Bill Text: IL SB3003 | 2009-2010 | 96th General Assembly | Introduced
Bill Title: Amends the Environmental Protection Act. Makes technical changes to a provision concerning facilities that accept exclusively general construction or demolition debris for transfer, storage, or treatment.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2010-02-04 - Referred to Assignments [SB3003 Detail]
Download: Illinois-2009-SB3003-Introduced.html
|
||||||||||||||||||||
|
||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
| ||||||||||||||||||||
1 | AN ACT concerning safety.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Environmental Protection Act is amended by | |||||||||||||||||||
5 | changing Section 22.38 as follows:
| |||||||||||||||||||
6 | (415 ILCS 5/22.38)
| |||||||||||||||||||
7 | Sec. 22.38. Facilities accepting exclusively general | |||||||||||||||||||
8 | construction or
demolition debris
for transfer, storage, or | |||||||||||||||||||
9 | treatment.
| |||||||||||||||||||
10 | (a) Facilities accepting exclusively general construction | |||||||||||||||||||
11 | or demolition
debris for
transfer, storage, or treatment shall | |||||||||||||||||||
12 | be subject to local zoning, ordinance,
and and
land use | |||||||||||||||||||
13 | requirements.
Those facilities shall be located in accordance | |||||||||||||||||||
14 | with local zoning requirements
or, in the absence of local | |||||||||||||||||||
15 | zoning requirements, shall be located so that no
part of the | |||||||||||||||||||
16 | facility boundary is closer than 1,320 feet from the nearest
| |||||||||||||||||||
17 | property zoned for primarily residential use.
| |||||||||||||||||||
18 | (b) An owner or operator of a facility accepting | |||||||||||||||||||
19 | exclusively general
construction or demolition debris for | |||||||||||||||||||
20 | transfer, storage, or treatment shall:
| |||||||||||||||||||
21 | (1) Within 48 hours of receipt of the general | |||||||||||||||||||
22 | construction or demolition
debris at the facility, sort the | |||||||||||||||||||
23 | general construction or demolition debris to
separate the
|
| |||||||
| |||||||
1 | recyclable general construction or demolition debris and | ||||||
2 | recovered wood that is processed for use as fuel from | ||||||
3 | non-recyclable
general construction or demolition debris | ||||||
4 | to be disposed of or discarded.
| ||||||
5 | (2) Transport off site for disposal all non-recyclable | ||||||
6 | general
construction or demolition debris that is neither | ||||||
7 | recyclable general construction or demolition debris nor | ||||||
8 | recovered wood that is processed for use as fuel in
| ||||||
9 | accordance with all applicable federal, State, and local | ||||||
10 | requirements within 72
hours of its receipt at the | ||||||
11 | facility.
| ||||||
12 | (3) Limit the percentage of incoming non-recyclable | ||||||
13 | general construction
or demolition debris to 25% or
less of | ||||||
14 | the total incoming general construction or demolition | ||||||
15 | debris,
as calculated on a daily basis, so that 75% or more | ||||||
16 | of the general construction or demolition debris accepted | ||||||
17 | on a daily basis consists of recyclable general | ||||||
18 | construction or demolition debris, recovered wood that is | ||||||
19 | processed for use as fuel, or both.
| ||||||
20 | (4) Transport all non-putrescible recyclable general | ||||||
21 | construction or
demolition debris
for recycling or | ||||||
22 | disposal within 6 months of its receipt at the facility.
| ||||||
23 | (5) Within within 45 days of its receipt at the | ||||||
24 | facility, transport Transport (i) all putrescible or | ||||||
25 | combustible recyclable general
construction or demolition | ||||||
26 | debris
(excluding recovered wood that is processed for use |
| |||||||
| |||||||
1 | as fuel) for recycling or disposal ; and (ii) all recovered | ||||||
2 | wood that is processed for use as fuel to an intermediate | ||||||
3 | processing facility for sizing, to a combustion facility | ||||||
4 | for use as fuel, or to a disposal facility ; .
| ||||||
5 | (6) Employ tagging and recordkeeping procedures to (i) | ||||||
6 | demonstrate
compliance
with this Section and (ii) identify | ||||||
7 | the source and transporter of material
accepted by the | ||||||
8 | facility.
| ||||||
9 | (7) Control odor, noise, combustion of materials, | ||||||
10 | disease vectors, dust,
and litter.
| ||||||
11 | (8) Control, manage, and dispose of any storm water | ||||||
12 | runoff and leachate
generated at the facility in accordance | ||||||
13 | with applicable federal, State, and
local requirements.
| ||||||
14 | (9) Control access to the facility.
| ||||||
15 | (10) Comply with all applicable federal, State, or | ||||||
16 | local requirements for
the handling, storage, | ||||||
17 | transportation, or disposal of asbestos-containing
| ||||||
18 | material or other material accepted at the
facility that is | ||||||
19 | not general construction or demolition debris.
| ||||||
20 | (11) Prior to August 24, 2009 ( the effective date of | ||||||
21 | Public Act 96-611) this amendatory Act of the 96th General | ||||||
22 | Assembly , submit to the Agency at least 30 days prior to | ||||||
23 | the initial acceptance
of general construction or | ||||||
24 | demolition debris at the facility, on forms provided
by the | ||||||
25 | Agency, the following information:
| ||||||
26 | (A) the name, address, and telephone number of both |
| |||||||
| |||||||
1 | the facility owner
and operator;
| ||||||
2 | (B) the street address and location of the | ||||||
3 | facility;
| ||||||
4 | (C) a description of facility operations;
| ||||||
5 | (D) a description of the tagging and recordkeeping | ||||||
6 | procedures the
facility will employ to (i) demonstrate | ||||||
7 | compliance with this Section and (ii)
identify the | ||||||
8 | source and transporter of any material accepted by the | ||||||
9 | facility;
| ||||||
10 | (E) the name and location of the disposal sites to | ||||||
11 | be used for the
disposal of any general construction or | ||||||
12 | demolition debris received at the facility that must be | ||||||
13 | disposed of;
| ||||||
14 | (F) the name and location of an individual, | ||||||
15 | facility, or business to
which recyclable materials | ||||||
16 | will be transported;
| ||||||
17 | (G) the name and location of intermediate | ||||||
18 | processing facilities or combustion facilities to | ||||||
19 | which recovered wood that is processed for use as fuel | ||||||
20 | will be transported; and
| ||||||
21 | (H) other information as specified on the form | ||||||
22 | provided by the Agency.
| ||||||
23 | (12) On or after August 24, 2009 ( the effective date of | ||||||
24 | Public Act 96-611) this amendatory Act of the 96th General | ||||||
25 | Assembly , obtain a permit issued by the Agency prior to the | ||||||
26 | initial acceptance of general construction or demolition |
| |||||||
| |||||||
1 | debris at the facility.
| ||||||
2 | When any of the information contained or processes | ||||||
3 | described in the initial
notification form submitted to the | ||||||
4 | Agency changes, the owner and operator shall
submit an | ||||||
5 | updated form within 14 days of the change.
| ||||||
6 | (c) For purposes of this Section, the term "recyclable | ||||||
7 | general
construction or demolition debris" means general | ||||||
8 | construction or demolition
debris that has been rendered | ||||||
9 | reusable and is reused or that would otherwise
be disposed of | ||||||
10 | or discarded but is collected, separated, or processed and
| ||||||
11 | returned to the economic mainstream in the form of raw | ||||||
12 | materials or products.
"Recyclable general construction or | ||||||
13 | demolition debris" does not include general
construction or | ||||||
14 | demolition debris processed for use as fuel, incinerated,
| ||||||
15 | burned, buried, or otherwise used as fill material.
| ||||||
16 | (d) For purposes of this Section, "treatment" means | ||||||
17 | processing
designed to alter the physical nature of the general | ||||||
18 | construction or
demolition debris, including but not limited to | ||||||
19 | size reduction, crushing,
grinding, or
homogenization, but | ||||||
20 | does not include processing designed to change the chemical
| ||||||
21 | nature of the general construction or demolition debris.
| ||||||
22 | (e) For purposes of this Section, "recovered wood that is | ||||||
23 | processed for use as fuel" means wood that has been salvaged | ||||||
24 | from general construction or demolition debris and processed | ||||||
25 | for use as fuel, as authorized by the applicable state or | ||||||
26 | federal environmental regulatory authority, and supplied only |
| |||||||
| |||||||
1 | to intermediate processing facilities for sizing, or to | ||||||
2 | combustion facilities for use as fuel, that have obtained all | ||||||
3 | necessary waste management and air permits for handling and | ||||||
4 | combustion of the fuel. | ||||||
5 | (f) For purposes of this Section, "non-recyclable general | ||||||
6 | construction or demolition debris" does not include "recovered | ||||||
7 | wood that is processed for use as fuel". | ||||||
8 | (g) Recyclable general construction or demolition debris | ||||||
9 | or recovered wood that is processed for use as fuel that is | ||||||
10 | sent for disposal at the end of the applicable retention period | ||||||
11 | shall not be considered as meeting the 75% diversion | ||||||
12 | requirement for purposes of subdivision (b)(3) of this Section. | ||||||
13 | (Source: P.A. 96-235, eff. 8-11-09; 96-611, eff. 8-24-09; | ||||||
14 | revised 9-15-09.)
|