Be it enacted by the General Assembly of Virginia:
1. That §§67-102 and 67-201of the Code of Virginia are amended and reenacted as follows:
§67-102. Commonwealth Energy Policy.
A. To achieve the objectives enumerated in §67-101, it shall be the policy of the Commonwealth to:
1. Support research and development of, and promote the use of, renewable energy sources;
2. Ensure that the combination of energy supplies and energy-saving systems are sufficient to support the demands of economic growth;
3. Promote research and development of clean coal
technologies, including but not limited to integrated gasification combined
cycle systems;
4. Promote cost-effective conservation of energy and
fuel supplies;
5. Ensure the availability of affordable natural gas
throughout the Commonwealth by expanding Virginia's natural gas distribution
and transmission pipeline infrastructure; developing coalbed methane gas
resources and methane hydrate resources; encouraging the productive use of
landfill gas; and siting one or more liquefied natural gas terminals;
4. Ensure the adequate supply of natural gas necessary to ensure the reliability of the electricity supply and the needs of businesses during the transition to renewable energy.
6. 5. Promote the generation of electricity
through technologies that do not contribute to greenhouse gases and global
warming;
7. Facilitate the development of new, and the expansion of
existing, petroleum refining facilities within the Commonwealth;
8. 6. Promote the use of motor vehicles that
utilize alternate fuels and are highly energy efficient;
9. 7. Support efforts to reduce the demand for
imported petroleum by developing alternative technologies, including but not
limited to the production of synthetic and hydrogen-based fuels, and the
infrastructure required for the widespread implementation of such technologies;
10. Promote the sustainable production and use of biofuels
produced from silvicultural and agricultural crops grown in the Commonwealth,
and support the delivery infrastructure needed for statewide distribution to
consumers;
11. 8. Ensure that development of new, or
expansion of existing, energy resources or facilities does not have a
disproportionate adverse impact on economically disadvantaged or minority
communities; and
12. Ensure that energy generation and delivery systems that
may be approved for development in the Commonwealth, including liquefied
natural gas and related delivery and storage systems, should be located so as
to minimize impacts to pristine natural areas and other significant onshore
natural resources, and as near to compatible development as possible
9. Establish greenhouse gas emissions reduction standards across all sectors of Virginia's economy that target net-zero emissions carbon by 2045;
10. Enact mandatory clean energy standards and overall strategies for reaching net-zero carbon in the electric power sector by 2040;
11. Equitably incorporate requirements for technical, policy, and economic analyses and assessments that recognize the unique attributes of different energy resources and delivery systems to identify pathways to net-zero carbon that maximize Virginia's energy reliability and resilience, economic development, and jobs; and
12. Minimize the negative impacts of climate change and the energy transition on economically disadvantaged or minority communities and prioritize investment in these areas.
B. The elements of the policy set forth in subsection A shall be referred to collectively in this title as the Commonwealth Energy Policy.
C. All agencies and political subdivisions of the Commonwealth, in taking discretionary action with regard to energy issues, shall recognize the elements of the Commonwealth Energy Policy and where appropriate, shall act in a manner consistent therewith.
D. The Commonwealth Energy Policy is intended to provide guidance to the agencies and political subdivisions of the Commonwealth in taking discretionary action with regard to energy issues, and shall not be construed to amend, repeal, or override any contrary provision of applicable law. The failure or refusal of any person to recognize the elements of the Commonwealth Energy Policy, to act in a manner consistent with the Commonwealth Energy Policy, or to take any other action whatsoever, shall not create any right, action, or cause of action or provide standing for any person to challenge the action of the Commonwealth or any of its agencies or political subdivisions.
§67-201. Development of the Virginia Energy Plan.
A. The Division, in consultation with the State Corporation
Commission, the Department of Environmental Quality, and the Center
for Coal and Energy Research Clean Energy Advisory Board, solar,
wind, and energy efficiency sectors, and a stakeholder group that shall include
representatives of consumer, environmental, manufacturing, and agricultural
organizations and electric utilities, shall prepare a comprehensive
Virginia Energy Plan covering that identifies actions over a 10-year
period consistent with the goal of the Commonwealth Energy Policy set forth
in §67-102 to achieve, no later than 2045, a net-zero carbon energy economy
for all sectors, including electricity, transportation, building, and
industrial sectors. The Plan shall propose actions, consistent with the
objectives enumerated in §67-101, that will implement the Commonwealth Energy
Policy set forth in §67-102.
B. In addition, the Plan shall include:
1. Projections of energy consumption in the Commonwealth,
including but not limited to the use of fuel sources and costs of
electricity, natural gas, gasoline, coal, renewable resources, and other forms
of non-greenhouse-gas-generating energy resources, such as nuclear
power, used in the Commonwealth;
2. An analysis of the adequacy of electricity generation, transmission, and distribution resources in the Commonwealth for the natural gas and electric industries, and how distributed energy resources and regional generation, transmission, and distribution resources affect the Commonwealth;
3. An analysis of siting requirements for electric generation resources and natural gas and electric transmission and distribution resources, including an assessment of state and local impediments to expanded use of distributed resources and recommendations to reduce or eliminate these impediments;
4. An analysis of fuel diversity for electricity generation, recognizing the importance of flexibility in meeting future capacity needs;
5. An analysis of the efficient use of energy resources and conservation initiatives;
6. An analysis of how these Virginia-specific issues relate to regional initiatives to assure the adequacy of fuel production, generation, transmission, and distribution assets;
7. An analysis of siting of energy resource development, refining or transmission facilities to identify any disproportionate adverse impact of such activities on economically disadvantaged or minority communities;
8. With regard to any regulations proposed or promulgated by
the U.S. Environmental Protection Agency to reduce carbon dioxide emissions
from fossil fuel-fired electric generating units under §111(d) of the Clean
Air Act, 42 U.S.C. §7411 (d), an analysis of (i) the costs to and benefits for
energy producers and electric utility customers; (ii) the effect on energy
markets and reliability; and (iii) the commercial availability of technology
required to comply with such regulations; and
9. An inventory of greenhouse gas emissions using a method determined by the Department of Environmental Quality for the four years prior to the issuance of the Plan and projections for the greenhouse gas emissions that would result from the implementation of the Plan's proposed actions; and
10. Recommendations, based on the analyses completed
under subdivisions 1 through 8 9, for legislative, regulatory,
and other public and private actions to implement the elements of the
Commonwealth Energy Policy.
C. In preparing the Plan, the Division and other agencies involved in the planning process shall utilize state geographic information systems, to the extent deemed practicable, to assess how recommendations in the plan may affect pristine natural areas and other significant onshore natural resources.
D. In preparing the Plan, the Division and other agencies involved in the planning process shall develop a system for ascribing numerical scores to parcels of real property based on the extent to which the parcels are suitable for the siting of a wind energy facility or solar energy facility. For wind energy facilities, the scoring system shall address the wind velocity, sustained velocity, turbulence, proximity to electric power transmission systems, potential impacts to natural and historic resources and to economically disadvantaged or minority communities, and compatibility with the local land use plan. For solar energy facilities, the scoring system shall address the parcel's proximity to electric power transmission lines, potential impacts of such a facility to natural and historic resources and to economically disadvantaged or minority communities, and compatibility with the local land use plan. The system developed pursuant to this section shall allow the suitability of the parcel for the siting of a wind energy facility or solar energy facility to be compared to the suitability of other parcels so scored, and shall be based on a scale that allows the suitability of the parcel for the siting of a such an energy facility to be measured against the hypothetical score of an ideal location for such a facility.
E. After July 1, 2007, upon receipt by the Division of a recommendation from the Department of General Services, a local governing body, or the parcel's owner that a parcel of real property is a potentially suitable location for a wind energy facility or solar energy facility, the Division shall analyze the suitability of the parcel for the location of such a facility. In conducting its analysis, the Division shall ascribe a numerical score to the parcel using the scoring system developed pursuant to subsection D.