Bill Text: TX HB4836 | 2023-2024 | 88th Legislature | Introduced
Bill Title: Relating to the legislature's goals for natural gas generating capacity.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced) 2023-03-29 - Left pending in committee [HB4836 Detail]
Download: Texas-2023-HB4836-Introduced.html
88R10520 CXP-D | ||
By: Hunter | H.B. No. 4836 |
|
||
|
||
relating to the legislature's goals for natural gas generating | ||
capacity. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Sections 39.9044(a) and (c), Utilities Code, are | ||
amended to read as follows: | ||
(a) It is the intent of the legislature that 50 percent of | ||
the megawatts of generating capacity installed in this state after | ||
January 1, 2000, use natural gas. To the extent permitted by law, | ||
the commission shall establish a program to encourage utilities to | ||
comply with this section by using natural gas produced in this state | ||
as the preferential fuel. [ |
||
(c) The [ |
||
shall adopt rules necessary to administer and enforce this section | ||
and to perform any necessary studies in cooperation with the | ||
Railroad Commission of Texas. At a minimum, the rules shall: | ||
(1) establish the minimum annual natural gas | ||
generation requirement for each power generation company, | ||
municipally owned utility, and electric cooperative operating in | ||
this state in a manner reasonably calculated by the commission to | ||
produce, on a statewide basis, compliance with the requirement | ||
prescribed by Subsection (a); and | ||
(2) specify reasonable performance standards that all | ||
natural gas capacity additions must meet to count against the | ||
requirement prescribed by Subsection (a) and that: | ||
(A) are designed and operated so as to maximize | ||
the energy output from the capacity additions in accordance with | ||
then-current industry standards and best industry standards; and | ||
(B) encourage the development, construction, and | ||
operation of new natural gas energy projects at those sites in this | ||
state that have the greatest economic potential for capture and | ||
development of this state's environmentally beneficial natural gas | ||
resources. | ||
SECTION 2. This Act takes effect September 1, 2023. |