Bill Text: TX HB4831 | 2023-2024 | 88th Legislature | Introduced
Bill Title: Relating to the implementation of a program to meet the reliability needs in the ERCOT power region.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced - Dead) 2023-03-29 - Left pending in committee [HB4831 Detail]
Download: Texas-2023-HB4831-Introduced.html
By: Hunter | H.B. No. 4831 |
|
||
|
||
relating to the implementation of a program to meet the reliability | ||
needs in the ERCOT power region. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Subchapter D, Chapter 39, Utilities Code, is | ||
amended by adding Section 39.1595 to read as follows: | ||
Sec. 39.166. RELIABILITY PROGRAM. (a) The commission may | ||
not implement a reliability program for the ERCOT power region that | ||
provides for the purchase of credits earned by generators based on | ||
generator availability during times of high demand and low supply | ||
at a centrally determined clearing price until an updated | ||
assessment on the cost to and impact on the ERCOT market of the | ||
proposed program is conducted by both the independent organization | ||
certified under Section 39.151 for the ERCOT power region and the | ||
independent market monitor. The assessment must include: | ||
(1) an evaluation of the cost of new entry and the | ||
impact on consumer costs and the competitive retail market; | ||
(2) compilation of detailed information regarding | ||
cost offsets realized through a reduction in ancillary services; | ||
and | ||
(3) development of a set of metrics to measure the | ||
impact of the program on system reliability. | ||
(b) The reliability program described in Subsection (a) | ||
implemented by the commission must provide that: | ||
(1) credits are centrally cleared to avoid market | ||
manipulation by affiliated generation and retail companies; | ||
(2) participation in the program is limited to | ||
dispatchable resources with the specific attributes necessary to | ||
meet operational needs of the ERCOT power region; | ||
(3) qualifying generators receive performance credits | ||
not to exceed the amount of generation bid into the forward market | ||
on an individual basis; | ||
(4) generating units receive performance credits only | ||
for providing power during the tightest hours as defined by the | ||
commission; | ||
(5) a penalty structure exists for generators that bid | ||
into the forward market but do not meet their full obligation, | ||
without exception, that results in a net benefit to load; | ||
(6) the independent market monitor has the authority | ||
and necessary resources to investigate potential instances of | ||
market manipulation, including financial and physical actions, and | ||
recommend penalties to the commission; and | ||
(7) the program is subject to an independent review to | ||
determine the benefits of its continuation that must be completed | ||
by January 1, 2029. | ||
(c) This section expires September 1, 2029. | ||
SECTION 2. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2023. |