Bill Text: NH HB535 | 2017 | Regular Session | Introduced
Bill Title: Relative to community net metering.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced - Dead) 2017-11-30 - Died on Table [HB535 Detail]
Download: New_Hampshire-2017-HB535-Introduced.html
HB 535 - AS INTRODUCED
2017 SESSION
17-0655
06/09
HOUSE BILL 535
AN ACT relative to community net metering.
SPONSORS: Rep. Murotake, Hills. 32
COMMITTEE: Science, Technology and Energy
-----------------------------------------------------------------
ANALYSIS
This bill raises the total peak generating capacity for group net metering when the generator is a city or town.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Explanation: Matter added to current law appears in bold italics.
Matter removed from current law appears [in brackets and struckthrough.]
Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
17-0655
06/09
STATE OF NEW HAMPSHIRE
In the Year of Our Lord Two Thousand Seventeen
AN ACT relative to community net metering.
Be it Enacted by the Senate and House of Representatives in General Court convened:
1 Limited Electrical Energy Producers Act; Definitions; "Eligible Customer-generator." Amend RSA 362-A:1-a, II-b to read as follows:
II-b. "Eligible customer-generator'' or "customer-generator'' means an electric utility customer who owns, operates, or purchases power from an electrical generating facility either powered by renewable energy or which employs a heat led combined heat and power system, with a total peak generating capacity of up to and including one megawatt, or up to 5 megawatts for a municipal electric utility customer, that is located behind a retail meter on the customer's premises, is interconnected and operates in parallel with the electric grid, and is used to offset the customer's own electricity requirements. Incremental generation added to an existing generation facility, that does not itself qualify for net metering, shall qualify if such incremental generation meets the qualifications of this paragraph and is metered separately from the non qualifying facility.
2 Effective Date. This act shall take effect 60 days after its passage.