relating to the procurement and operation of backup generation | ||
facilities for the ERCOT power region. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 31.002, Utilities Code, is amended by | ||
adding Subdivision (3-a) to read as follows: | ||
(3-a) "Backup generation facility" means an electric | ||
generation facility operated under Subchapter O, Chapter 39. | ||
SECTION 2. Section 35.004(b), Utilities Code, is amended to | ||
read as follows: | ||
(b) The commission shall ensure that an electric utility or | ||
transmission and distribution utility provides nondiscriminatory | ||
access to wholesale transmission service for qualifying | ||
facilities, exempt wholesale generators, power marketers, power | ||
generation companies, retail electric providers, backup generation | ||
facility operators, and other electric utilities or transmission | ||
and distribution utilities. | ||
SECTION 3. Section 35.005(a), Utilities Code, is amended to | ||
read as follows: | ||
(a) The commission may require an electric utility to | ||
provide transmission service at wholesale to another electric | ||
utility, a qualifying facility, an exempt wholesale generator, a | ||
backup generation facility operator, or a power marketer and may | ||
determine whether terms for the transmission service are | ||
reasonable. | ||
SECTION 4. Chapter 39, Utilities Code, is amended by adding | ||
Subchapter O to read as follows: | ||
SUBCHAPTER O. BACKUP GENERATION FACILITIES | ||
Sec. 39.701. PURPOSE; LIMITATION. (a) The purpose of this | ||
subchapter is to establish a program to allow the comptroller, in | ||
consultation with the commission, to contract with entities for the | ||
construction and operation of at least 5,000 megawatts of | ||
generating capacity powered by nuclear energy or natural gas for | ||
the ERCOT power region. | ||
(b) Not later than January 31, 2024, the commission shall | ||
determine whether market participants have contracted for the | ||
installation of at least 5,000 megawatts of new generation capacity | ||
for the ERCOT power region compared to the amount of installed | ||
generation capacity on January 1, 2023. | ||
(c) If the commission determines under Subsection (b) that | ||
market participants have contracted for the installation of at | ||
least 5,000 megawatts of new generation capacity for the ERCOT | ||
power region, the comptroller may not enter into a contract under | ||
this subchapter. | ||
Sec. 39.702. CONSTRUCTION AND OPERATION OF BACKUP | ||
GENERATION FACILITY. (a) The comptroller may contract with one or | ||
more entities to construct or operate backup generation facilities | ||
in the manner provided by this subchapter. The comptroller may use | ||
any procurement method that provides the best value to the state, | ||
including a method authorized by Chapter 2267, Government Code. | ||
(b) A contract must provide that an entity that constructs | ||
or operates a backup generation facility: | ||
(1) is entitled to payments from the state for the | ||
construction or operation of a backup generation facility equal to | ||
103 percent of the actual costs of constructing or operating the | ||
facility; | ||
(2) is not entitled to sell electric energy from the | ||
backup generation facility; | ||
(3) may not sell the backup generation facility | ||
without the permission of the comptroller; and | ||
(4) shall provide electric energy for the ERCOT power | ||
region as directed by the independent system operator in times of | ||
high demand and low supply. | ||
(c) A backup generation facility constructed under this | ||
subchapter: | ||
(1) is the property of the state; and | ||
(2) is not considered to be installed generation | ||
capacity for the purposes of Sections 39.154 and 39.158. | ||
(d) An entity is eligible to operate a backup generation | ||
facility under this subchapter only if the entity is authorized by | ||
this title to generate electric energy at wholesale. | ||
(e) If a backup generation facility is constructed under | ||
this subchapter, the commission shall: | ||
(1) annually evaluate the reserve margin for the ERCOT | ||
power region; and | ||
(2) determine whether the reserve margin equals at | ||
least 15 percent of peak electric demand over the preceding two | ||
years. | ||
(f) If the condition under Subsection (e)(2) is met, the | ||
comptroller shall sell each backup generation facility constructed | ||
under this subchapter. | ||
SECTION 5. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2023. |