By: Johnson, Eckhardt | S.B. No. 1212 |
|
||
|
||
relating to the interconnection and integration of distributed | ||
energy resources. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 31.002, Utilities Code, is amended by | ||
adding Subdivisions (2-a) and (4-c) and amending Subdivision (10) | ||
to read as follows: | ||
(2-a) "Aggregated distributed energy resource" means | ||
a group of distributed energy resources joined together to be | ||
operated as a single distributed energy resource, where each | ||
individual resource in the aggregation produces not more than 1.5 | ||
megawatts of electricity, subject to an increase or decrease by | ||
commission rule if the commission determines that a different | ||
capacity size limit is appropriate and does not adversely affect | ||
the ERCOT power region or distribution system reliability. | ||
(4-c) "Distributed energy resource" means a source of | ||
electricity connected at a voltage less than 60 kilovolts, | ||
including electric energy storage, distributed generation, | ||
distributed natural gas generation, or electric vehicles that | ||
provide electricity onto the distribution system. The term does | ||
not include a facility that provides temporary emergency electric | ||
energy under Section 39.918. | ||
(10) "Power generation company" means a person[ |
||
(A) generates electricity that is intended to be | ||
sold at wholesale, including the owner or operator of electric | ||
energy storage equipment or facilities to which Subchapter E, | ||
Chapter 35, applies; | ||
(B) does not own a transmission or distribution | ||
facility in this state other than an essential interconnecting | ||
facility, a facility not dedicated to public use, or a facility | ||
otherwise excluded from the definition of "electric utility" under | ||
this section; and | ||
(C) does not have a certificated service area, | ||
although its affiliated electric utility or transmission and | ||
distribution utility may have a certificated service area. | ||
SECTION 2. Subchapter H, Chapter 39, Utilities Code, is | ||
amended by adding Section 39.3515 to read as follows: | ||
Sec. 39.3515. REGISTRATION OF DISTRIBUTED ENERGY | ||
RESOURCES. (a) An owner or operator of a distributed energy | ||
resource may provide energy or ancillary services in the wholesale | ||
market in the ERCOT power region through generating electricity and | ||
providing that electricity onto a distribution system only if: | ||
(1) the owner or operator is registered with the | ||
commission as a power generation company under Section 39.351 and | ||
authorized by the independent organization certified under Section | ||
39.151 for the ERCOT power region; or | ||
(2) the distributed energy resource: | ||
(A) is part of an aggregated distributed energy | ||
resource that is included in the registration of a power generation | ||
company under Section 39.351 and the independent organization | ||
certified under Section 39.151 for the ERCOT power region; and | ||
(B) has complied with the interconnection | ||
requirements of the interconnecting transmission and distribution | ||
utility. | ||
(b) The commission may establish simplified filing | ||
requirements to facilitate the registration of aggregated | ||
distributed energy resources. The filing requirements must require | ||
the registrant to disclose the name of the power generation company | ||
that operates the aggregated distributed energy resource. | ||
(c) Notwithstanding any other provision of this chapter, a | ||
facility described by Section 39.914 or 39.916 may not be | ||
aggregated unless the facility is interconnected and operated in | ||
parallel with the distribution system, and: | ||
(1) electricity from the facility provides energy or | ||
ancillary services in the wholesale market in the ERCOT power | ||
region in a manner described by this section; or | ||
(2) the estimated annual amount of electricity to be | ||
produced by the facility is more than the retail electric | ||
customer's estimated annual electricity consumption at the time of | ||
the facility's installation or the actual amount of electricity | ||
produced by the facility was more than the retail electric | ||
customer's actual electricity consumption in the year prior to the | ||
facility's installation. | ||
(d) The commission by rule shall: | ||
(1) authorize the registrations described by | ||
Subsection (a); and | ||
(2) adopt procedures for the creation of aggregated | ||
distributed energy resources. | ||
SECTION 3. Chapter 39, Utilities Code, is amended by adding | ||
Subchapter O to read as follows: | ||
SUBCHAPTER O. INTERCONNECTION OF DISTRIBUTED ENERGY RESOURCES | ||
Sec. 39.701. METERING EQUIPMENT AND INFORMATION. An | ||
interconnecting transmission and distribution utility is not | ||
required to provide an owner or operator of a distributed energy | ||
resource access to the utility's meter equipment if essential | ||
metering information is made available by the utility or | ||
cooperative. | ||
Sec. 39.702. INTEGRATION AND COST RECOVERY. (a) The | ||
commission by rule shall establish for the ERCOT power region: | ||
(1) requirements for the dispatchability, | ||
reliability, and other characteristics of each type or | ||
classification of distributed energy resource; | ||
(2) appropriate disclosure requirements and other | ||
customer protections for residential and small commercial | ||
customers of providers of aggregated distributed energy services; | ||
(3) information an owner or operator of a distributed | ||
energy resource must provide to the interconnecting transmission | ||
and distribution utility to ensure the resource will not adversely | ||
affect the transmission or distribution system; | ||
(4) interconnection guidelines that address: | ||
(A) the determination of whether a given | ||
interconnection or combination of interconnections would exceed a | ||
transmission and distribution utility's system capacity in a | ||
particular location; | ||
(B) considerations for feeder locations related | ||
to distributed energy resources; | ||
(C) considerations of the size or capacity of a | ||
distributed energy resource; | ||
(D) the assessment by the interconnecting | ||
transmission and distribution utility of potential impacts to other | ||
customers in the area of the distributed energy resource; and | ||
(E) other operating parameters necessary for the | ||
transmission and distribution utility's reliable operation of its | ||
transmission and distribution system; | ||
(5) a methodology for the appropriate allocation and | ||
recovery of the transmission and distribution utility's costs to | ||
interconnect a distributed energy resource; and | ||
(6) requirements for the independent organization | ||
certified under Section 39.151 for the ERCOT power region to report | ||
to the commission periodically: | ||
(A) the categories and generation levels of | ||
distributed energy resources allowed to participate in the ERCOT | ||
wholesale market; | ||
(B) the categories and megawatt levels of | ||
aggregated distributed energy resources allowed to participate in | ||
the ERCOT wholesale market; | ||
(C) performance metrics for distributed energy | ||
resources allowed to participate in the ERCOT wholesale market; and | ||
(D) other information the commission may | ||
require. | ||
(b) The commission shall authorize a transmission and | ||
distribution utility to: | ||
(1) defer for recovery in a later ratemaking | ||
proceeding the incremental operations and maintenance expenses, or | ||
other expenses, and the return, not otherwise recovered in a rate | ||
proceeding, associated with the installation, modification, | ||
upgrade, or maintenance of its transmission or distribution | ||
facilities required by an interconnection with a distributed energy | ||
resource; and | ||
(2) request recovery of the costs associated with an | ||
interconnection with a distributed energy resource, including any | ||
deferred expenses, through a proceeding under Section 35.004 or | ||
36.210 or in another ratemaking proceeding regardless of whether | ||
the utility or cooperative first requested recovery in a base-rate | ||
proceeding. | ||
(c) Facilities required by an interconnection with a | ||
distributed energy resource are considered used and useful in | ||
providing service to the public and are prudent and includable in | ||
the rate base, regardless of the extent of the actual use of the | ||
facilities. | ||
(d) This subchapter does not: | ||
(1) require or authorize a distribution service | ||
provider to procure distributed energy resource services to enable | ||
the operation of the distribution system; | ||
(2) require a distribution service provider to | ||
disclose to any third party, except as required by the independent | ||
system operator, the provider's system planning information, | ||
studies, models, critical infrastructure information, or other | ||
confidential information; | ||
(3) diminish a distribution service provider's rights | ||
or obligations to own or operate its distribution system and | ||
provide electric delivery service to retail customers in the | ||
provider's certificated service area; | ||
(4) obligate a distribution service provider to | ||
interconnect a distributed energy resource with a capacity equal to | ||
or greater than 10 megawatts; or | ||
(5) prohibit an interconnecting distribution service | ||
provider from shedding a distributed energy resource, or otherwise | ||
obligate an interconnecting distribution service provider to | ||
provide preferential treatment to feeders with distributed energy | ||
resources or prevent a transmission and distribution utility from | ||
fulfilling its load shedding obligations during an involuntary load | ||
shedding event initiated by the independent system operator or a | ||
planned or unplanned outage of the distribution system. | ||
Sec. 39.703. LIABILITY. An interconnecting transmission | ||
and distribution utility or retail electric provider providing | ||
service to a distributed energy resource to which this subchapter | ||
applies is not liable for: | ||
(1) a violation of reliability or service metrics | ||
caused by distributed energy resource operations that violate its | ||
interconnection agreement; or | ||
(2) a distributed energy resource's inability or | ||
failure to provide services that violate its interconnection | ||
agreement or a penalty for such inability or failure. | ||
SECTION 4. (a) This section takes effect only if the Act of | ||
the 88th Legislature, Regular Session, 2023, relating to | ||
nonsubstantive additions to and corrections in enacted codes | ||
becomes law. | ||
(b) Subchapter Z, Chapter 39, Utilities Code, is amended by | ||
adding Section 39.9166 to read as follows: | ||
Sec. 39.9166. DISTRIBUTED ENERGY RESOURCES. (a) A | ||
customer who purchases or leases a distributed energy resource or | ||
enters into a power purchase agreement for a distributed energy | ||
resource in the ERCOT power region is entitled to the information | ||
and disclosures required under Chapter 115, Business & Commerce | ||
Code, and is entitled to protection from fraudulent, unfair, | ||
misleading, or deceptive practices. | ||
(b) An owner or operator of a distributed energy resource | ||
may provide energy or ancillary services in the wholesale market in | ||
the ERCOT power region. | ||
(c) A person who owns or operates a distributed energy | ||
resource in an area in which customer choice has been introduced and | ||
is part of an aggregated distributed energy resource, or has not | ||
individually registered with the commission as its own power | ||
generation company, must sell the surplus electricity that is | ||
produced by the distributed energy resource and not consumed by the | ||
owner's premise to the retail electric provider that serves the | ||
premise's load at a value agreed to between the distributed energy | ||
resource owner and the retail electric provider that serves the | ||
premise's load. The value may be an agreed value based on the | ||
clearing price of energy or ancillary service at the time of day | ||
that the electricity is made available to the grid. | ||
(d) A person who operates an aggregated distributed energy | ||
resource in an area in which customer choice has been introduced is | ||
subject to customer protection rules established by the commission | ||
under Chapter 17 and this chapter. | ||
(e) The independent organization certified under Section | ||
39.151 for the ERCOT power region shall adopt procedures to ensure | ||
that the amount of electricity purchased from a distributed energy | ||
resource owner under this section is accounted for when settling | ||
the total load served by the retail electric provider that serves | ||
that premise owner's load. | ||
(f) A distributed energy resource owner that requests net | ||
metering services for purposes of this section must have metering | ||
devices capable of providing measurements consistent with the | ||
independent organization's settlement requirements. | ||
(g) A transmission and distribution utility may provide to | ||
customers educational information regarding the technical | ||
requirements for the interconnection of distributed energy | ||
resources to the distribution system. The provision of information | ||
under this subsection is not considered a competitive energy | ||
service. | ||
(h) This section does not apply to a purchase or agreement | ||
entered into under Section 39.914 or 39.916. | ||
SECTION 5. (a) This section takes effect only if the Act of | ||
the 88th Legislature, Regular Session, 2023, relating to | ||
nonsubstantive additions to and corrections in enacted codes does | ||
not become law. | ||
(b) Subchapter Z, Chapter 39, Utilities Code, is amended by | ||
adding Section 39.9166 to read as follows: | ||
Sec. 39.9166. DISTRIBUTED ENERGY RESOURCES. (a) A | ||
customer who purchases or leases a distributed energy resource or | ||
enters into a power purchase agreement for a distributed energy | ||
resource in the ERCOT power region is entitled to the information | ||
and disclosures required under Chapter 113, Business & Commerce | ||
Code, as added by Chapter 561 (S.B. 398), Acts of the 87th | ||
Legislature, Regular Session, 2021, and is entitled to protection | ||
from fraudulent, unfair, misleading, or deceptive practices. | ||
(b) An owner or operator of a distributed energy resource | ||
may provide energy or ancillary services in the wholesale market in | ||
the ERCOT power region. | ||
(c) A person who owns or operates a distributed energy | ||
resource in an area in which customer choice has been introduced and | ||
is part of an aggregated distributed energy resource, or has not | ||
individually registered with the commission as its own power | ||
generation company, must sell the surplus electricity that is | ||
produced by the distributed energy resource and not consumed by the | ||
owner's premise to the retail electric provider that serves the | ||
premise's load at a value agreed to between the distributed energy | ||
resource owner and the retail electric provider that serves the | ||
premise's load. The value may be an agreed value based on the | ||
clearing price of energy or ancillary service at the time of day | ||
that the electricity is made available to the grid. | ||
(d) A person who operates an aggregated distributed energy | ||
resource in an area in which customer choice has been introduced is | ||
subject to customer protection rules established by the commission | ||
under Chapter 17 and this chapter. | ||
(e) The independent organization certified under Section | ||
39.151 for the ERCOT power region shall adopt procedures to ensure | ||
that the amount of electricity purchased from a distributed energy | ||
resource owner under this section is accounted for when settling | ||
the total load served by the retail electric provider that serves | ||
that premise owner's load. | ||
(f) A distributed energy resource owner that requests net | ||
metering services for purposes of this section must have metering | ||
devices capable of providing measurements consistent with the | ||
independent organization's settlement requirements. | ||
(g) A transmission and distribution utility may provide to | ||
customers educational information regarding the technical | ||
requirements for the interconnection of distributed energy | ||
resources to the distribution system. The provision of information | ||
under this subsection is not considered a competitive energy | ||
service. | ||
(h) This section does not apply to a purchase or agreement | ||
entered into under Section 39.914 or 39.916. | ||
SECTION 6. For the purposes of Section 39.3515(c)(2), | ||
Utilities Code, as added by this Act, a facility described by | ||
Section 39.914 or 39.916, Utilities Code, may be registered as an | ||
aggregated distributed energy resource with the Public Utility | ||
Commission of Texas if: | ||
(1) the estimated annual amount of electricity to be | ||
produced by the facility was more than the retail electric | ||
customer's estimated annual electricity consumption at the time of | ||
installation, if the facility was installed not more than a year | ||
before the effective date of this Act; or | ||
(2) the actual amount of electricity produced by the | ||
facility was more than the retail electric customer's actual | ||
electricity consumption in the year prior to the facility's | ||
installation, if the facility was installed more than a year before | ||
the effective date of this Act. | ||
SECTION 7. As soon as practicable after the effective date | ||
of this Act, the Public Utility Commission of Texas shall adopt | ||
rules necessary to implement the changes in law made by this Act. | ||
SECTION 8. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2023. |