BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 31.002(20), Utilities Code, is amended | ||
to read as follows: | ||
(20) "Transmission service" includes siting of | ||
facilities, including substations, construction or enlargement of | ||
facilities, transmission over distribution facilities, control | ||
area services, scheduling resources, regulation services, reactive | ||
power support, voltage control, provision of operating reserves, | ||
and any other associated electrical service the commission | ||
determines appropriate, except that, on and after the | ||
implementation of customer choice, control area services, | ||
scheduling resources, regulation services, provision of operating | ||
reserves, and reactive power support, voltage control, and other | ||
services provided by generation resources are not "transmission | ||
service." | ||
SECTION 2. Section 37.052, Utilities Code, is amended by | ||
adding Subsection (d) to read as follows: | ||
(d) A municipality that receives a request from an electric | ||
utility for written consent under Subsection (c)(2) for the | ||
construction of a transmission line: | ||
(1) shall send written notice to the electric utility | ||
that includes the municipal conditions that the electric utility | ||
must meet before construction of the transmission line may proceed; | ||
and | ||
(2) is considered to have consented to the | ||
construction of the transmission line if the municipality does not | ||
respond in writing to the request before the 90th day after the date | ||
the electric utility submitted the request. | ||
SECTION 3. Section 41.005, Utilities Code, is amended to | ||
read as follows: | ||
Sec. 41.005. LIMITATION ON MUNICIPAL AUTHORITY. | ||
Notwithstanding any other provision of this title, a municipality | ||
may not directly or indirectly regulate the rates, operations, and | ||
services, including transmission services, of an electric | ||
cooperative, except, with respect to operations, a municipality may | ||
impose conditions reasonably [ |
||
the public health, safety, or welfare. This section does not | ||
prohibit a municipality from making a lawful charge for the use of | ||
public rights-of-way within the municipality as provided by Section | ||
182.025, Tax Code, and Section 33.008 of this code. An electric | ||
cooperative shall be an electric utility for purposes of Section | ||
182.025, Tax Code, and Section 33.008 of this code. | ||
SECTION 4. Section 181.042, Utilities Code, is amended to | ||
read as follows: | ||
Sec. 181.042. AUTHORITY TO CONSTRUCT, MAINTAIN, AND OPERATE | ||
LINES AND RELATED FACILITIES. An electric utility has the right to | ||
construct, maintain, and operate lines and related facilities over, | ||
under, across, on, or along a state highway, a county road, a | ||
municipal street or alley, or other public property in a | ||
municipality. | ||
SECTION 5. Section 181.043, Utilities Code, is amended by | ||
adding Subsection (c) to read as follows: | ||
(c) A municipality that receives a request from an electric | ||
utility for the municipality's consent to an activity described by | ||
Section 181.042: | ||
(1) shall send written notice to the electric utility | ||
that includes the municipal conditions that the electric utility | ||
must meet before the activity may proceed; and | ||
(2) is considered to have consented to the activity if | ||
the municipality does not respond in writing to the request before | ||
the 90th day after the date the electric utility submitted the | ||
request. | ||
SECTION 6. This Act takes effect September 1, 2023. |