Bill Text: NY A01375 | 2013-2014 | General Assembly | Introduced


Bill Title: Establishes New York state renewable electric generation pilot programs to authorize the development of up to three hundred megawatts renewable electric capacity statewide, in order to stimulate the growth of clean, affordable and reliable sources of energy and to foster new partnerships between electric corporations, energy producers and energy customers in this state.

Spectrum: Partisan Bill (Democrat 4-0)

Status: (Introduced - Dead) 2014-01-08 - referred to energy [A01375 Detail]

Download: New_York-2013-A01375-Introduced.html
                           S T A T E   O F   N E W   Y O R K
       ________________________________________________________________________
                                         1375
                              2013-2014 Regular Sessions
                                 I N  A S S E M B L Y
                                      (PREFILED)
                                    January 9, 2013
                                      ___________
       Introduced  by  M.  of A. CAHILL, HEVESI, ENGLEBRIGHT, ROSENTHAL -- read
         once and referred to the Committee on Energy
       AN ACT to amend the public service law, in relation to  New  York  state
         renewable electric generation pilot programs
         THE  PEOPLE OF THE STATE OF NEW YORK, REPRESENTED IN SENATE AND ASSEM-
       BLY, DO ENACT AS FOLLOWS:
    1    Section 1. The public service law is amended by adding a  new  section
    2  73 to read as follows:
    3    S  73. NEW YORK STATE RENEWABLE ELECTRIC GENERATION PILOT PROGRAMS. 1.
    4  THE COMMISSION SHALL ESTABLISH NEW YORK STATE RENEWABLE ELECTRIC  GENER-
    5  ATION PILOT PROGRAMS TO AUTHORIZE THE DEVELOPMENT OF UP TO THREE HUNDRED
    6  MEGAWATTS  OF  RENEWABLE ELECTRIC CAPACITY STATEWIDE, IN ORDER TO STIMU-
    7  LATE THE GROWTH OF CLEAN, AFFORDABLE, AND RELIABLE SOURCES OF ENERGY AND
    8  TO FOSTER NEW PARTNERSHIPS BETWEEN ELECTRIC CORPORATIONS, ENERGY PRODUC-
    9  ERS AND ENERGY CUSTOMERS IN NEW YORK STATE.
   10    2. (A) THE COMMISSION SHALL OVERSEE THE IMPLEMENTATION  OF  THE  PILOT
   11  PROGRAMS  AND SHALL DIRECT ELECTRIC CORPORATIONS TO BUILD OR CAUSE TO BE
   12  BUILT RENEWABLE ENERGY FACILITIES TO BE FINANCED UNDER TERMS ESTABLISHED
   13  THROUGH AN ORDER OF THE COMMISSION WHICH  SHALL  AUTHORIZE  CAPITAL  AND
   14  OPERATING  COSTS  TO  BE  RECOVERED IN THE CORPORATIONS RATE BASE AND TO
   15  EARN A REASONABLE RETURN OVER A PERIOD TO BE DETERMINED BY  THE  COMMIS-
   16  SION,  PROVIDED  THAT  THE  CORPORATION  SHALL,  AT MINIMUM, PROVIDE THE
   17  COMMISSION WITH THE FOLLOWING:
   18    (I) A DETAILED DESCRIPTION AND ECONOMIC  EVALUATION  OF  THE  PROPOSED
   19  INVESTMENT;
   20    (II)  A  DISCUSSION OF THE COSTS, BENEFITS, AND RISKS OF THE PROPOSAL,
   21  INCLUDING AN ANALYSIS OF THE COSTS, BENEFITS, AND RATE  IMPLICATIONS  TO
   22  THE PARTICIPATING CUSTOMERS, TO THE COMPANY'S DEFAULT SERVICE CUSTOMERS,
   23  AND TO THE UTILITY'S DISTRIBUTION CUSTOMERS;
        EXPLANATION--Matter in ITALICS (underscored) is new; matter in brackets
                             [ ] is old law to be omitted.
                                                                  LBD02770-01-3
       A. 1375                             2
    1    (III)  A  DESCRIPTION OF ANY EQUIPMENT OR INSTALLATION SPECIFICATIONS,
    2  SOLICITATIONS, AND PROCUREMENTS IT HAS IMPLEMENTED OR INTENDS TO  IMPLE-
    3  MENT;
    4    (IV)  A  SHOWING  THAT IT HAS MADE REASONABLE EFFORTS TO INVOLVE LOCAL
    5  BUSINESSES IN ITS PROGRAM;
    6    (V) EVIDENCE OF COMPLIANCE WITH ALL APPLICABLE  EMISSION  LIMITATIONS;
    7  AND
    8    (VI)  A COPY OF ANY CUSTOMER CONTRACTS OR AGREEMENTS TO BE EXECUTED AS
    9  PART OF THE PROGRAM.
   10    (B) RENEWABLE GENERATION FACILITIES ELIGIBLE  TO  BE  CONSTRUCTED  AND
   11  FINANCED  UNDER  THE  NEW YORK STATE RENEWABLE ELECTRIC GENERATION PILOT
   12  PROGRAMS SHALL:
   13    (I) GENERATE ELECTRICITY THROUGH USE OF  THE  FOLLOWING  TECHNOLOGIES:
   14  SOLAR; WIND; PHOTOVOLTAICS; TIDAL; GEOTHERMAL; AND FUEL CELLS; OR
   15    (II)  GENERATE ELECTRICITY THROUGH LOW-IMPACT, RUN-OF-RIVER HYDROELEC-
   16  TRIC ELECTRIC GENERATING EQUIPMENT WITH CAPACITY UP TO THIRTY  MEGAWATTS
   17  WITH NO NEW STORAGE IMPOUNDMENT;
   18    (III)  BE  MANUFACTURED,  INSTALLED  AND  OPERATED  IN ACCORDANCE WITH
   19  APPLICABLE GOVERNMENT AND INDUSTRY STANDARDS;
   20    (IV) CONNECT TO THE ELECTRIC SYSTEM AND OPERATED IN PARALLEL  WITH  AN
   21  ELECTRIC CORPORATION'S TRANSMISSION AND DISTRIBUTION FACILITIES;
   22    (V)  OPERATE  IN COMPLIANCE WITH ANY STANDARDS AND REQUIREMENTS ESTAB-
   23  LISHED BY THE COMMISSION; AND
   24    (VI) BE LOCATED WITHIN THE STATE, INCLUDING FACILITIES THAT CONSIST OF
   25  CUSTOMER-OWNED OR LEASED GENERATORS.
   26    (C) AUTHORIZE ELECTRIC CORPORATIONS TO OWN AN EQUITY INTEREST IN  SUCH
   27  FACILITIES  AND  ALLOW  PARTNERSHIPS  WITH  INDEPENDENT POWER PRODUCERS,
   28  DEVELOPERS, AND/OR CUSTOMER-OWNED OR LEASED GENERATORS.
   29    S 2. The public service commission shall provide an annual  report  on
   30  or before the first day of June to the governor, the temporary president
   31  of  the  senate, the speaker of the assembly, the minority leader of the
   32  senate, and the minority leader of the assembly reporting  the  progress
   33  of  their  efforts and the effects of the program on the environment and
   34  public. Such report shall identify each facility  participating  in  the
   35  pilot  project  and shall include, but not be limited to, information on
   36  each energy source or sources used for generation at such facility;  the
   37  sum  capacity, in megawatts, of all electrical generating equipment used
   38  by the facility; the date the facility will begin or has begun  generat-
   39  ing electricity; and the number and category of customer-owned or leased
   40  generators.
   41    S  3.  This act shall take effect immediately; provided, however, that
   42  not later than the one hundred eightieth day after this act  shall  have
   43  become  a  law,  the  public  service  commission  shall have in place a
   44  competitive process which shall be open to electric corporations.
feedback