HOUSE OF REPRESENTATIVES

H.B. NO.

2645

TWENTY-SEVENTH LEGISLATURE, 2014

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of the forty-fifth representative district.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $46,298,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2014-2015 for the purpose of improving the following school facilities in the forty-fifth representative district.

I.   To be expended by the department of education:

     1.   Leilehua high school, Oahu

Design and construction of a three-story building consisting of twelve classrooms.

              Design                  $ 1,900,000

Construction            $17,100,000

                   Total funding                $19,000,000

     2.   Kipapa elementary school, Oahu

A.   Planning, design, and construction to pave back parking lot.

              Plans                   $     1,000

              Design                  $     1,000

              Construction            $   498,000

                   Total funding                $   500,000

B.   Design and construction to resurface main/front parking lot.

              Design                  $     1,000

              Construction            $   299,000

                   Total funding                $   300,000

C.   Design and construction to replace unserviceable floor/tiles on cafeteria stage.

              Design                  $     1,000

              Construction            $    57,000

                   Total funding                $    58,000

D.   Design and construction to repair and replace roofing on walkways between main buildings and cafeteria.

              Design                  $     1,000

              Construction            $   299,000

                   Total funding                $   300,000

E.   Planning, design, and construction of a crosswalk on Kuahelani avenue.

              Plans                   $     1,000

              Design                  $     1,000

              Construction            $    48,000

                   Total funding                $    50,000

          F.   Reroof library building K.

                   Total funding                $   250,000

G.   Reroof office building J.

                   Total funding                $   179,000

H.   Stage and flooring renovation.

                   Total funding                $    48,000

I.   Reroof portable building 7.

                   Total funding                $    15,000

J.   Pave upper parking lot.

                   Total funding                $   500,000

K.   Reroof portable building 11.

              Design                  $    15,000

                   Total funding                $    15,000

L.   Reroof portable building 10.

              Design                  $    15,000

                   Total funding                $    15,000

M.   Reroof portable restroom 20.

              Design                  $    10,000

                   Total funding                $    10,000

N.   Renovate flooring, portable restroom 20.

                   Total funding                $    40,000

O.   Reroof building I.

              Design                  $   120,000

                   Total funding                $   120,000

P.   Parking lot and drop off area.

                   Total funding                $   500,000

Q.   Reroof buildings L, P-8, and P-9.

                   Total funding                $   223,000

3.   Mililani high school, Oahu

A.   Planning, design, and construction of a new auditorium.

              Plans                   $     1,000

              Design                  $     1,000

              Construction            $11,998,000

                   Total funding                $12,000,000

B.   Planning, design, and construction of a new six-classroom building.

              Plans                   $     1,000

              Design                  $     1,000

              Construction            $ 1,998,000

                   Total funding                $ 2,000,000

     4.   Mililani middle school, Oahu

Design and construction to replace gravel in parking lot medians and concrete bike path.

              Design                  $     1,000

              Construction            $    49,000

                   Total funding                $    50,000

     5.   Mililani Uka elementary school, Oahu

Design and construction to replace the ramp by the first grade portable classrooms to meet ADA requirements.

              Design                  $     1,000

              Construction            $   374,000

                   Total funding                $   375,000

     6.   Waialua elementary school, Oahu

A.   Planning, design, and construction for campus-wide air conditioning.

              Plans                   $     1,000

              Design                  $     1,000

              Construction            $ 3,498,000

                   Total funding                $ 3,500,000

B.   Waialua elementary school, Oahu

Planning, design, and construction to cover students' play area.

              Plans                   $     1,000

              Design                  $     1,000

              Construction            $   748,000

                   Total funding                $   750,000

II.  To be expended by the department of transportation.

     1.   Farrington highway, Waialua, Oahu

A.   Design and construction to resurface Farrington highway from Kaena point to Kaukonahua road.

              Design                  $     1,000

              Construction            $ 2,999,000

                   Total funding                $ 3,000,000

B.   Planning, design, and construction of a bike path on both sides of Farrington highway near Waialua elementary school and Waialua high and intermediate school from Kaiahulo drive to Kaukonahua road.

              Plans                   $     1,000

              Design                  $     1,000

              Construction            $   998,000

                   Total funding                $ 1,000,000

III. To be expended by the department of accounting and general services.

     1.   Waialua, Oahu

A.   Planning, design, and construction to redirect water runoff from hill to prevent debris buildup under bridge on way to Waialua high and intermediate school, a portion of which connects Goodale avenue and Kuhi street via Farrington highway; clear sidewalk of existing debris.

               Plans                        $     1,000

               Design                       $     1,000

               Construction                 $   998,000

                   Total funding                $ 1,000,000

IV.  To be expended by the city and county of Honolulu

     1.   Waialua, Oahu

A.   Planning, design, and construction of a bike path between Waialua elementary school and Waialua high and intermediate school on both sides of Goodale avenue from Farrington highway to Waialua Beach road.

              Plan                         $     1,000

              Design                       $     1,000

              Construction                 $   498,000

                   Total funding                $   500,000

     SECTION 2.  The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 3.  The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2016, shall lapse as of that date.

     SECTION 4.  This Act shall take effect on July 1, 2014.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 45th Representative District

 

Description:

Appropriates funds for capital improvement projects in the 45th representative district.

 

 

 