  By: Canales, Darby, Clardy, Phelan, Burrows, H.B. No. 2845
      et al.
 
  Substitute the following for H.B. No. 2845:
 
  By:  Raymond C.S.H.B. No. 2845
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the removal of wind power facilities.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  The Utilities Code is amended by adding Title 6
  to read as follows:
  TITLE 6. WIND POWER
  CHAPTER 301. WIND POWER FACILITY AGREEMENTS
         Sec. 301.0001.  DEFINITIONS. In this chapter:
               (1)  "Grantee" means a person who:
                     (A)  leases property from a landowner; and
                     (B)  operates a wind power facility on the
  property.
               (2)  "Wind power facility" includes:
                     (A)  a wind turbine generator; and
                     (B)  a facility or equipment used to support the
  operation of a wind turbine generator, including an underground or
  aboveground electrical transmission or communications line, an
  electric transformer, a battery storage facility, an energy storage
  facility, telecommunications equipment, a road, a meteorological
  tower with wind measurement equipment, or a maintenance yard.
               (3)  "Wind power facility agreement" means a lease
  agreement between a grantee and a landowner that authorizes the
  grantee to operate a wind power facility on the leased property.
         Sec. 301.0002.  WAIVER VOID; REMEDIES. (a) A provision of a
  wind power facility agreement that purports to waive a right or
  exempt a grantee from a liability or duty established by this
  chapter is void.
         (b)  A person who is harmed by a violation of this chapter is
  entitled to appropriate injunctive relief to prevent further
  violation of this chapter.
         (c)  The provisions of this section are not exclusive. The
  remedies provided in this section are in addition to any other
  procedures or remedies provided by other law.
         Sec. 301.0003.  REQUIRED AGREEMENT PROVISIONS ON FACILITY
  REMOVAL. (a) A wind power facility agreement must provide that the
  grantee is responsible for removing the grantee's wind power
  facilities from the landowner's property and that the grantee
  shall, in accordance with any other applicable laws or regulations,
  safely:
               (1)  clear, clean, and remove from the property:
                     (A)  each wind turbine generator, including
  towers and pad-mount transformers;
                     (B)  all liquids, greases, or similar substances
  contained in a wind turbine generator;
                     (C)  each substation; and
                     (D)  all liquids, greases, or similar substances
  contained in a substation;
               (2)  for each tower foundation and pad-mount
  transformer foundation installed in the ground:
                     (A)  clear, clean, and remove the foundation from
  the ground at least three feet from the grade of the land affected
  by the foundation; and
                     (B)  ensure that each hole or cavity created in
  the ground by the removal is filled with topsoil of the same type or
  a similar type as the predominant topsoil found on the property;
               (3)  for each buried cable, including power,
  fiber-optic, and communications cables, installed in the ground:
                     (A)  clear, clean, and remove the cable from the
  ground at least three feet below the grade of the land affected by
  the cable; and
                     (B)  ensure that each hole or cavity created in
  the ground by the removal is filled with topsoil of the same type or
  a similar type as the predominant topsoil found on the property; and
               (4)  clear, clean, and remove from the property each
  overhead power or communications line installed by the grantee on
  the property.
         (b)  The agreement must provide that, at the request of the
  landowner, the grantee shall:
               (1)  clear, clean, and remove each road constructed by
  the grantee on the property; and
               (2)  ensure that each hole or cavity created in the
  ground by the removal is filled with topsoil of the same type or a
  similar type as the predominant topsoil found on the property.
         (c)  The agreement must provide that, at the request of the
  landowner, if reasonable, the grantee shall:
               (1)  remove from the property all rocks over 12 inches
  in diameter excavated during the decommissioning or removal
  process;
               (2)  return the property to a tillable state using
  scarification, V-rip, or disc methods, as appropriate; and
               (3)  ensure that:
                     (A)  each hole or cavity created in the ground by
  the removal is filled with topsoil of the same type or a similar
  type as the predominant topsoil found on the property; and
                     (B)  the surface is returned as near as reasonably
  possible to the same condition as before the grantee dug holes or
  cavities, including by reseeding pastureland with native grasses
  prescribed by an appropriate governmental agency, if any.
         (d)  The agreement may not authorize the landowner to make a
  request under Subsection (b) or (c) after the first anniversary of
  the date on which the wind power facility is no longer capable of
  generating electricity in commercial quantities.
         Sec. 301.0004.  REQUIRED AGREEMENT PROVISIONS ON REMOVAL
  BOND. (a) A wind power facility agreement must provide that the
  grantee shall obtain and deliver to the landowner a bond or other
  form of financial assurance, such as a letter of credit, an escrow
  account, or other form of financial assurance acceptable to the
  landowner, that conforms to the requirements of this section to
  secure the performance of the grantee's obligation to remove the
  grantee's wind power facilities located on the landowner's property
  as described by Section 301.0003.
         (b)  The amount of the bond or other financial assurance must
  be at least equal to the estimated amount by which the cost of
  removing the wind power facilities from the landowner's property
  and restoring the property to as near as reasonably possible the
  condition of the property as of the date the agreement begins
  exceeds the salvage value of the wind power facilities, less any
  portion of the value of the wind power facilities pledged to secure
  outstanding debt.
         (c)  The agreement must provide that:
               (1)  the estimated cost of removing the wind power
  facilities from the landowner's property and restoring the property
  to as near as reasonably possible the condition of the property as
  of the date the agreement begins and the estimated salvage value of
  the wind power facilities must be determined by an independent,
  third-party professional engineer licensed in this state;
               (2)  the grantee must deliver to the landowner an
  updated estimate, prepared by an independent, third-party
  professional engineer licensed in this state, of the cost of
  removal and the salvage value at least once every five years for the
  remainder of the term of the agreement; and
               (3)  the grantee is responsible for ensuring that the
  amount of the bond or other financial assurance remains sufficient
  to cover the amount required by Subsection (b), consistent with the
  estimates required by this subsection.
         (d)  The grantee is responsible for the costs of obtaining a
  bond or other financial assurance described by this section and
  costs of determining the estimated removal costs and salvage value.
         (e)  The agreement must provide that the grantee shall
  deliver the bond or other financial assurance not later than the
  earlier of:
               (1)  the date the wind power facility agreement is
  terminated; or
               (2)  the 10th anniversary of the commercial operations
  date of the wind power facilities located on the landowner's leased
  property. 
         (f)  For purposes of this section, "commercial operations
  date" means the date on which the wind power facilities are approved
  for participation in market operations by a regional transmission
  organization and does not include the generation of electrical
  energy or other operations conducted before that date for purposes
  of maintenance and testing.
         (g)  The grantee may not cancel a bond or other financial
  assurance before the date the grantee has completed the grantee's
  obligation to remove the grantee's wind power facilities located on
  the landowner's property in the manner provided by this chapter,
  unless the grantee provides the landowner with a replacement bond
  or replacement financial assurance at the time of or before the
  cancellation. In the event of a transfer of ownership of the
  grantee's wind power facilities, the financial security provided by
  the grantee shall remain in place until the date evidence of
  financial security meeting the requirements of this chapter is
  provided to the landowner.
         SECTION 2.  Chapter 301, Utilities Code, as added by this
  Act, applies only to a wind power facility agreement entered into on
  or after the effective date of this Act. A wind power facility
  agreement entered into before the effective date of this Act is
  governed by the law as it existed immediately before that date, and
  that law is continued in effect for that purpose.
         SECTION 3.  This Act takes effect September 1, 2019.