Bill Text: HI SB2520 | 2014 | Regular Session | Introduced


Bill Title: CIP; 16th Senatorial District ($)

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2014-01-21 - Referred to WAM. [SB2520 Detail]

Download: Hawaii-2014-SB2520-Introduced.html

THE SENATE

S.B. NO.

2520

TWENTY-SEVENTH LEGISLATURE, 2014

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of THE sixteenth SENATORIAL DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $37,245,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2014-2015 for capital improvement projects for the sixteenth senatorial district, as follows:

1.   Aiea Elementary School, Oahu

     Design, construction, and equipment for demolition of Building H and replacement with a STEM Center; ground and site improvements; and equipment and appurtenances.

          Plans                          $70,000

          Design                        $500,000

          Construction                $4,000,000

          Equipment                      $30,000

          Total                                      $4,600,000

2.   Aiea Intermediate School, Oahu

     Design, construction, and equipment for expansion of Band Room; ground and site improvements; and equipment and appurtenances.

          Design                        $200,000

          Construction                  $675,000

          Equipment                      $25,000

          Total                                        $900,000

3.   Aiea Intermediate School, Oahu

     Design, construction, and equipment for an Applied Technology Center; ground and site improvements; and equipment and appurtenances.

          Design                        $300,000

          Construction                $2,800,000

          Equipment                     $100,000

          Total                                      $3,200,000

4.   Aiea Intermediate School, Oahu

     Design and construction for a retaining wall, perimeter fencing and gates; ground and site improvements; and equipment and appurtenances.

          Design                        $100,000

          Construction                  $900,000

          Total                                      $1,000,000

5.   Aiea High School, Oahu

     Design and construction for air conditioning of Building F; ground and site improvements; and equipment and appurtenances.

          Design                        $225,000

          Construction                $1,625,000

          Total                                      $1,850,000

6.   Alvah Scott Elementary School, Oahu

     Design and construction for ADA upgrades to cafeteria restrooms; ground and site improvements; and equipment and appurtenances.

          Design                        $120,000

          Construction                  $780,000

          Total                                        $900,000

7.   Alvah Scott Elementary School, Oahu

     Design and construction for campus-wide electrical upgrade; ground and site improvements; and equipment and appurtenances.

          Design                        $250,000

          Construction                $1,500,000

          Total                                      $1,750,000

8.   Highlands Intermediate School, Oahu

     Design and construction for air conditioning of Building G; ground and site improvements; and equipment and appurtenances.

          Design                        $100,000

          Construction                  $450,000

          Total                                        $550,000

9.   Highlands Intermediate School, Oahu

     Design and construction for air conditioning of Building K; ground and site improvements; and equipment and appurtenances.

          Design                        $100,000

          Construction                  $450,000

          Total                                        $550,000

 

10.  Highlands Intermediate School, Oahu

     Design and construction of an addition to the existing rock wall surrounding the school and installation of a chain link fence on top of the rock wall; ground and site improvements; and equipment and appurtenances.

          Design                         $45,000

          Construction                  $410,000

          Total                                        $455,000

11.  Lehua Elementary School, Oahu

     Design and construction for electrical upgrades for Building B; ground and site improvements; and equipment and appurtenances.

          Design                         $20,000

          Construction                   $80,000

          Total                                        $100,000

12.  Lehua Elementary School, Oahu

     Design, construction, and equipment of a new Administration Building; ground and site improvements; and equipment and appurtenances.

          Design                        $730,000

          Construction                $7,000,000

          Equipment                      $20,000

          Total                                      $7,750,000

13.  Manana Elementary School, Oahu

     Design and construction for parking lot expansion and new parking; ground and site improvements; and equipment and appurtenances.

          Design                         $40,000

          Construction                  $130,000

          Total                                        $170,000

14.  Manana Elementary School, Oahu

     Design and construction of a portable classroom; ground and site improvements; and equipment and appurtenances.

          Design                         $90,000

          Construction                  $400,000

          Equipment                      $10,000

          Total                                        $500,000

15.  Manana Elementary School, Oahu

     Design and construction of five additional classrooms; ground and site improvements; and equipment and appurtenances.

          Design                        $200,000

          Construction                $1,800,000

          Total                                      $2,000,000

16.  Momilani Elementary School, Oahu

     Design and construction of air conditioning for the cafeteria; ground and site improvements; and equipment and appurtenances.

          Design                        $100,000

          Construction                  $500,000

          Total                                        $600,000

17.  Momilani Elementary School, Oahu

     Design and construction of a storage shed by the Electrical Room; ground and site improvements; and equipment and appurtenances.

          Design                         $40,000

          Construction                  $160,000

          Total                                        $200,000

18.  Momilani Elementary School, Oahu

     Design and construction of a covered play court; ground and site improvements; and equipment and appurtenances.

          Design                        $350,000

          Construction                $2,400,000

          Total                                      $2,750,000

19.  Momilani Elementary School, Oahu

     Design and construction of campus-wide electrical upgrades; ground and site improvements; and equipment and appurtenances.

          Design                        $100,000

          Construction                  $500,000

          Total                                        $600,000

20.  Palisades Elementary School, Oahu

     Design and construction for parking expansion and new parking; ground and site improvements; and equipment and appurtenances.

          Design                         $40,000

          Construction                  $130,000

          Total                                        $170,000

21.  Pearl City High School, Oahu

     Design and construction to concrete lower courtyard by Buildings B & C; ground and site improvements; and equipment and appurtenances.

          Design                         $40,000

          Construction                  $130,000

          Total                                        $170,000

22.  Pearl City High School, Oahu

     Design and construction to concrete upper courtyard by Buildings B & C; ground and site improvements; and equipment and appurtenances.

          Design                         $40,000

          Construction                  $130,000

          Total                                        $170,000

23.  Pearl City High School, Oahu

     Design and construction of handicap parking lot by tennis court; ground and site improvements; and equipment and appurtenances.

          Design                         $50,000

          Construction                  $200,000

          Total                                        $250,000

24.  Pearl Ridge Elementary School, Oahu

     Design and construction for air conditioning of Buildings H & J; ground and site improvements; and equipment and appurtenances.

          Design                        $280,000

          Construction                $2,120,000

          Total                                      $2,400,000

25.  Waiau Elementary School, Oahu

     Design and construction of a covered walkway between Building F, Building D, and the portable classrooms; ground and site improvements; and equipment and appurtenances.

          Design

          Construction

          Equipment

          Total

26.  Waiau Elementary School, Oahu

     Design and construction for air conditioning of ten portable classrooms; ground and site improvements; and equipment and appurtenances.

          Design                         $20,000

          Construction                   $80,000

          Total                                        $100,000

27.  Waiau Elementary School, Oahu

     Design and construction of campus-wide electrical upgrades; ground and site improvements; and equipment and appurtenances.

          Design                         $35,000

          Construction                  $400,000

          Total                                        $435,000

28.  Waimalu Elementary School, Oahu

     Design and construction for ADA access to second floor and with connection between Building D and Building E; ground and site improvements; and equipment and appurtenances.

          Design                        $120,000

          Construction                $1,130,000

          Total                                      $1,250,000

29.  Webling Elementary School, Oahu

     Design and construction for campus-wide electrical upgrades; ground and site improvements; and equipment and appurtenances.

          Design                        $250,000

          Construction                $1,500,000

          Total                                      $1,750,000

30.  Webling Elementary School, Oahu

     Design and construction for landscape improvements and lower elementary playground equipment; ground and site improvements; and equipment and appurtenances.

          Design                          $5,000

          Construction                  $120,000

          Total                                        $125,000

     SECTION 2.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriations are made; provided that all moneys from the appropriations that are unencumbered as of June 30, 2016, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 4.  This Act shall take effect on July 1, 2014.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 16th Senatorial District

 

Description:

Appropriates funds for capital improvement projects to benefit the sixteenth senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback