Bill Text: IL HB5410 | 2021-2022 | 102nd General Assembly | Introduced


Bill Title: Amends the Environmental Protection Act. Removes language concerning notice of a demolition conducted at a coal-fueled power plant. Sets forth notice requirements before any person may obtain a permit for the demolition of a thermal power plant. Provides for civil penalties for notice violations not to exceed $1,000 for the first violation and not to exceed $5,000 for each subsequent violation. Provides that civil penalties collected must be deposited into the Environmental Protection Trust Fund to be used in accordance with the provisions of the Environmental Protection Trust Fund Act. Requires at least one public meeting with the impacted community to discuss proposed demolition and sets forth requirements for a public meeting. Requires a comprehensive air quality plan that investigates air quality impacts from fugitive dust prior to implosion and establishes a plan for the monitoring of PM10 in the air before, during, and after implosion activities to be prepared and submitted to the Environmental Protection Agency for approval before a person may obtain a permit for the demolition of a thermal power plant via implosion. Sets forth requirements for a comprehensive air quality plan. Defines terms. Effective immediately.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2022-02-18 - Rule 19(a) / Re-referred to Rules Committee [HB5410 Detail]

Download: Illinois-2021-HB5410-Introduced.html


102ND GENERAL ASSEMBLY
State of Illinois
2021 and 2022
HB5410

Introduced , by Rep. Rita Mayfield

SYNOPSIS AS INTRODUCED:
415 ILCS 5/3.141

Amends the Environmental Protection Act. Renames section as power plant demolition transparency and air protection. Sets forth notice requirements before any person may obtain a permit for the demolition of a thermal power plant. Provides for civil penalties for notice violations not to exceed $1,000 for the first violation and not to exceed $5,000 for each subsequent violation. Provides that civil penalties collected must be deposited into the Environmental Protection Trust Fund to be used in accordance with the provisions of the Environmental Protection Trust Fund Act. Requires at least one public meeting with the impacted community to discuss proposed demolition and sets forth requirements for public meetings. Requires a person to prepare and submit to the Environmental Protection Agency for approval a comprehensive air quality plan that investigates air quality impacts from fugitive dust prior to implosion and establishes a plan for the monitoring of PM10 in the air before, during, and after implosion activities, before that person may obtain a permit for the demolition of a thermal power plant via implosion. Sets forth requirements for a comprehensive air quality plan. Defines terms. Effective immediately.
LRB102 25374 CPF 34654 b

A BILL FOR

HB5410LRB102 25374 CPF 34654 b
1 AN ACT concerning environmental safety.
2 Be it enacted by the People of the State of Illinois,
3represented in the General Assembly:
4 Section 5. The Environmental Protection Act is amended by
5changing Section 3.141 as follows:
6 (415 ILCS 5/3.141)
7 Sec. 3.141. Power plant demolition transparency and air
8protection Notice of power plant demolition.
9 (a) In this Section, the following definitions apply:
10 "Agency" means the Environmental Protection Agency.
11 "Air quality monitoring plan" means the air quality
12 monitoring plan required to be included in the
13 comprehensive plan.
14 "Demolition" means any of the following activities
15 conducted in relation to a thermal power plant:
16 (A) the demolition of a smokestack;
17 (B) the demolition of an entire building or
18 structure;
19 (C) the demolition of substantially all of the
20 above-grade portion of a building or structure; or
21 (D) the alteration of an existing building to
22 permanently reduce its building area via demolition.
23 "Dust mitigation plan" means the dust monitoring plan

HB5410- 2 -LRB102 25374 CPF 34654 b
1 required to be included in the air quality plan.
2 "Fugitive dust" means any solid particulate matter
3 that becomes airborne by natural or human-made activities,
4 excluding engine combustion exhaust and particulate matter
5 emitted from a properly permitted exhaust stack equipped
6 with a pollution control device.
7 "Implosion" means the use of explosives for the
8 demolition of buildings or other structure.
9 "Notify" means to conduct all of the following
10 activities in the context of a demolition process:
11 (A) post notices in both physical and online form
12 in a newspaper of general circulation within 25 miles
13 of where the thermal power plant is located (or, if a
14 newspaper is unavailable, using appropriate broadcast
15 media such as radio or television);
16 (B) mail or hand-deliver notices to the Agency and
17 all residents within a one-mile radius from the
18 property line of the thermal power plant site;
19 (C) post the notices in conspicuous public
20 locations;
21 (D) request that the Agency email the notices to
22 the Agency's listserv for the facility;
23 (E) establish a publicly accessible website that
24 can be visited without providing login credentials and
25 that functions as a repository for all
26 demolition-related communications and documents and

HB5410- 3 -LRB102 25374 CPF 34654 b
1 all public notices;
2 (F) create phone, email, and text lists to notify
3 of 60-day periods, public meetings, and specific
4 demolition dates;
5 (G) use State or municipal phone and mobile alert
6 systems to notify residents of public meetings and
7 specific demolition days (including safety protocols
8 for demolition days).
9 "Particulate Emission Potential" or "PEP" means the
10 potential for in situ soils to be dispersed by wind or by
11 physical disturbance as determined using the procedures
12 described in paragraph (4) of subsection (c) of this
13 Section.
14 "Public" means the residents of any town, village, or
15 city in the State that is within 25 miles of a thermal
16 power plant at which demolition is to be conducted;
17 "Thermal power plant" means a facility that currently
18 produces or has ever produced electricity using a thermal
19 generation technology; this definition includes, at a
20 minimum, generation facilities creating power using coal,
21 gas, or nuclear fuel as inputs.
22 "Recognized Environmental Conditions" or "REC" means
23 the presence or likely presence of any hazardous
24 substances or petroleum products on a property under
25 conditions that indicate an existing release, a past
26 release, or a material threat of a release of any

HB5410- 4 -LRB102 25374 CPF 34654 b
1 hazardous substances or petroleum products into structures
2 on the property or into the ground, groundwater, or
3 surface water of the property.
4 "Site" means real property containing a building or
5 structure to be demolished and all structures, equipment,
6 and ancillary fixtures on a site used in or to support the
7 demolition. A site may include, but is not limited to,
8 structures, buildings, scales, roadways, parking areas,
9 queuing areas, fences, processing equipment, processing
10 areas, staging or stockpiling areas, and monitoring
11 stations.
12 "Site cleanup plan" means the site cleanup plan
13 required to be included in the comprehensive plan. If a
14 demolition is conducted at a coal-fueled power plant, the
15 owner of the coal-fueled power plant shall, at least 60
16 days before commencing the demolition or as otherwise
17 required under State or federal law, notify the Agency and
18 the public about the demolition and provide the Agency and
19 the public with copies of any plans for the demolition.
20 The notice shall comply with the following:
21 (1) The notice must be provided, where applicable, in
22 both physical and online form in a newspaper of general
23 circulation within 25 miles of where the coal-fueled power
24 plant is located. The notice must also be posted in
25 physical form in 3 prominent public places and, where
26 applicable, posted on a relevant municipal website.

HB5410- 5 -LRB102 25374 CPF 34654 b
1 (2) The notice must include reference to any relevant
2 permits issued to the coal-fueled power plant in relation
3 to the demolition, with express instructions stating how
4 to access a copy of the permits.
5 (3) The notice must include the following information:
6 (A) The date and time of any scheduled demolition
7 activity.
8 (B) The portion of the coal-fueled power plant
9 that is set for demolition.
10 (C) Any potential contaminants associated with the
11 demolition.
12 (D) The business name of any company that will
13 perform the demolition in whole or in part.
14 (E) Information on any applicable permits.
15 (F) Whether any unlined CCR surface impoundment or
16 public water source is near the coal-fueled power
17 plant.
18 (G) Details of the preventative measures
19 implemented by the coal-fueled power plant to control,
20 mitigate, or prevent any pollution from occurring.
21 (b) Notification requirements. Before any person may
22obtain a permit for the demolition of a thermal power plant,
23the person must notify and provide a copy of the plans for
24demolition to the public at least 60 days, or as otherwise
25required under State or federal law, before the anticipated
26date of initiation of demolition.

HB5410- 6 -LRB102 25374 CPF 34654 b
1 (1) Notices must include the following information:
2 (A) the date and time of the scheduled demolition
3 activity;
4 (B) the portion of the facility that is set for
5 demolition;
6 (C) the amount of demolition debris anticipated,
7 expressed in terms of both weight and volume and
8 broken down by major category if multiple waste
9 streams will result from the demolition, how and where
10 it will be transported, and how and where it will
11 ultimately be disposed or otherwise repurposed;
12 (D) the Agency approved operating program as
13 described in the Illinois Administrative Code;
14 (E) the date, time, and location of the public
15 meeting required under paragraph 4 of this subsection
16 (b), along with a reference to the statute requiring
17 said public meeting;
18 (F) a description of potential demolition impacts
19 including, but not limited to, a list of potential
20 contaminants in the demolition debris broken down by
21 major waste stream, if applicable, dates, hours, and
22 decibels of noise anticipated, and dates and hours of
23 road closures anticipated;
24 (G) the owner's or operator's contact information,
25 as well as the business name of each demolition
26 company that will be performing the demolition in

HB5410- 7 -LRB102 25374 CPF 34654 b
1 whole or in part;
2 (H) information on any applicable permits,
3 including any permits issued to the facility in
4 relation to the demolition, with express instructions
5 explaining how to access a copy of each permit;
6 (I) whether there are any unlined CCR surface
7 impoundments at or nearby the facility or public water
8 sources or private wells within 2,500 feet of the
9 facility;
10 (J) a detailed description of the preventative
11 measures that will be implemented by the facility to
12 control, mitigate, or prevent from occurring any air,
13 soil, or water pollution during the demolition;
14 (K) the address of the Internet website to which
15 the information required by subparagraphs (C) and (G)
16 of paragraph (4) of this subsection (b) will be posted
17 and the date on which the required information will be
18 posted to the Internet website;
19 (L) instructions for how to join phone, mail, or
20 text lists for notification periods, public meetings,
21 and specific demolition dates; and
22 (M) when a proposed demolition activity is located
23 in an area with 10% or more non-English speaking
24 residents, non-English versions of all of the above
25 reflecting local language prevalence.
26 (2) In the event of a change to the schedule, the owner

HB5410- 8 -LRB102 25374 CPF 34654 b
1 or operator must update the publicly accessible Internet
2 website at least 7 days prior to the new demolition date.
3 (3) Civil penalties for notice violations. An owner or
4 operator who violates the notice requirements is subject
5 to a civil penalty not to exceed $1,000 for the first
6 violation and a civil penalty not to exceed $5,000 for
7 each subsequent violation. Civil penalties collected under
8 this Section must be deposited into the Environmental
9 Protection Trust Fund to be used in accordance with the
10 provisions of the Environmental Protection Trust Fund Act.
11 (4) Public Meeting. At least 30 days before the
12 submission of a permit, if required, for demolition of a
13 thermal power plant, and at least 30 days after providing
14 notice pursuant to this Section, the owner or operator of
15 the facility must hold at least one public meeting within
16 the impacted community to discuss the proposed demolition,
17 subject to the following rules:
18 (A) This public meeting must begin after 5:00 p.m.
19 in the evening and be located at a venue that is
20 accessible to persons with disabilities; and the owner
21 or operator must provide reasonable accommodations, as
22 defined in the Americans with Disabilities Act, 42
23 U.S.C. § 12101 et seq., upon request.
24 (B) When a proposed demolition project is located
25 in an area with 10% or more non-English speaking
26 residents, the owner or operator must provide

HB5410- 9 -LRB102 25374 CPF 34654 b
1 translation services during the public meeting
2 required by this Section, if requested by a
3 non-English speaking member of the public.
4 (C) At least 14 days before holding a public
5 meeting, the owner or operator of the facility must
6 post to the owner's or operator's publicly accessible
7 Internet website:
8 (i) all documentation relied upon in making a
9 permit application; and
10 (ii) the facility's Agency approved operating
11 program.
12 (D) At the public meeting, the owner or operator
13 of the facility or the demolition company performing
14 the demolition must:
15 (i) present the schedule and process for the
16 demolition, which must cover the noise, air
17 quality, environmental, public health, and any
18 other community (e.g., road closures) impacts
19 expected from the demolition, as well as a summary
20 of the operating program, including control
21 equipment and best management practices that will
22 be used to reduce fugitive particulate matter
23 emissions.
24 (ii) include a question and answer portion of
25 the meeting to allow the public to ask questions;
26 and

HB5410- 10 -LRB102 25374 CPF 34654 b
1 (iii) ensure the presence of representatives
2 from the owner or operator that are qualified and
3 knowledgeable enough to answer the questions posed
4 by the public.
5 (E) The Agency shall have a representative present
6 at the public meeting, familiar with the thermal power
7 plant's operating program and the Agency's review of
8 the operating program, as well as the demolition
9 requirements. The Agency representative shall be
10 prepared to respond to and answer questions from the
11 public regarding its review and the operating program
12 itself.
13 (F) The owner or operator of the facility or the
14 demolition company must respond to all questions in
15 writing no later than 14 days after the meeting. The
16 owner or operator must respond on the post owner's or
17 operator's publicly accessible Internet website.
18 (G) The public meeting should be made available to
19 watch and participate in a meaningful way online and
20 recorded. The recording should be made available on
21 the owner's or operator's publicly accessible Internet
22 website.
23 (H) Within 15 days following the public meeting,
24 the owner or operator must distribute a general
25 summary of the issues raised by the public, as well as
26 a response to those issues or comments raised by the

HB5410- 11 -LRB102 25374 CPF 34654 b
1 public. This summary must be distributed to any
2 attendee who requests a copy at the public meeting.
3 (5) Consistency with air quality plan. The
4 notification and public meetings required under this
5 subsection shall be designed at a minimum to ensure the
6 public is given meaningful opportunity to review the air
7 quality plan set forth in this Section, and to provide
8 public feedback that plan before the Agency determines
9 whether to approve or deny the air quality plan. In this
10 Section, "public" means the population of a town, village,
11 or city in the State of Illinois that is within 25 miles of
12 a coal-fueled power plant at which demolition is to be
13 conducted.
14 (c) Air Quality Plan. Before any person may obtain a
15permit for the demolition of a thermal power plant via
16implosion, the person must prepare and submit to the Agency
17for approval a comprehensive air quality plan that
18investigates air quality impacts from fugitive dust prior to
19implosion and a establishes plan for the monitoring of PM10 in
20the air before, during, and after implosion activities. The
21air quality plan shall include, but may not be limited to, the
22following:
23 (1) An air dispersion modeling study using
24 computational fluid dynamic simulation such as finite
25 element method, applied element method, or other methods
26 approved by the Agency. The study shall simulate dust

HB5410- 12 -LRB102 25374 CPF 34654 b
1 propagation generated from the implosion under varying
2 wind speeds, wind directions, and weather stability
3 classes (unstable, neutral, and stable). The model shall
4 calculate the concentrations of PM10 in the dust plume
5 generated from the impact of the collapsed building or
6 structure with the ground. Its results shall inform the
7 placement of air monitors, as well as the dust mitigation
8 plan and the site cleanup plan, and traffic management
9 plans and the siting of protection and exclusion zones
10 onsite and offsite. The model shall produce the following
11 outputs superimposed over aerial or satellite imagery:
12 (A) PM10 concentration contours;
13 (B) PM10 concentration versus time at the source,
14 in the surrounding public way, and at sensitive areas
15 offsite; and
16 (C) maximum PM10 concentrations at the areas
17 specified above; and computer-generated videos for the
18 estimated dust cloud propagation and dissipation.
19 (2) Air monitoring of the air upwind and downwind at
20 the site, as well the air at sensitive areas within 1,000
21 feet of the site or within the plume modeled in paragraph
22 (1), whichever distance is greater, for PM10. Such
23 modeling shall be conducted at least for a 24-hour
24 duration one week prior, the day of, and one week
25 following the implosion until air monitoring confirms that
26 the hourly and 24-hour PM10 levels are back to normal,

HB5410- 13 -LRB102 25374 CPF 34654 b
1 pre-Implosion levels. PM10 levels shall be considered
2 normal when the measured PM10 levels are within the
3 historic mean, plus or minus the standard deviation,
4 within the last three years, unless the Agency has reason
5 to believe that the site is still causing PM10 levels to be
6 elevated. Historic PM10 data shall be based on data
7 collected from the nearest ambient air quality station
8 operated by the Agency or other data sources approved by
9 the Agency.
10 (A) In conjunction with the above PM10 monitoring,
11 air samples shall be collected at all monitored
12 locations for analysis of lead using NIOSH Method
13 7300, 7302 or 7303; asbestos fibers using NIOSH
14 Method(s) 7400 and/or 7402; silica using NIOSH Method
15 7500 or 7602; respirable particulates using NIOSH
16 Method 0600; and total dust using NIOSH Method 0500.
17 The Agency may approve alternate test methods or
18 require the use of United States Environmental
19 Protection Agency methods, depending on site-specific
20 factors. The Agency may also require the air sampling
21 of any or all RECs that may be emitted into the air by
22 the implosion. The PM10 monitoring shall be conducted
23 using instruments designated as Federal Equivalent
24 Method (FEM) by the United States Environmental
25 Protection Agency.
26 (B) The air quality plan shall also include

HB5410- 14 -LRB102 25374 CPF 34654 b
1 operation, according to manufacturer's specifications,
2 a weather station, or other permanent device to
3 monitor and record wind speed and wind direction,
4 along with the corresponding temperature, barometric
5 pressure, and relative humidity at or near the site.
6 The readings shall be taken at an unobstructed,
7 unsheltered area, unimpacted by the implosion, and at
8 a minimum height of 10 meters above ground level,
9 unless another height is appropriate pursuant to
10 applicable US Environmental Protection Agency
11 protocols and guidance.
12 (3) A dust mitigation plan that demonstrates that
13 adequate precautions and best practices are employed to
14 minimize fugitive dust; as well as demonstrates that a
15 robust contingency plan will be in place in case the above
16 primary measures fail to control or minimize fugitive
17 dust.
18 (4) Evaluation of onsite surficial soil for
19 particulate emission potential (PEP), which shall be
20 calculated by plotting the soil's fines content against
21 its optimal moisture content. The fines content shall be
22 determined using ASTM D1140-17, while the optimum moisture
23 content shall be measured using ASTM D1557 or AASHTO T180-
24 D. Alternate methods may be used with prior written
25 approval from the Agency. The results of the investigation
26 shall be depicted on a site map showing the PEP of unpaved

HB5410- 15 -LRB102 25374 CPF 34654 b
1 surfaces at the site.
2 (5) Dust mitigation measures that will be implemented
3 to limit the generation and dispersion of fugitive dust.
4 Such measures shall include, but are not limited to, the
5 following best practices:
6 (A) The thorough sweeping of paved surfaces using
7 a sweeper effective at removing fine particulates.
8 (B) Adequate wetting of all unpaved areas. The
9 operator shall ensure that surficial soils within the
10 ground impact area and 50% beyond are thoroughly
11 saturated up to a depth of four inches, or otherwise
12 treated using a method or methods approved by the
13 Agency, on the day of and within one hour prior to the
14 implosion, or within the closest timeframe allowed by
15 safety protocol.
16 (C) Employing misting cannons around the building,
17 structure, or both at strategic locations and
18 elevations determined based on the results of the air
19 dispersion modeling in paragraph (1) of this
20 subsection.
21 (D) Applying water to debris immediately following
22 blast and safety clearance.
23 (E) Restricting traffic and operations to paved
24 areas or stabilized surfaces. Soils exhibiting a High
25 PEP should be fenced off or otherwise demarcated to
26 prevent disturbance, or shall be effectively

HB5410- 16 -LRB102 25374 CPF 34654 b
1 stabilized, removed or covered if vehicle traffic or
2 operations will occur over these areas.
3 (6) A contingency plan describing the contingency
4 measures to be implemented if the above control measures
5 fail to adequately control dust emissions. In addition,
6 the plan must describe the steps that will be taken to
7 verify that a dust control measure is working and, upon
8 discovery of an inadequacy, the steps that will be taken
9 to initiate a contingency measure.
10 (7) A site cleanup plan, to remove dust, debris, and
11 litter from the surrounding impacted area as expeditiously
12 and as safely possible to minimize disruption to the
13 community. The site cleanup plan shall include, but is not
14 limited to, the following:
15 (A) the use of a street sweeper to clean impacted
16 paved areas. The street sweeper shall be equipped with
17 a waterless dust suppression system comprised of
18 vacuum assist and filtration for pickup and mitigation
19 of potential fugitive fine particulates, and
20 PM10-certified by Canada's Environmental Technology
21 Verification Program or as approved by the Agency;
22 (B) the cleaning of impacted parkways and private
23 properties (with owner permission);
24 (C) inspection protocols that ensure impacted
25 areas are returned to pre-implosion conditions; and
26 (D) a staffing plan and equipment list necessary

HB5410- 17 -LRB102 25374 CPF 34654 b
1 to execute the cleanup.
2(Source: P.A. 102-631, eff. 8-27-21.)
3 Section 99. Effective date. This Act takes effect upon
4becoming law.
feedback