Bill Text: AZ SB1399 | 2016 | Fifty-second Legislature 2nd Regular | Introduced

NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Water storage; plan report

Spectrum: Partisan Bill (Republican 1-0)

Status: (Passed) 2016-05-11 - Chapter 164 [SB1399 Detail]

Download: Arizona-2016-SB1399-Introduced.html

 

 

 

REFERENCE TITLE: dams; affidavit; recording

 

 

 

State of Arizona

Senate

Fifty-second Legislature

Second Regular Session

2016

 

 

SB 1399

 

Introduced by

Senator Griffin

 

 

AN ACT

 

amending section 45-1209, Arizona Revised Statutes; relating to waters.

 

 

(TEXT OF BILL BEGINS ON NEXT PAGE)

 


Be it enacted by the Legislature of the State of Arizona:

Section 1.  Section 45-1209, Arizona Revised Statutes, is amended to read:

START_STATUTE45-1209.  Notice of completion; license of final approval; removal of dam

A.  Immediately upon completion or enlargement of a dam, notice of completion shall be given to the director.  As soon as possible thereafter supplementary drawings or descriptive matter showing or describing the dam as actually constructed shall be filed with the director which shall include:

1.  A record of all grout holes and grouting.

2.  A record of permanent location points and bench marks.

3.  A record of tests of concrete or other material used in the construction of the dam.

4.  A record of other items of permanent value bearing on safety and permanence of construction.

B.  When an existing dam is enlarged, the supplementary drawings and descriptive matter need apply only to the new work.

C.  The owner of a completed dam shall file an affidavit of the total cost of the dam comprised composed of items set forth in section 45-1204, and shall furnish such evidence in support thereof as the director requires and shall record a copy of the affidavit in the office of the county recorder for the county in which the dam is located.  No license of final approval shall issue until the affidavit is filed.  The director shall inspect the completed dam shall be inspected by the director, and upon finding that the work has been done as required and that the dam is safe, the director shall issue a license of final approval forthwith, subject to such terms as the director deems necessary for the protection of life and property.  In the event the total cost exceeds the estimated cost, the fee shall be recomputed in accordance with rules adopted pursuant to section 45-1204, subsection B.  The owner shall pay the difference between the fee already paid and the recomputed fee.

D.  Pending issuance of the license, the dam shall not be used except on written consent of the director, subject to conditions he the director may impose.

E.  When a dam is removed the owner shall file with the director evidence showing that a sufficient portion has been removed to permit the free passage of floodwaters.  Before final approval of the removal of the dam the director shall inspect the work to ascertain its safety. END_STATUTE

feedback