Bill Text: OH SB310 | 2013-2014 | 130th General Assembly | Engrossed
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: To make changes to the renewable energy, energy efficiency, and peak demand reduction requirements, to prohibit the imposition of a waiting period before enrolling an eligible customer in the percentage of income payment plan, and to create a study committee.
Spectrum: Partisan Bill (Republican 18-0)
Status: (Passed) 2014-09-12 - Effective Date [SB310 Detail]
Download: Ohio-2013-SB310-Engrossed.html
As Passed by the Senate
A BILL
BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF OHIO:
Bill Title: To make changes to the renewable energy, energy efficiency, and peak demand reduction requirements, to prohibit the imposition of a waiting period before enrolling an eligible customer in the percentage of income payment plan, and to create a study committee.
Spectrum: Partisan Bill (Republican 18-0)
Status: (Passed) 2014-09-12 - Effective Date [SB310 Detail]
Download: Ohio-2013-SB310-Engrossed.html
|
|
Senator Balderson
Cosponsors:
Senators Coley, Eklund, Faber, Jones, Seitz
To amend sections 3706.25, 4928.01, 4928.20, 4928.64, | 1 |
4928.65, and 4928.66, to amend, for the purpose of | 2 |
adopting a new section number as indicated in | 3 |
parentheses, section 4928.65 (4928.645), and to | 4 |
enact new section 4928.65 and sections 4928.641, | 5 |
4928.642, 4928.662, 4928.6610, 4928.6611, | 6 |
4928.6612, 4928.6613, 4928.6614, 4928.6615, and | 7 |
4928.6616 of the Revised Code to make changes to | 8 |
the renewable energy, energy efficiency, and peak | 9 |
demand reduction requirements and to create a | 10 |
study committee. | 11 |
BE IT ENACTED BY THE GENERAL ASSEMBLY OF THE STATE OF OHIO:
Section 1. That sections 3706.25, 4928.01, 4928.20, 4928.64, | 12 |
4928.65, and 4928.66 be amended, section 4928.65 (4928.645) be | 13 |
amended for the purpose of adopting a new section number as | 14 |
indicated in parentheses, and new section 4928.65 and sections | 15 |
4928.641, 4928.642, 4928.662, 4928.6610, 4928.6611, 4928.6612, | 16 |
4928.6613, 4928.6614, 4928.6615, and 4928.6616 of the Revised Code | 17 |
be enacted to read as follows: | 18 |
Sec. 3706.25. As used in sections 3706.25 to 3706.30 of the | 19 |
Revised Code: | 20 |
(A) "Advanced energy project" means any technologies, | 21 |
products, activities, or management practices or strategies that | 22 |
facilitate the generation or use of electricity or energy and that | 23 |
reduce or support the reduction of energy consumption or support | 24 |
the production of clean, renewable energy for industrial, | 25 |
distribution, commercial, institutional, governmental, research, | 26 |
not-for-profit, or residential energy users including, but not | 27 |
limited to, advanced energy resources and renewable energy | 28 |
resources. "Advanced energy project" includes any project | 29 |
described in division (A), (B), or (C) of section 4928.621 of the | 30 |
Revised Code. | 31 |
(B) "Advanced energy resource" means any of the following: | 32 |
(1) Any method or any modification or replacement of any | 33 |
property, process, device, structure, or equipment that increases | 34 |
the generation output of an electric generating facility to the | 35 |
extent such efficiency is achieved without additional carbon | 36 |
dioxide emissions by that facility; | 37 |
(2) Any distributed generation system consisting of customer | 38 |
cogeneration technology, primarily to meet the energy needs of the | 39 |
customer's facilities; | 40 |
(3) Advanced nuclear energy technology consisting of | 41 |
generation III technology as defined by the nuclear regulatory | 42 |
commission; other, later technology; or significant improvements | 43 |
to existing facilities; | 44 |
(4) Any fuel cell used in the generation of electricity, | 45 |
including, but not limited to, a proton exchange membrane fuel | 46 |
cell, phosphoric acid fuel cell, molten carbonate fuel cell, or | 47 |
solid oxide fuel cell; | 48 |
(5) Advanced solid waste or construction and demolition | 49 |
debris conversion technology, including, but not limited to, | 50 |
advanced stoker technology, and advanced fluidized bed | 51 |
gasification technology, that results in measurable greenhouse gas | 52 |
emissions reductions as calculated pursuant to the United States | 53 |
environmental protection agency's waste reduction model (WARM). | 54 |
(C) "Air contaminant source" has the same meaning as in | 55 |
section 3704.01 of the Revised Code. | 56 |
(D) "Cogeneration technology" means technology that produces | 57 |
electricity and useful thermal output simultaneously. | 58 |
(E) "Renewable energy resource" means solar photovoltaic or | 59 |
solar thermal energy, wind energy, | 60 |
hydroelectric facility, geothermal energy, fuel derived from solid | 61 |
wastes, as defined in section 3734.01 of the Revised Code, through | 62 |
fractionation, biological decomposition, or other process that | 63 |
does not principally involve combustion, biomass energy, energy | 64 |
produced by cogeneration technology that is placed into service on | 65 |
or before December 31, 2015, and for which more than ninety per | 66 |
cent of the total annual energy input is from combustion of a | 67 |
waste or byproduct gas from an air contaminant source in this | 68 |
state, which source has been in operation since on or before | 69 |
January 1, 1985, provided that the cogeneration technology is a | 70 |
part of a facility located in a county having a population of more | 71 |
than three hundred sixty-five thousand but less than three hundred | 72 |
seventy thousand according to the most recent federal decennial | 73 |
census, biologically derived methane gas, heat captured from a | 74 |
generator of electricity, boiler, or heat exchanger fueled by | 75 |
biologically derived methane gas, or energy derived from | 76 |
nontreated by-products of the pulping process or wood | 77 |
manufacturing process, including bark, wood chips, sawdust, and | 78 |
lignin in spent pulping liquors. "Renewable energy resource" | 79 |
includes, but is not limited to, any fuel cell used in the | 80 |
generation of electricity, including, but not limited to, a proton | 81 |
exchange membrane fuel cell, phosphoric acid fuel cell, molten | 82 |
carbonate fuel cell, or solid oxide fuel cell; wind turbine | 83 |
located in the state's territorial waters of Lake Erie; methane | 84 |
gas emitted from an abandoned coal mine; storage facility that | 85 |
will promote the better utilization of a renewable energy resource | 86 |
that primarily generates off peak; or distributed generation | 87 |
system used by a customer to generate electricity from any such | 88 |
energy. As used in this division, "hydroelectric facility" means a | 89 |
hydroelectric generating facility that is located at a dam on a | 90 |
river, or on any water discharged to a river, that is within or | 91 |
bordering this state or within or bordering an adjoining state and | 92 |
meets all of the following standards: | 93 |
(1) The facility provides for river flows that are not | 94 |
detrimental for fish, wildlife, and water quality, including | 95 |
seasonal flow fluctuations as defined by the applicable licensing | 96 |
agency for the facility. | 97 |
(2) The facility demonstrates that it complies with the water | 98 |
quality standards of this state, which compliance may consist of | 99 |
certification under Section 401 of the "Clean Water Act of 1977," | 100 |
91 Stat. 1598, 1599, 33 U.S.C. 1341, and demonstrates that it has | 101 |
not contributed to a finding by this state that the river has | 102 |
impaired water quality under Section 303(d) of the "Clean Water | 103 |
Act of 1977," 114 Stat. 870, 33 U.S.C. 1313. | 104 |
(3) The facility complies with mandatory prescriptions | 105 |
regarding fish passage as required by the federal energy | 106 |
regulatory commission license issued for the project, regarding | 107 |
fish protection for riverine, anadromous, and catadromous fish. | 108 |
(4) The facility complies with the recommendations of the | 109 |
Ohio environmental protection agency and with the terms of its | 110 |
federal energy regulatory commission license regarding watershed | 111 |
protection, mitigation, or enhancement, to the extent of each | 112 |
agency's respective jurisdiction over the facility. | 113 |
(5) The facility complies with provisions of the "Endangered | 114 |
Species Act of 1973," 87 Stat. 884, 16 U.S.C. 1531 to 1544, as | 115 |
amended. | 116 |
(6) The facility does not harm cultural resources of the | 117 |
area. This can be shown through compliance with the terms of its | 118 |
federal energy regulatory commission license or, if the facility | 119 |
is not regulated by that commission, through development of a plan | 120 |
approved by the Ohio historic preservation office, to the extent | 121 |
it has jurisdiction over the facility. | 122 |
(7) The facility complies with the terms of its federal | 123 |
energy regulatory commission license or exemption that are related | 124 |
to recreational access, accommodation, and facilities or, if the | 125 |
facility is not regulated by that commission, the facility | 126 |
complies with similar requirements as are recommended by resource | 127 |
agencies, to the extent they have jurisdiction over the facility; | 128 |
and the facility provides access to water to the public without | 129 |
fee or charge. | 130 |
(8) The facility is not recommended for removal by any | 131 |
federal agency or agency of any state, to the extent the | 132 |
particular agency has jurisdiction over the facility. | 133 |
Sec. 4928.01. (A) As used in this chapter: | 134 |
(1) "Ancillary service" means any function necessary to the | 135 |
provision of electric transmission or distribution service to a | 136 |
retail customer and includes, but is not limited to, scheduling, | 137 |
system control, and dispatch services; reactive supply from | 138 |
generation resources and voltage control service; reactive supply | 139 |
from transmission resources service; regulation service; frequency | 140 |
response service; energy imbalance service; operating | 141 |
reserve-spinning reserve service; operating reserve-supplemental | 142 |
reserve service; load following; back-up supply service; | 143 |
real-power loss replacement service; dynamic scheduling; system | 144 |
black start capability; and network stability service. | 145 |
(2) "Billing and collection agent" means a fully independent | 146 |
agent, not affiliated with or otherwise controlled by an electric | 147 |
utility, electric services company, electric cooperative, or | 148 |
governmental aggregator subject to certification under section | 149 |
4928.08 of the Revised Code, to the extent that the agent is under | 150 |
contract with such utility, company, cooperative, or aggregator | 151 |
solely to provide billing and collection for retail electric | 152 |
service on behalf of the utility company, cooperative, or | 153 |
aggregator. | 154 |
(3) "Certified territory" means the certified territory | 155 |
established for an electric supplier under sections 4933.81 to | 156 |
4933.90 of the Revised Code. | 157 |
(4) "Competitive retail electric service" means a component | 158 |
of retail electric service that is competitive as provided under | 159 |
division (B) of this section. | 160 |
(5) "Electric cooperative" means a not-for-profit electric | 161 |
light company that both is or has been financed in whole or in | 162 |
part under the "Rural Electrification Act of 1936," 49 Stat. 1363, | 163 |
7 U.S.C. 901, and owns or operates facilities in this state to | 164 |
generate, transmit, or distribute electricity, or a not-for-profit | 165 |
successor of such company. | 166 |
(6) "Electric distribution utility" means an electric utility | 167 |
that supplies at least retail electric distribution service. | 168 |
(7) "Electric light company" has the same meaning as in | 169 |
section 4905.03 of the Revised Code and includes an electric | 170 |
services company, but excludes any self-generator to the extent | 171 |
that it consumes electricity it so produces, sells that | 172 |
electricity for resale, or obtains electricity from a generating | 173 |
facility it hosts on its premises. | 174 |
(8) "Electric load center" has the same meaning as in section | 175 |
4933.81 of the Revised Code. | 176 |
(9) "Electric services company" means an electric light | 177 |
company that is engaged on a for-profit or not-for-profit basis in | 178 |
the business of supplying or arranging for the supply of only a | 179 |
competitive retail electric service in this state. "Electric | 180 |
services company" includes a power marketer, power broker, | 181 |
aggregator, or independent power producer but excludes an electric | 182 |
cooperative, municipal electric utility, governmental aggregator, | 183 |
or billing and collection agent. | 184 |
(10) "Electric supplier" has the same meaning as in section | 185 |
4933.81 of the Revised Code. | 186 |
(11) "Electric utility" means an electric light company that | 187 |
has a certified territory and is engaged on a for-profit basis | 188 |
either in the business of supplying a noncompetitive retail | 189 |
electric service in this state or in the businesses of supplying | 190 |
both a noncompetitive and a competitive retail electric service in | 191 |
this state. "Electric utility" excludes a municipal electric | 192 |
utility or a billing and collection agent. | 193 |
(12) "Firm electric service" means electric service other | 194 |
than nonfirm electric service. | 195 |
(13) "Governmental aggregator" means a legislative authority | 196 |
of a municipal corporation, a board of township trustees, or a | 197 |
board of county commissioners acting as an aggregator for the | 198 |
provision of a competitive retail electric service under authority | 199 |
conferred under section 4928.20 of the Revised Code. | 200 |
(14) A person acts "knowingly," regardless of the person's | 201 |
purpose, when the person is aware that the person's conduct will | 202 |
probably cause a certain result or will probably be of a certain | 203 |
nature. A person has knowledge of circumstances when the person is | 204 |
aware that such circumstances probably exist. | 205 |
(15) "Level of funding for low-income customer energy | 206 |
efficiency programs provided through electric utility rates" means | 207 |
the level of funds specifically included in an electric utility's | 208 |
rates on October 5, 1999, pursuant to an order of the public | 209 |
utilities commission issued under Chapter 4905. or 4909. of the | 210 |
Revised Code and in effect on October 4, 1999, for the purpose of | 211 |
improving the energy efficiency of housing for the utility's | 212 |
low-income customers. The term excludes the level of any such | 213 |
funds committed to a specific nonprofit organization or | 214 |
organizations pursuant to a stipulation or contract. | 215 |
(16) "Low-income customer assistance programs" means the | 216 |
percentage of income payment plan program, the home energy | 217 |
assistance program, the home weatherization assistance program, | 218 |
and the targeted energy efficiency and weatherization program. | 219 |
(17) "Market development period" for an electric utility | 220 |
means the period of time beginning on the starting date of | 221 |
competitive retail electric service and ending on the applicable | 222 |
date for that utility as specified in section 4928.40 of the | 223 |
Revised Code, irrespective of whether the utility applies to | 224 |
receive transition revenues under this chapter. | 225 |
(18) "Market power" means the ability to impose on customers | 226 |
a sustained price for a product or service above the price that | 227 |
would prevail in a competitive market. | 228 |
(19) "Mercantile customer" means a commercial or industrial | 229 |
customer if the electricity consumed is for nonresidential use and | 230 |
the customer consumes more than seven hundred thousand kilowatt | 231 |
hours per year or is part of a national account involving multiple | 232 |
facilities in one or more states. | 233 |
(20) "Municipal electric utility" means a municipal | 234 |
corporation that owns or operates facilities to generate, | 235 |
transmit, or distribute electricity. | 236 |
(21) "Noncompetitive retail electric service" means a | 237 |
component of retail electric service that is noncompetitive as | 238 |
provided under division (B) of this section. | 239 |
(22) "Nonfirm electric service" means electric service | 240 |
provided pursuant to a schedule filed under section 4905.30 of the | 241 |
Revised Code or pursuant to an arrangement under section 4905.31 | 242 |
of the Revised Code, which schedule or arrangement includes | 243 |
conditions that may require the customer to curtail or interrupt | 244 |
electric usage during nonemergency circumstances upon notification | 245 |
by an electric utility. | 246 |
(23) "Percentage of income payment plan arrears" means funds | 247 |
eligible for collection through the percentage of income payment | 248 |
plan rider, but uncollected as of July 1, 2000. | 249 |
(24) "Person" has the same meaning as in section 1.59 of the | 250 |
Revised Code. | 251 |
(25) "Advanced energy project" means any technologies, | 252 |
products, activities, or management practices or strategies that | 253 |
facilitate the generation or use of electricity or energy and that | 254 |
reduce or support the reduction of energy consumption or support | 255 |
the production of clean, renewable energy for industrial, | 256 |
distribution, commercial, institutional, governmental, research, | 257 |
not-for-profit, or residential energy users, including, but not | 258 |
limited to, advanced energy resources and renewable energy | 259 |
resources. "Advanced energy project" also includes any project | 260 |
described in division (A), (B), or (C) of section 4928.621 of the | 261 |
Revised Code. | 262 |
(26) "Regulatory assets" means the unamortized net regulatory | 263 |
assets that are capitalized or deferred on the regulatory books of | 264 |
the electric utility, pursuant to an order or practice of the | 265 |
public utilities commission or pursuant to generally accepted | 266 |
accounting principles as a result of a prior commission | 267 |
rate-making decision, and that would otherwise have been charged | 268 |
to expense as incurred or would not have been capitalized or | 269 |
otherwise deferred for future regulatory consideration absent | 270 |
commission action. "Regulatory assets" includes, but is not | 271 |
limited to, all deferred demand-side management costs; all | 272 |
deferred percentage of income payment plan arrears; | 273 |
post-in-service capitalized charges and assets recognized in | 274 |
connection with statement of financial accounting standards no. | 275 |
109 (receivables from customers for income taxes); future nuclear | 276 |
decommissioning costs and fuel disposal costs as those costs have | 277 |
been determined by the commission in the electric utility's most | 278 |
recent rate or accounting application proceeding addressing such | 279 |
costs; the undepreciated costs of safety and radiation control | 280 |
equipment on nuclear generating plants owned or leased by an | 281 |
electric utility; and fuel costs currently deferred pursuant to | 282 |
the terms of one or more settlement agreements approved by the | 283 |
commission. | 284 |
(27) "Retail electric service" means any service involved in | 285 |
supplying or arranging for the supply of electricity to ultimate | 286 |
consumers in this state, from the point of generation to the point | 287 |
of consumption. For the purposes of this chapter, retail electric | 288 |
service includes one or more of the following "service | 289 |
components": generation service, aggregation service, power | 290 |
marketing service, power brokerage service, transmission service, | 291 |
distribution service, ancillary service, metering service, and | 292 |
billing and collection service. | 293 |
(28) "Starting date of competitive retail electric service" | 294 |
means January 1, 2001. | 295 |
(29) "Customer-generator" means a user of a net metering | 296 |
system. | 297 |
(30) "Net metering" means measuring the difference in an | 298 |
applicable billing period between the electricity supplied by an | 299 |
electric service provider and the electricity generated by a | 300 |
customer-generator that is fed back to the electric service | 301 |
provider. | 302 |
(31) "Net metering system" means a facility for the | 303 |
production of electrical energy that does all of the following: | 304 |
(a) Uses as its fuel either solar, wind, biomass, landfill | 305 |
gas, or hydropower, or uses a microturbine or a fuel cell; | 306 |
(b) Is located on a customer-generator's premises; | 307 |
(c) Operates in parallel with the electric utility's | 308 |
transmission and distribution facilities; | 309 |
(d) Is intended primarily to offset part or all of the | 310 |
customer-generator's requirements for electricity. | 311 |
(32) "Self-generator" means an entity in this state that owns | 312 |
or hosts on its premises an electric generation facility that | 313 |
produces electricity primarily for the owner's consumption and | 314 |
that may provide any such excess electricity to another entity, | 315 |
whether the facility is installed or operated by the owner or by | 316 |
an agent under a contract. | 317 |
(33) "Rate plan" means the standard service offer in effect | 318 |
on the effective date of the amendment of this section by S.B. 221 | 319 |
of the 127th general assembly, July 31, 2008. | 320 |
(34) "Advanced energy resource" means any of the following: | 321 |
(a) Any method or any modification or replacement of any | 322 |
property, process, device, structure, or equipment that increases | 323 |
the generation output of an electric generating facility to the | 324 |
extent such efficiency is achieved without additional carbon | 325 |
dioxide emissions by that facility; | 326 |
(b) Any distributed generation system consisting of customer | 327 |
cogeneration technology; | 328 |
(c) Clean coal technology that includes a carbon-based | 329 |
product that is chemically altered before combustion to | 330 |
demonstrate a reduction, as expressed as ash, in emissions of | 331 |
nitrous oxide, mercury, arsenic, chlorine, sulfur dioxide, or | 332 |
sulfur trioxide in accordance with the American society of testing | 333 |
and materials standard D1757A or a reduction of metal oxide | 334 |
emissions in accordance with standard D5142 of that society, or | 335 |
clean coal technology that includes the design capability to | 336 |
control or prevent the emission of carbon dioxide, which design | 337 |
capability the commission shall adopt by rule and shall be based | 338 |
on economically feasible best available technology or, in the | 339 |
absence of a determined best available technology, shall be of the | 340 |
highest level of economically feasible design capability for which | 341 |
there exists generally accepted scientific opinion; | 342 |
(d) Advanced nuclear energy technology consisting of | 343 |
generation III technology as defined by the nuclear regulatory | 344 |
commission; other, later technology; or significant improvements | 345 |
to existing facilities; | 346 |
(e) Any fuel cell used in the generation of electricity, | 347 |
including, but not limited to, a proton exchange membrane fuel | 348 |
cell, phosphoric acid fuel cell, molten carbonate fuel cell, or | 349 |
solid oxide fuel cell; | 350 |
(f) Advanced solid waste or construction and demolition | 351 |
debris conversion technology, including, but not limited to, | 352 |
advanced stoker technology, and advanced fluidized bed | 353 |
gasification technology, that results in measurable greenhouse gas | 354 |
emissions reductions as calculated pursuant to the United States | 355 |
environmental protection agency's waste reduction model (WARM); | 356 |
(g) Demand-side management and any energy efficiency | 357 |
improvement; | 358 |
(h) Any new, retrofitted, refueled, or repowered generating | 359 |
facility located in Ohio, including a simple or combined-cycle | 360 |
natural gas generating facility or a generating facility that uses | 361 |
biomass, coal, modular nuclear, or any other fuel as its input; | 362 |
(i) Any uprated capacity of an existing electric generating | 363 |
facility if the uprated capacity results from the deployment of | 364 |
advanced technology. | 365 |
"Advanced energy resource" does not include a waste energy | 366 |
recovery system that is, or has been, included in an energy | 367 |
efficiency program of an electric distribution utility pursuant to | 368 |
requirements under section 4928.66 of the Revised Code. | 369 |
(35) "Air contaminant source" has the same meaning as in | 370 |
section 3704.01 of the Revised Code. | 371 |
(36) "Cogeneration technology" means technology that produces | 372 |
electricity and useful thermal output simultaneously. | 373 |
(37)(a) "Renewable energy resource" means any of the | 374 |
following: | 375 |
(i) Solar photovoltaic or solar thermal energy; | 376 |
(ii) Wind energy; | 377 |
(iii) | 378 |
(iv) Geothermal energy; | 379 |
(v) Fuel derived from solid wastes, as defined in section | 380 |
3734.01 of the Revised Code, through fractionation, biological | 381 |
decomposition, or other process that does not principally involve | 382 |
combustion; | 383 |
(vi) Biomass energy; | 384 |
(vii) Energy produced by cogeneration technology that is | 385 |
placed into service on or before December 31, 2015, and for which | 386 |
more than ninety per cent of the total annual energy input is from | 387 |
combustion of a waste or byproduct gas from an air contaminant | 388 |
source in this state, which source has been in operation since on | 389 |
or before January 1, 1985, provided that the cogeneration | 390 |
technology is a part of a facility located in a county having a | 391 |
population of more than three hundred sixty-five thousand but less | 392 |
than three hundred seventy thousand according to the most recent | 393 |
federal decennial census; | 394 |
(viii) Biologically derived methane gas; | 395 |
(ix) Heat captured from a generator of electricity, boiler, | 396 |
or heat exchanger fueled by biologically derived methane gas; | 397 |
(x) Energy derived from nontreated by-products of the pulping | 398 |
process or wood manufacturing process, including bark, wood chips, | 399 |
sawdust, and lignin in spent pulping liquors. | 400 |
"Renewable energy resource" includes, but is not limited to, | 401 |
any fuel cell used in the generation of electricity, including, | 402 |
but not limited to, a proton exchange membrane fuel cell, | 403 |
phosphoric acid fuel cell, molten carbonate fuel cell, or solid | 404 |
oxide fuel cell; wind turbine located in the state's territorial | 405 |
waters of Lake Erie; methane gas emitted from an abandoned coal | 406 |
mine; waste energy recovery system placed into service or | 407 |
retrofitted on or after the effective date of the amendment of | 408 |
this section by S.B. 315 of the 129th general assembly, September | 409 |
10, 2012, except that a waste energy recovery system described in | 410 |
division (A)(38)(b) of this section may be included only if it was | 411 |
placed into service between January 1, 2002, and December 31, | 412 |
2004; storage facility that will promote the better utilization of | 413 |
a renewable energy resource; or distributed generation system used | 414 |
by a customer to generate electricity from any such energy. | 415 |
"Renewable energy resource" does not include a waste energy | 416 |
recovery system that is, or was, on or after January 1, 2012, | 417 |
included in an energy efficiency program of an electric | 418 |
distribution utility pursuant to requirements under section | 419 |
4928.66 of the Revised Code. | 420 |
(b) As used in division (A)(37) of this section, | 421 |
"hydroelectric facility" means a hydroelectric generating facility | 422 |
that is located at a dam on a river, or on any water discharged to | 423 |
a river, that is within or bordering this state or within or | 424 |
bordering an adjoining state and meets all of the following | 425 |
standards: | 426 |
(i) The facility provides for river flows that are not | 427 |
detrimental for fish, wildlife, and water quality, including | 428 |
seasonal flow fluctuations as defined by the applicable licensing | 429 |
agency for the facility. | 430 |
(ii) The facility demonstrates that it complies with the | 431 |
water quality standards of this state, which compliance may | 432 |
consist of certification under Section 401 of the "Clean Water Act | 433 |
of 1977," 91 Stat. 1598, 1599, 33 U.S.C. 1341, and demonstrates | 434 |
that it has not contributed to a finding by this state that the | 435 |
river has impaired water quality under Section 303(d) of the | 436 |
"Clean Water Act of 1977," 114 Stat. 870, 33 U.S.C. 1313. | 437 |
(iii) The facility complies with mandatory prescriptions | 438 |
regarding fish passage as required by the federal energy | 439 |
regulatory commission license issued for the project, regarding | 440 |
fish protection for riverine, anadromous, and catadromous fish. | 441 |
(iv) The facility complies with the recommendations of the | 442 |
Ohio environmental protection agency and with the terms of its | 443 |
federal energy regulatory commission license regarding watershed | 444 |
protection, mitigation, or enhancement, to the extent of each | 445 |
agency's respective jurisdiction over the facility. | 446 |
(v) The facility complies with provisions of the "Endangered | 447 |
Species Act of 1973," 87 Stat. 884, 16 U.S.C. 1531 to 1544, as | 448 |
amended. | 449 |
(vi) The facility does not harm cultural resources of the | 450 |
area. This can be shown through compliance with the terms of its | 451 |
federal energy regulatory commission license or, if the facility | 452 |
is not regulated by that commission, through development of a plan | 453 |
approved by the Ohio historic preservation office, to the extent | 454 |
it has jurisdiction over the facility. | 455 |
(vii) The facility complies with the terms of its federal | 456 |
energy regulatory commission license or exemption that are related | 457 |
to recreational access, accommodation, and facilities or, if the | 458 |
facility is not regulated by that commission, the facility | 459 |
complies with similar requirements as are recommended by resource | 460 |
agencies, to the extent they have jurisdiction over the facility; | 461 |
and the facility provides access to water to the public without | 462 |
fee or charge. | 463 |
(viii) The facility is not recommended for removal by any | 464 |
federal agency or agency of any state, to the extent the | 465 |
particular agency has jurisdiction over the facility. | 466 |
(38) "Waste energy recovery system" means either of the | 467 |
following: | 468 |
(a) A facility that generates electricity through the | 469 |
conversion of energy from either of the following: | 470 |
(i) Exhaust heat from engines or manufacturing, industrial, | 471 |
commercial, or institutional sites, except for exhaust heat from a | 472 |
facility whose primary purpose is the generation of electricity; | 473 |
(ii) Reduction of pressure in gas pipelines before gas is | 474 |
distributed through the pipeline, provided that the conversion of | 475 |
energy to electricity is achieved without using additional fossil | 476 |
fuels. | 477 |
(b) A facility at a state institution of higher education as | 478 |
defined in section 3345.011 of the Revised Code that recovers | 479 |
waste heat from electricity-producing engines or combustion | 480 |
turbines and that simultaneously uses the recovered heat to | 481 |
produce steam, provided that the facility was placed into service | 482 |
between January 1, 2002, and December 31, 2004. | 483 |
(39) "Smart grid" means capital improvements to an electric | 484 |
distribution utility's distribution infrastructure that improve | 485 |
reliability, efficiency, resiliency, or reduce energy demand or | 486 |
use, including, but not limited to, advanced metering and | 487 |
automation of system functions. | 488 |
(40) "Combined heat and power system" means the coproduction | 489 |
of electricity and useful thermal energy from the same fuel source | 490 |
designed to achieve thermal-efficiency levels of at least sixty | 491 |
per cent, with at least twenty per cent of the system's total | 492 |
useful energy in the form of thermal energy. | 493 |
(B) For the purposes of this chapter, a retail electric | 494 |
service component shall be deemed a competitive retail electric | 495 |
service if the service component is competitive pursuant to a | 496 |
declaration by a provision of the Revised Code or pursuant to an | 497 |
order of the public utilities commission authorized under division | 498 |
(A) of section 4928.04 of the Revised Code. Otherwise, the service | 499 |
component shall be deemed a noncompetitive retail electric | 500 |
service. | 501 |
Sec. 4928.20. (A) The legislative authority of a municipal | 502 |
corporation may adopt an ordinance, or the board of township | 503 |
trustees of a township or the board of county commissioners of a | 504 |
county may adopt a resolution, under which, on or after the | 505 |
starting date of competitive retail electric service, it may | 506 |
aggregate in accordance with this section the retail electrical | 507 |
loads located, respectively, within the municipal corporation, | 508 |
township, or unincorporated area of the county and, for that | 509 |
purpose, may enter into service agreements to facilitate for those | 510 |
loads the sale and purchase of electricity. The legislative | 511 |
authority or board also may exercise such authority jointly with | 512 |
any other such legislative authority or board. For customers that | 513 |
are not mercantile customers, an ordinance or resolution under | 514 |
this division shall specify whether the aggregation will occur | 515 |
only with the prior, affirmative consent of each person owning, | 516 |
occupying, controlling, or using an electric load center proposed | 517 |
to be aggregated or will occur automatically for all such persons | 518 |
pursuant to the opt-out requirements of division (D) of this | 519 |
section. The aggregation of mercantile customers shall occur only | 520 |
with the prior, affirmative consent of each such person owning, | 521 |
occupying, controlling, or using an electric load center proposed | 522 |
to be aggregated. Nothing in this division, however, authorizes | 523 |
the aggregation of the retail electric loads of an electric load | 524 |
center, as defined in section 4933.81 of the Revised Code, that is | 525 |
located in the certified territory of a nonprofit electric | 526 |
supplier under sections 4933.81 to 4933.90 of the Revised Code or | 527 |
an electric load center served by transmission or distribution | 528 |
facilities of a municipal electric utility. | 529 |
(B) If an ordinance or resolution adopted under division (A) | 530 |
of this section specifies that aggregation of customers that are | 531 |
not mercantile customers will occur automatically as described in | 532 |
that division, the ordinance or resolution shall direct the board | 533 |
of elections to submit the question of the authority to aggregate | 534 |
to the electors of the respective municipal corporation, township, | 535 |
or unincorporated area of a county at a special election on the | 536 |
day of the next primary or general election in the municipal | 537 |
corporation, township, or county. The legislative authority or | 538 |
board shall certify a copy of the ordinance or resolution to the | 539 |
board of elections not less than ninety days before the day of the | 540 |
special election. No ordinance or resolution adopted under | 541 |
division (A) of this section that provides for an election under | 542 |
this division shall take effect unless approved by a majority of | 543 |
the electors voting upon the ordinance or resolution at the | 544 |
election held pursuant to this division. | 545 |
(C) Upon the applicable requisite authority under divisions | 546 |
(A) and (B) of this section, the legislative authority or board | 547 |
shall develop a plan of operation and governance for the | 548 |
aggregation program so authorized. Before adopting a plan under | 549 |
this division, the legislative authority or board shall hold at | 550 |
least two public hearings on the plan. Before the first hearing, | 551 |
the legislative authority or board shall publish notice of the | 552 |
hearings once a week for two consecutive weeks in a newspaper of | 553 |
general circulation in the jurisdiction or as provided in section | 554 |
7.16 of the Revised Code. The notice shall summarize the plan and | 555 |
state the date, time, and location of each hearing. | 556 |
(D) No legislative authority or board, pursuant to an | 557 |
ordinance or resolution under divisions (A) and (B) of this | 558 |
section that provides for automatic aggregation of customers that | 559 |
are not mercantile customers as described in division (A) of this | 560 |
section, shall aggregate the electrical load of any electric load | 561 |
center located within its jurisdiction unless it in advance | 562 |
clearly discloses to the person owning, occupying, controlling, or | 563 |
using the load center that the person will be enrolled | 564 |
automatically in the aggregation program and will remain so | 565 |
enrolled unless the person affirmatively elects by a stated | 566 |
procedure not to be so enrolled. The disclosure shall state | 567 |
prominently the rates, charges, and other terms and conditions of | 568 |
enrollment. The stated procedure shall allow any person enrolled | 569 |
in the aggregation program the opportunity to opt out of the | 570 |
program every three years, without paying a switching fee. Any | 571 |
such person that opts out before the commencement of the | 572 |
aggregation program pursuant to the stated procedure shall default | 573 |
to the standard service offer provided under section 4928.14 or | 574 |
division (D) of section 4928.35 of the Revised Code until the | 575 |
person chooses an alternative supplier. | 576 |
(E)(1) With respect to a governmental aggregation for a | 577 |
municipal corporation that is authorized pursuant to divisions (A) | 578 |
to (D) of this section, resolutions may be proposed by initiative | 579 |
or referendum petitions in accordance with sections 731.28 to | 580 |
731.41 of the Revised Code. | 581 |
(2) With respect to a governmental aggregation for a township | 582 |
or the unincorporated area of a county, which aggregation is | 583 |
authorized pursuant to divisions (A) to (D) of this section, | 584 |
resolutions may be proposed by initiative or referendum petitions | 585 |
in accordance with sections 731.28 to 731.40 of the Revised Code, | 586 |
except that: | 587 |
(a) The petitions shall be filed, respectively, with the | 588 |
township fiscal officer or the board of county commissioners, who | 589 |
shall perform those duties imposed under those sections upon the | 590 |
city auditor or village clerk. | 591 |
(b) The petitions shall contain the signatures of not less | 592 |
than ten per cent of the total number of electors in, | 593 |
respectively, the township or the unincorporated area of the | 594 |
county who voted for the office of governor at the preceding | 595 |
general election for that office in that area. | 596 |
(F) A governmental aggregator under division (A) of this | 597 |
section is not a public utility engaging in the wholesale purchase | 598 |
and resale of electricity, and provision of the aggregated service | 599 |
is not a wholesale utility transaction. A governmental aggregator | 600 |
shall be subject to supervision and regulation by the public | 601 |
utilities commission only to the extent of any competitive retail | 602 |
electric service it provides and commission authority under this | 603 |
chapter. | 604 |
(G) This section does not apply in the case of a municipal | 605 |
corporation that supplies such aggregated service to electric load | 606 |
centers to which its municipal electric utility also supplies a | 607 |
noncompetitive retail electric service through transmission or | 608 |
distribution facilities the utility singly or jointly owns or | 609 |
operates. | 610 |
(H) A governmental aggregator shall not include in its | 611 |
aggregation the accounts of any of the following: | 612 |
(1) A customer that has opted out of the aggregation; | 613 |
(2) A customer in contract with a certified electric services | 614 |
company; | 615 |
(3) A customer that has a special contract with an electric | 616 |
distribution utility; | 617 |
(4) A customer that is not located within the governmental | 618 |
aggregator's governmental boundaries; | 619 |
(5) Subject to division (C) of section 4928.21 of the Revised | 620 |
Code, a customer who appears on the "do not aggregate" list | 621 |
maintained under that section. | 622 |
(I) Customers that are part of a governmental aggregation | 623 |
under this section shall be responsible only for such portion of a | 624 |
surcharge under section 4928.144 of the Revised Code that is | 625 |
proportionate to the benefits, as determined by the commission, | 626 |
that electric load centers within the jurisdiction of the | 627 |
governmental aggregation as a group receive. The proportionate | 628 |
surcharge so established shall apply to each customer of the | 629 |
governmental aggregation while the customer is part of that | 630 |
aggregation. If a customer ceases being such a customer, the | 631 |
otherwise applicable surcharge shall apply. Nothing in this | 632 |
section shall result in less than full recovery by an electric | 633 |
distribution utility of any surcharge authorized under section | 634 |
4928.144 of the Revised Code. Nothing in this section shall result | 635 |
in less than the full and timely imposition, charging, collection, | 636 |
and adjustment by an electric distribution utility, its assignee, | 637 |
or any collection agent, of the phase-in-recovery charges | 638 |
authorized pursuant to a final financing order issued pursuant to | 639 |
sections 4928.23 to 4928.2318 of the Revised Code. | 640 |
(J) On behalf of the customers that are part of a | 641 |
governmental aggregation under this section and by filing written | 642 |
notice with the public utilities commission, the legislative | 643 |
authority that formed or is forming that governmental aggregation | 644 |
may elect not to receive standby service within the meaning of | 645 |
division (B)(2)(d) of section 4928.143 of the Revised Code from an | 646 |
electric distribution utility in whose certified territory the | 647 |
governmental aggregation is located and that operates under an | 648 |
approved electric security plan under that section. Upon the | 649 |
filing of that notice, the electric distribution utility shall not | 650 |
charge any such customer to whom competitive retail electric | 651 |
generation service is provided by another supplier under the | 652 |
governmental aggregation for the standby service. Any such | 653 |
consumer that returns to the utility for competitive retail | 654 |
electric service shall pay the market price of power incurred by | 655 |
the utility to serve that consumer plus any amount attributable to | 656 |
the utility's cost of compliance with the | 657 |
energy resource provisions of section 4928.64 of the Revised Code | 658 |
to serve the consumer. Such market price shall include, but not be | 659 |
limited to, capacity and energy charges; all charges associated | 660 |
with the provision of that power supply through the regional | 661 |
transmission organization, including, but not limited to, | 662 |
transmission, ancillary services, congestion, and settlement and | 663 |
administrative charges; and all other costs incurred by the | 664 |
utility that are associated with the procurement, provision, and | 665 |
administration of that power supply, as such costs may be approved | 666 |
by the commission. The period of time during which the market | 667 |
price and | 668 |
assessed on the consumer shall be from the time the consumer so | 669 |
returns to the electric distribution utility until the expiration | 670 |
of the electric security plan. However, if that period of time is | 671 |
expected to be more than two years, the commission may reduce the | 672 |
time period to a period of not less than two years. | 673 |
(K) The commission shall adopt rules to encourage and promote | 674 |
large-scale governmental aggregation in this state. For that | 675 |
purpose, the commission shall conduct an immediate review of any | 676 |
rules it has adopted for the purpose of this section that are in | 677 |
effect on the effective date of the amendment of this section by | 678 |
S.B. 221 of the 127th general assembly, July 31, 2008. Further, | 679 |
within the context of an electric security plan under section | 680 |
4928.143 of the Revised Code, the commission shall consider the | 681 |
effect on large-scale governmental aggregation of any | 682 |
nonbypassable generation charges, however collected, that would be | 683 |
established under that plan, except any nonbypassable generation | 684 |
charges that relate to any cost incurred by the electric | 685 |
distribution utility, the deferral of which has been authorized by | 686 |
the commission prior to the effective date of the amendment of | 687 |
this section by S.B. 221 of the 127th general assembly, July 31, | 688 |
2008. | 689 |
Sec. 4928.64. (A)(1) As used in | 690 |
691 | |
renewable energy resource" means | 692 |
renewable energy resource, as defined in section 4928.01 of the | 693 |
Revised Code that has a placed-in-service date of January 1, 1998, | 694 |
or after; a renewable energy resource created on or after January | 695 |
1, 1998, by the modification or retrofit of any facility placed in | 696 |
service prior to January 1, 1998; or a mercantile customer-sited | 697 |
698 | |
or existing, that the mercantile customer commits for integration | 699 |
into the electric distribution utility's demand-response, energy | 700 |
efficiency, or peak demand reduction programs as provided under | 701 |
division (A)(2)(c) of section 4928.66 of the Revised Code, | 702 |
including, but not limited to, any of the following: | 703 |
(a) A resource that has the effect of improving the | 704 |
relationship between real and reactive power; | 705 |
(b) A resource that makes efficient use of waste heat or | 706 |
other thermal capabilities owned or controlled by a mercantile | 707 |
customer; | 708 |
(c) Storage technology that allows a mercantile customer more | 709 |
flexibility to modify its demand or load and usage | 710 |
characteristics; | 711 |
(d) Electric generation equipment owned or controlled by a | 712 |
mercantile customer that uses | 713 |
renewable energy resource | 714 |
| 715 |
716 | |
717 | |
718 | |
719 | |
720 |
(2) For the purpose of this section and as it considers | 721 |
appropriate, the public utilities commission may classify any new | 722 |
technology as such | 723 |
renewable energy resource. | 724 |
(B)(1) By | 725 |
utility shall provide from | 726 |
resources, including, at its discretion, | 727 |
renewable energy resources obtained pursuant to an electricity | 728 |
supply contract, a portion of the electricity supply required for | 729 |
its standard service offer under section 4928.141 of the Revised | 730 |
Code, and an electric services company shall provide a portion of | 731 |
its electricity supply for retail consumers in this state from | 732 |
733 | |
its discretion, | 734 |
obtained pursuant to an electricity supply contract. That portion | 735 |
shall equal | 736 |
number of kilowatt hours of electricity sold by the subject | 737 |
utility or company to any and all retail electric consumers whose | 738 |
electric load centers are served by that utility and are located | 739 |
within the utility's certified territory or, in the case of an | 740 |
electric services company, are served by the company and are | 741 |
located within this state. However, nothing in this section | 742 |
precludes a utility or company from providing a greater | 743 |
percentage. The baseline for a utility's or company's compliance | 744 |
with the | 745 |
this section shall be the average of such total kilowatt hours it | 746 |
sold in the preceding three calendar years, except that the | 747 |
commission may reduce a utility's or company's baseline to adjust | 748 |
for new economic growth in the utility's certified territory or, | 749 |
in the case of an electric services company, in the company's | 750 |
service area in this state. | 751 |
| 752 |
753 |
| 754 |
(2) | 755 |
of this section shall be generated from renewable energy | 756 |
resources, including one-half per cent from solar energy | 757 |
resources, in accordance with the following benchmarks: | 758 |
By end of year | Renewable energy resources | Solar energy resources | 759 | |
2009 | 0.25% | 0.004% | 760 | |
2010 | 0.50% | 0.010% | 761 | |
2011 | 1% | 0.030% | 762 | |
2012 | 1.5% | 0.060% | 763 | |
2013 | 2% | 0.090% | 764 | |
2014 | 2.5% | 0.12% | 765 | |
2015 | 766 | |||
2016 | 767 | |||
2017 | 768 | |||
2018 | 769 | |||
2019 | 770 | |||
2020 | 771 | |||
2021 | 772 | |||
2022 | 773 | |||
2023 | 774 | |||
2024 |
775 | |||
2025 | 11.5% | 0.46% | 776 | |
2026 and each calendar year thereafter | 12.5% | 0.5%. | 777 |
(3) | 778 |
resources implemented by the utility or company shall be met | 779 |
780 |
(a) Through facilities located in this state; | 781 |
782 |
(b) With resources that can be shown to be deliverable into | 783 |
this state. | 784 |
(C)(1) The commission annually shall review an electric | 785 |
distribution utility's or electric services company's compliance | 786 |
with the most recent applicable benchmark under division (B)(2) of | 787 |
this section and, in the course of that review, shall identify any | 788 |
undercompliance or noncompliance of the utility or company that it | 789 |
determines is weather-related, related to equipment or resource | 790 |
shortages for
| 791 |
resources as applicable, or is otherwise outside the utility's or | 792 |
company's control. | 793 |
(2) Subject to the cost cap provisions of division (C)(3) of | 794 |
this section, if the commission determines, after notice and | 795 |
opportunity for hearing, and based upon its findings in that | 796 |
review regarding avoidable undercompliance or noncompliance, but | 797 |
subject to division (C)(4) of this section, that the utility or | 798 |
company has failed to comply with any such benchmark, the | 799 |
commission shall impose a renewable energy compliance payment on | 800 |
the utility or company. | 801 |
(a) The compliance payment pertaining to the solar energy | 802 |
resource benchmarks under division (B)(2) of this section shall be | 803 |
an amount per megawatt hour of undercompliance or noncompliance in | 804 |
the period under review,
| 805 |
(i) Three hundred | 806 |
and 2016; | 807 |
(ii) Two hundred fifty dollars for | 808 |
809 |
(iii) Two hundred dollars for 2019 and 2020; | 810 |
(iv) Similarly reduced every two years thereafter through | 811 |
812 |
(b) The compliance payment pertaining to the renewable energy | 813 |
resource benchmarks under division (B)(2) of this section shall | 814 |
equal the number of additional renewable energy credits that the | 815 |
electric distribution utility or electric services company would | 816 |
have needed to comply with the applicable benchmark in the period | 817 |
under review times an amount that shall begin at forty-five | 818 |
dollars and shall be adjusted annually by the commission to | 819 |
reflect any change in the consumer price index as defined in | 820 |
section 101.27 of the Revised Code, but shall not be less than | 821 |
forty-five dollars. | 822 |
(c) The compliance payment shall not be passed through by the | 823 |
electric distribution utility or electric services company to | 824 |
consumers. The compliance payment shall be remitted to the | 825 |
commission, for deposit to the credit of the advanced energy fund | 826 |
created under section 4928.61 of the Revised Code. Payment of the | 827 |
compliance payment shall be subject to such collection and | 828 |
enforcement procedures as apply to the collection of a forfeiture | 829 |
under sections 4905.55 to 4905.60 and 4905.64 of the Revised Code. | 830 |
(3) An electric distribution utility or an electric services | 831 |
company need not comply with a benchmark under division (B) | 832 |
(2) of this section to the extent that its reasonably expected | 833 |
cost of that compliance exceeds its reasonably expected cost of | 834 |
otherwise producing or acquiring the requisite electricity by | 835 |
three per cent or more. The cost of compliance shall be calculated | 836 |
as though any exemption from taxes and assessments had not been | 837 |
granted under section 5727.75 of the Revised Code. | 838 |
(4)(a) An electric distribution utility or electric services | 839 |
company may request the commission to make a force majeure | 840 |
determination pursuant to this division regarding all or part of | 841 |
the utility's or company's compliance with any minimum benchmark | 842 |
under division (B)(2) of this section during the period of review | 843 |
occurring pursuant to division (C)(2) of this section. The | 844 |
commission may require the electric distribution utility or | 845 |
electric services company to make solicitations for renewable | 846 |
energy resource credits as part of its default service before the | 847 |
utility's or company's request of force majeure under this | 848 |
division can be made. | 849 |
(b) Within ninety days after the filing of a request by an | 850 |
electric distribution utility or electric services company under | 851 |
division (C)(4)(a) of this section, the commission shall determine | 852 |
if qualifying renewable energy resources are reasonably available | 853 |
in the marketplace in sufficient quantities for the utility or | 854 |
company to comply with the subject minimum benchmark during the | 855 |
review period. In making this determination, the commission shall | 856 |
consider whether the electric distribution utility or electric | 857 |
services company has made a good faith effort to acquire | 858 |
sufficient qualifying renewable energy or, as applicable, solar | 859 |
energy resources to so comply, including, but not limited to, by | 860 |
banking or seeking renewable energy resource credits or by seeking | 861 |
the resources through long-term contracts. Additionally, the | 862 |
commission shall consider the availability of qualifying | 863 |
renewable energy or solar energy resources in this state and other | 864 |
jurisdictions in the PJM interconnection regional transmission | 865 |
organization, L.L.C., or its successor and the
| 866 |
midcontinent independent system operator or its successor. | 867 |
(c) If, pursuant to division (C)(4)(b) of this section, the | 868 |
commission determines that qualifying renewable energy or solar | 869 |
energy resources are not reasonably available to permit the | 870 |
electric distribution utility or electric services company to | 871 |
comply, during the period of review, with the subject minimum | 872 |
benchmark prescribed under division (B)(2) of this section, the | 873 |
commission shall modify that compliance obligation of the utility | 874 |
or company as it determines appropriate to accommodate the | 875 |
finding. Commission modification shall not automatically reduce | 876 |
the obligation for the electric distribution utility's or electric | 877 |
services company's compliance in subsequent years. If it modifies | 878 |
the electric distribution utility or electric services company | 879 |
obligation under division (C)(4)(c) of this section, the | 880 |
commission may require the utility or company, if sufficient | 881 |
renewable energy resource credits exist in the marketplace, to | 882 |
acquire additional renewable energy resource credits in subsequent | 883 |
years equivalent to the utility's or company's modified obligation | 884 |
under division (C)(4)(c) of this section. | 885 |
(5) The commission shall establish a process to provide for | 886 |
at least an annual review of the | 887 |
resource market in this state and in the service territories of | 888 |
the regional transmission organizations that manage transmission | 889 |
systems located in this state. The commission shall use the | 890 |
results of this study to identify any needed changes to the amount | 891 |
of the renewable energy compliance payment specified under | 892 |
divisions (C)(2)(a) and (b) of this section. Specifically, the | 893 |
commission may increase the amount to ensure that payment of | 894 |
compliance payments is not used to achieve compliance with this | 895 |
section in lieu of actually acquiring or realizing energy derived | 896 |
from qualifying renewable energy resources. However, if the | 897 |
commission finds that the amount of the compliance payment should | 898 |
be otherwise changed, the commission shall present this finding to | 899 |
the general assembly for legislative enactment. | 900 |
(D) | 901 |
assembly in accordance with section 101.68 of the Revised Code a | 902 |
report describing all of the following: | 903 |
| 904 |
electric services companies with division (B) of this section; | 905 |
| 906 |
purchased by utilities and companies for the year covered in the | 907 |
report; | 908 |
| 909 |
encouraging the use of | 910 |
resources in supplying this state's electricity needs in a manner | 911 |
that considers available technology, costs, job creation, and | 912 |
economic impacts. | 913 |
The commission shall begin providing the information | 914 |
described in division (D) | 915 |
submitted after | 916 |
917 | |
2012. The commission shall allow and consider public comments on | 918 |
the report prior to its submission to the general assembly. | 919 |
Nothing in the report shall be binding on any person, including | 920 |
any utility or company for the purpose of its compliance with any | 921 |
benchmark under division (B) of this section, or the enforcement | 922 |
of that provision under division (C) of this section. | 923 |
| 924 |
925 | |
926 | |
927 | |
928 | |
929 | |
930 |
(E) All costs incurred by an electric distribution utility in | 931 |
complying with the requirements of this section shall be | 932 |
bypassable by any consumer that has exercised choice of supplier | 933 |
under section 4928.03 of the Revised Code. | 934 |
Sec. 4928.641. (A) If an electric distribution utility has | 935 |
executed a contract before April 1, 2014, to procure renewable | 936 |
energy resources and there are ongoing costs associated with that | 937 |
contract that are being recovered from customers through a | 938 |
bypassable charge as of the effective date of S.B. 310 of the | 939 |
130th general assembly, that cost recovery shall continue on a | 940 |
bypassable basis until the costs associated with that contract are | 941 |
fully recovered. | 942 |
(B) Division (A) of this section applies only to costs | 943 |
associated with the original term of a contract described in that | 944 |
division and entered into before April 1, 2014. This section does | 945 |
not permit recovery of costs associated with an extension of such | 946 |
a contract. This section does not permit recovery of costs | 947 |
associated with an amendment of such a contract if that amendment | 948 |
was made on or after April 1, 2014. | 949 |
Sec. 4928.642. Every contract to procure renewable energy | 950 |
resources or renewable energy credits entered into by an electric | 951 |
distribution utility or an electric services company on or after | 952 |
the effective date of S.B. 310 of the 130th general assembly shall | 953 |
contain a change-of-law provision. Such a provision shall provide | 954 |
that the parties to the contract are released from their | 955 |
obligations under the contract if there is a change in the | 956 |
renewable energy resource requirements, governed by section | 957 |
4928.64 of the Revised Code. | 958 |
| 959 |
or electric services company may use, for the purpose of complying | 960 |
with the requirements under divisions (B)(1) and (2) of section | 961 |
4928.64 of the Revised Code, renewable energy credits any time in | 962 |
the five calendar years following the date of their purchase or | 963 |
acquisition from any entity, including, but not limited to, | 964 |
following: | 965 |
(1) A mercantile customer | 966 |
(2) An owner or operator of a hydroelectric generating | 967 |
facility that is located at a dam on a river, or on any water | 968 |
discharged to a river, that is within or bordering this state or | 969 |
within or bordering an adjoining state,
| 970 |
971 | |
972 | |
973 | |
transmission organization; | 974 |
(3) A seller of compressed natural gas that has been produced | 975 |
from biologically derived methane gas, provided that the seller | 976 |
may only provide renewable energy credits for metered amounts of | 977 |
gas. | 978 |
(B)(1) The public utilities commission shall adopt rules | 979 |
specifying that one unit of credit shall equal one megawatt hour | 980 |
of electricity derived from renewable energy resources, except | 981 |
that, for a generating facility of seventy-five megawatts or | 982 |
greater that is situated within this state and has committed by | 983 |
December 31, 2009, to modify or retrofit its generating unit or | 984 |
units to enable the facility to generate principally from biomass | 985 |
energy by June 30, 2013, each megawatt hour of electricity | 986 |
generated principally from that biomass energy shall equal, in | 987 |
units of credit, the product obtained by multiplying the actual | 988 |
percentage of biomass feedstock heat input used to generate such | 989 |
megawatt hour by the quotient obtained by dividing the then | 990 |
existing unit dollar amount used to determine a renewable energy | 991 |
compliance payment as provided under division (C)(2)(b) of section | 992 |
4928.64 of the Revised Code by the then existing market value of | 993 |
one renewable energy credit, but such megawatt hour shall not | 994 |
equal less than one unit of credit. Renewable energy resources do | 995 |
not have to be converted to electricity in order to be eligible to | 996 |
receive renewable energy credits. The rules shall specify that, | 997 |
for purposes of converting the quantity of energy derived from | 998 |
biologically derived methane gas to an electricity equivalent, one | 999 |
megawatt hour equals 3,412,142 British thermal units. | 1000 |
(2) The rules also shall provide for this state a system of | 1001 |
registering renewable energy credits by specifying which of any | 1002 |
generally available registries shall be used for that purpose and | 1003 |
not by creating a registry. That selected system of registering | 1004 |
renewable energy credits shall allow a hydroelectric generating | 1005 |
facility to be eligible for obtaining renewable energy credits and | 1006 |
shall allow customer-sited projects or actions the broadest | 1007 |
opportunities to be eligible for obtaining renewable energy | 1008 |
credits. | 1009 |
Sec. 4928.65. (A) Not later than January 1, 2015, the public | 1010 |
utilities commission shall adopt rules governing the disclosure of | 1011 |
the costs to customers of the renewable energy resource, energy | 1012 |
efficiency savings, and peak demand reduction requirements of | 1013 |
sections 4928.64 and 4928.66 of the Revised Code. The rules shall | 1014 |
include both of the following requirements: | 1015 |
(1) That every electric distribution utility list, on all | 1016 |
customer bills sent by the utility, including utility consolidated | 1017 |
bills that include both electric distribution utility and electric | 1018 |
services company charges, the individual customer cost of the | 1019 |
utility's compliance with all of the following for the applicable | 1020 |
billing period: | 1021 |
(a) The renewable energy resource requirements under section | 1022 |
4928.64 of the Revised Code, subject to division (B) of this | 1023 |
section; | 1024 |
(b) The energy efficiency savings requirements under section | 1025 |
4928.66 of the Revised Code; | 1026 |
(c) The peak demand reduction requirements under section | 1027 |
4928.66 of the Revised Code. | 1028 |
(2) That every electric services company list, on all | 1029 |
customer bills sent by the company, the individual customer cost, | 1030 |
subject to division (B) of this section, of the company's | 1031 |
compliance with the renewable energy resource requirements under | 1032 |
section 4928.64 of the Revised Code for the applicable billing | 1033 |
period. | 1034 |
(B)(1) For purposes of division (A)(1)(a) of this section, | 1035 |
the cost of compliance with the renewable energy resource | 1036 |
requirements shall be calculated by multiplying the individual | 1037 |
customer's monthly usage by the combined weighted average of | 1038 |
renewable-energy-credit costs, including | 1039 |
solar-renewable-energy-credit costs, paid by all electric | 1040 |
distribution utilities, as listed in the commission's most | 1041 |
recently available alternative energy portfolio standard report. | 1042 |
(2) For purposes of division (A)(2) of this section, the cost | 1043 |
of compliance with the renewable energy resource requirements | 1044 |
shall be calculated by multiplying the individual customer's | 1045 |
monthly usage by the combined weighted average of | 1046 |
renewable-energy-credit costs, including | 1047 |
solar-renewable-energy-credit costs, paid by all electric services | 1048 |
companies, as listed in the commission's most recently available | 1049 |
alternative energy portfolio standard report. | 1050 |
(C) The costs required to be listed under division (A)(1) of | 1051 |
this section shall be listed on each customer's monthly bill as | 1052 |
three distinct line items. The cost required to be listed under | 1053 |
division (A)(2) of this section shall be listed on each customer's | 1054 |
monthly bill as a distinct line item. | 1055 |
Sec. 4928.66. (A)(1)(a) Beginning in 2009, an electric | 1056 |
distribution utility shall implement energy efficiency programs | 1057 |
that achieve energy savings equivalent to at least three-tenths of | 1058 |
one per cent of the total, annual average, and normalized | 1059 |
kilowatt-hour sales of the electric distribution utility during | 1060 |
the preceding three calendar years to customers in this state. An | 1061 |
energy efficiency program may include a combined heat and power | 1062 |
system placed into service or retrofitted on or after the | 1063 |
effective date of the amendment of this section by S.B. 315 of the | 1064 |
129th general assembly, September 10, 2012, or a waste energy | 1065 |
recovery system placed into service or retrofitted on or after | 1066 |
1067 | |
system described in division (A)(38)(b) of section 4928.01 of the | 1068 |
Revised Code may be included only if it was placed into service | 1069 |
between January 1, 2002, and December 31, 2004. For a waste energy | 1070 |
recovery or combined heat and power system, the savings shall be | 1071 |
as estimated by the public utilities commission. The savings | 1072 |
requirement, using such a three-year average, shall increase to an | 1073 |
additional five-tenths of one per cent in 2010, seven-tenths of | 1074 |
one per cent in 2011, eight-tenths of one per cent in 2012, | 1075 |
nine-tenths of one per cent in 2013, and one per cent | 1076 |
1077 | |
achieve energy savings equal to the result of subtracting the | 1078 |
cumulative energy savings achieved since 2009 from the product of | 1079 |
multiplying the baseline for energy savings, described in division | 1080 |
(A)(2)(a) of this section, by four and two-tenths of one per cent. | 1081 |
If the result is zero or less for the year for which the | 1082 |
calculation is being made, the utility shall not be required to | 1083 |
achieve additional energy savings for that year, but may achieve | 1084 |
additional energy savings for that year. Thereafter, the annual | 1085 |
savings requirements shall be, for years 2017, 2018, 2019, and | 1086 |
2020, one per cent of the baseline, and two per cent each year | 1087 |
thereafter, achieving
| 1088 |
excess of twenty-two per cent by the end of | 1089 |
purposes of a waste energy recovery or combined heat and power | 1090 |
system, an electric distribution utility shall not apply more than | 1091 |
the total annual percentage of the electric distribution utility's | 1092 |
industrial-customer load, relative to the electric distribution | 1093 |
utility's total load, to the annual energy savings requirement. | 1094 |
(b) Beginning in 2009, an electric distribution utility shall | 1095 |
implement peak demand reduction programs designed to achieve a one | 1096 |
per cent reduction in peak demand in 2009 and an additional | 1097 |
seventy-five hundredths of one per cent reduction each year | 1098 |
through | 1099 |
1100 | |
1101 | |
1102 | |
achieve a reduction in peak demand equal to the result of | 1103 |
subtracting the cumulative peak demand reductions achieved since | 1104 |
2009 from the product of multiplying the baseline for peak demand | 1105 |
reduction, described in division (A)(2)(a) of this section, by | 1106 |
four and seventy-five hundredths of one per cent. If the result is | 1107 |
zero or less for the year for which the calculation is being made, | 1108 |
the utility shall not be required to achieve an additional | 1109 |
reduction in peak demand for that year, but may achieve an | 1110 |
additional reduction in peak demand for that year. In 2017 and | 1111 |
each year thereafter through 2020, the utility shall achieve an | 1112 |
additional seventy-five hundredths of one per cent reduction in | 1113 |
peak demand | 1114 |
(2) For the purposes of divisions (A)(1)(a) and (b) of this | 1115 |
section: | 1116 |
(a) The baseline for energy savings under division (A)(1)(a) | 1117 |
of this section shall be the average of the total kilowatt hours | 1118 |
the electric distribution utility sold in the preceding three | 1119 |
calendar years | 1120 |
under division (A)(1)(b) of this section shall be the average peak | 1121 |
demand on the utility in the preceding three calendar years, | 1122 |
except that the commission may reduce either baseline to adjust | 1123 |
for new economic growth in the utility's certified territory. | 1124 |
Neither baseline shall include the load and usage of any of the | 1125 |
following customers: | 1126 |
(i) Beginning January 1, 2017, a customer for which a | 1127 |
reasonable arrangement has been approved under section 4905.31 of | 1128 |
the Revised Code; | 1129 |
(ii) A customer that has opted out of the utility's portfolio | 1130 |
plan under section 4928.6611 of the Revised Code; | 1131 |
(iii) A customer that has opted out of the utility's | 1132 |
portfolio plan under Section 8 of S.B. 310 of the 130th general | 1133 |
assembly. | 1134 |
(b) The commission may amend the benchmarks set forth in | 1135 |
division (A)(1)(a) or (b) of this section if, after application by | 1136 |
the electric distribution utility, the commission determines that | 1137 |
the amendment is necessary because the utility cannot reasonably | 1138 |
achieve the benchmarks due to regulatory, economic, or | 1139 |
technological reasons beyond its reasonable control. | 1140 |
(c) Compliance with divisions (A)(1)(a) and (b) of this | 1141 |
section shall be measured by including the effects of all | 1142 |
demand-response programs for mercantile customers of the subject | 1143 |
electric distribution utility, all waste energy recovery systems | 1144 |
and all combined heat and power systems, and all such mercantile | 1145 |
customer-sited energy efficiency, including waste energy recovery | 1146 |
and combined heat and power, and peak demand reduction programs, | 1147 |
adjusted upward by the appropriate loss factors. Any mechanism | 1148 |
designed to recover the cost of energy efficiency, including waste | 1149 |
energy recovery and combined heat and power, and peak demand | 1150 |
reduction programs under divisions (A)(1)(a) and (b) of this | 1151 |
section may exempt mercantile customers that commit their | 1152 |
demand-response or other customer-sited capabilities, whether | 1153 |
existing or new, for integration into the electric distribution | 1154 |
utility's demand-response, energy efficiency, including waste | 1155 |
energy recovery and combined heat and power, or peak demand | 1156 |
reduction programs, if the commission determines that that | 1157 |
exemption reasonably encourages such customers to commit those | 1158 |
capabilities to those programs. If a mercantile customer makes | 1159 |
such existing or new demand-response, energy efficiency, including | 1160 |
waste energy recovery and combined heat and power, or peak demand | 1161 |
reduction capability available to an electric distribution utility | 1162 |
pursuant to division (A)(2)(c) of this section, the electric | 1163 |
utility's baseline under division (A)(2)(a) of this section shall | 1164 |
be adjusted to exclude the effects of all such demand-response, | 1165 |
energy efficiency, including waste energy recovery and combined | 1166 |
heat and power, or peak demand reduction programs that may have | 1167 |
existed during the period used to establish the baseline. The | 1168 |
baseline also shall be normalized for changes in numbers of | 1169 |
customers, sales, weather, peak demand, and other appropriate | 1170 |
factors so that the compliance measurement is not unduly | 1171 |
influenced by factors outside the control of the electric | 1172 |
distribution utility. | 1173 |
(d)(i) Programs implemented by a utility may include | 1174 |
1175 |
(I) Demand-response programs | 1176 |
(II) Smart grid investment programs, provided that such | 1177 |
programs are demonstrated to be cost-beneficial | 1178 |
(III) Customer-sited programs, including waste energy | 1179 |
recovery and combined heat and power systems | 1180 |
(IV) Transmission and distribution infrastructure | 1181 |
improvements that reduce line losses | 1182 |
(V) Energy efficiency savings and peak demand reduction that | 1183 |
are achieved, in whole or in part, as a result of funding provided | 1184 |
from the universal service fund established by section 4928.51 of | 1185 |
the Revised Code to benefit low-income customers through programs | 1186 |
that include, but are not limited to, energy audits, the | 1187 |
installation of energy efficiency insulation, appliances, and | 1188 |
windows, and other weatherization measures. No energy efficiency | 1189 |
or peak demand reduction achieved under division (A)(2)(d)(i)(V) | 1190 |
of this section shall qualify for shared savings. | 1191 |
(ii) Division (A)(2)(c) of this section shall be applied to | 1192 |
include facilitating efforts by a mercantile customer or group of | 1193 |
those customers to offer customer-sited demand-response, energy | 1194 |
efficiency, including waste energy recovery and combined heat and | 1195 |
power, or peak demand reduction capabilities to the electric | 1196 |
distribution utility as part of a reasonable arrangement submitted | 1197 |
to the commission pursuant to section 4905.31 of the Revised Code. | 1198 |
(e) No programs or improvements described in division | 1199 |
(A)(2)(d) of this section shall conflict with any statewide | 1200 |
building code adopted by the board of building standards. | 1201 |
(B) In accordance with rules it shall adopt, the public | 1202 |
utilities commission shall produce and docket at the commission an | 1203 |
annual report containing the results of its verification of the | 1204 |
annual levels of energy efficiency and of peak demand reductions | 1205 |
achieved by each electric distribution utility pursuant to | 1206 |
division (A) of this section. A copy of the report shall be | 1207 |
provided to the consumers' counsel. | 1208 |
(C) If the commission determines, after notice and | 1209 |
opportunity for hearing and based upon its report under division | 1210 |
(B) of this section, that an electric distribution utility has | 1211 |
failed to comply with an energy efficiency or peak demand | 1212 |
reduction requirement of division (A) of this section, the | 1213 |
commission shall assess a forfeiture on the utility as provided | 1214 |
under sections 4905.55 to 4905.60 and 4905.64 of the Revised Code, | 1215 |
either in the amount, per day per undercompliance or | 1216 |
noncompliance, relative to the period of the report, equal to that | 1217 |
prescribed for noncompliances under section 4905.54 of the Revised | 1218 |
Code, or in an amount equal to the then existing market value of | 1219 |
one renewable energy credit per megawatt hour of undercompliance | 1220 |
or noncompliance. Revenue from any forfeiture assessed under this | 1221 |
division shall be deposited to the credit of the advanced energy | 1222 |
fund created under section 4928.61 of the Revised Code. | 1223 |
(D) The commission may establish rules regarding the content | 1224 |
of an application by an electric distribution utility for | 1225 |
commission approval of a revenue decoupling mechanism under this | 1226 |
division. Such an application shall not be considered an | 1227 |
application to increase rates and may be included as part of a | 1228 |
proposal to establish, continue, or expand energy efficiency or | 1229 |
conservation programs. The commission by order may approve an | 1230 |
application under this division if it determines both that the | 1231 |
revenue decoupling mechanism provides for the recovery of revenue | 1232 |
that otherwise may be forgone by the utility as a result of or in | 1233 |
connection with the implementation by the electric distribution | 1234 |
utility of any energy efficiency or energy conservation programs | 1235 |
and reasonably aligns the interests of the utility and of its | 1236 |
customers in favor of those programs. | 1237 |
(E) The commission additionally shall adopt rules that | 1238 |
require an electric distribution utility to provide a customer | 1239 |
upon request with two years' consumption data in an accessible | 1240 |
form. | 1241 |
Sec. 4928.662. For the purpose of measuring and determining | 1242 |
compliance with the energy efficiency and peak demand reduction | 1243 |
requirements under section 4928.66 of the Revised Code, the public | 1244 |
utilities commission shall count and recognize compliance as | 1245 |
follows: | 1246 |
(A) Energy efficiency savings and peak demand reduction | 1247 |
achieved through actions taken by customers or through electric | 1248 |
distribution utility programs that comply with federal standards | 1249 |
for either or both energy efficiency and peak demand reduction | 1250 |
requirements, including resources associated with such savings or | 1251 |
reduction that are recognized as capacity resources by the | 1252 |
regional transmission organization operating in Ohio in compliance | 1253 |
with section 4928.12 of the Revised Code, shall count toward | 1254 |
compliance with the energy efficiency and peak demand reduction | 1255 |
requirements. | 1256 |
(B) Energy efficiency savings and peak demand reduction | 1257 |
achieved on and after the effective date of S.B. 310 of the 130th | 1258 |
general assembly shall be measured on the higher of an as found or | 1259 |
deemed basis, except that, solely at the option of the electric | 1260 |
distribution utility, such savings and reduction achieved since | 1261 |
2006 may also be measured using this method. For new construction, | 1262 |
the energy efficiency savings and peak demand reduction shall be | 1263 |
counted based on 2008 federal standards, provided that when new | 1264 |
construction replaces an existing facility, the difference in | 1265 |
energy consumed, energy intensity, and peak demand between the new | 1266 |
and replaced facility shall be counted toward meeting the energy | 1267 |
efficiency and peak demand reduction requirements. | 1268 |
(C) The commission shall count both the energy efficiency | 1269 |
savings and peak demand reduction on an annualized basis. | 1270 |
(D) The commission shall count both the energy efficiency | 1271 |
savings and peak demand reduction on a gross savings basis. | 1272 |
(E) The commission shall count energy efficiency savings and | 1273 |
peak demand reductions associated with transmission and | 1274 |
distribution infrastructure improvements that reduce line losses. | 1275 |
(F) The commission shall recognize and count all energy | 1276 |
efficiency savings and peak demand reduction that are physically | 1277 |
located within the certified territory of the electric | 1278 |
distribution utility and are bid into the regional transmission | 1279 |
organization operating in Ohio in compliance with section 4928.12 | 1280 |
of the Revised Code capacity auctions as energy efficiency | 1281 |
resources and demand response resources toward the peak demand | 1282 |
reduction requirements. No energy efficiency or peak demand | 1283 |
reduction achieved under division (F) of this section shall | 1284 |
qualify for shared savings. | 1285 |
(G) Energy efficiency savings and peak demand reduction | 1286 |
amounts approved by the commission shall continue to be counted | 1287 |
toward achieving the energy efficiency and peak demand reduction | 1288 |
requirements as long as the requirements remain in effect. | 1289 |
(H) Any energy efficiency savings or peak demand reduction | 1290 |
amount achieved in excess of the requirements may, at the | 1291 |
discretion of the electric distribution utility, be banked and | 1292 |
applied toward achieving the energy efficiency or peak demand | 1293 |
reduction requirements in future years. | 1294 |
Sec. 4928.6610. As used in sections 4928.6611 to 4928.6616 | 1295 |
of the Revised Code: | 1296 |
(A) "Customer" means any retail customer of an electric | 1297 |
distribution utility to which either of the following applies: | 1298 |
(1) The retail customer receives service above the primary | 1299 |
voltage level as determined by the utility's tariff | 1300 |
classification. | 1301 |
(2) The retail customer is a commercial or industrial | 1302 |
customer to which both of the following apply: | 1303 |
(a) The retail customer receives electricity through a meter | 1304 |
of an end user or through more than one meter at a single location | 1305 |
in a quantity that exceeds forty-five million kilowatt hours of | 1306 |
electricity for the preceding calendar year. | 1307 |
(b) The retail customer has made a written request for | 1308 |
registration as a self-assessing purchaser pursuant to section | 1309 |
5727.81 of the Revised Code. | 1310 |
(B) "Portfolio plan" means the comprehensive energy | 1311 |
efficiency and peak-demand reduction program portfolio plan | 1312 |
required under rules adopted by the public utilities commission | 1313 |
and codified in Chapter 4901:1-39 of the Administrative Code or | 1314 |
hereafter recodified or amended. | 1315 |
Sec. 4928.6611. Beginning January 1, 2017, a customer of an | 1316 |
electric distribution utility may opt out of the opportunity and | 1317 |
ability to obtain direct benefits from the utility's portfolio | 1318 |
plan. Such an opt out shall extend to all of the customer's | 1319 |
accounts, irrespective of the size or service voltage level that | 1320 |
are associated with the activities performed by the customer and | 1321 |
that are located on or adjacent to the customer's premises. | 1322 |
Sec. 4928.6612. Any customer electing to opt out under | 1323 |
section 4928.6611 of the Revised Code shall do so by providing a | 1324 |
verified written notice of intent to opt out to the electric | 1325 |
distribution utility from which it receives service and submitting | 1326 |
a complete copy of the opt-out notice to the secretary of the | 1327 |
public utilities commission. | 1328 |
The notice provided to the utility shall include all of the | 1329 |
following: | 1330 |
(A) A statement indicating that the customer has elected to | 1331 |
opt out; | 1332 |
(B) The effective date of the election to opt out; | 1333 |
(C) The account number for each customer account to which the | 1334 |
opt out shall apply; | 1335 |
(D) The physical location of the customer's load center; | 1336 |
(E) The date upon which the customer established, or plans to | 1337 |
establish a process and implement, cost-effective measures to | 1338 |
improve its energy efficiency savings and peak demand reductions. | 1339 |
Sec. 4928.6613. Upon a customer's election to opt out under | 1340 |
section 4928.6611 of the Revised Code and commencing on the | 1341 |
effective date of the election to opt out, no account properly | 1342 |
identified in the customer's verified notice under division (C) of | 1343 |
section 4928.6612 of the Revised Code shall be subject to any cost | 1344 |
recovery mechanism under section 4928.66 of the Revised Code or | 1345 |
eligible to participate in, or directly benefit from, programs | 1346 |
arising from electric distribution utility portfolio plans | 1347 |
approved by the public utilities commission. | 1348 |
Sec. 4928.6614. (A) A customer subsequently may opt in to an | 1349 |
electric distribution utility's portfolio plan after a previous | 1350 |
election to opt out under section 4928.6611 of the Revised Code if | 1351 |
both of the following apply: | 1352 |
(1) The customer has previously opted out for a period of at | 1353 |
least three consecutive calendar years. | 1354 |
(2) The customer gives twelve months' advance notice of its | 1355 |
intent to opt in to the public utilities commission and the | 1356 |
electric distribution utility from which it receives service. | 1357 |
(B) A customer that opts in under this section shall maintain | 1358 |
its opt-in status for three consecutive calendar years before | 1359 |
being eligible subsequently to exercise its right to opt out after | 1360 |
giving the utility twelve months' advance notice. | 1361 |
Sec. 4928.6615. Any customer electing to opt in under | 1362 |
section 4928.6614 of the Revised Code shall do so by providing a | 1363 |
written notice of intent to opt in to the electric distribution | 1364 |
utility from which it receives service and submitting a complete | 1365 |
copy of the opt-in notice to the secretary of the public utilities | 1366 |
commission. The notice shall include all of the following: | 1367 |
(A) A statement indicating that the customer has elected to | 1368 |
opt in; | 1369 |
(B) The effective date of the election to opt in; | 1370 |
(C) The account number for each customer account to which the | 1371 |
opt in shall apply; | 1372 |
(D) The physical location of the customer's load center. | 1373 |
Sec. 4928.6616. (A) Upon a customer's election to opt out | 1374 |
under section 4928.6611 of the Revised Code, the customer shall | 1375 |
prepare and submit a report to the staff of the public utilities | 1376 |
commission. The report shall, for the period that the opt out is | 1377 |
in effect, summarize the energy efficiency and peak demand | 1378 |
reduction measures implemented by the customer and identify the | 1379 |
cumulative energy efficiency savings and peak demand reductions | 1380 |
achieved. The report shall be verified by the customer and filed | 1381 |
at least once every three years following the date of the | 1382 |
customer's election to opt out. | 1383 |
(B) Upon submission of a report, the staff of the commission | 1384 |
may request the customer to provide additional information on the | 1385 |
measures adopted by the customer and the amount of energy | 1386 |
efficiency savings and peak demand reductions achieved during the | 1387 |
period covered by the report. | 1388 |
(C) All information contained in a report submitted under | 1389 |
this section and any customer responses to requests for additional | 1390 |
information shall be deemed to be confidential, proprietary, and a | 1391 |
trade secret. No such information or response shall be publicly | 1392 |
divulged without written authorization by the customer or used for | 1393 |
any purpose other than to identify the measures adopted by the | 1394 |
customer and the quantity of energy efficiency savings and peak | 1395 |
demand reductions achieved by the customer. | 1396 |
Section 2. That existing sections 3706.25, 4928.01, 4928.20, | 1397 |
4928.64, 4928.65, and 4928.66 of the Revised Code are hereby | 1398 |
repealed. | 1399 |
Section 3. It is the intent of the General Assembly to ensure | 1400 |
that customers in Ohio have access to affordable energy. It is the | 1401 |
intent of the General Assembly to incorporate as many forms of | 1402 |
inexpensive, reliable energy sources in the state of Ohio as | 1403 |
possible. It is also the intent of the General Assembly to get a | 1404 |
better understanding of how energy mandates impact jobs and the | 1405 |
economy in Ohio and to minimize government mandates. Because the | 1406 |
energy mandates in current law may be unrealistic and | 1407 |
unattainable, it is the intent of the General Assembly to review | 1408 |
all energy resources as part of its efforts to address energy | 1409 |
pricing issues. | 1410 |
Therefore, it is the intent of the General Assembly to enact | 1411 |
legislation in the future, after taking into account the | 1412 |
recommendations of the Energy Mandates Study Committee, that will | 1413 |
reduce the mandates in sections 4928.64 and 4928.66 of the Revised | 1414 |
Code and provide greater transparency to electric customers on the | 1415 |
costs of future energy mandates, if there are to be any. | 1416 |
Section 4. (A) There is hereby created the Energy Mandates | 1417 |
Study Committee to study Ohio's renewable energy, energy | 1418 |
efficiency, and peak demand reduction mandates. The Committee | 1419 |
shall consist of the following members: | 1420 |
(1) Six members of the House of Representatives appointed by | 1421 |
the Speaker of the House of Representatives, with not more than | 1422 |
four members from the same political party; | 1423 |
(2) Six members of the Senate appointed by the President of | 1424 |
the Senate, with not more than four members from the same | 1425 |
political party; | 1426 |
(3) The chairperson of the Public Utilities Commission, as an | 1427 |
exoffcio, nonvoting member. | 1428 |
(B) The Speaker of the House of Representatives and the | 1429 |
President of the Senate shall each appoint one member of the | 1430 |
Committee to serve as a cochairperson of the Committee. Any | 1431 |
vacancies that occur on the Committee shall be filled in the same | 1432 |
manner as the original appointment. | 1433 |
(C) Not later than September 30, 2015, the Committee shall | 1434 |
submit a report of its findings to the House of Representatives | 1435 |
and the Senate in accordance with division (B) of section 101.68 | 1436 |
of the Revised Code. The Committee shall cease to exist on October | 1437 |
1, 2015. The report shall include, at a minimum, all of the | 1438 |
following: | 1439 |
(1) A cost-benefit analysis of the renewable energy, energy | 1440 |
efficiency, and peak demand reduction mandates, including the | 1441 |
projected costs on electric customers if the mandates were to | 1442 |
remain at the percentage levels required under sections 4928.64 | 1443 |
and 4928.66 of the Revised Code, as amended by this act; | 1444 |
(2) A recommendation of the best, evidence-based standard for | 1445 |
reviewing the mandates in the future, including an examination of | 1446 |
readily available technology to attain such a standard; | 1447 |
(3) The potential benefits of an opt-in system for the | 1448 |
mandates, in contrast to an opt-out system for the mandates, and a | 1449 |
recommendation as to whether an opt-in system should apply to all | 1450 |
electric customers, whether an opt-out system should apply to only | 1451 |
certain customers, or whether a hybrid of these two systems is | 1452 |
recommended; | 1453 |
(4) A review of the risk of increased grid congestion due to | 1454 |
the anticipated retirement of coal-fired generation capacity and | 1455 |
other factors; the ability of distributed generation, including | 1456 |
combined heat and power and waste energy recovery, to reduce | 1457 |
electric grid congestion; and the potential benefit to all energy | 1458 |
consumers resulting from reduced grid congestion; | 1459 |
(5) An analysis of whether there are alternatives for the | 1460 |
development of advanced energy resources as that term is defined | 1461 |
in section 4928.01 of the Revised Code. | 1462 |
Section 5. As used in Sections 6, 7, 8, 9, 10, and 11 of this | 1463 |
act: | 1464 |
"Customer" and "portfolio plan" have the same meanings as in | 1465 |
section 4928.6610 of the Revised Code. | 1466 |
"Electric distribution utility" has the same meaning as in | 1467 |
section 4928.01 of the Revised Code. | 1468 |
Section 6. (A) If an electric distribution utility has a | 1469 |
portfolio plan that is in effect on the effective date of this | 1470 |
section, the utility shall do either of the following, at its sole | 1471 |
discretion: | 1472 |
(1) Continue to implement the portfolio plan with no | 1473 |
amendments to the plan, for the duration that the Public Utilities | 1474 |
Commission originally approved, subject to divisions (D) and (E) | 1475 |
of this section; | 1476 |
(2) Seek an amendment of the portfolio plan under division | 1477 |
(B) of this section. | 1478 |
(B)(1) An electric distribution utility that seeks to amend | 1479 |
its portfolio plan under division (A)(2) of this section shall | 1480 |
file an application with the Commission to amend the plan not | 1481 |
later than thirty days after the effective date of this section. | 1482 |
The Commission shall review the application in accordance with its | 1483 |
rules as if the application were for a new portfolio plan. The | 1484 |
Commission shall review and approve, or modify and approve, the | 1485 |
application not later than sixty days after the date that the | 1486 |
application is filed. Any portfolio plan amended under this | 1487 |
division shall take effect on January 1, 2015, and expire on | 1488 |
December 31, 2016. If the Commission fails to review and approve, | 1489 |
or modify and approve, the application on or before January 1, | 1490 |
2015, the plan shall be deemed approved as amended in the | 1491 |
application and shall take effect on January 1, 2015, and expire | 1492 |
on December 31, 2016. | 1493 |
(2) Section 4928.66 of the Revised Code, as amended by this | 1494 |
act, shall apply to an electric distribution utility that applies | 1495 |
to amend its portfolio plan under division (B) of this section. | 1496 |
(C) If an electric distribution utility fails to file an | 1497 |
application to amend its portfolio plan under division (B) of this | 1498 |
section within the required thirty-day period, the electric | 1499 |
distribution utility shall proceed in accordance with division | 1500 |
(A)(1) of this section. | 1501 |
(D) If an electric distribution utility implements its | 1502 |
portfolio plan under division (A)(1) of this section for the | 1503 |
plan's original duration and if the plan expires before December | 1504 |
31, 2016, the Commission shall automatically extend the plan | 1505 |
through December 31, 2016, with no amendments to the plan. | 1506 |
(E)(1) The provisions of section 4928.66 of the Revised Code, | 1507 |
as it existed prior to the effective date of this section, shall | 1508 |
apply to an electric distribution utility that has a portfolio | 1509 |
plan that is implemented under division (A)(1) of this section for | 1510 |
either of the following time periods: | 1511 |
(a) The plan's original duration; | 1512 |
(b) The plan's original duration and then, until December 31, | 1513 |
2016, if the plan is extended under division (D) of this section. | 1514 |
(2) Beginning January 1, 2017, the provisions of section | 1515 |
4928.66 of the Revised Code as amended by this act shall apply to | 1516 |
the electric distribution utility. | 1517 |
Section 7. (A) The Public Utilities Commission shall neither | 1518 |
review nor approve an application for a portfolio plan if the | 1519 |
application is pending on the effective date of this section. | 1520 |
(B) Prior to January 1, 2017, the Commission shall not take | 1521 |
any action with regard to any portfolio plan or application | 1522 |
regarding a portfolio plan, except those actions expressly | 1523 |
authorized or required by Section 6 of this act and actions | 1524 |
necessary to administer the implementation of existing portfolio | 1525 |
plans. | 1526 |
Section 8. Beginning January 1, 2015, a customer of an | 1527 |
electric distribution utility may opt out of the opportunity and | 1528 |
ability to obtain direct benefits from the utility's portfolio | 1529 |
plan that is amended under division (B) of Section 6 of this act. | 1530 |
The opt out shall apply only to the amended plan. The opt out | 1531 |
shall extend to all of the customer's accounts, irrespective of | 1532 |
the size or service voltage level that are associated with the | 1533 |
activities performed by the customer and that are located on or | 1534 |
adjacent to the customer's premises. | 1535 |
Section 9. Any customer electing to opt out under Section 8 | 1536 |
of this act shall do so by providing a verified written notice of | 1537 |
intent to opt out to the electric distribution utility from which | 1538 |
it receives service and submitting a complete copy of the opt-out | 1539 |
notice to the Secretary of the Public Utilities Commission. | 1540 |
The notice provided to the utility shall include all of the | 1541 |
following: | 1542 |
(A) A statement indicating that the customer has elected to | 1543 |
opt out; | 1544 |
(B) The effective date of the election to opt out; | 1545 |
(C) The account number for each customer account to which the | 1546 |
opt out shall apply; | 1547 |
(D) The physical location of the customer's load center; | 1548 |
(E) The date upon which the customer established, or plans to | 1549 |
establish a process and implement, cost-effective measures to | 1550 |
improve its energy efficiency savings and peak demand reductions. | 1551 |
Section 10. Upon a customer's election to opt out under | 1552 |
Section 8 of this act and commencing on the effective date of the | 1553 |
election to opt out, no account properly identified in the | 1554 |
customer's verified notice under division (C) of Section 9 of this | 1555 |
act shall be subject to any cost recovery mechanism under section | 1556 |
4928.66 of the Revised Code, as amended by this act, for the | 1557 |
duration of the amended portfolio plan or eligible to participate | 1558 |
in, or directly benefit from, programs arising from the amended | 1559 |
portfolio plan. | 1560 |
Section 11. (A) Upon a customer's election to opt out under | 1561 |
Section 8 of this act, the customer shall prepare and submit a | 1562 |
report to the staff of the Public Utilities Commission. The report | 1563 |
shall, for the period that the opt out is in effect, summarize the | 1564 |
energy efficiency and peak demand reduction measures implemented | 1565 |
by the customer and identify the cumulative energy efficiency | 1566 |
savings and peak demand reductions achieved. The report shall be | 1567 |
verified by the customer and filed not later than January 1, 2017. | 1568 |
(B) Upon submission of the report, the staff of the | 1569 |
Commission may request the customer to provide additional | 1570 |
information on the measures adopted by the customer and the amount | 1571 |
of energy efficiency savings and peak demand reductions achieved | 1572 |
during the period covered by the report. | 1573 |
(C) All information contained in a report submitted under | 1574 |
this section and any customer responses to requests for additional | 1575 |
information shall be deemed to be confidential, proprietary, and a | 1576 |
trade secret. No such information or response shall be publicly | 1577 |
divulged without written authorization by the customer or used for | 1578 |
any purpose other than to identify the measures adopted by the | 1579 |
customer and the quantity of energy efficiency savings and peak | 1580 |
demand reductions achieved by the customer. | 1581 |