Bill Text: AZ HB2396 | 2022 | Fifty-fifth Legislature 2nd Regular | Introduced


Bill Title: Appropriations; greater Arizona transportation projects

Spectrum: Slight Partisan Bill (Republican 6-2)

Status: (Introduced - Dead) 2022-02-02 - House TRANS Committee action: Do Pass, voting: (11-1-0-0-0-0) [HB2396 Detail]

Download: Arizona-2022-HB2396-Introduced.html

 

 

 

REFERENCE TITLE: appropriations; greater Arizona transportation projects

 

 

 

 

State of Arizona

House of Representatives

Fifty-fifth Legislature

Second Regular Session

2022

 

 

 

HB 2396

 

Introduced by

Representatives Dunn: Biasiucci, Blackman, Blackwater-Nygren, Cook, John, Senators Gabaldon, Kerr

 

 

AN ACT

 

APPROPRIATING MONIES TO THE DEPARTMENT OF TRANSPORTATION.

 

 

(TEXT OF BILL BEGINS ON NEXT PAGE)

 


Be it enacted by the Legislature of the State of Arizona:

Section 1. Appropriations; highway and road projects; fiscal year 2022-2023; lapsing

A. The following amounts are appropriated from the state general fund in fiscal year 2022-2023 to the department of transportation for the following highway and road projects:

1. Distribution to Globe for sidewalk                $1,293,882

construction and improvements

on Jesse Hayes Road and Six

Shooter Canyon Road

2. Distribution to Winkelman for Golf                $ 951,644

Course Road and Quarelli Street

pavement rehabilitation and

improvements

3. Eastbound ramp improvements to the                $2,000,000

State Route 89 and State Route 89A

traffic interchange

4. Distribution to Prescott for the design           $1,450,000

of the Sundog Connector Corridor

5. Roundabout intersection construction              $ 400,488

at State Route 69 and State Route 169

6. Distribution to Lake Havasu City for              $1,687,775

Swanson Avenue pavement

rehabilitation and improvements

     between Lake Havasu Avenue and

     Smoketree Avenue

7. Distribution to Apache Junction for               $4,494,144

improvements from the intersection

of Tomahawk Road and Southern

     Avenue extending south on

Tomahawk Road and west on

Southern Avenue

8. Distribution to Queen Creek to add                $4,171,537

lanes and other improvements to

Ironwood Road from State Route 24

     to Germann Road

9. Distribution to Flagstaff for the                 $2,601,548

Lone Tree Corridor

10. Distribution to Show Low for the                 $ 610,020

construction of a roundabout

at the intersection of Central

Avenue and Old Linden Road

11. Distribution to Show Low for an                  $ 376,573

extension of East Owens east

of Central Avenue

12. Distribution to Show Low for the                 $1,590,000

reconstruction of Woolford Road

13. Distribution to Coconino county for the          $1,453,618

widening of Townsend-Winona Road

from U.S. Route 89 to Koch Field

Road

14. Distribution to Yavapai county for               $2,532,510

intersection improvements at

Cornville Road and Tissaw Road

15. Distribution to Apache county for a dirt         $ 410,551

road stabilization pilot project

16. Distribution to Apache county for                $1,583,311

pavement rehabilitation on the

Concho Highway

17. Distribution to Winslow for the design           $ 500,000

of the extension of 900 Acres

Access Road

18. Distribution to Clarkdale for the design         $ 230,000

of an additional bridge to support

      the Bitter Creek Bridge

19. Distribution to Huachuca City for the            $ 850,533

reconstruction of Skyline Drive

between State Route 90 and the

town landfill entrance

20. Distribution to Sierra Vista for a               $1,140,000

joint corridor improvement project

with Cochise county for Theater

Drive between 7th Street and

Carmichael Avenue

21. Distribution to the San Carlos Apache            $ 710,550

tribe for pavement overlay of

Peridot Siding Road between B.I.A.

Route 170 and U.S. Route 70

22. Distribution to Graham county for a low          $ 731,207

water crossing improvement on

Safford Bryce Road between Talley

Lane and Freeport McMoRan Road

23. Distribution to Nogales for the                  $1,566,815

reconstruction of Industrial Park

Drive from Manor Drive to Mariposa

Road

24. Distribution to Santa Cruz county for            $1,517,304

the replacement and expansion of

Potrero Creek Bridge on Ruby Road

spanning Potrero Creek and an

adjacent at-grade railroad crossing

25. Distribution to Eloy for pavement                $ 250,000

rehabilitation and improvements

to Stuart Boulevard between

Frontier Street and 5th Street

26. Distribution to Eloy for intersection            $ 200,000

improvements on Main Street

from Frontier Street to 3rd Street

27. Distribution to Eloy for D Street                $ 225,000

pavement rehabilitation between

Frontier Street and Myers Boulevard

28. Distribution to Eloy for Houser                  $ 218,667

Road pavement rehabilitation

between Frontier Street and

Eleven Mile Corner Road

29. Distribution to Casa Grande for                  $ 893,667

improvements to Florence

Boulevard between Interstate 10

and Pinal Avenue

30. Distribution to Pinal county for the             $ 893,667

reconstruction of Trekell Road

between Jimmie Kerr Boulevard

and Hanna Road

31. Traffic signal installation and other            $ 893,667

improvements at State Route 87

and Skousen Road intersection

32. Distribution to Kingman for improvements         $2,189,145

to Eastern Street between Calumet

Avenue and Detroit Avenue

33. Distribution to Mohave county for the            $1,200,000

paving of Mountain View Road between

Aztec Road and Camp Mohave Road

34. Distribution to Mohave county for a soil         $ 600,000

stabilization project on Alamo Road

between mileposts 3.8 and 7.5

35. Distribution to Bullhead City to resurface       $1,047,104

Hancock Road between State Route 95

west and Colorado Boulevard

36. U.S. Route 95 improvements from Rifle Range      $6,535,072

Road to Wellton/Mohawk Canal Bridge

B. Each appropriation in subsection A of this section does not lapse until the purpose for which the appropriation is made is accomplished or abandoned or the appropriation stands for a full fiscal year without an expenditure or encumbrance.