Bill Text: IN HB1260 | 2019 | Regular Session | Introduced


Bill Title: Local referenda for wind power devices. Provides that after June 30, 2019, a unit may not authorize, or establish requirements for, the installation or siting of wind power devices in the unit unless the voters of the unit have approved the installation or siting of wind power devices in the unit through a local public question. Provides that a regulation that: (1) is adopted or amended by a unit after June 30, 2019; and (2) authorizes, or establishes requirements for, the installation or siting of wind power devices in the unit; does not take effect unless this condition is met. Sets forth procedures for conducting a local public question concerning the installation or siting of wind power devices in a unit.

Spectrum: Partisan Bill (Republican 1-0)

Status: (Introduced - Dead) 2019-01-10 - First reading: referred to Committee on Utilities, Energy and Telecommunications [HB1260 Detail]

Download: Indiana-2019-HB1260-Introduced.pdf
It appears your computer is unable to display this document, however you can download the file from the links above.
feedback