Bill Text: KY HJR142 | 2016 | Regular Session | Draft
Bill Title: Direct the Transportation Cabinet and the Economic Development Cabinet to conduct feasibility studies on the economic impact and costs of widening the Hal Rogers Parkway into four lanes from Interstate 75 to Perry County; require results to be reported to the Interim Joint Committees on Transportation and Economic Development and Tourism by October 31, 2016.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced - Dead) 2016-03-03 - posted in committee [HJR142 Detail]
Download: Kentucky-2016-HJR142-Draft.pdf