RI H7810 | 2024 | Regular Session
Status
Spectrum: Slight Partisan Bill (Republican 6-2)
Status: Introduced on March 1 2024 - 25% progression, died in committee
Action: 2024-03-21 - Committee recommended measure be held for further study
Pending: House Corporations Committee
Text: Latest bill text (Introduced) [PDF]
Status: Introduced on March 1 2024 - 25% progression, died in committee
Action: 2024-03-21 - Committee recommended measure be held for further study
Pending: House Corporations Committee
Text: Latest bill text (Introduced) [PDF]
Summary
PUBLIC UTILITIES AND CARRIERS -- PUBLIC UTILITIES COMMISSION - Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.
Title
Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.
Sponsors
Rep. Michael Chippendale [R] | Rep. Robert Quattrocchi [R] | Rep. Brian Newberry [R] | Rep. Brian Rea [R] |
Rep. Sherry Roberts [R] | Rep. George Nardone [R] | Rep. Jon Brien [D] | Rep. Charlene Lima [D] |
History
Date | Chamber | Action |
---|---|---|
2024-03-21 | House | Committee recommended measure be held for further study |
2024-03-15 | House | Scheduled for hearing and/or consideration (03/21/2024) |
2024-03-01 | House | Introduced, referred to House Corporations |
Subjects
Rhode Island State Sources
Type | Source |
---|---|
Summary | https://status.rilegislature.gov/ |
Text | https://webserver.rilegislature.gov/BillText24/HouseText24/H7810.pdf |