NY S06764 | 2021-2022 | General Assembly
Status
Completed Legislative Action
Spectrum: Partisan Bill (Republican 1-0)
Status: Passed on August 2 2021 - 100% progression
Action: 2021-08-02 - SIGNED CHAP.381
Text: Latest bill text (Introduced) [HTML]
Spectrum: Partisan Bill (Republican 1-0)
Status: Passed on August 2 2021 - 100% progression
Action: 2021-08-02 - SIGNED CHAP.381
Text: Latest bill text (Introduced) [HTML]
Summary
Designates a portion of the state highway system constituting the Sunrise Highway Peconic overpass on route 27, in the town of Southampton, county of Suffolk, as the "State Trooper Donald A. Strand Memorial Bridge".
Title
Designates a portion of the state highway system constituting the Sunrise Highway Peconic overpass on route 27, in the town of Southampton, county of Suffolk, as the "State Trooper Donald A. Strand Memorial Bridge".
Sponsors
Roll Calls
2021-06-11 - Assembly - Assembly Floor Vote - Final Passage (Y: 149 N: 0 NV: 0 Abs: 1) [PASS]
2021-06-02 - Senate - Senate Floor Vote - Final Passage (Y: 62 N: 1 NV: 0 Abs: 0) [PASS]
2021-06-01 - Senate - Senate Rules Committee Vote (Y: 21 N: 0 NV: 0 Abs: 0) [PASS]
2021-06-02 - Senate - Senate Floor Vote - Final Passage (Y: 62 N: 1 NV: 0 Abs: 0) [PASS]
2021-06-01 - Senate - Senate Rules Committee Vote (Y: 21 N: 0 NV: 0 Abs: 0) [PASS]
History
Date | Chamber | Action |
---|---|---|
2021-08-02 | Senate | SIGNED CHAP.381 |
2021-07-21 | Senate | DELIVERED TO GOVERNOR |
2021-06-10 | Assembly | returned to senate |
2021-06-10 | Assembly | passed assembly |
2021-06-10 | Assembly | ordered to third reading rules cal.727 |
2021-06-10 | Assembly | substituted for a7624 |
2021-06-02 | Assembly | referred to transportation |
2021-06-02 | Senate | DELIVERED TO ASSEMBLY |
2021-06-02 | Senate | PASSED SENATE |
2021-06-01 | Senate | ORDERED TO THIRD READING CAL.1405 |
2021-06-01 | Senate | COMMITTEE DISCHARGED AND COMMITTED TO RULES |
2021-05-14 | Senate | REFERRED TO TRANSPORTATION |
Same As/Similar To
A07624 (Same As) 2021-06-10 - substituted by s6764