Bill Text: IL HB0691 | 2011-2012 | 97th General Assembly | Introduced
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Amends the Public Utilities Act. Makes a technical change in a Section concerning authorization of water and sewer surcharges by the Illinois Commerce Commission.
Sponsorship: Partisan Bill (Democrat 2)
Status: (Passed) 2011-12-08 - Public Act . . . . . . . . . 97-0630 [HB0691 Detail]
Download: Illinois-2011-HB0691-Introduced.html
Bill Title: Amends the Public Utilities Act. Makes a technical change in a Section concerning authorization of water and sewer surcharges by the Illinois Commerce Commission.
Sponsorship: Partisan Bill (Democrat 2)
Status: (Passed) 2011-12-08 - Public Act . . . . . . . . . 97-0630 [HB0691 Detail]
Download: Illinois-2011-HB0691-Introduced.html
| |||||||
| |||||||
| |||||||
| 1 | AN ACT concerning regulation.
| ||||||
| 2 | Be it enacted by the People of the State of Illinois,
| ||||||
| 3 | represented in the General Assembly:
| ||||||
| 4 | Section 5. The Public Utilities Act is amended by changing | ||||||
| 5 | Section 9-220 as follows:
| ||||||
| 6 | (220 ILCS 5/9-220) (from Ch. 111 2/3, par. 9-220) | ||||||
| 7 | Sec. 9-220. Rate changes based on changes in fuel costs. | ||||||
| 8 | (a) Notwithstanding the provisions of Section 9-201, the
| ||||||
| 9 | Commission may authorize the increase or decrease of rates and | ||||||
| 10 | charges
based upon changes in the cost of fuel used in the | ||||||
| 11 | generation or production
of electric power, changes in the cost | ||||||
| 12 | of purchased power, or changes in
the cost of purchased gas | ||||||
| 13 | through the application of fuel adjustment
clauses or purchased | ||||||
| 14 | gas adjustment clauses. The Commission may also
authorize the | ||||||
| 15 | increase or decrease of rates and charges based upon | ||||||
| 16 | expenditures
or revenues resulting from the purchase or sale of | ||||||
| 17 | emission allowances created
under the federal Clean Air Act | ||||||
| 18 | Amendments of 1990,
through such fuel adjustment clauses, as a | ||||||
| 19 | cost of fuel. For the purposes of
this paragraph, cost of fuel | ||||||
| 20 | used in the generation or production of electric
power shall | ||||||
| 21 | include the amount of any fees paid by the utility for the
| ||||||
| 22 | implementation and operation of a process for the | ||||||
| 23 | desulfurization of the
flue gas when burning high sulfur coal | ||||||
| |||||||
| |||||||
| 1 | at any location within the State of
Illinois irrespective of | ||||||
| 2 | the attainment status designation of such
location; but shall | ||||||
| 3 | not include transportation costs
of coal
(i) except to the | ||||||
| 4 | extent that for contracts entered into on
and after the | ||||||
| 5 | effective date of this amendatory Act of 1997,
the cost of the | ||||||
| 6 | coal, including transportation costs,
constitutes the lowest | ||||||
| 7 | cost for adequate and reliable fuel
supply reasonably available | ||||||
| 8 | to the public utility in
comparison to the cost, including | ||||||
| 9 | transportation costs, of
other adequate and reliable sources of | ||||||
| 10 | fuel supply reasonably
available to the public utility, or (ii)
| ||||||
| 11 | except as otherwise provided in the next 3 sentences of this | ||||||
| 12 | paragraph.
Such costs of fuel
shall, when requested by a | ||||||
| 13 | utility or at the conclusion of the utility's
next general | ||||||
| 14 | electric rate proceeding, whichever shall first occur, include
| ||||||
| 15 | transportation costs of coal purchased under existing coal | ||||||
| 16 | purchase
contracts. For purposes of this paragraph "existing | ||||||
| 17 | coal purchase
contracts" means contracts for the purchase of | ||||||
| 18 | coal in effect on the
effective date of this amendatory Act of | ||||||
| 19 | 1991, as such contracts may
thereafter be amended, but only to | ||||||
| 20 | the extent that any such amendment does
not increase the | ||||||
| 21 | aggregate quantity of coal to be purchased under such
contract.
| ||||||
| 22 | Nothing herein shall authorize an electric utility
to recover | ||||||
| 23 | through its fuel adjustment clause any amounts of
| ||||||
| 24 | transportation costs of coal that were included in the revenue
| ||||||
| 25 | requirement used to set base rates in its most recent general
| ||||||
| 26 | rate proceeding.
Cost shall be based upon uniformly applied | ||||||
| |||||||
| |||||||
| 1 | accounting
principles. Annually, the Commission shall initiate | ||||||
| 2 | public hearings to
determine whether the clauses reflect actual | ||||||
| 3 | costs of fuel, gas, power, or
coal transportation purchased to | ||||||
| 4 | determine whether such purchases were
prudent, and to reconcile | ||||||
| 5 | any amounts collected with the actual costs of
fuel, power, | ||||||
| 6 | gas, or coal transportation prudently purchased. In each such
| ||||||
| 7 | proceeding, the burden of proof shall be upon the utility to | ||||||
| 8 | establish the
prudence of its cost of fuel, power, gas, or coal
| ||||||
| 9 | transportation purchases
and costs.
The Commission shall
issue | ||||||
| 10 | its final order in each such annual proceeding for an
electric | ||||||
| 11 | utility by December 31 of the year immediately
following the | ||||||
| 12 | year to which the proceeding pertains, provided,
that the | ||||||
| 13 | Commission shall issue its final order with respect
to such | ||||||
| 14 | annual proceeding for the years 1996 and earlier by December | ||||||
| 15 | 31, 1998. | ||||||
| 16 | (b) A public utility providing electric service, other than | ||||||
| 17 | a public utility
described in subsections (e) or (f) of this | ||||||
| 18 | Section, may at
any time during the mandatory transition period | ||||||
| 19 | file with the
Commission proposed tariff sheets that eliminate | ||||||
| 20 | the public
utility's fuel adjustment clause and adjust the | ||||||
| 21 | public
utility's base rate tariffs by the amount necessary for | ||||||
| 22 | the
base fuel component of the base rates to recover the public
| ||||||
| 23 | utility's average fuel and power supply costs per kilowatt-hour | ||||||
| 24 | for the 2
most recent years for which the Commission
has issued | ||||||
| 25 | final orders in annual proceedings pursuant to
subsection (a), | ||||||
| 26 | where the average fuel and power supply costs
per kilowatt-hour | ||||||
| |||||||
| |||||||
| 1 | shall be calculated as the sum of the public
utility's prudent | ||||||
| 2 | and allowable fuel and power supply costs as
found by the | ||||||
| 3 | Commission in the 2 proceedings divided by the
public utility's | ||||||
| 4 | actual jurisdictional kilowatt-hour sales for
those 2 years. | ||||||
| 5 | Notwithstanding any contrary or inconsistent
provisions in | ||||||
| 6 | Section 9-201 of this Act, in subsection (a) of
this Section or | ||||||
| 7 | in any rules or regulations promulgated by the
Commission | ||||||
| 8 | pursuant to subsection (g) of this Section, the
Commission | ||||||
| 9 | shall review and shall by order approve, or approve
as | ||||||
| 10 | modified, the proposed tariff sheets within 60 days after
the | ||||||
| 11 | date of the public utility's filing. The Commission may
modify | ||||||
| 12 | the public utility's proposed tariff sheets only to the
extent | ||||||
| 13 | the Commission finds necessary to achieve conformance
to the | ||||||
| 14 | requirements of this subsection (b). During the 5
years | ||||||
| 15 | following the date of the Commission's order, but in any
event | ||||||
| 16 | no earlier than January 1, 2007, a public utility whose
fuel | ||||||
| 17 | adjustment clause has been eliminated pursuant to this
| ||||||
| 18 | subsection shall not file proposed tariff sheets seeking, or
| ||||||
| 19 | otherwise petition the Commission for, reinstatement of a fuel
| ||||||
| 20 | adjustment clause. | ||||||
| 21 | (c) Notwithstanding any contrary or inconsistent
| ||||||
| 22 | provisions in Section 9-201 of this Act, in subsection (a) of
| ||||||
| 23 | this Section or in any rules or regulations promulgated by the
| ||||||
| 24 | Commission pursuant to subsection (g) of this Section, a
public | ||||||
| 25 | utility providing electric service, other than a public utility
| ||||||
| 26 | described
in subsection (e) or (f) of this Section, may at any | ||||||
| |||||||
| |||||||
| 1 | time
during the mandatory transition period file with the
| ||||||
| 2 | Commission proposed tariff sheets that establish the rate per
| ||||||
| 3 | kilowatt-hour to be applied pursuant to the public utility's
| ||||||
| 4 | fuel adjustment clause at the average value for such rate
| ||||||
| 5 | during the preceding 24 months, provided that such average
rate | ||||||
| 6 | results in a credit to customers' bills, without making
any | ||||||
| 7 | revisions to the public utility's base rate tariffs. The
| ||||||
| 8 | proposed tariff sheets shall establish the fuel adjustment
rate | ||||||
| 9 | for a specific time period of at least 3 years but not
more | ||||||
| 10 | than 5 years, provided that the terms and conditions for
any | ||||||
| 11 | reinstatement earlier than 5 years shall be set forth in
the | ||||||
| 12 | proposed tariff sheets and subject to modification or
approval | ||||||
| 13 | by the Commission. The Commission shall review and
shall by | ||||||
| 14 | order approve the proposed tariff sheets if it finds
that the | ||||||
| 15 | requirements of this subsection are met. The
Commission shall | ||||||
| 16 | not conduct the annual hearings specified in the
last 3 | ||||||
| 17 | sentences of subsection (a) of this Section for the
utility for | ||||||
| 18 | the period that the factor established pursuant to
this | ||||||
| 19 | subsection is in effect. | ||||||
| 20 | (d) A public utility providing electric service, or a | ||||||
| 21 | public utility
providing gas service
may file with the | ||||||
| 22 | Commission proposed tariff sheets that
eliminate the public | ||||||
| 23 | utility's fuel or purchased gas
adjustment clause and adjust | ||||||
| 24 | the public utility's base rate
tariffs to provide for recovery | ||||||
| 25 | of power supply costs or gas
supply costs that would have been | ||||||
| 26 | recovered through such
clause; provided, that the provisions of | ||||||
| |||||||
| |||||||
| 1 | this subsection (d) shall not be
available to a public utility | ||||||
| 2 | described in subsections (e) or (f) of this
Section to | ||||||
| 3 | eliminate its fuel adjustment clause. Notwithstanding any | ||||||
| 4 | contrary
or inconsistent
provisions in Section 9-201 of this | ||||||
| 5 | Act, in subsection (a) of
this Section, or in any rules or | ||||||
| 6 | regulations promulgated by
the Commission pursuant to | ||||||
| 7 | subsection (g) of this Section, the
Commission shall review and | ||||||
| 8 | shall by order approve, or approve
as modified in the | ||||||
| 9 | Commission's order, the proposed tariff
sheets within 240 days | ||||||
| 10 | after the date of the public utility's
filing. The Commission's | ||||||
| 11 | order shall approve rates and
charges that the Commission, | ||||||
| 12 | based on information in the
public utility's filing or on the | ||||||
| 13 | record if a hearing is held
by the Commission, finds will | ||||||
| 14 | recover the reasonable, prudent
and necessary jurisdictional | ||||||
| 15 | power supply costs or gas supply
costs incurred or to be | ||||||
| 16 | incurred by the public utility during
a 12 month period found | ||||||
| 17 | by the Commission to be appropriate
for these purposes, | ||||||
| 18 | provided, that such period shall be either
(i) a 12 month | ||||||
| 19 | historical period occurring during the 15
months ending on the | ||||||
| 20 | date of the public utility's filing, or
(ii) a 12 month future | ||||||
| 21 | period ending no later than 15 months
following the date of the | ||||||
| 22 | public utility's filing. The public
utility shall include with | ||||||
| 23 | its tariff filing information
showing both (1) its actual | ||||||
| 24 | jurisdictional power supply costs
or gas supply costs for a 12 | ||||||
| 25 | month historical period
conforming to (i) above and (2) its | ||||||
| 26 | projected jurisdictional
power supply costs or gas supply costs | ||||||
| |||||||
| |||||||
| 1 | for a future 12 month
period conforming to (ii) above. If the | ||||||
| 2 | Commission's order
requires modifications in the tariff sheets | ||||||
| 3 | filed by the
public utility, the public utility shall have 7 | ||||||
| 4 | days following
the date of the order to notify the Commission | ||||||
| 5 | whether the
public utility will implement the modified tariffs | ||||||
| 6 | or elect to
continue its fuel or purchased gas adjustment | ||||||
| 7 | clause in force
as though no order had been entered. The | ||||||
| 8 | Commission's order
shall provide for any reconciliation of | ||||||
| 9 | power supply costs or
gas supply costs, as the case may be, and | ||||||
| 10 | associated revenues
through the date that the public utility's | ||||||
| 11 | fuel or purchased
gas adjustment clause is eliminated. During | ||||||
| 12 | the 5 years
following the date of the Commission's order, a | ||||||
| 13 | public utility
whose fuel or purchased gas adjustment clause | ||||||
| 14 | has been
eliminated pursuant to this subsection shall not file | ||||||
| 15 | proposed
tariff sheets seeking, or otherwise petition the | ||||||
| 16 | Commission
for, reinstatement or adoption of a fuel or | ||||||
| 17 | purchased gas
adjustment clause. Nothing in this subsection (d) | ||||||
| 18 | shall be
construed as limiting the Commission's authority to | ||||||
| 19 | eliminate
a public utility's fuel adjustment clause or | ||||||
| 20 | purchased gas
adjustment clause in accordance with any other | ||||||
| 21 | applicable
provisions of this Act. | ||||||
| 22 | (e) Notwithstanding any contrary or inconsistent | ||||||
| 23 | provisions in
Section 9-201 of this Act, in subsection (a) of | ||||||
| 24 | this Section, or in
any rules promulgated by the Commission | ||||||
| 25 | pursuant
to subsection (g) of this Section, a public utility | ||||||
| 26 | providing
electric service to more than 1,000,000 customers in | ||||||
| |||||||
| |||||||
| 1 | this State may, within the
first 6 months after the
effective | ||||||
| 2 | date of this amendatory Act of 1997, file with the
Commission | ||||||
| 3 | proposed tariff sheets that eliminate, effective
January 1, | ||||||
| 4 | 1997, the public utility's fuel adjustment clause
without | ||||||
| 5 | adjusting its base rates, and such tariff sheets shall be
| ||||||
| 6 | effective upon filing. To the extent the application of the | ||||||
| 7 | fuel
adjustment clause had resulted in net charges to customers | ||||||
| 8 | after
January 1, 1997, the utility shall also file a tariff | ||||||
| 9 | sheet that
provides for a refund stated on a per kilowatt-hour | ||||||
| 10 | basis of such
charges over a period not to exceed 6 months; | ||||||
| 11 | provided
however, that such refund shall not include the | ||||||
| 12 | proportional
amounts of taxes paid under the Use Tax Act, | ||||||
| 13 | Service Use Tax Act,
Service Occupation Tax Act, and Retailers' | ||||||
| 14 | Occupation Tax Act on
fuel used in generation. The Commission | ||||||
| 15 | shall issue an order
within 45 days after the date of the | ||||||
| 16 | public utility's filing
approving or approving as modified such | ||||||
| 17 | tariff sheet. If the fuel
adjustment clause is eliminated | ||||||
| 18 | pursuant to this subsection, the
Commission shall not conduct | ||||||
| 19 | the annual hearings specified in the
last 3 sentences of | ||||||
| 20 | subsection (a) of this Section for the
utility for any period | ||||||
| 21 | after December 31, 1996 and prior to any
reinstatement of such | ||||||
| 22 | clause. A public utility whose fuel
adjustment clause has been | ||||||
| 23 | eliminated pursuant to this subsection
shall not file a | ||||||
| 24 | proposed tariff sheet seeking, or otherwise
petition the | ||||||
| 25 | Commission for, reinstatement of the fuel adjustment
clause | ||||||
| 26 | prior to January 1, 2007. | ||||||
| |||||||
| |||||||
| 1 | (f) Notwithstanding any contrary or inconsistent | ||||||
| 2 | provisions in Section
9-201 of this Act, in subsection (a) of | ||||||
| 3 | this Section, or in any rules or
regulations promulgated by the | ||||||
| 4 | Commission pursuant to subsection (g) of this
Section, a public | ||||||
| 5 | utility providing electric service to more than 500,000
| ||||||
| 6 | customers but fewer than 1,000,000 customers in this State may, | ||||||
| 7 | within the
first
6 months after the effective date of this | ||||||
| 8 | amendatory Act of 1997, file with the
Commission proposed | ||||||
| 9 | tariff sheets that eliminate, effective January 1, 1997,
the | ||||||
| 10 | public utility's fuel adjustment clause and adjust its base | ||||||
| 11 | rates by the
amount necessary for the base fuel component of | ||||||
| 12 | the base rates to recover
91% of the public utility's average | ||||||
| 13 | fuel and power supply costs for the 2 most
recent years for | ||||||
| 14 | which the Commission, as of January 1, 1997, has issued final
| ||||||
| 15 | orders in annual proceedings pursuant to subsection (a), where | ||||||
| 16 | the average fuel
and power supply costs per kilowatt-hour shall | ||||||
| 17 | be calculated as the sum of the
public utility's prudent and | ||||||
| 18 | allowable fuel and power supply costs as found by
the | ||||||
| 19 | Commission in the 2 proceedings divided by the public utility's | ||||||
| 20 | actual
jurisdictional kilowatt-hour sales for those 2 years, | ||||||
| 21 | provided, that such
tariff sheets shall be effective upon | ||||||
| 22 | filing. To the extent the application of
the fuel adjustment | ||||||
| 23 | clause had resulted in net charges to customers after
January | ||||||
| 24 | 1, 1997, the utility shall also file a tariff sheet that | ||||||
| 25 | provides for a
refund stated on a per kilowatt-hour basis of | ||||||
| 26 | such charges over a period not to
exceed 6 months. Provided | ||||||
| |||||||
| |||||||
| 1 | however, that such refund shall not include the
proportional | ||||||
| 2 | amounts of taxes paid under the Use Tax Act, Service Use Tax | ||||||
| 3 | Act,
Service Occupation Tax Act, and Retailers' Occupation Tax | ||||||
| 4 | Act on fuel used in
generation. The Commission shall issue an | ||||||
| 5 | order within 45 days after the date
of the public utility's | ||||||
| 6 | filing approving or approving as modified such tariff
sheet. If | ||||||
| 7 | the fuel adjustment clause is eliminated pursuant to this
| ||||||
| 8 | subsection, the Commission shall not conduct the annual | ||||||
| 9 | hearings specified in
the last 3 sentences of subsection (a) of | ||||||
| 10 | this Section for the utility for any
period after December 31, | ||||||
| 11 | 1996 and prior to any reinstatement of such clause.
A public | ||||||
| 12 | utility whose fuel adjustment clause has been eliminated | ||||||
| 13 | pursuant to
this subsection shall not file a proposed tariff | ||||||
| 14 | sheet seeking, or otherwise
petition the Commission for, | ||||||
| 15 | reinstatement of the fuel adjustment clause prior
to January 1, | ||||||
| 16 | 2007. | ||||||
| 17 | (g) The Commission shall have authority to promulgate rules | ||||||
| 18 | and
regulations to
carry out the provisions of this Section. | ||||||
| 19 | (h) Any Illinois gas utility may enter into a contract on | ||||||
| 20 | or before September 30, 2011 for up to 10 years of supply with | ||||||
| 21 | any company for the purchase of substitute natural gas (SNG) | ||||||
| 22 | produced from coal through the gasification process if the | ||||||
| 23 | company has commenced construction of a clean coal SNG facility | ||||||
| 24 | by July 1, 2012 and commencement of construction shall mean | ||||||
| 25 | that material physical site work has occurred, such as site | ||||||
| 26 | clearing and excavation, water runoff prevention, water | ||||||
| |||||||
| |||||||
| 1 | retention reservoir preparation, or foundation development. | ||||||
| 2 | The contract shall contain the following provisions: (i) at | ||||||
| 3 | least 90% of feedstock to be used in the gasification process | ||||||
| 4 | shall be coal with a high volatile bituminous rank and greater | ||||||
| 5 | than 1.7 pounds of sulfur per million Btu content; (ii) at the | ||||||
| 6 | time the contract term commences, the price per million Btu may | ||||||
| 7 | not exceed $7.95 in 2008 dollars, adjusted annually based on | ||||||
| 8 | the change in the Annual Consumer Price Index for All Urban | ||||||
| 9 | Consumers for the Midwest Region as published in April by the | ||||||
| 10 | United States Department of Labor, Bureau of Labor Statistics | ||||||
| 11 | (or a suitable Consumer Price Index calculation if this | ||||||
| 12 | Consumer Price Index is not available) for the previous | ||||||
| 13 | calendar year; provided that the price per million Btu shall | ||||||
| 14 | not exceed $9.95 at any time during the contract; (iii) the | ||||||
| 15 | utility's supply contract for the purchase of SNG does not | ||||||
| 16 | exceed 15% of the annual system supply requirements of the | ||||||
| 17 | utility as of 2008; and (iv) the contract costs pursuant to | ||||||
| 18 | subsection (h-10) of this Section shall not include any | ||||||
| 19 | lobbying expenses, charitable contributions, advertising, | ||||||
| 20 | organizational memberships, carbon dioxide pipeline or | ||||||
| 21 | sequestration expenses, or marketing expenses. | ||||||
| 22 | Any gas utility that is providing service to more than | ||||||
| 23 | 150,000 customers on August 2, 2011 (the effective date of | ||||||
| 24 | Public Act 97-239) this amendatory Act of the 97th General | ||||||
| 25 | Assembly shall either elect to enter into a contract on or | ||||||
| 26 | before September 30, 2011 for 10 years of SNG supply with the | ||||||
| |||||||
| |||||||
| 1 | owner of a clean coal SNG facility or to file biennial rate | ||||||
| 2 | proceedings before the Commission in the years 2012, 2014, and | ||||||
| 3 | 2016, with such filings made after August 2, 2011 the effective | ||||||
| 4 | date of this amendatory Act of the 97th General Assembly and no | ||||||
| 5 | later than September 30 of the years 2012, 2014, and 2016 | ||||||
| 6 | consistent with all requirements of 83 Ill. Adm. Code 255 and | ||||||
| 7 | 285 as though the gas utility were filing for an increase in | ||||||
| 8 | its rates, without regard to whether such filing would produce | ||||||
| 9 | an increase, a decrease, or no change in the gas utility's | ||||||
| 10 | rates, and the Commission shall review the gas utility's filing | ||||||
| 11 | and shall issue its order in accordance with the provisions of | ||||||
| 12 | Section 9-201 of this Act. | ||||||
| 13 | Within 7 days after August 2, 2011 the effective date of | ||||||
| 14 | this amendatory Act of the 97th General Assembly, the owner of | ||||||
| 15 | the clean coal SNG facility shall submit to the Illinois Power | ||||||
| 16 | Agency and each gas utility that is providing service to more | ||||||
| 17 | than 150,000 customers on August 2, 2011 the effective date of | ||||||
| 18 | this amendatory Act of the 97th General Assembly a copy of a | ||||||
| 19 | draft contract. Within 30 days after the receipt of the draft | ||||||
| 20 | contract, each such gas utility shall provide the Illinois | ||||||
| 21 | Power Agency and the owner of the clean coal SNG facility with | ||||||
| 22 | its comments and recommended revisions to the draft contract. | ||||||
| 23 | Within 7 days after the receipt of the gas utility's comments | ||||||
| 24 | and recommended revisions, the owner of the facility shall | ||||||
| 25 | submit its responsive comments and a further revised draft of | ||||||
| 26 | the contract to the Illinois Power Agency. The Illinois Power | ||||||
| |||||||
| |||||||
| 1 | Agency shall review the draft contract and comments. | ||||||
| 2 | During its review of the draft contract, the Illinois Power | ||||||
| 3 | Agency shall: | ||||||
| 4 | (1) review and confirm in writing that the terms stated | ||||||
| 5 | in this subsection (h) are incorporated in the SNG | ||||||
| 6 | contract; | ||||||
| 7 | (2) review the SNG pricing formula included in the | ||||||
| 8 | contract and approve that formula if the Illinois Power | ||||||
| 9 | Agency determines that the formula, at the time the | ||||||
| 10 | contract term commences: (A) starts with a price of $6.50 | ||||||
| 11 | per MMBtu adjusted by the adjusted final capitalized plant | ||||||
| 12 | cost; (B) takes into account budgeted miscellaneous net | ||||||
| 13 | revenue after cost allowance, including sale of SNG | ||||||
| 14 | produced by the clean coal SNG facility above the nameplate | ||||||
| 15 | capacity of the facility and other by-products produced by | ||||||
| 16 | the facility, as approved by the Illinois Power Agency; (C) | ||||||
| 17 | does not include carbon dioxide transportation or | ||||||
| 18 | sequestration expenses; and (D) includes all provisions | ||||||
| 19 | required under this subsection (h); if the Illinois Power | ||||||
| 20 | Agency does not approve of the SNG pricing formula, then | ||||||
| 21 | the Illinois Power Agency shall modify the formula to | ||||||
| 22 | ensure that it meets the requirements of this subsection | ||||||
| 23 | (h); | ||||||
| 24 | (3) review and approve the amount of budgeted | ||||||
| 25 | miscellaneous net revenue after cost allowance, including | ||||||
| 26 | sale of SNG produced by the clean coal SNG facility above | ||||||
| |||||||
| |||||||
| 1 | the nameplate capacity of the facility and other | ||||||
| 2 | by-products produced by the facility, to be included in the | ||||||
| 3 | pricing formula; the Illinois Power Agency shall approve | ||||||
| 4 | the amount of budgeted miscellaneous net revenue to be | ||||||
| 5 | included in the pricing formula if it determines the | ||||||
| 6 | budgeted amount to be reasonable and accurate; | ||||||
| 7 | (4) review and confirm in writing that using the EIA | ||||||
| 8 | Annual Energy Outlook-2011 Henry Hub Spot Price, the | ||||||
| 9 | contract terms set out in subsection (h), the | ||||||
| 10 | reconciliation account terms as set out in subsection | ||||||
| 11 | (h-15), and an estimated inflation rate of 2.5% for each | ||||||
| 12 | corresponding year, that there will be no cumulative | ||||||
| 13 | estimated increase for residential customers; and | ||||||
| 14 | (5) allocate the nameplate capacity of the clean coal | ||||||
| 15 | SNG by total therms sold to ultimate customers by each gas | ||||||
| 16 | utility in 2008; provided, however, no utility shall be | ||||||
| 17 | required to purchase more than 42% of the projected annual | ||||||
| 18 | output of the facility; additionally, the Illinois Power | ||||||
| 19 | Agency shall further adjust the allocation only as required | ||||||
| 20 | to take into account (A) adverse consolidation, | ||||||
| 21 | derivative, or lease impacts to the balance sheet or income | ||||||
| 22 | statement of any gas utility or (B) the physical capacity | ||||||
| 23 | of the gas utility to accept SNG. | ||||||
| 24 | If the parties to the contract do not agree on the terms | ||||||
| 25 | therein, then the Illinois Power Agency shall retain an | ||||||
| 26 | independent mediator to mediate the dispute between the | ||||||
| |||||||
| |||||||
| 1 | parties. If the parties are in agreement on the terms of the | ||||||
| 2 | contract, then the Illinois Power Agency shall approve the | ||||||
| 3 | contract. If after mediation the parties have failed to come to | ||||||
| 4 | agreement, then the Illinois Power Agency shall revise the | ||||||
| 5 | draft contract as necessary to confirm that the contract | ||||||
| 6 | contains only terms that are reasonable and equitable. The | ||||||
| 7 | Illinois Power Agency may, in its discretion, retain an | ||||||
| 8 | independent, qualified, and experienced expert to assist in its | ||||||
| 9 | obligations under this subsection (h). The Illinois Power | ||||||
| 10 | Agency shall adopt and make public policies detailing the | ||||||
| 11 | processes for retaining a mediator and an expert under this | ||||||
| 12 | subsection (h). Any mediator or expert retained under this | ||||||
| 13 | subsection (h) shall be retained no later than 60 days after | ||||||
| 14 | August 2, 2011 the effective date of this amendatory Act of the | ||||||
| 15 | 97th General Assembly. | ||||||
| 16 | The Illinois Power Agency shall complete all of its | ||||||
| 17 | responsibilities under this subsection (h) within 60 days after | ||||||
| 18 | August 2, 2011 the effective date of this amendatory Act of the | ||||||
| 19 | 97th General Assembly. The clean coal SNG facility shall pay a | ||||||
| 20 | reasonable fee as required by the Illinois Power Agency for its | ||||||
| 21 | services under this subsection (h) and shall pay the mediator's | ||||||
| 22 | and expert's reasonable fees, if any. A gas utility and its | ||||||
| 23 | customers shall have no obligation to reimburse the clean coal | ||||||
| 24 | SNG facility or the Illinois Power Agency of any such costs. | ||||||
| 25 | Within 30 days after commercial production of SNG has | ||||||
| 26 | begun, the Commission shall initiate a review to determine | ||||||
| |||||||
| |||||||
| 1 | whether the final capitalized plant cost of the clean coal SNG | ||||||
| 2 | facility reflects actual incurred costs and whether the | ||||||
| 3 | incurred costs were reasonable. In determining the actual | ||||||
| 4 | incurred costs included in the final capitalized plant cost and | ||||||
| 5 | the reasonableness of those costs, the Commission may in its | ||||||
| 6 | discretion retain independent, qualified, and experienced | ||||||
| 7 | experts to assist in its determination. The expert shall not | ||||||
| 8 | own or control any direct or indirect interest in the clean | ||||||
| 9 | coal SNG facility and shall have no contractual relationship | ||||||
| 10 | with the clean coal SNG facility. If an expert is retained by | ||||||
| 11 | the Commission, then the clean coal SNG facility shall pay the | ||||||
| 12 | expert's reasonable fees. The fees shall not be passed on to a | ||||||
| 13 | utility or its customers. The Commission shall adopt and make | ||||||
| 14 | public a policy detailing the process for retaining experts | ||||||
| 15 | under this subsection (h). | ||||||
| 16 | Within 30 days after completion of its review, the | ||||||
| 17 | Commission shall initiate a formal proceeding on the final | ||||||
| 18 | capitalized plant cost of the clean coal SNG facility at which | ||||||
| 19 | comments and testimony may be submitted by any interested | ||||||
| 20 | parties and the public. If the Commission finds that the final | ||||||
| 21 | capitalized plant cost includes costs that were not actually | ||||||
| 22 | incurred or costs that were unreasonably incurred, then the | ||||||
| 23 | Commission shall disallow the amount of non-incurred or | ||||||
| 24 | unreasonable costs from the SNG price under contracts entered | ||||||
| 25 | into under this subsection (h). If the Commission disallows any | ||||||
| 26 | costs, then the Commission shall adjust the SNG price using the | ||||||
| |||||||
| |||||||
| 1 | price formula in the contract approved by the Illinois Power | ||||||
| 2 | Agency under this subsection (h) to reflect the disallowed | ||||||
| 3 | costs and shall enter an order specifying the revised price. In | ||||||
| 4 | addition, the Commission's order shall direct the clean coal | ||||||
| 5 | SNG facility to issue refunds of such sums as shall represent | ||||||
| 6 | the difference between actual gross revenues and the gross | ||||||
| 7 | revenue that would have been obtained based upon the same | ||||||
| 8 | volume, from the price revised by the Commission. Any refund | ||||||
| 9 | shall include interest calculated at a rate determined by the | ||||||
| 10 | Commission and shall be returned according to procedures | ||||||
| 11 | prescribed by the Commission. | ||||||
| 12 | Nothing in this subsection (h) shall preclude any party | ||||||
| 13 | affected by a decision of the Commission under this subsection | ||||||
| 14 | (h) from seeking judicial review of the Commission's decision. | ||||||
| 15 | (h-1) Any Illinois gas utility may enter into a sourcing | ||||||
| 16 | agreement for up to 30 years of supply with the clean coal SNG | ||||||
| 17 | brownfield facility if the clean coal SNG brownfield facility | ||||||
| 18 | has commenced construction. Any gas utility that is providing | ||||||
| 19 | service to more than 150,000 customers on July 13, 2011 (the | ||||||
| 20 | effective date of Public Act 97-096) this amendatory Act of the | ||||||
| 21 | 97th General Assembly shall either elect to file biennial rate | ||||||
| 22 | proceedings before the Commission in the years 2012, 2014, and | ||||||
| 23 | 2016 or enter into a sourcing agreement or sourcing agreements | ||||||
| 24 | with a clean coal SNG brownfield facility with an initial term | ||||||
| 25 | of 30 years for either (i) a percentage of 43,500,000,000 cubic | ||||||
| 26 | feet per year, such that the utilities entering into sourcing | ||||||
| |||||||
| |||||||
| 1 | agreements with the clean coal SNG brownfield facility purchase | ||||||
| 2 | 100%,
allocated by total therms sold to ultimate customers by | ||||||
| 3 | each
gas utility in 2008 or (ii) such lesser amount as may be | ||||||
| 4 | available from the clean coal SNG brownfield facility; provided | ||||||
| 5 | that no utility shall be required to purchase more than 42% of | ||||||
| 6 | the projected annual output of the clean coal SNG brownfield | ||||||
| 7 | facility, with the remainder of such utility's obligation to be | ||||||
| 8 | divided proportionately between the other utilities, and | ||||||
| 9 | provided that the Illinois Power Agency shall
further adjust | ||||||
| 10 | the allocation only as required to take into
account adverse | ||||||
| 11 | consolidation, derivative, or lease impacts to
the balance | ||||||
| 12 | sheet or income statement of any gas utility. | ||||||
| 13 | A gas utility electing to file biennial rate proceedings | ||||||
| 14 | before the Commission must file a notice of its election with | ||||||
| 15 | the Commission within 60 days after July 13, 2011 the effective | ||||||
| 16 | date of this amendatory Act of the 97th General Assembly or its | ||||||
| 17 | right to make the election is irrevocably waived. A gas utility | ||||||
| 18 | electing to file biennial rate proceedings shall make such | ||||||
| 19 | filings no later than August 1 of the years 2012, 2014, and | ||||||
| 20 | 2016, consistent with all requirements of 83 Ill. Adm. Code 255 | ||||||
| 21 | and 285 as though the gas utility were filing for an increase | ||||||
| 22 | in its rates, without regard to whether such filing would | ||||||
| 23 | produce an increase, a decrease, or no change in the gas | ||||||
| 24 | utility's rates, and notwithstanding any other provisions of | ||||||
| 25 | this Act, the Commission shall fully review the gas utility's | ||||||
| 26 | filing and shall issue its order in accordance with the | ||||||
| |||||||
| |||||||
| 1 | provisions of Section 9-201 of this Act, regardless of whether | ||||||
| 2 | the
Commission has approved a formula rate for the gas utility. | ||||||
| 3 | Within 15 days after July 13, 2011 the effective date of | ||||||
| 4 | this amendatory Act of the 97th General Assembly, the owner of | ||||||
| 5 | the clean coal SNG brownfield facility shall submit to the | ||||||
| 6 | Illinois Power Agency and each gas utility that is providing | ||||||
| 7 | service to more than 150,000 customers on July 13, 2011 the | ||||||
| 8 | effective date of this amendatory Act of the 97th General | ||||||
| 9 | Assembly a copy of a draft sourcing agreement. Within 45 days | ||||||
| 10 | after receipt of the draft sourcing agreement, each such gas | ||||||
| 11 | utility shall provide the Illinois Power Agency and the owner | ||||||
| 12 | of a clean coal SNG brownfield facility with its comments and | ||||||
| 13 | recommended revisions to the draft sourcing agreement. Within | ||||||
| 14 | 15 days after the receipt of the gas utility's comments and | ||||||
| 15 | recommended revisions, the owner of the clean coal SNG | ||||||
| 16 | brownfield facility shall submit its responsive comments and a | ||||||
| 17 | further revised draft of the sourcing agreement to the Illinois | ||||||
| 18 | Power Agency. The Illinois Power Agency shall review the draft | ||||||
| 19 | sourcing agreement and comments. | ||||||
| 20 | If the parties to the sourcing agreement do not agree on | ||||||
| 21 | the terms therein, then the Illinois Power Agency shall retain | ||||||
| 22 | an independent mediator to mediate the dispute between the | ||||||
| 23 | parties. If the parties are in agreement on the terms of the | ||||||
| 24 | sourcing agreement, the Illinois Power Agency shall approve the | ||||||
| 25 | final draft sourcing agreement. If after mediation the parties | ||||||
| 26 | have failed to come to agreement, then the Illinois Power | ||||||
| |||||||
| |||||||
| 1 | Agency shall revise the draft sourcing agreement as necessary | ||||||
| 2 | to confirm that the final draft sourcing agreement contains | ||||||
| 3 | only terms that are reasonable and equitable. The Illinois | ||||||
| 4 | Power Agency shall adopt and make public a policy detailing the | ||||||
| 5 | process for retaining a mediator under this subsection (h-1). | ||||||
| 6 | Any mediator retained to assist with mediating disputes between | ||||||
| 7 | the parties regarding the sourcing agreement shall be retained | ||||||
| 8 | no later than 60 days after July 13, 2011 the effective date of | ||||||
| 9 | this amendatory Act of the 97th General Assembly. | ||||||
| 10 | Upon approval of a final draft agreement, the Illinois | ||||||
| 11 | Power Agency shall submit the final draft agreement to the | ||||||
| 12 | Capital Development Board and the Commission no later than 90 | ||||||
| 13 | days after July 13, 2011 the effective date of this amendatory | ||||||
| 14 | Act of the 97th General Assembly. The gas utility and the clean | ||||||
| 15 | coal SNG brownfield facility shall pay a reasonable fee as | ||||||
| 16 | required by the Illinois Power Agency for its services under | ||||||
| 17 | this subsection (h-1) and shall pay the mediator's reasonable | ||||||
| 18 | fees, if any. The Illinois Power Agency shall adopt and make | ||||||
| 19 | public a policy detailing the process for retaining a mediator | ||||||
| 20 | under this Section. | ||||||
| 21 | The sourcing agreement between a gas utility and the clean | ||||||
| 22 | coal SNG brownfield facility shall contain the following | ||||||
| 23 | provisions: | ||||||
| 24 | (1) Any and all coal used in the gasification process | ||||||
| 25 | must be coal that has high volatile bituminous rank and | ||||||
| 26 | greater than 1.7 pounds of sulfur per million Btu content. | ||||||
| |||||||
| |||||||
| 1 | (2) Coal and petroleum coke are feedstocks for the | ||||||
| 2 | gasification process, with coal comprising at least 50% of | ||||||
| 3 | the total feedstock over the term of the sourcing agreement | ||||||
| 4 | unless the facility reasonably determines that it is
| ||||||
| 5 | necessary to use additional petroleum coke to deliver net
| ||||||
| 6 | consumer savings, in which case the facility shall use
coal | ||||||
| 7 | for at least 35% of the total feedstock over the
term of | ||||||
| 8 | any sourcing agreement and with the feedstocks to be | ||||||
| 9 | procured in accordance with requirements of Section 1-78 of | ||||||
| 10 | the Illinois Power Agency Act. | ||||||
| 11 | (3) The sourcing agreement has an initial term that | ||||||
| 12 | once entered into terminates no more than 30 years after | ||||||
| 13 | the commencement of the commercial production of SNG at the | ||||||
| 14 | clean coal SNG brownfield facility. | ||||||
| 15 | (4) The clean coal SNG brownfield facility guarantees a | ||||||
| 16 | minimum of $100,000,000 in consumer savings to customers of
| ||||||
| 17 | the utilities that have entered into sourcing agreements
| ||||||
| 18 | with the clean coal SNG brownfield facility, calculated in | ||||||
| 19 | real 2010 dollars at the conclusion of the term of the | ||||||
| 20 | sourcing agreement by comparing the delivered SNG price to | ||||||
| 21 | the Chicago City-gate price on a weighted daily basis for | ||||||
| 22 | each day over the entire term of the sourcing agreement, to | ||||||
| 23 | be provided in accordance with subsection (h-2) of this | ||||||
| 24 | Section. | ||||||
| 25 | (5) Prior to the clean coal SNG brownfield facility | ||||||
| 26 | issuing a notice to proceed to construction, the clean coal | ||||||
| |||||||
| |||||||
| 1 | SNG brownfield facility shall establish a consumer | ||||||
| 2 | protection reserve account for the benefit of the customers | ||||||
| 3 | of the utilities that have entered into sourcing agreements | ||||||
| 4 | with the clean coal SNG brownfield facility pursuant to | ||||||
| 5 | this subsection (h-1), with cash principal in the amount of | ||||||
| 6 | $150,000,000. This cash principal shall only be | ||||||
| 7 | recoverable through the consumer protection reserve | ||||||
| 8 | account and not as a cost to be recovered in the delivered | ||||||
| 9 | SNG price pursuant to subsection (h-3) of this Section. The | ||||||
| 10 | consumer protection reserve account shall be maintained | ||||||
| 11 | and administered by an independent trustee that is mutually | ||||||
| 12 | agreed upon by the clean coal SNG brownfield facility, the | ||||||
| 13 | utilities, and the Commission in an interest-bearing | ||||||
| 14 | account in accordance with subsection (h-2) of this | ||||||
| 15 | Section. | ||||||
| 16 | "Consumer protection reserve account principal maximum | ||||||
| 17 | amount" shall mean the maximum amount of principal to be | ||||||
| 18 | maintained in the consumer protection reserve account. | ||||||
| 19 | During the first 2 years of operation of the facility, | ||||||
| 20 | there shall be no consumer protection reserve account | ||||||
| 21 | maximum amount. After the first 2 years of operation of the | ||||||
| 22 | facility, the consumer protection reserve account maximum | ||||||
| 23 | amount shall be $150,000,000. After 5 years of operation, | ||||||
| 24 | and every 5 years thereafter, the trustee shall calculate | ||||||
| 25 | the 5-year average balance of the consumer protection | ||||||
| 26 | reserve account. If the trustee determines that during the | ||||||
| |||||||
| |||||||
| 1 | prior 5 years the consumer protection reserve account has | ||||||
| 2 | had an average account balance of less than $75,000,000, | ||||||
| 3 | then the consumer protection reserve account principal | ||||||
| 4 | maximum amount shall be increased by $5,000,000. If the | ||||||
| 5 | trustee determines that during the prior 5 years the | ||||||
| 6 | consumer protection reserve account has had an average | ||||||
| 7 | account balance of more than $75,000,000, then the consumer | ||||||
| 8 | protection reserve account principal maximum amount shall | ||||||
| 9 | be decreased by $5,000,000. | ||||||
| 10 | (6) The clean coal SNG brownfield facility shall | ||||||
| 11 | identify and sell economically viable by-products produced | ||||||
| 12 | by the facility. | ||||||
| 13 | (7) Fifty percent of all additional net revenue, | ||||||
| 14 | defined as miscellaneous net revenue from products | ||||||
| 15 | produced by the
facility and delivered during the month | ||||||
| 16 | after cost allowance for costs associated with additional | ||||||
| 17 | net revenue that are not otherwise recoverable pursuant to | ||||||
| 18 | subsection (h-3) of this Section, including net revenue | ||||||
| 19 | from sales of substitute natural gas derived from the | ||||||
| 20 | facility above the nameplate capacity of the facility and | ||||||
| 21 | other by-products produced by the facility, shall be | ||||||
| 22 | credited to the consumer protection reserve account | ||||||
| 23 | pursuant to subsection (h-2) of this Section. | ||||||
| 24 | (8) The delivered SNG price per million btu to be paid | ||||||
| 25 | monthly by the utility to the clean coal SNG brownfield | ||||||
| 26 | facility, which shall be based only upon the following: (A) | ||||||
| |||||||
| |||||||
| 1 | a capital recovery charge, operations and maintenance | ||||||
| 2 | costs, and sequestration costs, only to the extent approved | ||||||
| 3 | by the Commission pursuant to paragraphs (1), (2), and (3) | ||||||
| 4 | of subsection (h-3) of this Section; (B) the actual | ||||||
| 5 | delivered and processed fuel costs pursuant to paragraph | ||||||
| 6 | (4) of subsection (h-3) of this Section; (C) actual costs | ||||||
| 7 | of SNG transportation pursuant to paragraph (6) of | ||||||
| 8 | subsection (h-3) of this Section; (D) certain taxes and | ||||||
| 9 | fees imposed by the federal government, the State, or any | ||||||
| 10 | unit of local government as provided in paragraph (6) of | ||||||
| 11 | subsection (h-3) of this Section; and (E) the credit, if | ||||||
| 12 | any, from the consumer protection reserve account pursuant | ||||||
| 13 | to subsection (h-2) of this Section. The delivered SNG | ||||||
| 14 | price per million Btu shall proportionately reflect these | ||||||
| 15 | elements over the term of the sourcing agreement. | ||||||
| 16 | (9) A formula to translate the recoverable costs and | ||||||
| 17 | charges under subsection (h-3) of this Section into the | ||||||
| 18 | delivered SNG price per million btu. | ||||||
| 19 | (10) Title to the SNG shall pass at a mutually | ||||||
| 20 | agreeable point in Illinois, and may provide that, rather | ||||||
| 21 | than the utility taking title to the SNG, a mutually agreed | ||||||
| 22 | upon third-party gas marketer pursuant to a contract | ||||||
| 23 | approved by the Illinois Power Agency or its designee may | ||||||
| 24 | take title to the SNG pursuant to an agreement between the | ||||||
| 25 | utility, the owner of the clean coal SNG brownfield | ||||||
| 26 | facility, and the third-party gas marketer. | ||||||
| |||||||
| |||||||
| 1 | (11) A utility may exit the sourcing agreement without | ||||||
| 2 | penalty if the clean coal SNG brownfield facility does not | ||||||
| 3 | commence construction by July 1, 2015. | ||||||
| 4 | (12) A utility is responsible to pay only the | ||||||
| 5 | Commission determined unit price cost of SNG that is | ||||||
| 6 | purchased by the utility. Nothing in the sourcing agreement | ||||||
| 7 | will obligate a utility to invest capital in a clean coal | ||||||
| 8 | SNG brownfield facility. | ||||||
| 9 | (13) The quality of SNG must, at a minimum, be | ||||||
| 10 | equivalent to the quality required for interstate pipeline | ||||||
| 11 | gas before a utility is required to accept and pay for SNG | ||||||
| 12 | gas. | ||||||
| 13 | (14) Nothing in the sourcing agreement will require a | ||||||
| 14 | utility to construct any facilities to accept delivery of | ||||||
| 15 | SNG. Provided, however, if a utility is required by law or | ||||||
| 16 | otherwise elects to connect the clean coal SNG brownfield | ||||||
| 17 | facility to an interstate pipeline, then the utility shall | ||||||
| 18 | be entitled to recover pursuant to its tariffs all just and | ||||||
| 19 | reasonable costs that are prudently incurred. Any costs | ||||||
| 20 | incurred by the utility to receive, deliver, manage, or | ||||||
| 21 | otherwise accommodate purchases under the SNG sourcing | ||||||
| 22 | agreement will be fully recoverable through a utility's | ||||||
| 23 | purchased gas adjustment clause rider mechanism in
| ||||||
| 24 | conjunction with a SNG brownfield facility rider
| ||||||
| 25 | mechanism. The SNG brownfield facility rider mechanism
(A) | ||||||
| 26 | shall be applicable to all customers who receive
| ||||||
| |||||||
| |||||||
| 1 | transportation service from the utility, (B) shall be
| ||||||
| 2 | designed to have an equal percent impact on the
| ||||||
| 3 | transportation services rates of each class of the
| ||||||
| 4 | utility's customers, and (C) shall accurately reflect the
| ||||||
| 5 | net consumer savings, if any, and above-market costs, if
| ||||||
| 6 | any, associated with the utility receiving, delivering,
| ||||||
| 7 | managing, or otherwise accommodating purchases under the
| ||||||
| 8 | SNG sourcing agreement. | ||||||
| 9 | (15) Remedies for the clean coal SNG brownfield | ||||||
| 10 | facility's failure to deliver a designated amount for a | ||||||
| 11 | designated period. | ||||||
| 12 | (16) The clean coal SNG brownfield facility shall
make | ||||||
| 13 | a good faith effort to ensure that an amount equal
to not | ||||||
| 14 | less than 15% of the value of its prime
construction | ||||||
| 15 | contract for the facility shall be
established as a goal to | ||||||
| 16 | be awarded to minority owned
businesses, female owned | ||||||
| 17 | businesses, and businesses owned
by a person with a | ||||||
| 18 | disability; provided that at least 75%
of the amount of | ||||||
| 19 | such total goal shall be for minority
owned businesses. | ||||||
| 20 | "Minority owned business", "female
owned business", and | ||||||
| 21 | "business owned by a person with a
disability" shall have | ||||||
| 22 | the meanings ascribed to them in
Section 2 of the Business | ||||||
| 23 | Enterprise for Minorities,
Females and Persons with | ||||||
| 24 | Disabilities Act. | ||||||
| 25 | (17) Prior to the clean coal SNG brownfield facility | ||||||
| 26 | issuing a notice to proceed to construction, the clean coal | ||||||
| |||||||
| |||||||
| 1 | SNG brownfield facility shall file with the Commission a | ||||||
| 2 | certificate from an independent engineer that the clean | ||||||
| 3 | coal SNG brownfield facility has (A) obtained all | ||||||
| 4 | applicable State and federal environmental permits | ||||||
| 5 | required for construction; (B) obtained approval from the | ||||||
| 6 | Commission of a carbon capture and sequestration plan; and | ||||||
| 7 | (C) obtained all necessary permits required for | ||||||
| 8 | construction for the transportation and sequestration of | ||||||
| 9 | carbon dioxide as set forth in the Commission-approved | ||||||
| 10 | carbon capture and sequestration plan. | ||||||
| 11 | (h-2) Consumer protection reserve account. The clean coal | ||||||
| 12 | SNG brownfield facility shall guarantee a minimum of | ||||||
| 13 | $100,000,000 in consumer savings to customers of the utilities
| ||||||
| 14 | that have entered into sourcing agreements with the clean coal
| ||||||
| 15 | SNG brownfield facility, calculated in real 2010 dollars at the | ||||||
| 16 | conclusion of the term of the sourcing agreement by comparing | ||||||
| 17 | the delivered SNG price to the Chicago City-gate price on a | ||||||
| 18 | weighted daily basis for each day over the entire term of the | ||||||
| 19 | sourcing agreement. Prior to the clean coal SNG brownfield | ||||||
| 20 | facility issuing a notice to proceed to construction, the clean | ||||||
| 21 | coal SNG brownfield facility shall establish a consumer | ||||||
| 22 | protection reserve account for the benefit of the retail | ||||||
| 23 | customers of the utilities that have entered into sourcing | ||||||
| 24 | agreements with the clean coal SNG brownfield facility pursuant | ||||||
| 25 | to subsection (h-1), with cash principal in the amount of | ||||||
| 26 | $150,000,000. Such cash principal shall only be recovered | ||||||
| |||||||
| |||||||
| 1 | through the consumer protection reserve account and not as a | ||||||
| 2 | cost to be recovered in the delivered SNG price pursuant to | ||||||
| 3 | subsection (h-3) of this Section. The consumer protection | ||||||
| 4 | reserve account shall be maintained and administered by an | ||||||
| 5 | independent trustee that is mutually agreed upon by the clean | ||||||
| 6 | coal SNG brownfield facility, the utilities, and the Commission | ||||||
| 7 | in an interest-bearing account in accordance with the | ||||||
| 8 | following: | ||||||
| 9 | (1) The clean coal SNG brownfield facility monthly | ||||||
| 10 | shall calculate (A) the difference between the monthly | ||||||
| 11 | delivered SNG price and the Chicago City-gate price, by | ||||||
| 12 | comparing the delivered SNG price, which shall include the | ||||||
| 13 | cost of transportation to the delivery point, if any, to | ||||||
| 14 | the Chicago City-gate price on a weighted daily basis for | ||||||
| 15 | each day of the prior month based upon a mutually agreed | ||||||
| 16 | upon published index and (B) the overage amount, if any, by
| ||||||
| 17 | calculating the annualized incremental additional cost,
if | ||||||
| 18 | any, of the delivered SNG in excess of 2.015% of the
| ||||||
| 19 | average annual inflation-adjusted amounts paid by all gas
| ||||||
| 20 | distribution customers in connection with natural gas
| ||||||
| 21 | service during the 5 years ending May 31, 2010. | ||||||
| 22 | (2) During the first 2 years of operation of the | ||||||
| 23 | facility: | ||||||
| 24 | (A) to the extent there is an overage amount, the | ||||||
| 25 | consumer protection reserve account shall be used to | ||||||
| 26 | provide a credit to reduce the SNG price by an amount | ||||||
| |||||||
| |||||||
| 1 | equal to the overage amount; and | ||||||
| 2 | (B) to the extent the monthly delivered SNG price | ||||||
| 3 | is less than or equal to the Chicago City-gate price, | ||||||
| 4 | the utility shall credit the difference between the | ||||||
| 5 | monthly delivered SNG price and the monthly Chicago | ||||||
| 6 | City-gate price, if any, to the consumer protection | ||||||
| 7 | reserve account. Such credit issued pursuant to this | ||||||
| 8 | paragraph (B) shall be deemed prudent and reasonable | ||||||
| 9 | and not subject to a Commission prudence review; | ||||||
| 10 | (3) After 2 years of operation of the facility, and | ||||||
| 11 | monthly, on an on-going basis, thereafter: | ||||||
| 12 | (A) to the extent that the monthly delivered SNG | ||||||
| 13 | price is less than or equal to the Chicago City-gate | ||||||
| 14 | price, calculated using the weighted average of the | ||||||
| 15 | daily Chicago City-gate price on a daily basis over the | ||||||
| 16 | entire month, the utility shall credit the difference, | ||||||
| 17 | if any, to the consumer protection reserve account. | ||||||
| 18 | Such credit issued pursuant to this subparagraph (A) | ||||||
| 19 | shall be deemed prudent and reasonable and not subject | ||||||
| 20 | to a Commission prudence review; | ||||||
| 21 | (B) any amounts in the consumer protection reserve | ||||||
| 22 | account in excess of the consumer protection reserve | ||||||
| 23 | account principal maximum amount shall be distributed | ||||||
| 24 | as follows: (i) if retail customers have not realized
| ||||||
| 25 | net consumer savings, calculated by comparing the
| ||||||
| 26 | delivered SNG price to the weighted average of the
| ||||||
| |||||||
| |||||||
| 1 | daily Chicago City-gate price on a daily basis over
the | ||||||
| 2 | entire term of the sourcing agreement to date,
then 50% | ||||||
| 3 | of any amounts in the consumer protection
reserve | ||||||
| 4 | account in excess of the consumer protection reserve | ||||||
| 5 | account principal maximum shall be
distributed to the | ||||||
| 6 | clean coal SNG brownfield
facility, with the remaining | ||||||
| 7 | 50% of any such
additional amounts being credited to | ||||||
| 8 | retail
customers, and (ii) if retail customers have | ||||||
| 9 | realized net
consumer savings, then 100% of any amounts | ||||||
| 10 | in the
consumer protection reserve account in excess of
| ||||||
| 11 | the consumer protection reserve account principal | ||||||
| 12 | maximum shall be distributed to the clean coal
SNG | ||||||
| 13 | brownfield facility; provided, however, that under no | ||||||
| 14 | circumstances shall the total cumulative amount | ||||||
| 15 | distributed to the clean coal SNG brownfield facility | ||||||
| 16 | under this subparagraph (B) exceed $150,000,000; | ||||||
| 17 | (C) to the extent there is an overage amount, after | ||||||
| 18 | distributing the amounts pursuant to subparagraph (B) | ||||||
| 19 | of this paragraph (3), if any, the consumer protection | ||||||
| 20 | reserve account shall be used to provide a credit to | ||||||
| 21 | reduce the SNG price by an amount equal to the overage | ||||||
| 22 | amount; | ||||||
| 23 | (D) if retail customers have realized net consumer | ||||||
| 24 | savings, calculated by comparing the delivered SNG | ||||||
| 25 | price to the weighted average of the daily Chicago | ||||||
| 26 | City-gate price on a daily basis over the entire term | ||||||
| |||||||
| |||||||
| 1 | of the sourcing agreement to date, then after | ||||||
| 2 | distributing the amounts pursuant to subparagraphs (B) | ||||||
| 3 | and (C) of this paragraph (3), 50% of any additional | ||||||
| 4 | amounts in the consumer protection reserve account in | ||||||
| 5 | excess of the consumer protection reserve account | ||||||
| 6 | principal maximum shall be distributed to the clean | ||||||
| 7 | coal SNG brownfield facility, with the remaining 50% of | ||||||
| 8 | any such additional amounts being credited to retail | ||||||
| 9 | customers; provided, however, that if retail customers | ||||||
| 10 | have not realized such net consumer savings, no such | ||||||
| 11 | distribution shall be made to the clean coal SNG | ||||||
| 12 | brownfield facility, and 100% of such additional | ||||||
| 13 | amounts shall be credited to the retail customers to | ||||||
| 14 | the extent the consumer protection reserve account | ||||||
| 15 | exceeds the consumer protection reserve account | ||||||
| 16 | principal maximum amount. | ||||||
| 17 | (4) Fifty percent of all additional net revenue, | ||||||
| 18 | defined as miscellaneous net revenue after cost allowance | ||||||
| 19 | for costs associated with additional net revenue that are | ||||||
| 20 | not otherwise recoverable pursuant to subsection (h-3) of | ||||||
| 21 | this Section, including net revenue from sales of | ||||||
| 22 | substitute natural gas derived from the facility above the | ||||||
| 23 | nameplate capacity of the facility and other by-products | ||||||
| 24 | produced by the facility, shall be credited to the consumer | ||||||
| 25 | protection reserve account. | ||||||
| 26 | (5) At the conclusion of the term of the sourcing | ||||||
| |||||||
| |||||||
| 1 | agreement, to the extent retail customers have not saved | ||||||
| 2 | the minimum of $100,000,000 in consumer savings as | ||||||
| 3 | guaranteed in this subsection (h-2), amounts in the | ||||||
| 4 | consumer protection reserve account shall be credited to | ||||||
| 5 | retail customers to the extent the retail customers have | ||||||
| 6 | saved the minimum of $100,000,000; 50% of any additional | ||||||
| 7 | amounts in the consumer protection reserve account shall be | ||||||
| 8 | distributed to the company, and the remaining 50% shall be | ||||||
| 9 | distributed to retail customers. | ||||||
| 10 | (6) If, at the conclusion of the term of the sourcing | ||||||
| 11 | agreement, the customers have not saved the minimum | ||||||
| 12 | $100,000,000 in savings as guaranteed in this subsection | ||||||
| 13 | (h-2) and the consumer protection reserve account has been | ||||||
| 14 | depleted, then the clean coal SNG brownfield facility shall | ||||||
| 15 | be liable for any remaining amount owed to the retail | ||||||
| 16 | customers to the extent that the customers are provided | ||||||
| 17 | with the $100,000,000 in savings as guaranteed in this | ||||||
| 18 | subsection (h-2). The retail customers shall have first | ||||||
| 19 | priority in recovering that debt above any creditors, | ||||||
| 20 | except the original senior secured lender to the extent | ||||||
| 21 | that the original senior secured lender has any senior | ||||||
| 22 | secured debt outstanding, including any clean coal SNG | ||||||
| 23 | brownfield facility parent companies or affiliates. | ||||||
| 24 | (7) The clean coal SNG brownfield facility, the | ||||||
| 25 | utilities, and the trustee shall work together to take | ||||||
| 26 | commercially reasonable steps to minimize the tax impact of | ||||||
| |||||||
| |||||||
| 1 | these transactions, while preserving the consumer | ||||||
| 2 | benefits. | ||||||
| 3 | (8) The clean coal SNG brownfield facility shall each | ||||||
| 4 | month, starting in the facility's first year of commercial | ||||||
| 5 | operation, file with the Commission, in such form as the | ||||||
| 6 | Commission shall require, a report as to the consumer | ||||||
| 7 | protection reserve account. The monthly report must | ||||||
| 8 | contain the following information: | ||||||
| 9 | (A) the extent the monthly delivered SNG price is | ||||||
| 10 | greater than, less than, or equal to the Chicago | ||||||
| 11 | City-gate price; | ||||||
| 12 | (B) the amount credited or debited to the consumer | ||||||
| 13 | protection reserve account during the month; | ||||||
| 14 | (C) the amounts credited to consumers and | ||||||
| 15 | distributed to the clean coal SNG brownfield facility | ||||||
| 16 | during the month; | ||||||
| 17 | (D) the total amount of the consumer protection | ||||||
| 18 | reserve account at the beginning and end of the month; | ||||||
| 19 | (E) the total amount of consumer savings to date; | ||||||
| 20 | (F) a confidential summary of the inputs used to | ||||||
| 21 | calculate the additional net revenue; and | ||||||
| 22 | (G) any other additional information the | ||||||
| 23 | Commission shall require. | ||||||
| 24 | When any report is erroneous or defective or appears to | ||||||
| 25 | the Commission to be erroneous or defective, the Commission | ||||||
| 26 | may notify the clean coal SNG brownfield facility to amend | ||||||
| |||||||
| |||||||
| 1 | the report within 30 days, and, before or after the | ||||||
| 2 | termination of the 30-day period, the Commission may | ||||||
| 3 | examine the trustee of the consumer protection reserve | ||||||
| 4 | account or the officers, agents, employees, books, | ||||||
| 5 | records, or accounts of the clean coal SNG brownfield | ||||||
| 6 | facility and correct such items in the report as upon such | ||||||
| 7 | examination the Commission may find defective or | ||||||
| 8 | erroneous. All reports shall be under oath. | ||||||
| 9 | All reports made to the Commission by the clean coal | ||||||
| 10 | SNG brownfield facility and the contents of the reports | ||||||
| 11 | shall be open to public inspection and shall be deemed a | ||||||
| 12 | public record under the Freedom of Information Act. Such | ||||||
| 13 | reports shall be preserved in the office of the Commission. | ||||||
| 14 | The Commission shall publish an annual summary of the | ||||||
| 15 | reports prior to February 1 of the following year. The | ||||||
| 16 | annual summary shall be made available to the public on the | ||||||
| 17 | Commission's website and shall be submitted to the General | ||||||
| 18 | Assembly. | ||||||
| 19 | Any facility that fails to file a report required under | ||||||
| 20 | this paragraph (8) to the Commission within the time | ||||||
| 21 | specified or to make specific answer to any question | ||||||
| 22 | propounded by the Commission within 30 days from the time | ||||||
| 23 | it is lawfully required to do so, or within such further | ||||||
| 24 | time not to exceed 90 days as may in its discretion be | ||||||
| 25 | allowed by the Commission, shall pay a penalty of $500 to | ||||||
| 26 | the Commission for each day it is in default. | ||||||
| |||||||
| |||||||
| 1 | Any person who willfully makes any false report to the | ||||||
| 2 | Commission or to any member, officer, or employee thereof, | ||||||
| 3 | any person who willfully in a report withholds or fails to | ||||||
| 4 | provide material information to which the Commission is | ||||||
| 5 | entitled under this paragraph (8) and which information is | ||||||
| 6 | either required to be filed by statute, rule, regulation, | ||||||
| 7 | order, or decision of the Commission or has been requested | ||||||
| 8 | by the Commission, and any person who willfully aids or | ||||||
| 9 | abets such person shall be guilty of a Class A misdemeanor. | ||||||
| 10 | (h-3) Recoverable costs and revenue by the clean coal SNG | ||||||
| 11 | brownfield facility. | ||||||
| 12 | (1) A capital recovery charge approved by the | ||||||
| 13 | Commission shall be recoverable by the clean coal SNG | ||||||
| 14 | brownfield facility under a sourcing agreement. The | ||||||
| 15 | capital recovery charge shall be comprised of capital costs | ||||||
| 16 | and a reasonable rate of return. "Capital costs" means | ||||||
| 17 | costs to be incurred in connection with the construction | ||||||
| 18 | and development of a facility, as defined in Section 1-10 | ||||||
| 19 | of the Illinois Power Agency Act, and such other costs as | ||||||
| 20 | the Capital Development Board deems appropriate to be | ||||||
| 21 | recovered in the capital recovery charge. | ||||||
| 22 | (A) Capital costs. The Capital Development Board | ||||||
| 23 | shall calculate a range of capital costs that it | ||||||
| 24 | believes would be reasonable for the clean coal SNG | ||||||
| 25 | brownfield facility to recover under the sourcing | ||||||
| 26 | agreement. In making this determination, the Capital | ||||||
| |||||||
| |||||||
| 1 | Development Board shall review the facility cost
| ||||||
| 2 | report, if any, of the clean coal SNG brownfield
| ||||||
| 3 | facility, adjusting the results based on the change in
| ||||||
| 4 | the Annual Consumer Price Index for All Urban Consumers
| ||||||
| 5 | for the Midwest Region as published in April by the
| ||||||
| 6 | United States Department of Labor, Bureau of Labor
| ||||||
| 7 | Statistics, the final draft of the sourcing agreement, | ||||||
| 8 | and the rate of return approved by the Commission. In | ||||||
| 9 | addition, the Capital Development Board may consult as | ||||||
| 10 | much as it deems necessary with the clean coal SNG | ||||||
| 11 | brownfield facility and conduct whatever research and | ||||||
| 12 | investigation it deems necessary. | ||||||
| 13 | The Capital Development Board shall retain an | ||||||
| 14 | engineering expert to assist in determining both the | ||||||
| 15 | range of capital costs and the range of operations and | ||||||
| 16 | maintenance costs that it believes would be reasonable | ||||||
| 17 | for the clean coal SNG brownfield facility to recover | ||||||
| 18 | under the sourcing agreement. Provided, however, that | ||||||
| 19 | such expert shall: (i) not have been involved in the | ||||||
| 20 | clean coal SNG brownfield facility's facility cost | ||||||
| 21 | report, if any, (ii) not own or control any direct or | ||||||
| 22 | indirect interest in the initial clean coal facility, | ||||||
| 23 | and (iii) have no contractual relationship with the | ||||||
| 24 | clean coal SNG brownfield facility. In order to qualify | ||||||
| 25 | as an independent expert, a person or company must | ||||||
| 26 | have: | ||||||
| |||||||
| |||||||
| 1 | (i) direct previous experience conducting | ||||||
| 2 | front-end engineering and design studies for | ||||||
| 3 | large-scale energy facilities and administering | ||||||
| 4 | large-scale energy operations and maintenance | ||||||
| 5 | contracts, which may be particularized to the | ||||||
| 6 | specific type of financing associated with the | ||||||
| 7 | clean coal SNG brownfield facility; | ||||||
| 8 | (ii) an advanced degree in economics, | ||||||
| 9 | mathematics, engineering, or a related area of | ||||||
| 10 | study; | ||||||
| 11 | (iii) ten years of experience in the energy | ||||||
| 12 | sector, including construction and risk management | ||||||
| 13 | experience; | ||||||
| 14 | (iv) expertise in assisting companies with | ||||||
| 15 | obtaining financing for large-scale energy | ||||||
| 16 | projects, which may be particularized to the | ||||||
| 17 | specific type of financing associated with the | ||||||
| 18 | clean coal SNG brownfield facility; | ||||||
| 19 | (v) expertise in operations and maintenance | ||||||
| 20 | which may be particularized to the specific type of | ||||||
| 21 | operations and maintenance associated with the | ||||||
| 22 | clean coal SNG brownfield facility; | ||||||
| 23 | (vi) expertise in credit and contract | ||||||
| 24 | protocols; | ||||||
| 25 | (vii) adequate resources to perform and | ||||||
| 26 | fulfill the required functions and | ||||||
| |||||||
| |||||||
| 1 | responsibilities; and | ||||||
| 2 | (viii) the absence of a conflict of interest | ||||||
| 3 | and inappropriate bias for or against an affected | ||||||
| 4 | gas utility or the clean coal SNG brownfield | ||||||
| 5 | facility. | ||||||
| 6 | The clean coal SNG brownfield facility and the | ||||||
| 7 | Illinois Power Agency shall cooperate with the Capital | ||||||
| 8 | Development Board in any investigation it deems | ||||||
| 9 | necessary. The Capital Development Board shall make | ||||||
| 10 | its final determination of the range of capital costs | ||||||
| 11 | confidentially and shall submit that range to the | ||||||
| 12 | Commission in a confidential filing within 120 days | ||||||
| 13 | after July 13, 2011 (the effective date of Public Act | ||||||
| 14 | 97-096) this amendatory Act of the 97th General | ||||||
| 15 | Assembly. The clean coal SNG brownfield facility shall | ||||||
| 16 | submit to the Commission its estimate of the capital | ||||||
| 17 | costs to be recovered under the sourcing agreement. | ||||||
| 18 | Only after the clean coal SNG brownfield facility has | ||||||
| 19 | submitted this estimate shall the Commission publicly | ||||||
| 20 | announce the range of capital costs submitted by the | ||||||
| 21 | Capital Development Board. | ||||||
| 22 | In the event that the estimate submitted by the | ||||||
| 23 | clean coal SNG brownfield facility is within or below | ||||||
| 24 | the range submitted by the Capital Development Board, | ||||||
| 25 | the clean coal SNG brownfield facility's estimate | ||||||
| 26 | shall be approved by the Commission as the amount of | ||||||
| |||||||
| |||||||
| 1 | capital costs to be recovered under the sourcing | ||||||
| 2 | agreement. In the event that the estimate submitted by | ||||||
| 3 | the clean coal SNG brownfield facility is above the | ||||||
| 4 | range submitted by the Capital Development Board, the | ||||||
| 5 | amount of capital costs at the lowest end of the range | ||||||
| 6 | submitted by the Capital Development Board shall be | ||||||
| 7 | approved by the Commission as the amount of capital | ||||||
| 8 | costs to be recovered under the sourcing agreement. | ||||||
| 9 | Within 15 days after the Capital Development Board has | ||||||
| 10 | submitted its range and the clean coal SNG brownfield | ||||||
| 11 | facility has submitted its estimate, the Commission | ||||||
| 12 | shall approve the capital costs for the clean coal SNG | ||||||
| 13 | brownfield facility. | ||||||
| 14 | The Capital Development Board shall monitor the | ||||||
| 15 | construction of the clean coal SNG brownfield facility | ||||||
| 16 | for the full duration of construction to assess | ||||||
| 17 | potential cost overruns. The Capital Development | ||||||
| 18 | Board, in its discretion, may retain an expert to | ||||||
| 19 | facilitate such monitoring. The clean coal SNG | ||||||
| 20 | brownfield facility shall pay a reasonable fee as | ||||||
| 21 | required by the Capital Development Board for the | ||||||
| 22 | Capital Development Board's services under this | ||||||
| 23 | subsection (h-3) to be deposited into the Capital | ||||||
| 24 | Development Board Revolving Fund, and such fee shall | ||||||
| 25 | not be passed through to a utility or its customers. If | ||||||
| 26 | an expert is retained by the Capital Development Board | ||||||
| |||||||
| |||||||
| 1 | for monitoring of construction, then the clean coal SNG | ||||||
| 2 | brownfield facility must pay for the expert's | ||||||
| 3 | reasonable fees and such costs shall not be passed | ||||||
| 4 | through to a utility or its customers. | ||||||
| 5 | (B) Rate of Return. No later than 30 days after the | ||||||
| 6 | date on which the Illinois Power Agency submits a final | ||||||
| 7 | draft sourcing agreement, the Commission shall hold a | ||||||
| 8 | public hearing to determine the rate of return to be | ||||||
| 9 | recovered under the sourcing agreement. Rate of return | ||||||
| 10 | shall be comprised of the clean coal SNG brownfield | ||||||
| 11 | facility's actual cost of debt, including | ||||||
| 12 | mortgage-style amortization, and a reasonable return | ||||||
| 13 | on equity. The Commission shall post notice of the | ||||||
| 14 | hearing on its website no later than 10 days prior to | ||||||
| 15 | the date of the hearing. The Commission shall provide | ||||||
| 16 | the public and all interested parties, including the | ||||||
| 17 | gas utilities, the Attorney General, and the Illinois | ||||||
| 18 | Power Agency, an opportunity to be heard. | ||||||
| 19 | In determining the return on equity, the | ||||||
| 20 | Commission shall select a commercially reasonable | ||||||
| 21 | return on equity taking into account the return on | ||||||
| 22 | equity being received by developers of similar | ||||||
| 23 | facilities in or outside of Illinois, the need to | ||||||
| 24 | balance an incentive for clean-coal technology with | ||||||
| 25 | the need to protect ratepayers from high gas prices, | ||||||
| 26 | the risks being borne by the clean coal SNG brownfield | ||||||
| |||||||
| |||||||
| 1 | facility in the final draft sourcing agreement, and any | ||||||
| 2 | other information that the Commission may deem | ||||||
| 3 | relevant. The Commission may establish a return on | ||||||
| 4 | equity that varies with the amount of savings, if any, | ||||||
| 5 | to customers during the term of the sourcing agreement, | ||||||
| 6 | comparing the delivered SNG price to a daily weighted | ||||||
| 7 | average price of natural gas, based upon an index. The | ||||||
| 8 | Illinois Power Agency shall recommend a return on | ||||||
| 9 | equity to the Commission using the same criteria. | ||||||
| 10 | Within 60 days after receiving the final draft sourcing | ||||||
| 11 | agreement from the Illinois Power Agency, the | ||||||
| 12 | Commission shall approve the rate of return for the | ||||||
| 13 | clean coal brownfield facility. Within 30 days after | ||||||
| 14 | obtaining debt financing for the clean coal SNG | ||||||
| 15 | brownfield facility, the clean coal SNG brownfield | ||||||
| 16 | facility shall file a notice with the Commission | ||||||
| 17 | identifying the actual cost of debt. | ||||||
| 18 | (2) Operations and maintenance costs approved by the | ||||||
| 19 | Commission shall be recoverable by the clean coal SNG | ||||||
| 20 | brownfield facility under the sourcing agreement. The | ||||||
| 21 | operations and maintenance costs mean costs that have been | ||||||
| 22 | incurred for the administration, supervision, operation, | ||||||
| 23 | maintenance, preservation, and protection of the clean | ||||||
| 24 | coal SNG brownfield facility's physical plant. | ||||||
| 25 | The Capital Development Board shall calculate a range | ||||||
| 26 | of operations and maintenance costs that it believes would | ||||||
| |||||||
| |||||||
| 1 | be reasonable for the clean coal SNG brownfield facility to | ||||||
| 2 | recover under the sourcing agreement, incorporating an
| ||||||
| 3 | inflation index or combination of inflation indices to
most | ||||||
| 4 | accurately reflect the actual costs of operating the
clean | ||||||
| 5 | coal SNG brownfield facility. In making this | ||||||
| 6 | determination, the Capital Development Board shall review | ||||||
| 7 | the facility cost report, if any, of the clean coal SNG
| ||||||
| 8 | brownfield facility, adjusting the results for inflation
| ||||||
| 9 | based on the change in the Annual Consumer Price Index for
| ||||||
| 10 | All Urban Consumers for the Midwest Region as published in
| ||||||
| 11 | April by the United States Department of Labor, Bureau of
| ||||||
| 12 | Labor Statistics, the final draft of the sourcing | ||||||
| 13 | agreement, and the rate of return approved by the | ||||||
| 14 | Commission. In addition, the Capital Development Board may | ||||||
| 15 | consult as much as it deems necessary with the clean coal | ||||||
| 16 | SNG brownfield facility and conduct whatever research and | ||||||
| 17 | investigation it deems necessary. As set forth in | ||||||
| 18 | subparagraph (A) of paragraph (1) of this subsection (h-3), | ||||||
| 19 | the Capital Development Board shall retain an independent | ||||||
| 20 | engineering expert to assist in determining both the range | ||||||
| 21 | of operations and maintenance costs that it believes would | ||||||
| 22 | be reasonable for the clean coal SNG brownfield facility to | ||||||
| 23 | recover under the sourcing agreement. The clean coal SNG | ||||||
| 24 | brownfield facility and the Illinois Power Agency shall | ||||||
| 25 | cooperate with the Capital Development Board in any | ||||||
| 26 | investigation it deems necessary. The Capital Development | ||||||
| |||||||
| |||||||
| 1 | Board shall make its final determination of the range of | ||||||
| 2 | operations and maintenance costs confidentially and shall | ||||||
| 3 | submit that range to the Commission in a confidential | ||||||
| 4 | filing within 120 days after July 13, 2011 the effective | ||||||
| 5 | date of this amendatory Act of the 97th General Assembly. | ||||||
| 6 | The clean coal SNG brownfield facility shall submit to | ||||||
| 7 | the Commission its estimate of the operations and | ||||||
| 8 | maintenance costs to be recovered under the sourcing | ||||||
| 9 | agreement. Only after the clean coal SNG brownfield | ||||||
| 10 | facility has submitted this estimate shall the Commission | ||||||
| 11 | publicly announce the range of operations and maintenance | ||||||
| 12 | costs submitted by the Capital Development Board. In the | ||||||
| 13 | event that the estimate submitted by the clean coal SNG | ||||||
| 14 | brownfield facility is within or below the range submitted | ||||||
| 15 | by the Capital Development Board, the clean coal SNG | ||||||
| 16 | brownfield facility's estimate shall be approved by the | ||||||
| 17 | Commission as the amount of operations and maintenance | ||||||
| 18 | costs to be recovered under the sourcing agreement. In the | ||||||
| 19 | event that the estimate submitted by the clean coal SNG | ||||||
| 20 | brownfield facility is above the range submitted by the | ||||||
| 21 | Capital Development Board, the amount of operations and | ||||||
| 22 | maintenance costs at the lowest end of the range submitted | ||||||
| 23 | by the Capital Development Board shall be approved by the | ||||||
| 24 | Commission as the amount of operations and maintenance | ||||||
| 25 | costs to be recovered under the sourcing agreement. Within | ||||||
| 26 | 15 days after the Capital Development Board has submitted | ||||||
| |||||||
| |||||||
| 1 | its range and the clean coal SNG brownfield facility has | ||||||
| 2 | submitted its estimate, the Commission shall approve the | ||||||
| 3 | operations and maintenance costs for the clean coal SNG | ||||||
| 4 | brownfield facility. | ||||||
| 5 | The clean coal SNG brownfield facility shall pay for | ||||||
| 6 | the independent engineering expert's reasonable fees and | ||||||
| 7 | such costs shall not be passed through to a utility or its | ||||||
| 8 | customers. The clean coal SNG brownfield facility shall pay | ||||||
| 9 | a reasonable fee as required by the Capital Development | ||||||
| 10 | Board for the Capital Development Board's services under | ||||||
| 11 | this subsection (h-3) to be deposited into the Capital | ||||||
| 12 | Development Board Revolving Fund, and such fee shall not be | ||||||
| 13 | passed through to a utility or its customers. | ||||||
| 14 | (3) Sequestration costs approved by the Commission | ||||||
| 15 | shall be recoverable by the clean coal SNG brownfield | ||||||
| 16 | facility. "Sequestration costs" means costs to be incurred | ||||||
| 17 | by the clean coal SNG brownfield facility in accordance | ||||||
| 18 | with its Commission-approved carbon capture and | ||||||
| 19 | sequestration plan to: | ||||||
| 20 | (A) capture carbon dioxide; | ||||||
| 21 | (B) build, operate, and maintain a sequestration | ||||||
| 22 | site in which carbon dioxide may be injected; | ||||||
| 23 | (C) build, operate, and maintain a carbon dioxide | ||||||
| 24 | pipeline; and | ||||||
| 25 | (D) transport the carbon dioxide to the | ||||||
| 26 | sequestration site or a pipeline. | ||||||
| |||||||
| |||||||
| 1 | The Commission shall assess the prudency of the | ||||||
| 2 | sequestration costs for the clean coal SNG brownfield | ||||||
| 3 | facility before construction commences at the | ||||||
| 4 | sequestration site or pipeline. Any revenues the clean coal | ||||||
| 5 | SNG brownfield facility receives as a result of the | ||||||
| 6 | capture, transportation, or sequestration of carbon | ||||||
| 7 | dioxide shall be first credited against all sequestration | ||||||
| 8 | costs, with the positive balance, if any, treated as | ||||||
| 9 | additional net revenue. | ||||||
| 10 | The Commission may, in its discretion, retain an expert | ||||||
| 11 | to assist in its review of sequestration costs. The clean | ||||||
| 12 | coal SNG brownfield facility shall pay for the expert's | ||||||
| 13 | reasonable fees if an expert is retained by the Commission, | ||||||
| 14 | and such costs shall not be passed through to a utility or | ||||||
| 15 | its customers. Once made, the Commission's determination | ||||||
| 16 | of the amount of recoverable sequestration costs shall not | ||||||
| 17 | be increased unless the clean coal SNG brownfield facility | ||||||
| 18 | can show by clear and convincing evidence that (i) the | ||||||
| 19 | costs were not reasonably foreseeable; (ii) the costs were | ||||||
| 20 | due to circumstances beyond the clean coal SNG brownfield | ||||||
| 21 | facility's control; and (iii) the clean coal SNG brownfield | ||||||
| 22 | facility took all reasonable steps to mitigate the costs. | ||||||
| 23 | If the Commission determines that sequestration costs may | ||||||
| 24 | be increased, the Commission shall provide for notice and a | ||||||
| 25 | public hearing for approval of the increased sequestration | ||||||
| 26 | costs. | ||||||
| |||||||
| |||||||
| 1 | (4) Actual delivered and processed fuel costs shall be | ||||||
| 2 | set by the Illinois Power Agency through a SNG feedstock | ||||||
| 3 | procurement, pursuant to Sections 1-20, 1-77, and 1-78 of | ||||||
| 4 | the Illinois Power Agency Act, to be performed at least | ||||||
| 5 | every 5 years and purchased by the clean coal SNG | ||||||
| 6 | brownfield facility pursuant to feedstock procurement | ||||||
| 7 | contracts developed by the Illinois Power Agency, with coal | ||||||
| 8 | comprising at least 50% of the total feedstock over the | ||||||
| 9 | term of the sourcing agreement and petroleum coke | ||||||
| 10 | comprising the remainder of the SNG feedstock. If the | ||||||
| 11 | Commission fails to approve a feedstock procurement plan or | ||||||
| 12 | fails to approve the results of a feedstock procurement | ||||||
| 13 | event, then the fuel shall be purchased by the company | ||||||
| 14 | month-by-month on the spot market and those actual | ||||||
| 15 | delivered and processed fuel costs shall be recoverable | ||||||
| 16 | under the sourcing agreement. If a supplier defaults under | ||||||
| 17 | the terms of a procurement contract, then the Illinois | ||||||
| 18 | Power Agency shall immediately initiate a feedstock | ||||||
| 19 | procurement process to obtain a replacement supply, and, | ||||||
| 20 | prior to the conclusion of that process, fuel shall be | ||||||
| 21 | purchased by the company month-by-month on the spot market | ||||||
| 22 | and those actual delivered and processed fuel costs shall | ||||||
| 23 | be recoverable under the sourcing agreement. | ||||||
| 24 | (5) Taxes and fees imposed by the federal government, | ||||||
| 25 | the State, or any unit of local government applicable to | ||||||
| 26 | the clean coal SNG brownfield facility, excluding income | ||||||
| |||||||
| |||||||
| 1 | tax, shall be recoverable by the clean coal SNG brownfield | ||||||
| 2 | facility under the sourcing agreement to the extent such | ||||||
| 3 | taxes and fees were not applicable to the facility on July | ||||||
| 4 | 13, 2011 the date of this amendatory Act of the 97th | ||||||
| 5 | General Assembly. | ||||||
| 6 | (6) The actual transportation costs, in accordance | ||||||
| 7 | with the applicable utility's tariffs, and third-party | ||||||
| 8 | marketer costs incurred by the company, if any, associated | ||||||
| 9 | with transporting the SNG from the clean coal SNG | ||||||
| 10 | brownfield facility to the Chicago City-gate to sell such | ||||||
| 11 | SNG into the natural gas markets shall be recoverable under | ||||||
| 12 | the sourcing agreement. | ||||||
| 13 | (7) Unless otherwise provided, within 30 days after a | ||||||
| 14 | decision of the Commission on recoverable costs under this | ||||||
| 15 | Section, any interested party to the Commission's decision | ||||||
| 16 | may apply for a rehearing with respect to the decision. The | ||||||
| 17 | Commission shall receive and consider the application for | ||||||
| 18 | rehearing and shall grant or deny the application in whole | ||||||
| 19 | or in part within 20 days after the date of the receipt of | ||||||
| 20 | the application by the Commission. If no rehearing is | ||||||
| 21 | applied for within the required 30 days or an application | ||||||
| 22 | for rehearing is denied, then the Commission decision shall | ||||||
| 23 | be final. If an application for rehearing is granted, then | ||||||
| 24 | the Commission shall hold a rehearing within 30 days after | ||||||
| 25 | granting the application. The decision of the Commission | ||||||
| 26 | upon rehearing shall be final. | ||||||
| |||||||
| |||||||
| 1 | Any person affected by a decision of the Commission | ||||||
| 2 | under this subsection (h-3) may have the decision reviewed | ||||||
| 3 | only under and in accordance with the Administrative Review | ||||||
| 4 | Law. Unless otherwise provided, the provisions of the | ||||||
| 5 | Administrative Review Law, all amendments and | ||||||
| 6 | modifications to that Law, and the rules adopted pursuant | ||||||
| 7 | to that Law shall apply to and govern all proceedings for | ||||||
| 8 | the judicial review of final administrative decisions of | ||||||
| 9 | the Commission under this subsection (h-3). The term | ||||||
| 10 | "administrative decision" is defined as in Section 3-101 of | ||||||
| 11 | the Code of Civil Procedure. | ||||||
| 12 | (8) The Capital Development Board shall adopt and make | ||||||
| 13 | public a policy detailing the process for retaining experts | ||||||
| 14 | under this Section. Any experts retained to assist with | ||||||
| 15 | calculating the range of capital costs or operations and | ||||||
| 16 | maintenance costs shall be retained no later than 45 days | ||||||
| 17 | after July 13, 2011 the effective date of this amendatory | ||||||
| 18 | Act of the 97th General Assembly. | ||||||
| 19 | (h-4) No later than 90 days after the Illinois Power Agency | ||||||
| 20 | submits the final draft sourcing agreement pursuant to | ||||||
| 21 | subsection (h-1), the Commission shall approve a sourcing | ||||||
| 22 | agreement containing (i) the capital costs, rate of return, and | ||||||
| 23 | operations and maintenance costs established pursuant to | ||||||
| 24 | subsection (h-3) and (ii) all other terms and conditions, | ||||||
| 25 | rights, provisions, exceptions, and limitations contained in | ||||||
| 26 | the final draft sourcing agreement; provided, however, the | ||||||
| |||||||
| |||||||
| 1 | Commission shall correct typographical and scrivener's errors | ||||||
| 2 | and modify the contract only as necessary to provide that the | ||||||
| 3 | gas utility does not have the right to terminate the sourcing | ||||||
| 4 | agreement due to any future events that may occur other than | ||||||
| 5 | the clean coal SNG brownfield facility's failure to timely meet | ||||||
| 6 | milestones, uncured default, extended force majeure, or | ||||||
| 7 | abandonment. Once the sourcing agreement is approved, then the | ||||||
| 8 | gas utility subject to that sourcing agreement shall have 45 | ||||||
| 9 | days after the date of the Commission's approval to enter into | ||||||
| 10 | the sourcing agreement. | ||||||
| 11 | (h-5) Sequestration enforcement. | ||||||
| 12 | (A) All contracts entered into under subsection (h) of | ||||||
| 13 | this Section Act and all sourcing agreements under | ||||||
| 14 | subsection (h-1) of this Section Act, regardless of | ||||||
| 15 | duration, shall require the owner of any facility supplying | ||||||
| 16 | SNG under the contract or sourcing agreement to provide | ||||||
| 17 | certified documentation to the Commission each year, | ||||||
| 18 | starting in the facility's first year of commercial | ||||||
| 19 | operation, accurately reporting the quantity of carbon | ||||||
| 20 | dioxide emissions from the facility that have been captured | ||||||
| 21 | and sequestered and reporting any quantities of carbon | ||||||
| 22 | dioxide released from the site or sites at which carbon | ||||||
| 23 | dioxide emissions were sequestered in prior years, based on | ||||||
| 24 | continuous monitoring of those sites. | ||||||
| 25 | (B) If, in any year, the owner of the clean coal SNG | ||||||
| 26 | facility fails to demonstrate that the SNG facility | ||||||
| |||||||
| |||||||
| 1 | captured and sequestered at least 90% of the total carbon | ||||||
| 2 | dioxide emissions that the facility would otherwise emit or | ||||||
| 3 | that sequestration of emissions from prior years has | ||||||
| 4 | failed, resulting in the release of carbon dioxide into the | ||||||
| 5 | atmosphere, then the owner of the clean coal SNG facility | ||||||
| 6 | must pay a penalty of $20 per ton of excess carbon dioxide | ||||||
| 7 | emissions not to exceed $40,000,000, in any given year | ||||||
| 8 | which shall be deposited into the Energy Efficiency Trust | ||||||
| 9 | Fund and distributed pursuant to subsection (b) of Section | ||||||
| 10 | 6-6 of the Renewable Energy, Energy Efficiency, and Coal | ||||||
| 11 | Resources Development Law of 1997. On or before the 5-year | ||||||
| 12 | anniversary of the execution of the contract and every 5 | ||||||
| 13 | years thereafter, an expert hired by the owner of the | ||||||
| 14 | facility with the approval of the Attorney General shall | ||||||
| 15 | conduct an analysis to determine the cost of sequestration | ||||||
| 16 | of at least 90% of the total carbon dioxide emissions the | ||||||
| 17 | plant would otherwise emit. If the analysis shows that the | ||||||
| 18 | actual annual cost is greater than the penalty, then the | ||||||
| 19 | penalty shall be increased to equal the actual cost. | ||||||
| 20 | Provided, however, to the extent that the owner of the | ||||||
| 21 | facility described in subsection (h) of this Section Act | ||||||
| 22 | can demonstrate that the failure was as a result of acts of | ||||||
| 23 | God (including fire, flood, earthquake, tornado, | ||||||
| 24 | lightning, hurricane, or other natural disaster); any | ||||||
| 25 | amendment, modification, or abrogation of any applicable | ||||||
| 26 | law or regulation that would prevent performance; war; | ||||||
| |||||||
| |||||||
| 1 | invasion; act of foreign enemies; hostilities (regardless | ||||||
| 2 | of whether war is declared); civil war; rebellion; | ||||||
| 3 | revolution; insurrection; military or usurped power or | ||||||
| 4 | confiscation; terrorist activities; civil disturbance; | ||||||
| 5 | riots; nationalization; sabotage; blockage; or embargo, | ||||||
| 6 | the owner of the facility described in subsection (h) of | ||||||
| 7 | this Section Act shall not be subject to a penalty if and | ||||||
| 8 | only if (i) it promptly provides notice of its failure to | ||||||
| 9 | the Commission; (ii) as soon as practicable and consistent | ||||||
| 10 | with any order or direction from the Commission, it submits | ||||||
| 11 | to the Commission proposed modifications to its carbon | ||||||
| 12 | capture and sequestration plan; and (iii) it carries out | ||||||
| 13 | its proposed modifications in the manner and time directed | ||||||
| 14 | by the Commission. | ||||||
| 15 | If the Commission finds that the facility has not | ||||||
| 16 | satisfied each of these requirements, then the facility | ||||||
| 17 | shall be subject to the penalty. If the owner of the clean | ||||||
| 18 | coal SNG facility captured and sequestered more than 90% of | ||||||
| 19 | the total carbon dioxide emissions that the facility would | ||||||
| 20 | otherwise emit, then the owner of the facility may credit | ||||||
| 21 | such additional amounts to reduce the amount of any future | ||||||
| 22 | penalty to be paid. The penalty resulting from the failure | ||||||
| 23 | to capture and sequester at least the minimum amount of | ||||||
| 24 | carbon dioxide shall not be passed on to a utility or its | ||||||
| 25 | customers. | ||||||
| 26 | If the clean coal SNG facility fails to meet the | ||||||
| |||||||
| |||||||
| 1 | requirements specified in this subsection (h-5), then the | ||||||
| 2 | Attorney General, on behalf of the People of the State of | ||||||
| 3 | Illinois, shall bring an action to enforce the obligations | ||||||
| 4 | related to the facility set forth in this subsection (h-5), | ||||||
| 5 | including any penalty payments owed, but not including the | ||||||
| 6 | physical obligation to capture and sequester at least 90% | ||||||
| 7 | of the total carbon dioxide emissions that the facility | ||||||
| 8 | would otherwise emit. Such action may be filed in any | ||||||
| 9 | circuit court in Illinois. By entering into a contract | ||||||
| 10 | pursuant to subsection (h) of this Section, the clean coal | ||||||
| 11 | SNG facility agrees to waive any objections to venue or to | ||||||
| 12 | the jurisdiction of the court with regard to the Attorney | ||||||
| 13 | General's action under this subsection (h-5). | ||||||
| 14 | Compliance with the sequestration requirements and any | ||||||
| 15 | penalty requirements specified in this subsection (h-5) | ||||||
| 16 | for the clean coal SNG facility shall be assessed annually | ||||||
| 17 | by the Commission, which may in its discretion retain an | ||||||
| 18 | expert to facilitate its assessment. If any expert is | ||||||
| 19 | retained by the Commission, then the clean coal SNG | ||||||
| 20 | facility shall pay for the expert's reasonable fees, and | ||||||
| 21 | such costs shall not be passed through to the utility or | ||||||
| 22 | its customers. | ||||||
| 23 | In addition, carbon dioxide emission credits received | ||||||
| 24 | by the clean coal SNG facility in connection with | ||||||
| 25 | sequestration of carbon dioxide from the facility must be | ||||||
| 26 | sold in a timely fashion with any revenue, less applicable | ||||||
| |||||||
| |||||||
| 1 | fees and expenses and any expenses required to be paid by | ||||||
| 2 | facility for carbon dioxide transportation or | ||||||
| 3 | sequestration, deposited into the reconciliation account | ||||||
| 4 | within 30 days after receipt of such funds by the owner of | ||||||
| 5 | the clean coal SNG facility. | ||||||
| 6 | The clean coal SNG facility is prohibited from | ||||||
| 7 | transporting or sequestering carbon dioxide unless the | ||||||
| 8 | owner of the carbon dioxide pipeline that transfers the | ||||||
| 9 | carbon dioxide from the facility and the owner of the | ||||||
| 10 | sequestration site where the carbon dioxide captured by the | ||||||
| 11 | facility is stored has acquired all applicable permits | ||||||
| 12 | under applicable State and federal laws, statutes, rules, | ||||||
| 13 | or regulations prior to the transfer or sequestration of | ||||||
| 14 | carbon dioxide. The responsibility for compliance with the | ||||||
| 15 | sequestration requirements specified in this subsection | ||||||
| 16 | (h-5) for the clean coal SNG facility shall reside solely | ||||||
| 17 | with the clean coal SNG facility, regardless of whether the | ||||||
| 18 | facility has contracted with another party to capture, | ||||||
| 19 | transport, or sequester carbon dioxide. described in | ||||||
| 20 | subsection (h) of this Act described in subsection (h) of | ||||||
| 21 | this Act | ||||||
| 22 | (C) If, in any year, the owner of a clean coal SNG | ||||||
| 23 | brownfield facility fails to demonstrate that the clean | ||||||
| 24 | coal SNG brownfield facility captured and sequestered at | ||||||
| 25 | least 85% of the total carbon dioxide emissions that the | ||||||
| 26 | facility would otherwise emit, then the owner of the clean | ||||||
| |||||||
| |||||||
| 1 | coal SNG brownfield facility must pay a penalty of $20 per | ||||||
| 2 | ton of excess carbon emissions up to $20,000,000, which | ||||||
| 3 | shall be deposited into the Energy Efficiency Trust Fund | ||||||
| 4 | and distributed pursuant to subsection (b) of Section 6-6 | ||||||
| 5 | of the Renewable Energy, Energy Efficiency, and Coal | ||||||
| 6 | Resources Development Law of 1997. Provided, however, to | ||||||
| 7 | the extent that the owner of the clean coal SNG brownfield | ||||||
| 8 | facility can demonstrate that the failure was as a result | ||||||
| 9 | of acts of God (including fire, flood, earthquake, tornado, | ||||||
| 10 | lightning, hurricane, or other natural disaster); any | ||||||
| 11 | amendment, modification, or abrogation of any applicable | ||||||
| 12 | law or regulation that would prevent performance; war; | ||||||
| 13 | invasion; act of foreign enemies; hostilities (regardless | ||||||
| 14 | of whether war is declared); civil war; rebellion; | ||||||
| 15 | revolution; insurrection; military or usurped power or | ||||||
| 16 | confiscation; terrorist activities; civil disturbances; | ||||||
| 17 | riots; nationalization; sabotage; blockage; or embargo, | ||||||
| 18 | the owner of the clean coal SNG brownfield facility shall | ||||||
| 19 | not be subject to a penalty if and only if (i) it promptly | ||||||
| 20 | provides notice of its failure to the Commission; (ii) as | ||||||
| 21 | soon as practicable and consistent with any order or | ||||||
| 22 | direction from the Commission, it submits to the Commission | ||||||
| 23 | proposed modifications to its carbon capture and | ||||||
| 24 | sequestration plan; and (iii) it carries out its proposed | ||||||
| 25 | modifications in the manner and time directed by the | ||||||
| 26 | Commission. If the Commission finds that the facility has | ||||||
| |||||||
| |||||||
| 1 | not satisfied each of these requirements, then the facility | ||||||
| 2 | shall be subject to the penalty. If the owner of a clean | ||||||
| 3 | coal SNG brownfield facility demonstrates that the clean | ||||||
| 4 | coal SNG brownfield facility captured and sequestered more | ||||||
| 5 | than 85% of the total carbon emissions that the facility | ||||||
| 6 | would otherwise emit, the owner of the clean coal SNG | ||||||
| 7 | brownfield facility may credit such additional amounts to | ||||||
| 8 | reduce the amount of any future penalty to be paid. The | ||||||
| 9 | penalty resulting from the failure to capture and sequester | ||||||
| 10 | at least the minimum amount of carbon dioxide shall not be | ||||||
| 11 | passed on to a utility or its customers. | ||||||
| 12 | In addition to any penalty for the clean coal SNG | ||||||
| 13 | brownfield facility's failure to capture and sequester at | ||||||
| 14 | least its minimum sequestration requirement, the Attorney | ||||||
| 15 | General, on behalf of the People of the State of Illinois, | ||||||
| 16 | shall bring an action for specific performance of this | ||||||
| 17 | subsection (h-5). Such action may be filed in any circuit | ||||||
| 18 | court in Illinois. By entering into a sourcing agreement | ||||||
| 19 | pursuant to subsection (h-1) of this Section, the clean | ||||||
| 20 | coal SNG brownfield facility agrees to waive any objections | ||||||
| 21 | to venue or to the jurisdiction of the court with regard to | ||||||
| 22 | the Attorney General's action for specific performance | ||||||
| 23 | under this subsection (h-5). for the facility described in | ||||||
| 24 | subsection (h) of this Act described in subsection (h) of | ||||||
| 25 | this Act | ||||||
| 26 | Compliance with the sequestration requirements and | ||||||
| |||||||
| |||||||
| 1 | penalty requirements specified in this subsection (h-5) | ||||||
| 2 | for the clean coal SNG brownfield facility shall be | ||||||
| 3 | assessed annually by the Commission, which may in its | ||||||
| 4 | discretion retain an expert to facilitate its assessment. | ||||||
| 5 | If an expert is retained by the Commission, then the clean | ||||||
| 6 | coal SNG brownfield facility shall pay for the expert's | ||||||
| 7 | reasonable fees, and such costs shall not be passed through | ||||||
| 8 | to a utility or its customers. or a clean coal SNG | ||||||
| 9 | brownfield facility or requisite penalties are paid | ||||||
| 10 | Responsibility for compliance with the sequestration | ||||||
| 11 | requirements specified in this subsection (h-5) for the | ||||||
| 12 | clean coal SNG brownfield facility shall reside solely with | ||||||
| 13 | the clean coal SNG brownfield facility regardless of | ||||||
| 14 | whether the facility has contracted with another party to | ||||||
| 15 | capture, transport, or sequester carbon dioxide. | ||||||
| 16 | (h-7) Sequestration permitting, oversight, and | ||||||
| 17 | investigations. | ||||||
| 18 | (1) No clean coal facility or clean coal SNG brownfield | ||||||
| 19 | facility may transport or sequester carbon dioxide unless | ||||||
| 20 | the Commission approves the method of carbon dioxide | ||||||
| 21 | transportation or sequestration. Such approval shall be | ||||||
| 22 | required regardless of whether the facility has contracted | ||||||
| 23 | with another to transport or sequester the carbon dioxide. | ||||||
| 24 | Nothing in this subsection (h-7) shall release the owner or | ||||||
| 25 | operator of a carbon dioxide sequestration site or carbon | ||||||
| 26 | dioxide pipeline from any other permitting requirements | ||||||
| |||||||
| |||||||
| 1 | under applicable State and federal laws, statutes, rules, | ||||||
| 2 | or regulations. | ||||||
| 3 | (2) The Commission shall review carbon dioxide | ||||||
| 4 | transportation and sequestration methods proposed by a | ||||||
| 5 | clean coal facility or a clean coal SNG brownfield facility | ||||||
| 6 | and shall approve those methods it deems reasonable and | ||||||
| 7 | cost-effective. For purposes of this review, | ||||||
| 8 | "cost-effective" means a commercially reasonable price for | ||||||
| 9 | similar carbon dioxide transportation or sequestration | ||||||
| 10 | techniques. In determining whether sequestration is | ||||||
| 11 | reasonable and cost-effective, the Commission may consult | ||||||
| 12 | with the Illinois State Geological Survey and retain third | ||||||
| 13 | parties to assist in its determination, provided that such | ||||||
| 14 | third parties shall not own or control any direct or | ||||||
| 15 | indirect interest in the facility that is proposing the | ||||||
| 16 | carbon dioxide transportation or the carbon dioxide | ||||||
| 17 | sequestration method and shall have no contractual | ||||||
| 18 | relationship with that facility. If a third party is | ||||||
| 19 | retained by the Commission, then the facility proposing the | ||||||
| 20 | carbon dioxide transportation or sequestration method | ||||||
| 21 | shall pay for the expert's reasonable fees, and these costs | ||||||
| 22 | shall not be passed through to a utility or its customers. | ||||||
| 23 | No later than 6 months prior to the date upon which the | ||||||
| 24 | owner intends to commence construction of a clean coal | ||||||
| 25 | facility or the clean coal SNG brownfield facility, the | ||||||
| 26 | owner of the facility shall file with the Commission a | ||||||
| |||||||
| |||||||
| 1 | carbon dioxide transportation or sequestration plan. The | ||||||
| 2 | Commission shall hold a public hearing within 30 days after | ||||||
| 3 | receipt of the facility's carbon dioxide transportation or | ||||||
| 4 | sequestration plan. The Commission shall post notice of the | ||||||
| 5 | review on its website upon submission of a carbon dioxide | ||||||
| 6 | transportation or sequestration method and shall accept | ||||||
| 7 | written public comments. The Commission shall take the | ||||||
| 8 | comments into account when making its decision. | ||||||
| 9 | The Commission may not approve a carbon dioxide | ||||||
| 10 | sequestration method if the owner or operator of the | ||||||
| 11 | sequestration site has not received (i) an Underground | ||||||
| 12 | Injection Control permit from the Illinois Environmental | ||||||
| 13 | Protection Agency pursuant to the Environmental Protection | ||||||
| 14 | Act; (ii) an Underground Injection Control permit from the | ||||||
| 15 | Illinois Department of Natural Resources pursuant to the | ||||||
| 16 | Illinois Oil and Gas Act; or (iii) a permit similar to | ||||||
| 17 | items (i) or (ii) from the state in which the sequestration | ||||||
| 18 | site is located if the sequestration will take place | ||||||
| 19 | outside of Illinois. The Commission shall approve or deny | ||||||
| 20 | the carbon dioxide transportation or sequestration method | ||||||
| 21 | within 90 days after the receipt of all required | ||||||
| 22 | information. | ||||||
| 23 | (3) At least annually, the Illinois Environmental | ||||||
| 24 | Protection Agency shall inspect all carbon dioxide | ||||||
| 25 | sequestration sites in Illinois. The Illinois | ||||||
| 26 | Environmental Protection Agency may, as often as deemed | ||||||
| |||||||
| |||||||
| 1 | necessary, monitor and conduct investigations of those | ||||||
| 2 | sites. The owner or operator of the sequestration site must | ||||||
| 3 | cooperate with the Illinois Environmental Protection | ||||||
| 4 | Agency investigations of carbon dioxide sequestration | ||||||
| 5 | sites. | ||||||
| 6 | If the Illinois Environmental Protection Agency | ||||||
| 7 | determines at any time a site creates conditions that | ||||||
| 8 | warrant the issuance of a seal order under Section 34 of | ||||||
| 9 | the Environmental Protection Act, then the Illinois | ||||||
| 10 | Environmental Protection Agency shall seal the site | ||||||
| 11 | pursuant to the Environmental Protection Act. If the | ||||||
| 12 | Illinois Environmental Protection Agency determines at any | ||||||
| 13 | time a carbon dioxide sequestration site creates | ||||||
| 14 | conditions that warrant the institution of a civil action | ||||||
| 15 | for an injunction under Section 43 of the Environmental | ||||||
| 16 | Protection Act, then the Illinois Environmental Protection | ||||||
| 17 | Agency shall request the State's Attorney or the Attorney | ||||||
| 18 | General institute such action. The Illinois Environmental | ||||||
| 19 | Protection Agency shall provide notice of any such actions | ||||||
| 20 | as soon as possible on its website. The SNG facility shall | ||||||
| 21 | incur all reasonable costs associated with any such | ||||||
| 22 | inspection or monitoring of the sequestration sites, and | ||||||
| 23 | these costs shall not be recoverable from utilities or | ||||||
| 24 | their customers. | ||||||
| 25 | (4) At least annually, the Commission shall inspect all | ||||||
| 26 | carbon dioxide pipelines in Illinois that transport carbon | ||||||
| |||||||
| |||||||
| 1 | dioxide to ensure the safety and feasibility of those | ||||||
| 2 | pipelines. The Commission may, as often as deemed | ||||||
| 3 | necessary, monitor and conduct investigations of those | ||||||
| 4 | pipelines. The owner or operator of the pipeline must | ||||||
| 5 | cooperate with the Commission investigations of the carbon | ||||||
| 6 | dioxide pipelines. | ||||||
| 7 | In circumstances whereby a carbon dioxide pipeline | ||||||
| 8 | creates a substantial danger to the environment or to the | ||||||
| 9 | public health of persons or to the welfare of persons where | ||||||
| 10 | such danger is to the livelihood of such persons, the | ||||||
| 11 | State's Attorney or Attorney General, upon the request of | ||||||
| 12 | the Commission or on his or her own motion, may institute a | ||||||
| 13 | civil action for an immediate injunction to halt any | ||||||
| 14 | discharge or other activity causing or contributing to the | ||||||
| 15 | danger or to require such other action as may be necessary. | ||||||
| 16 | The court may issue an ex parte order and shall schedule a | ||||||
| 17 | hearing on the matter not later than 3 working days after | ||||||
| 18 | the date of injunction. The Commission shall provide notice | ||||||
| 19 | of any such actions as soon as possible on its website. The | ||||||
| 20 | SNG facility shall incur all reasonable costs associated | ||||||
| 21 | with any such inspection or monitoring of the sequestration | ||||||
| 22 | sites, and these costs shall not be recoverable from a | ||||||
| 23 | utility or its customers. | ||||||
| 24 | (h-9) The clean coal SNG brownfield facility shall have the | ||||||
| 25 | right to recover prudently incurred increased costs or reduced | ||||||
| 26 | revenue resulting from any new or amendatory legislation or | ||||||
| |||||||
| |||||||
| 1 | other action. The State of Illinois pledges that the State will | ||||||
| 2 | not enact any law or take any action to: | ||||||
| 3 | (1) break, or repeal the authority for, sourcing | ||||||
| 4 | agreements approved by the Commission and entered into | ||||||
| 5 | between public utilities and the clean coal SNG brownfield | ||||||
| 6 | facility; | ||||||
| 7 | (2) deny public utilities full cost recovery for their | ||||||
| 8 | costs incurred under those sourcing agreements; or | ||||||
| 9 | (3) deny the clean coal SNG brownfield facility full | ||||||
| 10 | cost and revenue recovery as provided under those sourcing | ||||||
| 11 | agreements that are recoverable pursuant to subsection | ||||||
| 12 | (h-3) of this Section. | ||||||
| 13 | These pledges are for the benefit of the parties to those | ||||||
| 14 | sourcing agreements and the issuers and holders of bonds or | ||||||
| 15 | other obligations issued or incurred to finance or refinance | ||||||
| 16 | the clean coal SNG brownfield facility. The clean coal SNG | ||||||
| 17 | brownfield facility is authorized to include and refer to these | ||||||
| 18 | pledges in any financing agreement into which it may enter in | ||||||
| 19 | regard to those sourcing agreements. | ||||||
| 20 | The State of Illinois retains and reserves all other rights | ||||||
| 21 | to enact new or amendatory legislation or take any other | ||||||
| 22 | action, without impairment of the right of the clean coal SNG | ||||||
| 23 | brownfield facility to recover prudently incurred increased | ||||||
| 24 | costs or reduced revenue resulting from the new or amendatory | ||||||
| 25 | legislation or other action, including, but not limited to, | ||||||
| 26 | such legislation or other action that would (i) directly or | ||||||
| |||||||
| |||||||
| 1 | indirectly raise the costs the clean coal SNG brownfield | ||||||
| 2 | facility must incur; (ii) directly or indirectly place | ||||||
| 3 | additional restrictions, regulations, or requirements on the | ||||||
| 4 | clean coal SNG brownfield facility; (iii) prohibit | ||||||
| 5 | sequestration in general or prohibit a specific sequestration | ||||||
| 6 | method or project; or (iv) increase minimum sequestration | ||||||
| 7 | requirements for the clean coal SNG brownfield facility to the | ||||||
| 8 | extent technically feasible. The clean coal SNG brownfield | ||||||
| 9 | facility shall have the right to recover prudently incurred | ||||||
| 10 | increased costs or reduced revenue resulting from the new or | ||||||
| 11 | amendatory legislation or other action as described in this | ||||||
| 12 | subsection (h-9). | ||||||
| 13 | (h-10) Contract costs for SNG incurred by an Illinois gas | ||||||
| 14 | utility are reasonable and prudent and recoverable through the | ||||||
| 15 | purchased gas adjustment clause and are not subject to review | ||||||
| 16 | or disallowance by the Commission. Contract costs are costs | ||||||
| 17 | incurred by the utility under the terms of a contract that | ||||||
| 18 | incorporates the terms stated in subsection (h) of this Section | ||||||
| 19 | as confirmed in writing by the Illinois Power Agency as set | ||||||
| 20 | forth in subsection (h) of this Section, which confirmation | ||||||
| 21 | shall be deemed conclusive, or as a consequence of or condition | ||||||
| 22 | to its performance under the contract, including (i) amounts | ||||||
| 23 | paid for SNG under the SNG contract and (ii) costs of | ||||||
| 24 | transportation and storage services of SNG purchased from | ||||||
| 25 | interstate pipelines under federally approved tariffs. The | ||||||
| 26 | Illinois gas utility shall initiate a clean coal SNG facility | ||||||
| |||||||
| |||||||
| 1 | rider mechanism that (A) shall be applicable to all customers | ||||||
| 2 | who receive transportation service from the utility, (B) shall | ||||||
| 3 | be designed to have an equal percentage impact on the | ||||||
| 4 | transportation services rates of each class of the utility's | ||||||
| 5 | total customers, and (C) shall accurately reflect the net | ||||||
| 6 | customer savings, if any, and above market costs, if any, under | ||||||
| 7 | the SNG contract. Any contract, the terms of which have been | ||||||
| 8 | confirmed in writing by the Illinois Power Agency as set forth | ||||||
| 9 | in subsection (h) of this Section and the performance of the | ||||||
| 10 | parties under such contract cannot be grounds for challenging | ||||||
| 11 | prudence or cost recovery by the utility through the purchased | ||||||
| 12 | gas adjustment clause, and in such cases, the Commission is | ||||||
| 13 | directed not to consider, and has no authority to consider, any | ||||||
| 14 | attempted challenges. | ||||||
| 15 | The contracts entered into by Illinois gas utilities | ||||||
| 16 | pursuant to subsection (h) of this Section shall provide that | ||||||
| 17 | the utility retains the right to terminate the contract without | ||||||
| 18 | further obligation or liability to any party if the contract | ||||||
| 19 | has been impaired as a result of any legislative, | ||||||
| 20 | administrative, judicial, or other governmental action that is | ||||||
| 21 | taken that eliminates all or part of the prudence protection of | ||||||
| 22 | this subsection (h-10) or denies the recoverability of all or | ||||||
| 23 | part of the contract costs through the purchased gas adjustment | ||||||
| 24 | clause. Should any Illinois gas utility exercise its right | ||||||
| 25 | under this subsection (h-10) to terminate the contract, all | ||||||
| 26 | contract costs incurred prior to termination are and will be | ||||||
| |||||||
| |||||||
| 1 | deemed reasonable, prudent, and recoverable as and when | ||||||
| 2 | incurred and not subject to review or disallowance by the | ||||||
| 3 | Commission. Any order, issued by the State requiring or | ||||||
| 4 | authorizing the discontinuation of the merchant function, | ||||||
| 5 | defined as the purchase and sale of natural gas by an Illinois | ||||||
| 6 | gas utility for the ultimate consumer in its service territory | ||||||
| 7 | shall include provisions necessary to prevent the impairment of | ||||||
| 8 | the value of any contract hereunder over its full term. | ||||||
| 9 | (h-11) All costs incurred by an Illinois gas utility in | ||||||
| 10 | procuring SNG from a clean coal SNG brownfield facility | ||||||
| 11 | pursuant to subsection (h-1) or a third-party marketer pursuant | ||||||
| 12 | to subsection (h-1) are reasonable and prudent and recoverable | ||||||
| 13 | through the purchased gas adjustment clause in conjunction with
| ||||||
| 14 | a SNG brownfield facility rider mechanism and are not subject | ||||||
| 15 | to review or disallowance by the Commission; provided that
if a | ||||||
| 16 | utility is required by law or otherwise elects to connect
the | ||||||
| 17 | clean coal SNG brownfield facility to an interstate
pipeline, | ||||||
| 18 | then the utility shall be entitled to recover
pursuant to its | ||||||
| 19 | tariffs all just and reasonable costs that are
prudently | ||||||
| 20 | incurred. Sourcing agreement costs are costs incurred by the | ||||||
| 21 | utility under the terms of a sourcing agreement that | ||||||
| 22 | incorporates the terms stated in subsection (h-1) of this | ||||||
| 23 | Section as approved by the Commission as set forth in | ||||||
| 24 | subsection (h-4) of this Section, which approval shall be | ||||||
| 25 | deemed conclusive, or as a consequence of or condition to its | ||||||
| 26 | performance under the contract, including (i) amounts paid for | ||||||
| |||||||
| |||||||
| 1 | SNG under the SNG contract and (ii) costs of transportation and | ||||||
| 2 | storage services of SNG purchased from interstate pipelines | ||||||
| 3 | under federally approved tariffs. Any sourcing agreement, the | ||||||
| 4 | terms of which have been approved by the Commission as set | ||||||
| 5 | forth in subsection (h-4) of this Section, and the performance | ||||||
| 6 | of the parties under the sourcing agreement cannot be grounds | ||||||
| 7 | for challenging prudence or cost recovery by the utility, and | ||||||
| 8 | in these cases, the Commission is directed not to consider, and | ||||||
| 9 | has no authority to consider, any attempted challenges. | ||||||
| 10 | (h-15) Reconciliation account. The clean coal SNG facility | ||||||
| 11 | shall establish a reconciliation account for the benefit of the | ||||||
| 12 | retail customers of the utilities that have entered into | ||||||
| 13 | contracts with the clean coal SNG facility pursuant to | ||||||
| 14 | subsection (h). The reconciliation account shall be maintained | ||||||
| 15 | and administered by an independent trustee that is mutually | ||||||
| 16 | agreed upon by the owners of the clean coal SNG facility, the | ||||||
| 17 | utilities, and the Commission in an interest-bearing account in | ||||||
| 18 | accordance with the following: | ||||||
| 19 | (1) The clean coal SNG facility shall conduct an | ||||||
| 20 | analysis annually within 60 days after receiving the | ||||||
| 21 | necessary cost information, which shall be provided by the | ||||||
| 22 | gas utility within 6 months after the end of the preceding | ||||||
| 23 | calendar year, to determine (i) the average annual contract | ||||||
| 24 | SNG cost, which shall be calculated as the total amount | ||||||
| 25 | paid for SNG purchased from the clean coal SNG facility | ||||||
| 26 | over the preceding 12 months, plus the cost to the utility | ||||||
| |||||||
| |||||||
| 1 | of the required transportation and storage services of SNG, | ||||||
| 2 | divided by the total number of MMBtus of SNG actually | ||||||
| 3 | purchased from the clean coal SNG facility in the preceding | ||||||
| 4 | 12 months under the utility contract; (ii) the average | ||||||
| 5 | annual natural gas purchase cost, which shall be calculated | ||||||
| 6 | as the total annual supply costs paid for baseload natural | ||||||
| 7 | gas (excluding any SNG) purchased by such utility over the | ||||||
| 8 | preceding 12 months plus the costs of transportation and | ||||||
| 9 | storage services of such natural gas (excluding such costs | ||||||
| 10 | for SNG), divided by the total number of MMbtus of baseload | ||||||
| 11 | natural gas (excluding SNG) actually purchased by the | ||||||
| 12 | utility during the year; (iii) the cost differential, which | ||||||
| 13 | shall be the difference between the average annual contract | ||||||
| 14 | SNG cost and the average annual natural gas purchase cost; | ||||||
| 15 | and (iv) the revenue share target which shall be the cost | ||||||
| 16 | differential multiplied by the total amount of SNG | ||||||
| 17 | purchased over the preceding 12 months under such utility | ||||||
| 18 | contract. | ||||||
| 19 | (A) To the extent the annual average contract SNG | ||||||
| 20 | cost is less than the annual average natural gas | ||||||
| 21 | purchase cost, the utility shall credit an amount equal | ||||||
| 22 | to the revenue share target to the reconciliation | ||||||
| 23 | account. Such credit payment shall be made monthly | ||||||
| 24 | starting within 30 days after the completed analysis in | ||||||
| 25 | this subsection (h-15) and based on collections from | ||||||
| 26 | all customers via a line item charge in all customer | ||||||
| |||||||
| |||||||
| 1 | bills designed to have an equal percentage impact on | ||||||
| 2 | the transportation services of each class of | ||||||
| 3 | customers. Credit payments made pursuant to this | ||||||
| 4 | subparagraph (A) shall be deemed prudent and | ||||||
| 5 | reasonable and not subject to Commission prudence | ||||||
| 6 | review. | ||||||
| 7 | (B) To the extent the annual average contract SNG | ||||||
| 8 | cost is greater than the annual average natural gas | ||||||
| 9 | purchase cost, the reconciliation account shall be | ||||||
| 10 | used to provide a credit equal to the revenue share | ||||||
| 11 | target to the utilities to be used to reduce the | ||||||
| 12 | utility's natural gas costs through the purchased gas | ||||||
| 13 | adjustment clause. Such payment shall be made within 30 | ||||||
| 14 | days after the completed analysis pursuant to this | ||||||
| 15 | subsection (h-15), but only to the extent that the | ||||||
| 16 | reconciliation account has a positive balance. | ||||||
| 17 | (2) At the conclusion of the term of the SNG contracts | ||||||
| 18 | pursuant to subsection (h) and the completion of the final | ||||||
| 19 | annual analysis pursuant to this subsection (h-15), to the | ||||||
| 20 | extent the facility owes any amount to retail customers, | ||||||
| 21 | amounts in the account shall be credited to retail | ||||||
| 22 | customers to the extent the owed amount is repaid; 50% of | ||||||
| 23 | any additional amount in the reconciliation account shall | ||||||
| 24 | be distributed to the utilities to be used to reduce the | ||||||
| 25 | utilities' natural gas costs through the purchase gas | ||||||
| 26 | adjustment clause with the remaining amount distributed to | ||||||
| |||||||
| |||||||
| 1 | the clean coal SNG facility. Such payment shall be made | ||||||
| 2 | within 30 days after the last completed analysis pursuant | ||||||
| 3 | to this subsection (h-15). If the facility has repaid all | ||||||
| 4 | owed amounts, if any, to retail customers and has | ||||||
| 5 | distributed 50% of any additional amount in the account to | ||||||
| 6 | the utilities, then the owners of the clean coal SNG | ||||||
| 7 | facility shall have no further obligation to the utility or | ||||||
| 8 | the retail customers. | ||||||
| 9 | If, at the conclusion of the term of the contracts | ||||||
| 10 | pursuant to subsection (h) and the completion of the final | ||||||
| 11 | annual analysis pursuant to this subsection (h-15), the | ||||||
| 12 | facility owes any amount to retail customers and the | ||||||
| 13 | account has been depleted, then the clean coal SNG facility | ||||||
| 14 | shall be liable for any remaining amount owed to the retail | ||||||
| 15 | customers. The clean coal SNG facility shall market the | ||||||
| 16 | daily production of SNG and distribute on a monthly basis | ||||||
| 17 | 5% of the amounts collected with respect to such future | ||||||
| 18 | sales to the utilities in proportion to each utility's SNG | ||||||
| 19 | contract to be used to reduce the utility's natural gas | ||||||
| 20 | costs through the purchase gas adjustment clause; such | ||||||
| 21 | payments to the utility shall continue until either 15 | ||||||
| 22 | years after the conclusion of the contract or such time as | ||||||
| 23 | the sum of such payments equals the remaining amount owed | ||||||
| 24 | to the retail customers at the end of the contract, | ||||||
| 25 | whichever is earlier. If the debt to the retail customers | ||||||
| 26 | is not repaid within 15 years after the conclusion of the | ||||||
| |||||||
| |||||||
| 1 | contract, then the owner of the clean coal SNG facility | ||||||
| 2 | must sell the facility, and all proceeds from that sale | ||||||
| 3 | must be used to repay any amount owed to the retail | ||||||
| 4 | customers under this subsection (h-15). | ||||||
| 5 | The retail customers shall have first priority in | ||||||
| 6 | recovering that debt above any creditors, except the | ||||||
| 7 | secured lenders to the extent that the secured lenders have | ||||||
| 8 | any secured debt outstanding, including any parent | ||||||
| 9 | companies or affiliates of the clean coal SNG facility. | ||||||
| 10 | (3) 50% of all additional net revenue, defined as | ||||||
| 11 | miscellaneous net revenue after cost allowance and above | ||||||
| 12 | the budgeted estimate established for revenue pursuant to | ||||||
| 13 | subsection (h), including sale of substitute natural gas | ||||||
| 14 | derived from the clean coal SNG facility above the | ||||||
| 15 | nameplate capacity of the facility and other by-products | ||||||
| 16 | produced by the facility, shall be credited to the | ||||||
| 17 | reconciliation account on an annual basis with such payment | ||||||
| 18 | made within 30 days after the end of each calendar year | ||||||
| 19 | during the term of the contract. | ||||||
| 20 | (4) The clean coal SNG facility shall each year, | ||||||
| 21 | starting in the facility's first year of commercial | ||||||
| 22 | operation, file with the Commission, in such form as the | ||||||
| 23 | Commission shall require, a report as to the reconciliation | ||||||
| 24 | account. The annual report must contain the following | ||||||
| 25 | information: | ||||||
| 26 | (A) the revenue share target amount; | ||||||
| |||||||
| |||||||
| 1 | (B) the amount credited or debited to the | ||||||
| 2 | reconciliation account during the year; | ||||||
| 3 | (C) the amount credited to the utilities to be used | ||||||
| 4 | to reduce the utilities natural gas costs though the | ||||||
| 5 | purchase gas adjustment clause; | ||||||
| 6 | (D) the total amount of reconciliation account at | ||||||
| 7 | the beginning and end of the year; | ||||||
| 8 | (E) the total amount of consumer savings to date; | ||||||
| 9 | and | ||||||
| 10 | (F) any additional information the Commission may | ||||||
| 11 | require. | ||||||
| 12 | When any report is erroneous or defective or appears to the | ||||||
| 13 | Commission to be erroneous or defective, the Commission may | ||||||
| 14 | notify the clean coal SNG facility to amend the report within | ||||||
| 15 | 30 days; before or after the termination of the 30-day period, | ||||||
| 16 | the Commission may examine the trustee of the reconciliation | ||||||
| 17 | account or the officers, agents, employees, books, records, or | ||||||
| 18 | accounts of the clean coal SNG facility and correct such items | ||||||
| 19 | in the report as upon such examination the Commission may find | ||||||
| 20 | defective or erroneous. All reports shall be under oath. | ||||||
| 21 | All reports made to the Commission by the clean coal SNG | ||||||
| 22 | facility and the contents of the reports shall be open to | ||||||
| 23 | public inspection and shall be deemed a public record under the | ||||||
| 24 | Freedom of Information Act. Such reports shall be preserved in | ||||||
| 25 | the office of the Commission. The Commission shall publish an | ||||||
| 26 | annual summary of the reports prior to February 1 of the | ||||||
| |||||||
| |||||||
| 1 | following year. The annual summary shall be made available to | ||||||
| 2 | the public on the Commission's website and shall be submitted | ||||||
| 3 | to the General Assembly. | ||||||
| 4 | Any facility that fails to file the report required under | ||||||
| 5 | this paragraph (4) to the Commission within the time specified | ||||||
| 6 | or to make specific answer to any question propounded by the | ||||||
| 7 | Commission within 30 days after the time it is lawfully | ||||||
| 8 | required to do so, or within such further time not to exceed 90 | ||||||
| 9 | days as may be allowed by the Commission in its discretion, | ||||||
| 10 | shall pay a penalty of $500 to the Commission for each day it | ||||||
| 11 | is in default. | ||||||
| 12 | Any person who willfully makes any false report to the | ||||||
| 13 | Commission or to any member, officer, or employee thereof, any | ||||||
| 14 | person who willfully in a report withholds or fails to provide | ||||||
| 15 | material information to which the Commission is entitled under | ||||||
| 16 | this paragraph (4) and which information is either required to | ||||||
| 17 | be filed by statute, rule, regulation, order, or decision of | ||||||
| 18 | the Commission or has been requested by the Commission, and any | ||||||
| 19 | person who willfully aids or abets such person shall be guilty | ||||||
| 20 | of a Class A misdemeanor. | ||||||
| 21 | (h-20) The General Assembly authorizes the Illinois | ||||||
| 22 | Finance Authority to issue bonds to the maximum extent | ||||||
| 23 | permitted to finance coal gasification facilities described in | ||||||
| 24 | this Section, which constitute both "industrial projects" | ||||||
| 25 | under Article 801 of the Illinois Finance Authority Act and | ||||||
| 26 | "clean coal and energy projects" under Sections 825-65 through | ||||||
| |||||||
| |||||||
| 1 | 825-75 of the Illinois Finance Authority Act. | ||||||
| 2 | Administrative costs incurred by the Illinois Finance | ||||||
| 3 | Authority in performance of this subsection (h-20) shall be | ||||||
| 4 | subject to reimbursement by the clean coal SNG facility on | ||||||
| 5 | terms as the Illinois Finance Authority and the clean coal SNG | ||||||
| 6 | facility may agree. The utility and its customers shall have no | ||||||
| 7 | obligation to reimburse the clean coal SNG facility or the | ||||||
| 8 | Illinois Finance Authority for any such costs. | ||||||
| 9 | (h-25) The State of Illinois pledges that the State may not | ||||||
| 10 | enact any law or take any action to (1) break or repeal the | ||||||
| 11 | authority for SNG purchase contracts entered into between | ||||||
| 12 | public gas utilities and the clean coal SNG facility pursuant | ||||||
| 13 | to subsection (h) of this Section or (2) deny public gas | ||||||
| 14 | utilities their full cost recovery for contract costs, as | ||||||
| 15 | defined in subsection (h-10), that are incurred under such SNG | ||||||
| 16 | purchase contracts. These pledges are for the benefit of the | ||||||
| 17 | parties to such SNG purchase contracts and the issuers and | ||||||
| 18 | holders of bonds or other obligations issued or incurred to | ||||||
| 19 | finance or refinance the clean coal SNG facility. The | ||||||
| 20 | beneficiaries are authorized to include and refer to these | ||||||
| 21 | pledges in any finance agreement into which they may enter in | ||||||
| 22 | regard to such contracts. | ||||||
| 23 | (h-30) The State of Illinois retains and reserves all other | ||||||
| 24 | rights to enact new or amendatory legislation or take any other | ||||||
| 25 | action, including, but not limited to, such legislation or | ||||||
| 26 | other action that would (1) directly or indirectly raise the | ||||||
| |||||||
| |||||||
| 1 | costs that the clean coal SNG facility must incur; (2) directly | ||||||
| 2 | or indirectly place additional restrictions, regulations, or | ||||||
| 3 | requirements on the clean coal SNG facility; (3) prohibit | ||||||
| 4 | sequestration in general or prohibit a specific sequestration | ||||||
| 5 | method or project; or (4) increase minimum sequestration | ||||||
| 6 | requirements. | ||||||
| 7 | (i) If a gas utility or an affiliate of a gas utility has | ||||||
| 8 | an ownership interest in any entity that produces or sells | ||||||
| 9 | synthetic natural gas, Article VII of this Act shall apply.
| ||||||
| 10 | (Source: P.A. 96-1364, eff. 7-28-10; 97-96, eff. 7-13-11; | ||||||
| 11 | 97-239, eff. 8-2-11; revised 9-12-11.)
| ||||||
| 12 | Section 99. Effective date. This Act takes effect upon | ||||||
| 13 | becoming law.
| ||||||
