Bill Text: AZ HB2543 | 2023 | Fifty-sixth Legislature 1st Regular | Engrossed


Bill Title: Appropriations; greater Arizona transportation projects

Spectrum: Slight Partisan Bill (Republican 12-4)

Status: (Engrossed - Dead) 2023-04-04 - Senate APPROP Committee action: Do Pass Amended, voting: (10-0-0-0) [HB2543 Detail]

Download: Arizona-2023-HB2543-Engrossed.html

 

 

 

House Engrossed

 

appropriations; greater Arizona transportation projects

 

 

 

 

State of Arizona

House of Representatives

Fifty-sixth Legislature

First Regular Session

2023

 

 

 

HOUSE BILL 2543

 

 

 

An Act

 

appropriating monies to the department of transportation.

 

 

(TEXT OF BILL BEGINS ON NEXT PAGE)

 


Be it enacted by the Legislature of the State of Arizona:

Section 1. Appropriations; department of transportation; highway and road projects; fiscal year 2023-2024

The following amounts are appropriated from the state general fund in fiscal year 2023-2024 to the department of transportation for the following highway and road projects designated as regional priorities by the greater Arizona councils of government and metropolitan planning organizations:

1. U.S. Route 95 improvements between                $ 33,300,000

Wellton Mohawk Canal Road

and Aberdeen Road

2. Distribution to Yuma county for                   $ 5,910,429

U.S. Route 95 pavement

rehabilitation between County

22nd Street and County 11th Street

3. Distribution to Kingman for Airway                $ 2,634,640

Avenue improvements

4. Distribution to Bullhead City for                 $ 1,560,000

Hancock Road pavement resurfacing

between Colorado Boulevard and

State Route 95

5. Distribution to Mohave county to                  $ 750,000

fully pave Bank Street and other

improvements between Grace Neal Parkway

and Calle Castano Road

6. Distribution to Colorado City for the             $ 1,200,000

reconstruction of Mohave Avenue

and Redwood Street from State Route 389

to Airport Drive

7. Distribution to Kingman for Eastern               $ 8,045,021

Street improvements and

pavement rehabilitation

8. Distribution to La Paz county                     $ 5,597,442

for Vicksburg Road pavement

resurfacing between Interstate 10

and State Route 72

9. Interstate 40 and Rancho Sante Fe                 $ 10,430,393

Parkway traffic interchange

improvements between Santa Rosa Drive

and Louise Avenue

10. Distribution to Coolidge for Coolidge Avenue      $ 5,362,002

reconstruction between Christensen Road

and Clemans Road

11. Distribution to Eloy for Sunland Gin Road         $ 5,362,002

Interstate 10 overpass and road

improvements between Interstate 10

and Arica Road

12. Distribution to Casa Grande for                   $ 10,724,004

Maricopa-Casa Grande Highway improvements

between Burris Road and Anderson Road

13. Distribution to Douglas for road                  $ 9,071,649

development and construction connecting

the Douglas international commercial

port of entry and State Route 80

14. Distribution to Graham county for                 $ 487,821

intersection reconstruction at

Norton Road and Reay Lane

15. Distribution to Graham county for                 $ 1,781,466

Safford Bryce Road improvements

in the vicinity of Talley Wash Crossing

16. Distribution to Nogales for Frank Reed Road       $ 1,771,419

reconstruction between Ciardulli Place

and Grand Avenue

17. Distribution to Nogales for Industrial            $ 2,363,105

Park Drive reconstruction between

Manor Drive and Mariposa Road

18. Distribution to Patagonia for McKeown Avenue      $ 1,446,915

reconstruction between Fourth Avenue

West and State Route 82

19. Distribution to San Carlos Apache Tribe           $ 1,414,500

for Peridot Siding Road pavement

resurfacing between BIA Route 170

and State Route 70

20. Distribution to Santa Cruz county                 $ 799,349

for roundabout construction at

intersection of West Frontage Road

and Camino Ramanote

21. Distribution to Santa Cruz county for             $ 3,492,681

Ruby Road bridge replacement and

improvements at Potrero Creek

22. Distribution to Thatcher for 8th Street           $ 4,526,351

improvements between 1st Avenue

and 20th Avenue

23. Distribution to Huachuca City for                 $ 1,565,201

Skyline Drive reconstruction

between State Route 90 and Huachuca

City Landfill

24. Distribution to Sierra Vista for                  $ 1,822,000

Theater Drive corridor improvements

between 7th Street and Carmichael Avenue

25. Shared use pathway development along              $ 1,950,000

State Route 92 between Buffalo Soldier

Trail and Kachina Trail

26. Distribution to Cochise county for                $ 6,100,000

Moson Road drainage and safety

improvements between State Route 90

and Hereford Road

27. Distribution to Huachuca City for                 $ 506,000

Skyline Pathway development along

Skyline Drive between Gila Avenue

and Edgewood Street

28. Distribution to Show Low to extend                $ 3,600,000

East Woolford Road from

State Route 260 to Penrod Road

29. Distribution to Williams for Rodeo Road           $ 3,424,720

and Route 66 improvements between

Airport Road and East Route 66

30. Distribution to Clarkdale for                     $ 6,321,360

Verde Valley Bridge rail project

design, planning, and construction

31. Distribution to Apache county for dirt road       $ 448,524

enhancement and soil stabilization

pilot project

32. Distribution to Pinetop-Lakeside for              $ 2,242,161

Porter Mountain Road improvements in

vicinity of Blue Ridge Elementary School

33. Distribution to Sedona for roundabout             $ 5,016,000

construction and improvements at

intersection of State Route 89A,

Forest Road and Ranger Road

34. Distribution to Apache county for                 $ 2,148,524

Concho-Snowflake Highway

improvements from County Road 5270

to U.S. Route 180A

35. Distribution to Hopi Tribe for                    $ 261,212

Hotevilla-Bacavi Road reconstruction

36. Distribution to Eagar for electric                $ 407,971

vehicle charging station development

and construction

37. Distribution to Navajo Nation,                    $ 837,971

Cornfields Chapter for Cornfields

Sunrise Low Water Crossing Project

for Navajo Route 9205

38. Distribution to Hopi Tribe for                    $ 5,535,513

Kachina Point Road reconstruction

from State Route 264 to State Route 99

39. Distribution to Yavapai county for                $ 2,215,242

Old Route 66 improvements between

Interstate 40, Exit 139 and the

Mohave county border

40. Distribution to Apache county for                 $ 538,661

State Route 264 turn lane

construction into the Ganado

Senior Citizens Center and

Veterans Building development area

41. Distribution to Taylor for                        $ 170,000

Centennial Boulevard improvement

planning from Paper Mill Road

to West 7th Street

42. Distribution to Cottonwood for                    $ 4,000,000

Main Street pavement rehabilitation

between Cottonwood north city boundary

and State Route 89A

43. Distribution to Springerville                     $ 926,200

for Tori Circle reconstruction

44. Distribution to Winslow for access road           $ 2,881,686

construction between State Route 87

and Winslow commercial and

industrial site

45. Distribution to Winslow for Lindbergh Parkway     $ 6,103,373

development and construction between

State Route 87 and Interstate 40

46. Distribution to Tusayan for State Route 64        $ 250,000

restriping between Grand Canyon

National Park South Rim Entrance

and Long Jim Loop roundabout

47. U.S. Route 160 erosion control improvements       $ 1,286,299

in vicinity of Laguna Creek

48. Lupton, Window Rock, Painted Desert,              $ 571,888

Alpine Divide and Cerro Montoso Road

weather information system

upgrades and installation

49. Distribution to Williams for Airport Road         $ 3,032,191

pavement replacement and road extension

50. U.S. Route 191 drainage and flood safety          $ 3,500,000

improvements between mileposts

389 and 390

51. Distribution to Flagstaff for Lone Tree           $ 2,609,290

Corridor improvements

52. Distribution to Coconino County                   $ 5,000,000

Flood Control District for

State Route 89 flood mitigation

improvements in the vicinity of the

Government Tank Flood Corridor

53. Distribution to Flagstaff for                     $ 3,000,000

State Route 180 flood mitigation

improvements in the vicinity of

Schultz Creek

54. J.W. Powell Boulevard Interstate 17               $ 5,000,000

overpass bridge replacement

and widening

55. Distribution to Apache Junction for               $ 6,961,938

Ironwood Drive improvements between

Elliott Road and Baseline Avenue

56. Distribution to Florence for                      $ 4,535,540

Hunt Highway improvements extending

from 1,320 feet east of Attaway Drive

to 4,500 feet to the west

57. State Route 187 and Casa Grande Highway           $ 1,479,966

intersection improvements

58. Distribution to City of Maricopa                  $ 3,208,370

for Green Road improvements between

State Route 347 and McDavid Road

59. Distribution to City of Maricopa for              $ 3,208,370

Rancho El Dorado Parkway bridge

construction and improvements in the

vicinity of Santa Rosa Wash

60. Distribution to City of Maricopa for              $ 3,208,370

Sonoran Desert Parkway improvements

between Porter Road and Fuqua Road

61. Distribution to Pinal county for                  $ 27,474,844

State Route 24 extension from

Ironwood Drive to North-South Freeway

Corridor alignment

62. Distribution to Queen Creek for                   $ 1,916,691

Ironwood Road improvements between

Era Mae Boulevard and 1,250 feet

south of Ocotillo Road

63. Distribution to Lake Havasu City for              $ 1,690,593

Industrial Boulevard pavement

rehabilitation from Lake Havasu Avenue

to London Bridge Road

64. Distribution to Lake Havasu City for              $ 2,095,644

Lake Havasu Avenue pavement

rehabilitation from Palo Verde Boulevard

to Mesquite Avenue

65. Distribution to Lake Havasu City for McCulloch    $ 1,992,698

Boulevard pavement rehabilitation from

Lake Havasu Avenue to Smoketree Avenue

66. Distribution to Lake Havasu City for              $ 693,418

South Palo Verde Street pavement

rehabilitation from Lake Havasu Avenue

to London Bridge Road

67. Distribution to Lake Havasu City                  $ 1,768,477

for Mesquite Avenue improvements

and pavement rehabilitation from

Lake Havasu Avenue to Acoma Boulevard

68. Distribution to Lake Havasu City for              $ 1,585,822

Swanson Avenue improvements and

pavement rehabilitation from

State Route 95 to Smoketree Avenue

69. Distribution to Mohave county for                 $ 300,000

London Bridge Road pavement

rehabilitation between mileposts 4 and 8

70. Distribution to Prescott Valley for               $ 7,434,000

Glassford Hill Road improvements

between State Route 89A and

Long Look Drive

71. State Route 89 improvements including             $ 15,668,929

roundabout construction between

Road 3 North and Road 5 North

72. Distribution to Globe for sidewalk                $ 3,501,131

construction along Jesse Hayes Road

and Six Shooter Canyon Road

73. Distribution to Winkelman for                     $ 1,560,940

Golf Course Road and

Quarelli Street improvements

74. Distribution to Superior for Panther Drive        $ 2,486,653

bridge design and construction

at Queen Creek

75. Distribution to Payson for roundabout             $ 1,529,804

construction and improvements

at intersection of Longhorn Road

and McLane Road

76. Distribution to Payson for Goodnow Road           $ 960,293

improvements between State Route 260

and Bonita Street

77. Distribution to San Carlos Apache Tribe           $ 530,459

for BIA Route 170 sidewalk

extension and improvements

78. Distribution to Payson for multi-use              $ 719,187

path design and construction along

Forest Drive between State Route 87

and McLane Road

79. Distribution to San Carlos Apache Tribe           $ 403,236

for the installation of street lights

along White Mountain Road and

Airport Road

80. Distribution to Gila county for                   $ 262,161

Control Road improvements between

State Route 260 and .35 miles east of

Roberts Mesa Road

81. Distribution to Globe for Jesse Hayes Road        $ 643,170

bridge replacement and improvements

at Pinal Creek

82. Distribution to Globe for Cottonwood Street       $ 632,500

bridge replacement and improvements

at Pinal Creek

83. Distribution to Gila county for                   $ 243,620

Houston Mesa Road improvements

between State Route 260 and .4 miles

south of NF Route 198

84. Distribution to the town of Florence              $ 3,000,000

for design and engineering costs for

the Hunt Highway project

85. Distribution to Pinal county for design           $ 5,100,000

and engineering costs for

the Central Arizona Parkway project

phase one to Ocotillo Road

86. State Route 87 design of intersection             $   670,200

improvements at Arica Road

and Shedd Road                              

87. Distribution to the town of Marana                $ 10,000,000

for design costs for traffic

interchange between Interstate 10

and Cortaro Road

88. State Route 264 improvements                      $ 388,700

89. Distribution to the Navajo Nation for             $ 350,000

planning, designing and constructing

Cove Chapter infrastructure projects

90. Distribution to the Navajo Nation for             $ 266,000

improvements to the N9205 Pueblo

Colorado wash crossing

91. Distribution to the Navajo Nation for             $ 6,823,400

the BIA Route N15 phase one

reconstruction project

92. Distribution to the Navajo Nation for             $ 3,961,800

the BIA Route N9054 Steamboat Bridge

project

93. Distribution to the Canyon Water improvement      $ 510,000

district to make improvements to

infrastructure, including fire hydrants

and other related water needs

feedback