reduction of a procurement content requirement of subdivision (c). The commission may reduce a procurement content requirement of subdivision (c) to the extent the retail seller demonstrates that it cannot comply with that subdivision because of conditions beyond the control of the retail seller as provided in paragraph (5) of subdivision (b) of Section 399.15. The commission shall not, under any circumstance, reduce the obligation specified in paragraph (1) of subdivision (c) below 65 percent for any compliance period obligation after December 31, 2016.

SEC. 3.

 Section 399.30 of the Public Utilities Code is amended to read:

399.30.
 (a) (1) To fulfill unmet long-term generation resource needs, each local publicly owned electric utility shall adopt and implement a renewable energy resources procurement plan that requires the utility to procure a minimum quantity of electricity products from eligible renewable energy resources, including renewable energy credits, as a specified percentage of total kilowatthours sold to the utility’s retail end-use customers, each compliance period, to achieve the targets of subdivision (c).
(2) Beginning January 1, 2019, a local publicly owned electric utility subject to Section 9621 shall incorporate the renewable energy resources procurement plan required by this section as part of a broader integrated resource plan developed and adopted pursuant to Section 9621.
(b) The governing board shall implement procurement targets for a local publicly owned electric utility that require the utility to procure a minimum quantity of eligible renewable energy resources for each of the following compliance periods:
(1) January 1, 2011, to December 31, 2013, inclusive.
(2) January 1, 2014, to December 31, 2016, inclusive.
(3) January 1, 2017, to December 31, 2020, inclusive.
(4) January 1, 2021, to December 31, 2024, inclusive.
(5) January 1, 2025, to December 31, 2027, inclusive.
(6) January 1, 2028, to December 31, 2030, inclusive.
(c) The governing board of a local publicly owned electric utility shall ensure all of the following:
(1) The quantities of eligible renewable energy resources to be procured for the compliance period from January 1, 2011, to December 31, 2013, inclusive, are equal to an average of 20 percent of retail sales.
(2) The quantities of eligible renewable energy resources to be procured for all other compliance periods reflect reasonable progress in each of the intervening years sufficient to ensure that the procurement of electricity products from eligible renewable energy resources achieves 25 percent of retail sales by December 31, 2016, 33 percent by December 31, 2020, 44 percent by December 31, 2024, 52 percent by December 31, 2027, and 60 percent by December 31, 2030. The Energy Commission shall establish appropriate multiyear compliance periods for all subsequent years that require the local publicly owned electric utility to procure not less than 60 percent of retail sales of electricity products from eligible renewable energy resources.
(3) A local publicly owned electric utility shall adopt procurement requirements consistent with Section 399.16.
(4) Beginning January 1, 2014, in calculating the procurement requirements under this article, a local publicly owned electric utility may exclude from its total retail sales the kilowatthours generated by an eligible renewable energy resource that is credited to a participating customer pursuant to a voluntary green pricing or shared renewable generation program. Any exclusion shall be limited to electricity products that do not meet the portfolio content criteria set forth in paragraph (2) or (3) of subdivision (b) of Section 399.16. Any renewable energy credits associated with electricity credited to a participating customer shall not be used for compliance with procurement requirements under this article, shall be retired on behalf of the participating customer, and shall not be further sold, transferred, or otherwise monetized for any purpose. To the extent possible for generation that is excluded from retail sales under this subdivision, a local publicly owned electric utility shall seek to procure those eligible renewable energy resources that are located in reasonable proximity to program participants.
(d) (1) The governing board of a local publicly owned electric utility shall adopt procurement requirements consistent with subparagraph (B) of paragraph (4) (5) of subdivision (a) of, and subdivision (b) of, Section 399.13.
(2) The governing board of a local publicly owned electric utility may adopt the following measures:
(A) Conditions that allow for delaying timely compliance consistent with subdivision (b) of Section 399.15.
(B) Cost limitations for procurement expenditures consistent with subdivision (c) of Section 399.15.
(e) The governing board of the local publicly owned electric utility shall adopt a program for the enforcement of this article. The program shall be adopted at a publicly noticed meeting offering all interested parties an opportunity to comment. Not less than 30 days’ notice shall be given to the public of any meeting held for purposes of adopting the program. Not less than 10 days’ notice shall be given to the public before any meeting is held to make a substantive change to the program.
(f) Each local publicly owned electric utility shall annually post notice, in accordance with the Ralph M. Brown Act (Chapter 9 (commencing with Section 54950) of Part 1 of Division 2 of Title 5 of the Government Code), whenever its governing body will deliberate in public on its renewable energy resources procurement plan.
(g) A public utility district that receives all of its electricity pursuant to a preference right adopted and authorized by the United States Congress pursuant to Section 4 of the Trinity River Division Act of August 12, 1955 (Public Law 84-386), shall be in compliance with the renewable energy procurement requirements of this article.
(h) For a local publicly owned electric utility that was in existence on or before January 1, 2009, that provides retail electric service to 15,000 or fewer customer accounts in California, and is interconnected to a balancing authority located outside this state but within the WECC, an eligible renewable energy resource includes a facility that is located outside California that is connected to the WECC transmission system, if all of the following conditions are met:
(1) The electricity generated by the facility is procured by the local publicly owned electric utility, is delivered to the balancing authority area in which the local publicly owned electric utility is located, and is not used to fulfill renewable energy procurement requirements of other states.
(2) The local publicly owned electric utility participates in, and complies with, the accounting system administered by the Energy Commission pursuant to this article.
(3) The Energy Commission verifies that the electricity generated by the facility is eligible to meet the renewables portfolio standard procurement requirements.
(i) Notwithstanding subdivision (a), for a local publicly owned electric utility that is a joint powers authority of districts established pursuant to state law on or before January 1, 2005, that furnishes electric services other than to residential customers, and is formed pursuant to the Irrigation District Law (Division 11 (commencing with Section 20500) of the Water Code), the percentage of total kilowatthours sold to the district’s retail end-use customers, upon which the renewables portfolio standard procurement requirements in subdivision (b) are calculated, shall be based on the authority’s average retail sales over the previous seven years. If the authority has not furnished electric service for seven years, then the calculation shall be based on average retail sales over the number of completed years during which the authority has provided electric service.
(j) A local publicly owned electric utility in a city and county that only receives greater than 67 percent of its electricity sources from hydroelectric generation located within the state that it owns and operates, and that does not meet the definition of a “renewable electrical generation facility” pursuant to Section 25741 of the Public Resources Code, shall be required to procure eligible renewable energy resources, including renewable energy credits, to meet only the electricity demands unsatisfied by its hydroelectric generation in any given year, in order to satisfy its renewable energy procurement requirements.
(k) (1) For purposes of this subdivision, “large hydroelectric generation” means electricity generated from an existing hydroelectric facility located within the state that does not qualify as an eligible renewable energy resource and, as of January 1, 2018, was owned by a local publicly owned electric utility, the federal government as a part of the federal Central Valley Project, or a joint powers agency formed and created pursuant to the Joint Exercise of Powers Act (Chapter 5 (commencing with Section 6500) of Division 7 of Title 1 of the Government Code).
(2) If, during a year within a compliance period set forth in subdivision (b), a local publicly owned electric utility receives more than 40 percent of its retail sales from large hydroelectric generation under an ownership agreement or contract in effect as of January 1, 2018, it is not required to procure eligible renewable energy resources that exceed the lesser of the following for that year:
(A) The portion of the local publicly owned electric utility’s retail sales unsatisfied by the local publicly owned electric utility’s large hydroelectric generation.
(B) The soft target adopted by the Energy Commission for the intervening years of the relevant compliance period.
(3) An extension or renewal of a procurement agreement shall not be eligible to count towards the determination that the local publicly owned electric utility receives more than 40 percent of its retail sales from large hydroelectric generation in any year. This paragraph shall not apply to any agreement in effect on January 1, 2015, between a local publicly owned electric utility and the Western Area Power Administration or federal government as part of the federal Central Valley Project.
(4) The Energy Commission shall adjust the total quantities of eligible renewable energy resources to be procured by a local publicly owned electric utility for a compliance period to reflect any reductions required pursuant to paragraph (2).
(5) This subdivision does not modify the compliance obligation of a local publicly owned electric utility to satisfy the requirements of subdivision (c) of Section 399.16.
(l) (1) (A) For purposes of this subdivision, “unavoidable long-term contracts and ownership agreements” means commitments for electricity from a coal-fired powerplant, located outside the state, originally entered into by a local publicly owned electric utility before June 1, 2010, that is not subsequently modified to result in an extension of the duration of the agreement or result in an increase in total quantities of energy delivered during any compliance period set forth in subdivision (b).
(B) The governing board of a local publicly owned electric utility shall demonstrate in its renewable energy resources procurement plan required pursuant to subdivision (f) that any cancellation or divestment of the commitment would result in significant economic harm to its retail customers that cannot be substantially mitigated through resale, transfer to another entity, early closure of the facility, or other feasible measures.
(2) For the compliance period set forth in paragraph (4) of subdivision (b), a local publicly owned electric utility meeting the requirement of subparagraph (B) of paragraph (1) may adjust its renewable energy procurement targets to ensure that the procurement of additional electricity from eligible renewable energy resources, in combination with the procurement of electricity from unavoidable long-term contracts and ownership agreements, does not exceed the total retail sales of the local publicly owned electric utility during that compliance period. The local publicly owned electric utility may limit its procurement of eligible renewable energy resources for that compliance period to no less than an average of 33 percent of its retail sales.
(3) The Energy Commission shall approve any reductions in procurement targets proposed by a local publicly owned electric utility if it determines that the requirements of this subdivision are satisfied.
(m) A local publicly owned electric utility shall retain discretion over both of the following:
(1) The mix of eligible renewable energy resources procured by the utility and those additional generation resources procured by the utility for purposes of ensuring resource adequacy and reliability.
(2) The reasonable costs incurred by the utility for eligible renewable energy resources owned by the utility.
(n) The Energy Commission shall adopt regulations specifying procedures for enforcement of this article. The regulations shall include a public process under which the Energy Commission may issue a notice of violation and correction against a local publicly owned electric utility for failure to comply with this article, and for referral of violations to the State Air Resources Board for penalties pursuant to subdivision (o).
(o) (1) Upon a determination by the Energy Commission that a local publicly owned electric utility has failed to comply with this article, the Energy Commission shall refer the failure to comply with this article to the State Air Resources Board, which may impose penalties to enforce this article consistent with Part 6 (commencing with Section 38580) of Division 25.5 of the Health and Safety Code. Any penalties imposed shall be comparable to those adopted by the commission for noncompliance by retail sellers.
(2) Any penalties collected by the State Air Resources Board pursuant to this article shall be deposited in the Air Pollution Control Fund and, upon appropriation by the Legislature, shall be expended for reducing emissions of air pollution or greenhouse gases within the same geographic area as the local publicly owned electric utility.

SEC. 4.

 Section 454.5 of the Public Utilities Code is amended to read:

454.5.
 (a) The commission shall specify the allocation of electricity, including quantity, characteristics, and duration of electricity delivery, that the Department of Water Resources shall provide under its power purchase agreements to the customers of each electrical corporation, which shall be reflected in the electrical corporation’s proposed procurement plan. Each electrical corporation shall file a proposed procurement plan with the commission not later than 60 days after the commission specifies the allocation of electricity. The proposed procurement plan shall specify the date that the electrical corporation intends to resume procurement of electricity for its retail customers, consistent with its obligation to serve. After the commission’s adoption of a procurement plan, the commission shall allow not less than 60 days before the electrical corporation resumes procurement pursuant to this section.
(b) An electrical corporation’s proposed procurement plan shall include, but not be limited to, all of the following:
(1) An assessment of the price risk associated with the electrical corporation’s portfolio, including any utility-retained generation, existing power purchase and exchange contracts, and proposed contracts or purchases under which an electrical corporation will procure electricity, electricity demand reductions, and electricity-related products and the remaining open position to be served by spot market transactions.
(2) A definition of each electricity product, electricity-related product, and procurement related financial product, including support and justification for the product type and amount to be procured under the plan.
(3) The duration of the plan.
(4) The duration, timing, and range of quantities of each product to be procured.
(5) A competitive procurement process under which the electrical corporation may request bids for procurement-related services, including the format and criteria of that procurement process.
(6) An incentive mechanism, if any incentive mechanism is proposed, including the type of transactions to be covered by that mechanism, their respective procurement benchmarks, and other parameters needed to determine the sharing of risks and benefits.
(7) The upfront standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to execution of the transaction. This shall include an expedited approval process for the commission’s review of proposed contracts and subsequent approval or rejection thereof. The electrical corporation shall propose alternative procurement choices in the event a contract is rejected.
(8) Procedures for updating the procurement plan.
(9) A showing that the procurement plan will achieve the following:
(A) The electrical corporation, in order to fulfill its unmet resource needs, shall procure resources from eligible renewable energy resources in an amount sufficient to meet its procurement requirements pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3).
(B) The electrical corporation shall create or maintain a diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C) (i) The electrical corporation shall first meet its unmet resource needs through all available energy efficiency and demand reduction resources that are cost effective, reliable, and feasible.
(ii) In determining the availability of cost-effective, reliable, and feasible demand reduction resources, the commission shall consider the findings regarding technically and economically achievable demand reduction in the Demand Response Potential Study required pursuant to Commission Order D.14-12-024, to the extent those findings are not superseded by other demand reduction studies conducted by academic institutions or government agencies, and to the extent that any demand reduction is consistent with commission policy.
(D) (i)   The electrical corporation, in soliciting bids for new gas-fired generating units, shall actively seek bids for resources that are not gas-fired generating units located in communities that suffer from cumulative pollution burdens, including, but not limited to, high emission levels of toxic air contaminants, criteria air pollutants, and greenhouse gases.
(ii) In considering bids for, or negotiating contracts for, new gas-fired generating units, the electrical corporation shall provide greater preference to resources that are not gas-fired generating units located in communities that suffer from cumulative pollution burdens, including, but not limited to, high emission levels of toxic air contaminants, criteria air pollutants, and greenhouse gases.
(iii) This subparagraph does not apply to contracts signed by an electrical corporation and approved by the commission prior to January 1, 2017.
(10) The electrical corporation’s risk management policy, strategy, and practices, including specific measures of price stability.
(11) A plan to achieve appropriate increases in diversity of ownership and diversity of fuel supply of nonutility electrical generation.
(12) A mechanism for recovery of reasonable administrative costs related to procurement in the generation component of rates.
(c) The commission shall review and accept, modify, or reject each electrical corporation’s procurement plan and any amendments or updates to the plan. The commission shall ensure that the plan contains the elements required by this section, including the elements described in subparagraphs (C) and (D) of paragraph (9) of subdivision (b). The commission’s review shall consider each electrical corporation’s individual procurement situation, and shall give strong consideration to that situation in determining which one or more of the features set forth in this subdivision shall apply to that electrical corporation. A procurement plan approved by the commission shall contain one or more of the following features, provided that the commission may not approve a feature or mechanism for an electrical corporation if it finds that the feature or mechanism would impair the restoration of an electrical corporation’s creditworthiness or would lead to a deterioration of an electrical corporation’s creditworthiness:
(1) A competitive procurement process under which the electrical corporation may request bids for procurement-related services. The commission shall specify the format of that procurement process, as well as criteria to ensure that the auction process is open and adequately subscribed. Any purchases made in compliance with the commission-authorized process shall be recovered in the generation component of rates.
(2) An incentive mechanism that establishes a procurement benchmark or benchmarks and authorizes the electrical corporation to procure from the market, subject to comparing the electrical corporation’s performance to the commission-authorized benchmark or benchmarks. The incentive mechanism shall be clear, achievable, and contain quantifiable objectives and standards. The incentive mechanism shall contain balanced risk and reward incentives that limit the risk and reward of an electrical corporation.
(3) Upfront achievable standards and criteria by which the acceptability and eligibility for rate recovery of a proposed procurement transaction will be known by the electrical corporation prior to the execution of the bilateral contract for the transaction. The commission shall provide for expedited review and either approve or reject the individual contracts submitted by the electrical corporation to ensure compliance with its procurement plan. To the extent the commission rejects a proposed contract pursuant to this criteria, the commission shall designate alternative procurement choices obtained in the procurement plan that will be recoverable for ratemaking purposes.
(d) A procurement plan approved by the commission shall accomplish each of the following objectives:
(1) Enable the electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(2) Eliminate the need for after-the-fact reasonableness reviews of an electrical corporation’s actions in compliance with an approved procurement plan, including resulting electricity procurement contracts, practices, and related expenses. However, the commission may establish a regulatory process to verify and ensure that each contract was administered in accordance with the terms of the contract, and contract disputes that may arise are reasonably resolved.
(3) Ensure timely recovery of prospective procurement costs incurred pursuant to an approved procurement plan. The commission shall establish rates based on forecasts of procurement costs adopted by the commission, actual procurement costs incurred, or combination thereof, as determined by the commission. The commission shall establish power procurement balancing accounts to track the differences between recorded revenues and costs incurred pursuant to an approved procurement plan. The commission shall review the power procurement balancing accounts, not less than semiannually, and shall adjust rates or order refunds, as necessary, to promptly amortize a balancing account, according to a schedule determined by the commission. Until January 1, 2006, the commission shall ensure that any overcollection or undercollection in the power procurement balancing account does not exceed 5 percent of the electrical corporation’s actual recorded generation revenues for the prior calendar year excluding revenues collected for the Department of Water Resources. The commission shall determine the schedule for amortizing the overcollection or undercollection in the balancing account to ensure that the 5-percent threshold is not exceeded. After January 1, 2006, this adjustment shall occur when deemed appropriate by the commission consistent with the objectives of this section.
(4) Moderate the price risk associated with serving its retail customers, including the price risk embedded in its long-term supply contracts, by authorizing an electrical corporation to enter into financial and other electricity-related product contracts.
(5) Provide for just and reasonable rates, with an appropriate balancing of price stability and price level in the electrical corporation’s procurement plan.
(e) The commission shall provide for the periodic review and prospective modification of an electrical corporation’s procurement plan.
(f) The commission may engage an independent consultant or advisory service to evaluate risk management and strategy. The reasonable costs of any consultant or advisory service is a reimbursable expense and eligible for funding pursuant to Section 631.
(g) The commission shall adopt appropriate procedures to ensure the confidentiality of any market sensitive information submitted in an electrical corporation’s proposed procurement plan or resulting from or related to its approved procurement plan, including, but not limited to, proposed or executed power purchase agreements, data request responses, or consultant reports, or any combination of these, provided that the Public Advocate’s Office of the Public Utilities Commission and other consumer groups that are nonmarket participants shall be provided access to this information under confidentiality procedures authorized by the commission.
(h) Nothing in this section alters, modifies, or amends the commission’s oversight of affiliate transactions under its rules and decisions or the commission’s existing authority to investigate and penalize an electrical corporation’s alleged fraudulent activities, or to disallow costs incurred as a result of gross incompetence, fraud, abuse, or similar grounds. Nothing in this section expands, modifies, or limits the Energy Commission’s existing authority and responsibilities as set forth in Sections 25216, 25216.5, and 25323 of the Public Resources Code.
(i) An electrical corporation that serves less than 500,000 electric retail customers within the state may file with the commission a request for exemption from this section, which the commission shall grant upon a showing of good cause.
(j) (1) Prior to its approval pursuant to Section 851 of any divestiture of generation assets owned by an electrical corporation on or after the date of enactment of the act adding this section, the commission shall determine the impact of the proposed divestiture on the electrical corporation’s procurement rates and shall approve a divestiture only to the extent it finds, taking into account the effect of the divestiture on procurement rates, that the divestiture is in the public interest and will result in net ratepayer benefits.
(2) Any electrical corporation’s procurement necessitated as a result of the divestiture of generation assets on or after the effective date of the act adding this subdivision shall be subject to the mechanisms and procedures set forth in this section only if its actual cost is less than the recent historical cost of the divested generation assets.
(3) Notwithstanding paragraph (2), the commission may deem proposed procurement eligible to use the procedures in this section upon its approval of asset divestiture pursuant to Section 851.
(k) The commission shall direct electrical corporations to include in their proposed procurement plans the integration costs described and determined pursuant to clause (v) of subparagraph (A) of paragraph (4) (5) of subdivision (a) of Section 399.13.
(l) Prior to approving an electrical corporation’s contract for any new gas-fired generating unit, the commission shall require the electrical corporation to demonstrate compliance with its approved procurement plan.

SEC. 2.SEC. 5.

 Section 454.52 of the Public Utilities Code is amended to read:

454.52.
 (a) (1) Beginning in 2017, and to be updated regularly thereafter, the commission shall adopt a process for each load-serving entity, as defined in Section 380, to file an integrated resource plan, and a schedule for periodic updates to the plan, and shall ensure that load-serving entities do the following:
(A) Meet the greenhouse gas emissions reduction targets established by the State Air Resources Board, in coordination with the commission and the Energy Commission, for the electricity sector and each load-serving entity that reflect the electricity sector’s percentage in achieving the economywide greenhouse gas emissions reductions of 40 percent from 1990 levels by 2030.
(B) Procure at least 60 percent eligible renewable energy resources by December 31, 2030, consistent with Article 16 (commencing with Section 399.11) of Chapter 2.3.
(C) Enable each electrical corporation to fulfill its obligation to serve its customers at just and reasonable rates.
(D) Minimize impacts on ratepayers’ bills.
(E) Ensure system and local reliability on both a near-term and long-term basis, including meeting the near-term and forecast long-term resource adequacy requirements of Section 380.
(F) Comply with subdivision (b) of Section 399.13.

(F)

(G) Strengthen the diversity, sustainability, and resilience of the bulk transmission and distribution systems, and local communities.

(G)

(H) Enhance distribution systems and demand-side energy management.

(H)

(I) Minimize localized air pollutants and other greenhouse gas emissions, with early priority on disadvantaged communities identified pursuant to Section 39711 of the Health and Safety Code.
(2) (A) The commission may authorize all source procurement for electrical corporations that includes various resource types including demand-side resources, supply side resources, and resources that may be either demand-side resources or supply side resources, taking into account the differing electrical corporations’ geographic service areas, to ensure that each load-serving entity meets the goals set forth in paragraph (1).
(B) The commission may approve procurement of resource types that will reduce overall greenhouse gas emissions from the electricity sector and meet the other goals specified in paragraph (1), but due to the nature of the technology or fuel source may not compete favorably in price against other resources over the time period of the integrated resource plan.
(3) In furtherance of the requirements of paragraph (1), the commission shall consider the role of existing renewable generation, grid operational efficiencies, energy storage, and distributed energy resources, including energy efficiency, in helping to ensure each load-serving entity meets energy needs and reliability needs in hours to encompass the hour of peak demand of electricity, excluding demand met by variable renewable generation directly connected to a California balancing authority, as defined in Section 399.12, while reducing the need for new electricity generation resources and new transmission resources in achieving the state’s energy goals at the least cost to ratepayers.
(b) (1) Each load-serving entity shall prepare and file an integrated resource plan consistent with paragraph (2) of subdivision (a) on a time schedule directed by the commission and subject to commission review.
(2) Each electrical corporation’s plan shall follow the provisions of Section 454.5.
(3) The plan of a community choice aggregator shall be submitted to its governing board for approval and provided to the commission for certification, consistent with paragraph (5) of subdivision (a) of Section 366.2, and shall achieve the following:
(A) Economic, reliability, environmental, security, and other benefits and performance characteristics that are consistent with the goals set forth in paragraph (1) of subdivision (a).
(B) A diversified procurement portfolio consisting of both short-term and long-term electricity and electricity-related and demand reduction products.
(C) The resource adequacy requirements established pursuant to Section 380.
(4) The plan of an electric service provider shall achieve the goals set forth in paragraph (1) of subdivision (a) through a diversified portfolio consisting of both short-term and long-term electricity, electricity-related, and demand reduction products.
(c) To the extent that additional procurement is authorized for the electrical corporation in the integrated resource plan or the procurement process authorized pursuant to Section 454.5, the commission shall ensure that the costs are allocated in a fair and equitable manner to all customers consistent with Section 454.51, that there is no cost shifting among customers of load-serving entities, and that community choice aggregators may self-provide renewable integration resources consistent with Section 454.51.
(d) To eliminate redundancy and increase efficiency, the process adopted pursuant to subdivision (a) shall incorporate, and not duplicate, any other planning processes of the commission.
(e) This section applies to an electrical cooperative, as defined in Section 2776, only if the electrical cooperative has an annual electrical demand exceeding 700 gigawatthours, as determined based on a three-year average commencing with January 1, 2013.

SEC. 3.SEC. 6.

 Section 454.54 of the Public Utilities Code is amended to read:

454.54.
 In addition to the requirements of Section 454.52, the commission shall enforce the requirement, that the integrated resource plan of each load-serving entity shall contribute to a diverse and balanced portfolio of resources needed to ensure a reliable electricity supply that provides optimal integration of renewable energy resources in a cost-effective manner, meets the emissions reduction targets for greenhouse gases described in subparagraph (A) of paragraph (1) of subdivision (a) of Section 454.52, and prevents cost shifting among load-serving entities. The commission shall also enforce, as if part of the plan of each load-serving entity for those purposes, compliance with subdivision (b) of Section 399.13.