NY S07821 | 2023-2024 | General Assembly
Status
Spectrum: Partisan Bill (Republican 1-0)
Status: Introduced on December 20 2023 - 25% progression
Action: 2024-01-03 - REFERRED TO TRANSPORTATION
Pending: Senate Transportation Committee
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on December 20 2023 - 25% progression
Action: 2024-01-03 - REFERRED TO TRANSPORTATION
Pending: Senate Transportation Committee
Text: Latest bill text (Introduced) [HTML]
Summary
Provides that in the design, construction, maintenance, or renovation of any transit facility, transportation facility, or equipment of the metropolitan transportation authority, work shall take place over a continuous period of time until such point at which the project has been completed.
Title
Provides that in the design, construction, maintenance, or renovation of any transit facility, transportation facility, or equipment of the metropolitan transportation authority, work shall take place over a continuous period of time until such point at which the project has been completed.
Sponsors
History
Date | Chamber | Action |
---|---|---|
2024-01-03 | Senate | REFERRED TO TRANSPORTATION |
2023-12-20 | Senate | REFERRED TO RULES |