Bill Text: AZ HB2218 | 2010 | Forty-ninth Legislature 2nd Regular | Introduced

NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Irrigation districts; contracts; certification board

Spectrum: Partisan Bill (Republican 5-0)

Status: (Passed) 2010-04-14 - Governor Signed [HB2218 Detail]

Download: Arizona-2010-HB2218-Introduced.html

 

 

 

REFERENCE TITLE: irrigation districts; contracts; certification board

 

 

 

State of Arizona

House of Representatives

Forty-ninth Legislature

Second Regular Session

2010

 

 

HB 2218

 

Introduced by

Representatives Weiers J, Quelland, Stevens, Senators Gray L, Nelson

 

 

AN ACT

 

amending section 48-2986, Arizona Revised Statutes; relating to irrigation and water conservation districts.

 

 

(TEXT OF BILL BEGINS ON NEXT PAGE)

 



Be it enacted by the Legislature of the State of Arizona:

Section 1.  Section 48-2986, Arizona Revised Statutes, is amended to read:

START_STATUTE48-2986.  Award of contract; bond; letting of work without advertising for bids

A.  At the time and place specified in the advertisement the board shall meet and consider the bids and shall within a reasonable time thereafter accept or reject all or any portion of any bid, or may reject all bids, and shall return deposits of unsuccessful bidders.  The board may thereafter proceed to readvertise for such portions of the proposed project as to which no bid was accepted, or the board may proceed to perform the work so advertised under its own direction and supervision.

B.  The board shall enter into contracts according to the bids as accepted and shall require from each person with whom a contract is made such bond or bonds as required under the provisions of title 34, chapter 2, article 2.  Upon the bond being given and approved, prior deposits of the principal shall be returned.

C.  The work performed under any contract authorized and executed pursuant to this chapter shall be performed under the direction and to the satisfaction of the district engineer and by the terms of the contract shall be paid for in cash.

D.  Nothing contained in this chapter shall be construed to prohibit the district from letting any work required by it without first advertising for bids when the estimated cost of the work does not exceed fifteen thirty thousand dollars for construction, ten thirty thousand dollars for materials or ten thirty thousand dollars for services and the total amount of the contract does not exceed fifteen thirty thousand dollars or when an emergency exists as determined jointly by the board of directors of the district and the state certification board.END_STATUTE

Sec. 2.  Emergency

This act is an emergency measure that is necessary to preserve the public peace, health or safety and is operative immediately as provided by law.

feedback