Bill Text: WA HB2045 | 2015-2016 | Regular Session | Introduced


Bill Title: Promoting development of reliable distributed energy resources through extending and modifying an existing tax incentive for certain net metering systems, preserving the existing ground rules for net metering until net metering systems' generating capacity equals 0.5 percent of the utility's 1996 peak demand, requiring distribution resources planning, and authorizing a reliability charge and other alternatives to existing ground rules for net metering, for a utility that has achieved the existing 0.5 percent interconnection requirement for net metering systems.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2016-03-10 - By resolution, reintroduced and retained in present status. [HB2045 Detail]

Download: Washington-2015-HB2045-Introduced.pdf
It appears your computer is unable to display this document, however you can download the file from the links above.
feedback