US HB8085 | 2023-2024 | 118th Congress
Status
Spectrum: Partisan Bill (Democrat 1-0)
Status: Introduced on April 19 2024 - 25% progression
Action: 2024-04-19 - Referred to the House Committee on Energy and Commerce.
Pending: House Energy And Commerce Committee
Status: Introduced on April 19 2024 - 25% progression
Action: 2024-04-19 - Referred to the House Committee on Energy and Commerce.
Pending: House Energy And Commerce Committee
Summary
To require the Federal Energy Regulatory Commission to promulgate regulations that accelerate the interconnection of electric generation and storage resources to the transmission system through more efficient and effective interconnection procedures.
Title
To require the Federal Energy Regulatory Commission to promulgate regulations that accelerate the interconnection of electric generation and storage resources to the transmission system through more efficient and effective interconnection procedures.
Sponsors
Rep. Kathy Castor [D-FL] |
History
Date | Chamber | Action |
---|---|---|
2024-04-19 | House | Referred to the House Committee on Energy and Commerce. |
2024-04-19 | House | Introduced in House |
US Congress State Sources
Type | Source |
---|---|
Summary | https://www.congress.gov/bill/118th-congress/house-bill/8085/all-info |