Bill Text: TX HB3239 | 2023-2024 | 88th Legislature | Introduced
Bill Title: Relating to the participation of distributed energy resources in the ERCOT ancillary services and wholesale energy markets.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2023-03-15 - Referred to State Affairs [HB3239 Detail]
Download: Texas-2023-HB3239-Introduced.html
88R10513 JXC-F | ||
By: Hernandez | H.B. No. 3239 |
|
||
|
||
relating to the participation of distributed energy resources in | ||
the ERCOT ancillary services and wholesale energy markets. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 31.002, Utilities Code, is amended by | ||
adding Subdivision (4-c) and amending Subdivisions (10) and (17) to | ||
read as follows: | ||
(4-c) "Distributed energy resource" means a resource | ||
that: | ||
(A) is capable of providing energy, providing | ||
ancillary services, or providing both energy and ancillary | ||
services; | ||
(B) is operated in parallel with and is connected | ||
to the distribution system at a voltage of less than 60 kilovolts; | ||
and | ||
(C) has an installed capacity of more than 100 | ||
kilowatts and less than 10 megawatts. | ||
(10) "Power generation company" means a person, | ||
including a person who owns or operates a distributed natural gas | ||
generation facility, that: | ||
(A) generates electricity: | ||
(i) that is intended to be sold at | ||
wholesale, including the owner or operator of electric energy | ||
storage equipment or facilities to which Subchapter E, Chapter 35, | ||
applies; or | ||
(ii) from a facility that is part of an | ||
aggregated distributed energy resource or that is owned by a person | ||
who is part of an aggregated distributed energy resource; | ||
(B) does not own a transmission or distribution | ||
facility in this state other than an essential interconnecting | ||
facility, a facility not dedicated to public use, or a facility | ||
otherwise excluded from the definition of "electric utility" under | ||
this section; and | ||
(C) does not have a certificated service area, | ||
although its affiliated electric utility or transmission and | ||
distribution utility may have a certificated service area. | ||
(17) "Retail electric provider" means a person that | ||
sells electric energy to retail customers in this state. A retail | ||
electric provider may not own or operate generation assets but may | ||
aggregate distributed energy resources. The term does not include | ||
a person not otherwise a retail electric provider who owns or | ||
operates equipment used solely to provide electricity charging | ||
service for consumption by an alternatively fueled vehicle, as | ||
defined by Section 502.004, Transportation Code. | ||
SECTION 2. Section 39.351, Utilities Code, is amended by | ||
amending Subsections (b) and (c) and adding Subsection (d) to read | ||
as follows: | ||
(b) A power generation company shall comply with the | ||
reliability standards adopted by an independent organization | ||
certified by the commission to ensure the reliability of the | ||
regional electrical network for a power region in which the power | ||
generation company is generating or selling electricity and | ||
aggregated distributed energy resources. | ||
(c) The commission may establish simplified filing | ||
requirements for distributed natural gas generation facilities and | ||
aggregated distributed energy resources. | ||
(d) Notwithstanding Subsection (a): | ||
(1) a facility or owner of a facility that is part of | ||
an aggregated distributed energy resource, or a retail electric | ||
provider that is involved in aggregating facilities as part of an | ||
aggregated distributed energy resource, is not considered to be a | ||
power generation company solely as a result of those activities; | ||
and | ||
(2) a facility or owner of a facility that is part of | ||
an aggregated distributed energy resource is not required to | ||
register as a power generation company if the person who aggregates | ||
the resources registers as a power generation company. | ||
SECTION 3. Subchapter Z, Chapter 39, Utilities Code, is | ||
amended by adding Section 39.9166 to read as follows: | ||
Sec. 39.9166. PARTICIPATION OF DISTRIBUTED ENERGY | ||
RESOURCES IN MARKET. (a) The commission may delegate authority to | ||
the independent organization certified under Section 39.151 for the | ||
ERCOT power region to enforce requirements adopted by the | ||
commission under this section. | ||
(b) The commission by rule shall allow a person who owns or | ||
operates a distributed energy resource or an aggregation of | ||
distributed energy resources to participate in the ancillary | ||
services and wholesale energy markets in the ERCOT power region if: | ||
(1) the owner or operator is registered as a power | ||
generation company if required under Section 39.351 or is exempt | ||
from registration under Section 39.916(k); and | ||
(2) the resource meets all requirements established by | ||
the commission and the independent organization, including | ||
electric utility specifications applicable under the | ||
commission-approved tariff. | ||
(c) The commission by rule shall allow a person to aggregate | ||
resources that are geographically linked to the same electric bus | ||
or node so that the resources may be considered to be a single | ||
distributed energy resource for the purposes of operations, | ||
compliance, and participation in the ancillary services and | ||
wholesale energy markets in the ERCOT power region. The commission | ||
by rule shall direct the independent organization certified under | ||
Section 39.151 for the ERCOT power region to enable aggregations | ||
broader than a single electric bus or node when technically | ||
feasible. In addition to any other applicable requirements, | ||
aggregated distributed energy resources must: | ||
(1) demonstrate the ability to deploy energy, | ||
ancillary services, or both at the direction of the independent | ||
organization certified under Section 39.151 for the ERCOT power | ||
region; and | ||
(2) comply with applicable distribution system | ||
reliability and market requirements. | ||
(d) In allowing for the participation of a person who owns | ||
or operates a distributed energy resource or aggregation of | ||
distributed energy resources under this section, the commission | ||
shall adopt registration, qualification, interconnection, | ||
telemetry, data submission, compliance, cost allocation, and other | ||
appropriate requirements. The requirements: | ||
(1) must ensure that: | ||
(A) participation does not unduly affect the | ||
security or reliability of the transmission and distribution | ||
system; and | ||
(B) the provision of ancillary services by a | ||
distributed energy resource or aggregation of distributed energy | ||
resources, to the extent technically necessary to the provision of | ||
ancillary services, can be measured and verified separately from | ||
any associated load; | ||
(2) may differ from requirements for a generation | ||
resource that is not a distributed energy resource; and | ||
(3) must provide for energy production and consumption | ||
at a single metering point to be accounted for and settled by the | ||
independent organization certified under Section 39.151 for the | ||
ERCOT power region to the distributed energy provider and the | ||
retail electric provider in a manner that prevents double counting. | ||
(e) A retail electric provider may aggregate distributed | ||
energy resources or assist in the aggregation of distributed energy | ||
resources for a third party. The retail electric provider: | ||
(1) is not: | ||
(A) considered to be a power generation company | ||
solely for that reason; | ||
(B) required to register as a power generation | ||
company; or | ||
(C) exempt from Chapter 17, this chapter, or | ||
commission rules relating to the aggregation; and | ||
(2) is responsible for ensuring the compliance of a | ||
subcontractor, an agent, or any other entity compensated by the | ||
retail electric provider for aggregation services. | ||
(f) Participation in an aggregated distributed energy | ||
resource by a market participant or consumer is subject to the | ||
commission's consumer protection rules, jurisdiction, and | ||
authority under this title. | ||
SECTION 4. (a) The Public Utility Commission of Texas shall | ||
adopt the rules required by Section 39.9166, Utilities Code, as | ||
added by this Act, as soon as practicable after the effective date | ||
of this Act to ensure that the requirements of Subsection (b) of | ||
this section are met. | ||
(b) The Public Utility Commission of Texas shall allow the | ||
participation as required by Section 39.9166, Utilities Code, as | ||
added by this Act, not later than September 1, 2024. | ||
(c) The Public Utility Commission of Texas: | ||
(1) may operate a pilot program to allow the | ||
participation described by Section 39.9166, Utilities Code, as | ||
added by this Act, before September 1, 2024; and | ||
(2) before September 1, 2024, is not required to | ||
modify a pilot program operated before the effective date of this | ||
Act to allow the participation of distributed energy resources in | ||
the ancillary services and wholesale energy markets in the ERCOT | ||
power region. | ||
SECTION 5. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2023. |