Bill Text: TX HB3344 | 2021-2022 | 87th Legislature | Introduced
Bill Title: Relating to a study to project the economic and grid reliability effects that may result from interconnecting certain electric transmission facilities with transmission facilities operated by the Midcontinent Independent System Operator.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2021-03-22 - Referred to State Affairs [HB3344 Detail]
Download: Texas-2021-HB3344-Introduced.html
87R11474 BRG-D | ||
By: Wu | H.B. No. 3344 |
|
||
|
||
relating to a study to project the economic and grid reliability | ||
effects that may result from interconnecting certain electric | ||
transmission facilities with transmission facilities operated by | ||
the Midcontinent Independent System Operator. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. The president of the University of Houston shall | ||
designate a department or entity at the university to conduct a | ||
study to project the economic effects and electric grid reliability | ||
effects that may result from: | ||
(1) interconnecting transmission facilities that are | ||
located in Harris County with transmission facilities that are | ||
operated by the Midcontinent Independent System Operator; and | ||
(2) allowing for the purchase of power at wholesale by | ||
entities in Harris County through markets operated by the | ||
Midcontinent Independent System Operator. | ||
SECTION 2. The department or entity at the University of | ||
Houston designated by the president of the university to conduct | ||
the study under Section 1 of this Act shall prepare a report with | ||
the conclusions of the study and submit the report to the | ||
legislature and the Commissioners Court of Harris County not later | ||
than September 1, 2022. | ||
SECTION 3. This Act expires December 1, 2022. | ||
SECTION 4. This Act takes effect September 1, 2021. |