1 | AN ACT concerning local government.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Counties Code is amended by changing Section | |||||||||||||||||||
5 | 5-12001.2 as follows:
| |||||||||||||||||||
6 | (55 ILCS 5/5-12001.2) | |||||||||||||||||||
7 | Sec. 5-12001.2. Regulation of telecommunications | |||||||||||||||||||
8 | facilities; Lake County and Will County pilot project. In | |||||||||||||||||||
9 | addition to any other requirements under this Division | |||||||||||||||||||
10 | concerning the regulation of telecommunications facilities, | |||||||||||||||||||
11 | the following applies to any new telecommunications facilities | |||||||||||||||||||
12 | in Lake County and Will County that are not AM | |||||||||||||||||||
13 | telecommunications towers or facilities: | |||||||||||||||||||
14 | (a) For every new wireless telecommunications facility | |||||||||||||||||||
15 | requiring a new tower structure, a telecommunications | |||||||||||||||||||
16 | carrier shall provide the county with documentation | |||||||||||||||||||
17 | consisting of the proposed location, a site plan, and an | |||||||||||||||||||
18 | elevation that sufficiently describes a proposed wireless | |||||||||||||||||||
19 | facility location. | |||||||||||||||||||
20 | (b) The county shall have 7 days to review the facility | |||||||||||||||||||
21 | proposal and contact the telecommunications carrier in | |||||||||||||||||||
22 | writing via e-mail or other written means as specified by | |||||||||||||||||||
23 | the telecommunications carrier. This written communication |
| |||||||
| |||||||
1 | shall either approve the proposed location or request a | ||||||
2 | meeting to review other possible alternative locations. If | ||||||
3 | requested, the meeting shall take place within 7 days after | ||||||
4 | the date of the written communication. | ||||||
5 | (c) At the meeting, the telecommunications carrier | ||||||
6 | shall provide the county documentation consisting of radio | ||||||
7 | frequency engineering criteria and a corresponding | ||||||
8 | telecommunications facility search ring map, together with | ||||||
9 | documentation of the carrier's efforts to site the proposed | ||||||
10 | facility within the telecommunications facility search | ||||||
11 | ring. | ||||||
12 | (d) Within 21 days after receipt of the carrier's | ||||||
13 | documentation, the county shall propose either an | ||||||
14 | alternative site within the telecommunications facility | ||||||
15 | search ring, or an alternative site outside of the | ||||||
16 | telecommunications search ring that meets the radio | ||||||
17 | frequency engineering criteria provided by the | ||||||
18 | telecommunications carrier and that will not materially | ||||||
19 | increase the construction budget beyond what was estimated | ||||||
20 | on the original carrier proposed site. | ||||||
21 | (e) If the county's proposed alternative site meets the | ||||||
22 | radio frequency engineering criteria provided by the | ||||||
23 | telecommunications carrier, and will not materially | ||||||
24 | increase the construction budget beyond what was estimated | ||||||
25 | on the original carrier proposed site, then the | ||||||
26 | telecommunications carrier shall agree to build the |
| |||||||
| |||||||
1 | facility at the alternative location, subject to the | ||||||
2 | negotiation of a lease with commercially reasonable terms | ||||||
3 | and the obtainment of the customary building permits. | ||||||
4 | (f) If the telecommunications carrier can demonstrate | ||||||
5 | that: (i) the county's proposed alternative site does not | ||||||
6 | meet the radio frequency engineering criteria, (ii) the | ||||||
7 | county's proposed alternative site will materially | ||||||
8 | increase the construction budget beyond what was estimated | ||||||
9 | on the original carrier proposed site, (iii) the county has | ||||||
10 | failed to provide an alternative site, or (iv) after a | ||||||
11 | period of 90 days after receipt of the alternative site, | ||||||
12 | the telecommunications carrier has failed, after acting in | ||||||
13 | good faith and with due diligence, to obtain a lease or, at | ||||||
14 | a minimum, a letter of intent to lease the alternative site | ||||||
15 | at lease rates not materially greater than the lease rate | ||||||
16 | for the original proposed site; then the carrier can | ||||||
17 | proceed to permit and construct the site under the | ||||||
18 | provisions and standards of Section 5-12001.1 of this Code.
| ||||||
19 | (Source: P.A. 98-197, eff. 8-9-13; 98-756, eff. 7-16-14.)
|