Bill Text: TX HB655 | 2015-2016 | 84th Legislature | Enrolled
Bill Title: Relating to the storage and recovery of water in aquifers; authorizing fees and surcharges; adding provisions subject to a criminal penalty.
Sponsorship: Moderate Partisan Bill (Republican 6-1)
Status: (Passed) 2015-06-16 - Effective immediately [HB655 Detail]
Download: Texas-2015-HB655-Enrolled.html
| H.B. No. 655 | ||
|
|
||
| relating to the storage and recovery of water in aquifers; | ||
| authorizing fees and surcharges; adding provisions subject to a | ||
| criminal penalty. | ||
| BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
| SECTION 1. Sections 11.153(a), (b), and (c), Water Code, | ||
| are amended to read as follows: | ||
| (a) In this section, "aquifer storage and recovery project" | ||
| has the meaning assigned by Section 27.151 [ |
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
| (b) A water right holder or a person who has contracted for | ||
| the use of water under a contract that does not prohibit the use of | ||
| the water in an aquifer storage and recovery project may undertake | ||
| an aquifer storage and recovery project without obtaining any | ||
| additional authorization under this chapter for the project. A | ||
| person described by this subsection undertaking an aquifer storage | ||
| and recovery project must: | ||
| (1) obtain any required authorizations under | ||
| Subchapter G, Chapter 27, and Subchapter N, Chapter 36; and | ||
| (2) comply with the terms of the applicable water | ||
| right [ |
||
|
|
||
|
|
||
|
|
||
| (c) This section does not preclude the commission from | ||
| considering an aquifer storage and recovery project to be a | ||
| component of a project permitted under this chapter that is not | ||
| required to be based on the continuous availability of historic, | ||
| normal stream flow [ |
||
|
|
||
|
|
||
|
|
||
|
|
||
|
|
||
| SECTION 2. Section 11.155, Water Code, is amended to read as | ||
| follows: | ||
| Sec. 11.155. AQUIFER STORAGE AND RECOVERY [ |
||
| REPORTS. [ |
||
|
|
||
| [ |
||
|
|
||
| [ |
||
|
|
||
| [ |
||
| and surveys of the aquifers in the state as it considers necessary | ||
| to determine the occurrence, quantity, quality, and availability of | ||
| [ |
||
| retrieved for beneficial use. The board shall undertake the | ||
| studies, investigations, and surveys in the following order of | ||
| priority: | ||
| (1) [ |
||
| [ |
||
| groundwater management areas" under Section 35.008; and | ||
| (2) [ |
||
| determined by the board's ranking of where the greatest need | ||
| exists. | ||
| SECTION 3. Chapter 27, Water Code, is amended by adding | ||
| Subchapter G to read as follows: | ||
| SUBCHAPTER G. AQUIFER STORAGE AND RECOVERY PROJECTS | ||
| Sec. 27.151. DEFINITIONS. In this subchapter: | ||
| (1) "Aquifer storage and recovery project" means a | ||
| project involving the injection of water into a geologic formation | ||
| for the purpose of subsequent recovery and beneficial use by the | ||
| project operator. | ||
| (2) "ASR injection well" means a Class V injection | ||
| well used for the injection of water into a geologic formation as | ||
| part of an aquifer storage and recovery project. | ||
| (3) "ASR recovery well" means a well used for the | ||
| recovery of water from a geologic formation as part of an aquifer | ||
| storage and recovery project. | ||
| (4) "Native groundwater" means the groundwater | ||
| naturally occurring in a geologic formation. | ||
| (5) "Project operator" means a person holding an | ||
| authorization under this subchapter to undertake an aquifer storage | ||
| and recovery project. | ||
| Sec. 27.152. JURISDICTION. The commission has exclusive | ||
| jurisdiction over the regulation and permitting of ASR injection | ||
| wells. | ||
| Sec. 27.153. AUTHORIZATION FOR USE OF CLASS V INJECTION | ||
| WELLS. (a) The commission may authorize the use of a Class V | ||
| injection well as an ASR injection well: | ||
| (1) by rule; | ||
| (2) under an individual permit; or | ||
| (3) under a general permit. | ||
| (b) In adopting a rule or issuing a permit under this | ||
| section, the commission shall consider: | ||
| (1) whether the injection of water will comply with | ||
| the standards set forth under the federal Safe Drinking Water Act | ||
| (42 U.S.C. Section 300f et seq.); | ||
| (2) the extent to which the cumulative volume of water | ||
| injected for storage in the receiving geologic formation can be | ||
| successfully recovered from the geologic formation for beneficial | ||
| use, taking into account that injected water may be commingled to | ||
| some degree with native groundwater; | ||
| (3) the effect of the aquifer storage and recovery | ||
| project on existing water wells; and | ||
| (4) whether the introduction of water into the | ||
| receiving geologic formation will alter the physical, chemical, or | ||
| biological quality of the native groundwater to a degree that | ||
| would: | ||
| (A) render the groundwater produced from the | ||
| receiving geologic formation harmful or detrimental to people, | ||
| animals, vegetation, or property; or | ||
| (B) require an unreasonably higher level of | ||
| treatment of the groundwater produced from the receiving geologic | ||
| formation than is necessary for the native groundwater in order to | ||
| render the groundwater suitable for beneficial use. | ||
| (c) All wells associated with a single aquifer storage and | ||
| recovery project must be located within a continuous perimeter | ||
| boundary of one parcel of land, or two or more adjacent parcels of | ||
| land under common ownership, lease, joint operating agreement, or | ||
| contract. | ||
| (d) The commission by rule shall provide for public notice | ||
| and comment on a proposed general permit authorized under this | ||
| section. The commission shall require an applicant for an | ||
| individual permit authorized under this section to provide notice | ||
| of the application by first class mail to any groundwater | ||
| conservation district in which the wells associated with the | ||
| aquifer storage and recovery project will be located and by | ||
| publishing notice in a newspaper of general circulation in the | ||
| county in which the wells will be located. | ||
| Sec. 27.154. TECHNICAL STANDARDS. (a) The commission shall | ||
| adopt technical standards governing the approval of the use of a | ||
| Class V injection well as an ASR injection well. | ||
| (b) This subsection applies only to an aquifer storage and | ||
| recovery project proposed to be located in a groundwater | ||
| conservation district or other special-purpose district with the | ||
| authority to regulate the withdrawal of groundwater. Except as | ||
| otherwise provided by this section, the commission shall limit the | ||
| volume of water that may be recovered by an aquifer storage and | ||
| recovery project to an amount that does not exceed the amount of | ||
| water injected under the project. If the commission determines that | ||
| the proposed injection of water into a geologic formation will | ||
| result in a loss of injected water or native groundwater, the | ||
| commission shall impose additional restrictions on the amount of | ||
| water that may be recovered to account for the loss. The commission | ||
| may not deny a permit based on a determination that a loss described | ||
| by this subsection will occur. A limitation imposed under this | ||
| subsection may not prohibit the production of native groundwater by | ||
| an aquifer storage and recovery project if the production complies | ||
| with Subchapter N, Chapter 36. | ||
| (c) The commission by rule shall prescribe construction and | ||
| completion standards and metering and reporting requirements for | ||
| ASR injection wells and ASR recovery wells, including for an ASR | ||
| injection well that also serves as an ASR recovery well. | ||
| (d) The commission may not adopt or enforce groundwater | ||
| quality protection standards for the quality of water injected into | ||
| an ASR injection well that are more stringent than applicable | ||
| federal standards. | ||
| Sec. 27.155. REPORTING OF INJECTION AND RECOVERY VOLUMES. | ||
| (a) A project operator shall install a meter on each ASR injection | ||
| well and ASR recovery well associated with the aquifer storage and | ||
| recovery project. | ||
| (b) Each calendar month, the project operator shall provide | ||
| to the commission a written or electronic report showing for the | ||
| preceding calendar month the volume of water: | ||
| (1) injected for storage; and | ||
| (2) recovered for beneficial use. | ||
| Sec. 27.156. REPORTING OF WATER QUALITY DATA. A project | ||
| operator shall: | ||
| (1) perform water quality testing annually on water to | ||
| be injected into a geologic formation and water recovered from a | ||
| geologic formation as part of the aquifer storage and recovery | ||
| project; and | ||
| (2) provide the results of the testing described by | ||
| Subdivision (1) in written or electronic form to the commission. | ||
| Sec. 27.157. OTHER LAWS NOT AFFECTED. (a) This subchapter | ||
| does not affect the ability to regulate an aquifer storage and | ||
| recovery project as authorized under: | ||
| (1) Chapter 626, Acts of the 73rd Legislature, Regular | ||
| Session, 1993, for the Edwards Aquifer Authority; | ||
| (2) Chapter 8801, Special District Local Laws Code, | ||
| for the Harris-Galveston Subsidence District; | ||
| (3) Chapter 8834, Special District Local Laws Code, | ||
| for the Fort Bend Subsidence District; | ||
| (4) Chapter 8802, Special District Local Laws Code, | ||
| for the Barton Springs-Edwards Aquifer Conservation District; or | ||
| (5) Chapter 8811, Special District Local Laws Code, | ||
| for the Corpus Christi Aquifer Storage and Recovery Conservation | ||
| District. | ||
| (b) This subchapter does not affect the authority of the | ||
| commission regarding: | ||
| (1) recharge projects in certain portions of the | ||
| Edwards underground reservoir under Sections 11.023(c) and (d); or | ||
| (2) injection wells that transect or terminate in | ||
| certain portions of the Edwards Aquifer under Section 27.0516. | ||
| SECTION 4. Chapter 36, Water Code, is amended by adding | ||
| Subchapter N to read as follows: | ||
| SUBCHAPTER N. AQUIFER STORAGE AND RECOVERY PROJECTS | ||
| Sec. 36.451. DEFINITIONS. In this subchapter, "aquifer | ||
| storage and recovery project," "ASR injection well," "ASR recovery | ||
| well," and "project operator" have the meanings assigned by Section | ||
| 27.151. | ||
| Sec. 36.452. APPLICABILITY TO RECOVERY WELLS THAT ALSO | ||
| FUNCTION AS INJECTION WELLS. Notwithstanding Section 27.152, this | ||
| subchapter applies to an ASR recovery well that also functions as an | ||
| ASR injection well. | ||
| Sec. 36.453. REGISTRATION AND REPORTING OF WELLS. (a) A | ||
| project operator shall: | ||
| (1) register the ASR injection wells and ASR recovery | ||
| wells associated with the aquifer storage and recovery project with | ||
| any district in which the wells are located; | ||
| (2) each calendar month by the deadline established by | ||
| the commission for reporting to the commission, provide the | ||
| district with a copy of the written or electronic report required to | ||
| be provided to the commission under Section 27.155; and | ||
| (3) annually by the deadline established by the | ||
| commission for reporting to the commission, provide the district | ||
| with a copy of the written or electronic report required to be | ||
| provided to the commission under Section 27.156. | ||
| (b) If an aquifer storage and recovery project recovers an | ||
| amount of groundwater that exceeds the volume authorized by the | ||
| commission to be recovered under the project, the project operator | ||
| shall report to the district the volume of groundwater recovered | ||
| that exceeds the volume authorized to be recovered in addition to | ||
| providing the report required by Subsection (a)(2). | ||
| Sec. 36.454. PERMITTING, SPACING, AND PRODUCTION | ||
| REQUIREMENTS. (a) Except as provided by Subsection (b), a district | ||
| may not require a permit for the drilling, equipping, operation, or | ||
| completion of an ASR injection well or an ASR recovery well that is | ||
| authorized by the commission. | ||
| (b) The ASR recovery wells that are associated with an | ||
| aquifer storage and recovery project are subject to the permitting, | ||
| spacing, and production requirements of the district if the amount | ||
| of groundwater recovered from the wells exceeds the volume | ||
| authorized by the commission to be recovered under the project. The | ||
| requirements of the district apply only to the portion of the volume | ||
| of groundwater recovered from the ASR recovery wells that exceeds | ||
| the volume authorized by the commission to be recovered. | ||
| (c) A project operator may not recover groundwater by an | ||
| aquifer storage and recovery project in an amount that exceeds the | ||
| volume authorized by the commission to be recovered under the | ||
| project unless the project operator complies with the applicable | ||
| requirements of a district as described by this section. | ||
| Sec. 36.455. FEES AND SURCHARGES. (a) A district may not | ||
| assess a production fee or a transportation or export fee or | ||
| surcharge for groundwater recovered from an ASR recovery well, | ||
| except to the extent that the amount of groundwater recovered under | ||
| the aquifer storage and recovery project exceeds the volume | ||
| authorized by the commission to be recovered. | ||
| (b) A district may assess a well registration fee or other | ||
| administrative fee for an ASR recovery well in the same manner that | ||
| the district assesses such a fee for other wells registered with the | ||
| district. | ||
| Sec. 36.456. DESIRED FUTURE CONDITIONS. A district may | ||
| consider hydrogeologic conditions related to the injection and | ||
| recovery of groundwater as part of an aquifer storage and recovery | ||
| project in the planning for and monitoring of the achievement of a | ||
| desired future condition for the aquifer in which the wells | ||
| associated with the project are located. | ||
| Sec. 36.457. OTHER LAWS NOT AFFECTED. This subchapter does | ||
| not affect the ability to regulate groundwater as authorized under: | ||
| (1) Chapter 626, Acts of the 73rd Legislature, Regular | ||
| Session, 1993, for the Edwards Aquifer Authority; | ||
| (2) Chapter 8801, Special District Local Laws Code, | ||
| for the Harris-Galveston Subsidence District; | ||
| (3) Chapter 8834, Special District Local Laws Code, | ||
| for the Fort Bend Subsidence District; | ||
| (4) Chapter 8802, Special District Local Laws Code, | ||
| for the Barton Springs-Edwards Aquifer Conservation District; or | ||
| (5) Chapter 8811, Special District Local Laws Code, | ||
| for the Corpus Christi Aquifer Storage and Recovery Conservation | ||
| District. | ||
| SECTION 5. The following sections of the Water Code are | ||
| repealed: | ||
| (1) Sections 11.153(d) and (e); and | ||
| (2) Section 11.154. | ||
| SECTION 6. Not later than May 1, 2016, the Texas Commission | ||
| on Environmental Quality shall adopt rules to implement Section | ||
| 11.153, Water Code, as amended by this Act, and Subchapter G, | ||
| Chapter 27, Water Code, as added by this Act. | ||
| SECTION 7. This Act takes effect immediately if it receives | ||
| a vote of two-thirds of all the members elected to each house, as | ||
| provided by Section 39, Article III, Texas Constitution. If this | ||
| Act does not receive the vote necessary for immediate effect, this | ||
| Act takes effect September 1, 2015. | ||
| ______________________________ | ______________________________ | |
| President of the Senate | Speaker of the House | |
| I certify that H.B. No. 655 was passed by the House on April | ||
| 22, 2015, by the following vote: Yeas 142, Nays 2, 2 present, not | ||
| voting; and that the House concurred in Senate amendments to H.B. | ||
| No. 655 on May 21, 2015, by the following vote: Yeas 142, Nays 1, 2 | ||
| present, not voting. | ||
| ______________________________ | ||
| Chief Clerk of the House | ||
| I certify that H.B. No. 655 was passed by the Senate, with | ||
| amendments, on May 18, 2015, by the following vote: Yeas 29, Nays | ||
| 1. | ||
| ______________________________ | ||
| Secretary of the Senate | ||
| APPROVED: __________________ | ||
| Date | ||
| __________________ | ||
| Governor | ||
