Bill Title: Establishes a highway and depot charging needs evaluation to assist in achieving targets set forth by the climate leadership and community protection act, zero-emissions vehicle sales target and regulations, including the advanced clean truck, advanced clean cars II rules and the zero-emissions school bus mandate.

Spectrum: Moderate Partisan Bill (Democrat 8-1)

Status: (Introduced) 2023-06-08 - SUBSTITUTED BY A5052C [S04830 Detail]

Download: New_York-2023-S04830-Introduced.html



                STATE OF NEW YORK
        ________________________________________________________________________

                                          4830

                               2023-2024 Regular Sessions

                    IN SENATE

                                    February 15, 2023
                                       ___________

        Introduced  by  Sen. KENNEDY -- read twice and ordered printed, and when
          printed to be committed to the Committee on Corporations,  Authorities
          and Commissions

        AN  ACT  to amend the public authorities law and the public service law,
          in relation to establishing a highway and depot charging action plan

          The People of the State of New York, represented in Senate and  Assem-
        bly, do enact as follows:

     1    Section 1. Legislative findings. In order to achieve targets set forth
     2  by  the  climate leadership and community protection act, zero-emissions
     3  vehicle sales target and regulations, including the advanced clean truck
     4  and advanced clean cars II rules, zero-emissions school bus mandate, and
     5  other relevant goals, the interests of the people of the state would  be
     6  served by:
     7    1.  Coordinating  efforts  to  plan for electric vehicle fast-charging
     8  deployment on New York's highways;
     9    2. Identifying priority sites for  the  deployment  of  fast  chargers
    10  along  New  York's  highways, estimating future charging demand at these
    11  sites for all vehicle classes, and identifying necessary  electric  grid
    12  transmission   and   distribution   infrastructure  and  interconnection
    13  upgrades at these sites;
    14    3. Expediting electric grid transmission and distribution  infrastruc-
    15  ture  and  interconnection  upgrades at sites controlled by the New York
    16  state thruway authority, sufficient to future-proof  thruway  sites  for
    17  accelerated fast charger deployment to serve light duty, medium duty and
    18  heavy duty vehicles; and
    19    4.    Identifying additional high priority areas for the deployment of
    20  charging for medium and heavy duty vehicles, such as school buses, tran-
    21  sit buses, and other light,  medium  and  heavy  duty  commercial  fleet
    22  depots, and removing barriers to charging deployment, including electric
    23  infrastructure constraints.

         EXPLANATION--Matter in italics (underscored) is new; matter in brackets
                              [ ] is old law to be omitted.
                                                                   LBD09078-02-3

        S. 4830                             2

     1    §  2.  The  public  authorities law is amended by adding a new section
     2  1885 to read as follows:
     3    § 1885. Highway and depot charging action plan.  1. Within nine months
     4  of the effective date of this section, and every three years thereafter,
     5  the  authority,  in  consultation with the department of transportation,
     6  the department of motor vehicles, the New York state thruway  authority,
     7  the  New  York  power  authority,  the  Long Island power authority, the
     8  department of environmental conservation, and the electric  distribution
     9  and  local  transmission  utilities,  shall  develop a highway and depot
    10  charging action plan. The charging action plan shall:
    11    (a) support and complement planning by the department  of  transporta-
    12  tion for fast charger deployment along alternative fuel corridors;
    13    (b)  identify  the number and location of fast chargers along priority
    14  highway corridors, including fast chargers currently in operation and in
    15  development;
    16    (c) estimate future need for fast charger  deployment  along  priority
    17  highway  corridors  for the purposes of (i) facilitating the cost-effec-
    18  tive and timely achievement of mandates,  and  any  amendments  thereto,
    19  under  (1)  article  seventy-five of the environmental conservation law,
    20  (2) section 19-0306-b of the environmental  conservation  law  regarding
    21  zero-emissions  vehicle  sales  targets,  (3)  rules and regulations for
    22  zero-emissions vehicles adopted by  the  commissioner  of  environmental
    23  conservation,  and  (4)  other relevant and applicable federal and state
    24  rules or regulations or local requirements or goals to reduce  transpor-
    25  tation  sector  emissions; and (ii) supporting electric vehicle adoption
    26  by consumers and fleet operators;
    27    (d) identify the number and location of highway charging hubs, includ-
    28  ing but not limited to thruway charging hubs, currently in operation and
    29  in development along priority highway corridors;
    30    (e) estimate total charging capacity  required  to  serve  light duty,
    31  medium duty, and heavy duty electric vehicles at each  highway  charging
    32  hub through at least the year two thousand fifty;
    33    (f)  to  the  extent  practicable, identify the number and location of
    34  commercial and public fleet vehicles in operation, including their  body
    35  type, fuel type, model year, zip code, and  other  relevant  information
    36  needed  to  forecast the number and location of zero-emissions vehicles,
    37  per state policy;
    38    (g) identify the number and location of fleet charging zones;
    39    (h) estimate future need for charging deployment and charging capacity
    40  in the fleet charging zones, sufficient to satisfy the targets and regu-
    41  lations identified in paragraph (c) of this section; and
    42    (i) seek to optimize fast charger deployment among the highway  charg-
    43  ing  hubs  and  charging  development  among the fleet charging zones to
    44  reduce the cost of interconnection,  electric  distribution,  and  local
    45  transmission upgrades while serving projected vehicle traffic volumes.
    46    2.  The  authority  shall  develop a stakeholder engagement process to
    47  raise consumer awareness and education  across  the  state  and  solicit
    48  feedback  from the public, representatives or residents of environmental
    49  justice or disadvantaged communities,  electric  vehicle  manufacturers,
    50  electric  vehicle  supply  equipment manufacturers, fleet operators, and
    51  others on the highway and depot charging action plan.    To  the  extent
    52  practicable  and consistent with applicable timelines, the authority may
    53  coordinate the highway and depot charging action plan stakeholder  input
    54  process  with  the process set forth in section eighteen hundred eighty-
    55  four of this article.

        S. 4830                             3

     1    3. The authority shall submit the highway and depot charging  plan  to
     2  the public service commission no later than nine months after the effec-
     3  tive date of this section and an updated charging plan every three years
     4  thereafter.  The  highway  and  depot charging action plan shall be made
     5  publicly available on the authority's website.
     6    4.  To  facilitate  development  of  a fast charging network along the
     7  priority highway corridors as set forth in  this  section,  the  highway
     8  charging action plan shall designate locations as highway charging hubs,
     9  as follows:
    10    (a)  All thruway charging hubs shall be designated as highway charging
    11  hubs.
    12    (b) Additional sites or geographic  areas  shall  be  prioritized  for
    13  designation as highway charging hubs based on (i) eligibility for feder-
    14  al,  state, or other funding opportunities, including but not limited to
    15  needs identified through the NEVI formula program planning process, (ii)
    16  proximity to electric transmission infrastructure, (iii) projected vehi-
    17  cle traffic, (iv) charging network coverage, (v) interstate  and  intra-
    18  state commerce, (vi) benefits to environmental justice and disadvantaged
    19  communities,  (vii) benefits of increased charging accessibility in host
    20  communities, (viii) real property  ownership  or  control  of  potential
    21  sites,  (ix)  relevant  commitments from site and/or charging operators,
    22  and (x) other factors deemed relevant for the development and successful
    23  implementation of the highway charging action plan.
    24    (c) Highway charging hubs shall be within one  mile  of  the  priority
    25  highway  corridors,  spaced  no  more  than  fifty miles apart along the
    26  priority highway  corridors  and  reasonably  accessible  regardless  of
    27  direction of travel.
    28    (d) The authority may consider privately operated sites which are open
    29  to  the  public  or  multiple commercial entities as eligible for desig-
    30  nation as a highway charging hub, subject to reasonable restrictions.
    31    (e) A single highway charging hub may be comprised of multiple  charg-
    32  ing service areas within a reasonable distance from one another.
    33    5.  Geographic  areas  shall  be  prioritized for designation as fleet
    34  charging zones based on:
    35    (a) total number of commercial and public fleet vehicles in  operation
    36  and/or total number of fleet operators in the geographic area,
    37    (b) projected vehicle traffic in the geographic area,
    38    (c) benefits to public fleets, such as school bus operators,
    39    (d) benefits to environmental justice and disadvantaged communities,
    40    (e)  relevant  commitments from fleet and/or site operators to install
    41  charging equipment,
    42    (f) available capacity on the electric distribution and  local  trans-
    43  mission network to serve vehicle chargers,
    44    (g)  ensuring equitable coverage and access to fleet charging through-
    45  out the state, and
    46    (h) other factors deemed relevant for the development  and  successful
    47  implementation of the depot charging action plan.
    48    6. As used in this section, the following terms shall have the follow-
    49  ing meanings:
    50    (a) "Alternative fuel corridors" shall mean highways designated within
    51  the  state  pursuant  to  the  national  electric vehicle infrastructure
    52  formula program under 23 U.S.C.  151 and previously designated under the
    53  federal Fixing America's Surface Transportation Act of 2015.
    54    (b) "Charging plan" shall mean the highway and depot  charging  action
    55  plan.

        S. 4830                             4

     1    (c) "Fast charger" shall mean a direct current electric vehicle charg-
     2  ing port which can charge at a level of at least one hundred fifty kilo-
     3  watts.
     4    (d)  "Fleet  charging  zone" shall mean a priority geographic area for
     5  the deployment of charging  infrastructure  for  public  and  commercial
     6  fleet operators or owners, including school bus fleets.
     7    (e)  "Highway  and  depot  charging  action  plan" shall mean the plan
     8  developed pursuant to subdivision two of this section.
     9    (f) "Highway charging hub" shall mean a priority site for the  deploy-
    10  ment  of  large  scale,  fast charging infrastructure, which has minimum
    11  station power capability at or above six hundred kilowatts and  supports
    12  at least one hundred fifty kilowatts per port simultaneously across four
    13  ports  for  charging.  These  sites shall include but are not limited to
    14  thruway charging hubs.
    15    (g) "NEVI" shall mean the  national  electric  vehicle  infrastructure
    16  program established under the federal Infrastructure Investment and Jobs
    17  Act of 2021.
    18    (h)  "Priority highway corridor" shall mean alternative fuel corridors
    19  and other state and county highways identified in the charging  plan  as
    20  appropriate  to ensure sufficient and equitable charging access through-
    21  out the state.
    22    (i) "Thruway charging hubs"  shall  mean  all  highway  service  areas
    23  controlled,  leased,  owned,  or  operated by the New York state thruway
    24  authority.
    25    § 3. The public service law is amended by adding a new  section  121-b
    26  to read as follows:
    27    §  121-b.  Electric  network and interconnections upgrades for highway
    28  charging hubs. 1. Within ninety days of  the  submission  of  a  highway
    29  charging  action  plan  or  depot charging action plan to the commission
    30  pursuant to section eighteen hundred eighty-five of the public  authori-
    31  ties law, and in consultation with the New York state thruway authority,
    32  the  New  York power authority, and the Long Island power authority, the
    33  commission shall commence a proceeding to direct New York electric util-
    34  ities to produce capital plans to develop, own,  and  operate  intercon-
    35  nection,  electric  distribution, and local transmission upgrades neces-
    36  sary to meet charging capacity  requirements  at  all  highway  charging
    37  hubs.  Such capital plans shall:
    38    (a)  include  upgrades to site interconnection at all highway charging
    39  hubs;
    40    (b) be designed to minimize  the  need  for  multiple  or  duplicative
    41  upgrades  at  a given site by considering charging capacity requirements
    42  for all vehicle classes through the year  two  thousand  fifty,  and  by
    43  considering  other  sources of electric demand at highway charging hubs.
    44  Where feasible, upgrades shall be designed as future-proofing upgrades;
    45    (c) prioritize interconnection, electric distribution, and local tran-
    46  smission upgrades at thruway charging hubs  and  shall  include  future-
    47  proofing upgrades at all thruway charging hubs;
    48    (d)  consider  the  existence of relevant commitments from site and/or
    49  charging operators in prioritizing the schedule of upgrades for  highway
    50  charging hubs; and
    51    (e)  identify a schedule for upgrades, provided such schedule shall be
    52  subject to reasonable constraints such as availability of land,  permit-
    53  ting,  relevant commitments from site operators, updates to the charging
    54  plan, or other factors.
    55    2. All investments in the utility capital plan, including upgrades  to
    56  site interconnection at all highway charging hubs, shall be recovered by

        S. 4830                             5

     1  the  utilities  through  a  proceeding  established by the commission, a
     2  petition filed by one or more utilities, or the utility rate case  proc-
     3  ess.  The  commission  may  establish  an appropriate mechanism for site
     4  owners  or  operators  to contribute to the cost of identified upgrades,
     5  such as, but not limited to, a contribution from charging revenue at the
     6  site.
     7    3. The commission shall act to ensure that upgrades are implemented in
     8  a timely and cost-effective manner to  meet  the  charging  requirements
     9  identified  in  the highway charging action plan at all highway charging
    10  hubs.  Provided, in evaluating the benefits of  proposed  upgrades,  the
    11  commission may consider, among other factors:
    12    (a)  appropriate  benchmarks  for  resilience  and redundancy of power
    13  supply at selected sites;
    14    (b) each site's role in providing charging in emergency conditions;
    15    (c) opportunities for the upgrades to improve system  reliability  and
    16  resiliency, or address existing asset condition needs;
    17    (d)  opportunities  for the upgrades to serve additional electric load
    18  growth, such as adjacent fleet  depot  charging  or  charging  for  host
    19  communities;
    20    (e) opportunities for the upgrades to facilitate renewable generation,
    21  distributed energy resources, or hydrogen production;
    22    (f)  potential for upgrades at highway charging hubs to defer the need
    23  for upgrades at other existing charging locations; and
    24    (g) availability of complementary funding or incentives for make-ready
    25  infrastructure to promote charging development.
    26    4. In establishing the capital  plan,  the  electric  utilities  shall
    27  evaluate  benefits  of  utilizing  distributed energy resources, such as
    28  energy storage or managed charging programs. Such benefits may  include,
    29  but  are  not  limited  to, lowering the total cost of the capital plan,
    30  providing increased resiliency at a highway charging hub, and  providing
    31  interim  solutions  to enable charging deployment where grid infrastruc-
    32  ture is not yet in place. Interconnection,  electric  distribution,  and
    33  local  transmission  upgrades  in  the  capital plan may include utility
    34  ownership and operation of energy storage facilities, including, but not
    35  limited to, mobile or temporary storage facilities.
    36    5. For the purposes of this section, "future-proofing upgrades"  shall
    37  mean upgrades that seek to accommodate future growth in charging capaci-
    38  ty requirements.
    39    6.  The  commission, in consultation with the commissioner of environ-
    40  mental conservation, may issue such rules and regulations as the commis-
    41  sion  determines  necessary  for  the  purposes  of  carrying  out   the
    42  provisions of this section.
    43    7.  In  the proceeding established in subdivision one of this section,
    44  or in another proceeding designated by the  commission,  the  commission
    45  shall act to identify and remove the barriers to the efficient and time-
    46  ly  deployment of charging infrastructure needed to electrify New York's
    47  commercial and public fleet vehicles in the fleet charging zones.    The
    48  commission shall consider, among other factors:
    49    (a)  revisions  to utility electric vehicle infrastructure planning to
    50  encourage proactive investments in the fleet charging zones,  especially
    51  in disadvantaged and environmental justice communities;
    52    (b)  appropriate  benchmarks  for  resilience  and redundancy of power
    53  supply in selected areas;
    54    (c) opportunities for the upgrades to improve system  reliability  and
    55  resiliency, or address existing asset condition needs;

        S. 4830                             6

     1    (d)  opportunities  for the upgrades to serve additional electric load
     2  growth;
     3    (e) opportunities for the upgrades to facilitate renewable generation,
     4  distributed energy resources, or hydrogen production;
     5    (f) opportunities for future-proofing upgrades;
     6    (g) availability of complementary funding or incentives for make ready
     7  infrastructure to promote charging development; and
     8    (h)  benefits  of distributed energy resources, including energy stor-
     9  age.
    10    § 4. Section 1020-gg of the public authorities law, as added by  chap-
    11  ter 433 of the laws of 2009, is amended to read as follows:
    12    § 1020-gg. Energy plan. The authority shall complete a biennial energy
    13  plan in accordance with the provisions of article six of the energy law.
    14  In  addition  to  any requirements of article six of the energy law, the
    15  authority shall provide copies of its biennial energy plan to the gover-
    16  nor, the temporary president of the senate, the speaker of the assembly,
    17  the chair of the assembly committee on  energy  and  the  chair  of  the
    18  senate committee on energy and telecommunications. Further, the authori-
    19  ty  shall  cooperate and participate in the state energy planning proce-
    20  dures as enumerated in article six of the energy law.    Notwithstanding
    21  the  foregoing, the authority shall establish or amend an existing capi-
    22  tal plan to implement upgrades in its service  territory  in  accordance
    23  with  the  dictates  of  a  proceeding implemented by the public service
    24  commission pursuant to section one hundred twenty-one-b  of  the  public
    25  service  law.   The authority and the New York state energy research and
    26  development authority shall identify no fewer than two highway  charging
    27  hubs in the authority's service territory where future-proofing upgrades
    28  shall  be  implemented  on a similar timeline as at the thruway charging
    29  hubs, as defined in section eighteen hundred eighty-five of  this  chap-
    30  ter, subject to reasonable constraints.
    31    § 5. This act shall take effect immediately.