Bill Title: Further providing for referendum or public hearing required prior to construction or lease and for approved reimbursable rental for certain leases and approved reimbursable sinking fund charges on indebtedness.

Spectrum: Slight Partisan Bill (Democrat 5-2)

Status: (Introduced - Dead) 2009-02-20 - Referred to EDUCATION [SB399 Detail]

Download: Pennsylvania-2009-SB399-Introduced.html

  

 

    

PRINTER'S NO.  402

  

THE GENERAL ASSEMBLY OF PENNSYLVANIA

  

SENATE BILL

 

No.

399

Session of

2009

  

  

INTRODUCED BY LEACH, WASHINGTON, FERLO, ERICKSON, BOSCOLA, COSTA AND M. WHITE, FEBRUARY 20, 2009

  

  

REFERRED TO EDUCATION, FEBRUARY 20, 2009  

  

  

  

AN ACT

  

1

Amending the act of March 10, 1949 (P.L.30, No.14), entitled "An

2

act relating to the public school system, including certain

3

provisions applicable as well to private and parochial

4

schools; amending, revising, consolidating and changing the

5

laws relating thereto," further providing for referendum or

6

public hearing required prior to construction or lease and

7

for approved reimbursable rental for certain leases and

8

approved reimbursable sinking fund charges on indebtedness.

9

The General Assembly of the Commonwealth of Pennsylvania

10

hereby enacts as follows:

11

Section 1.  Section 701.1 of the act of March 10, 1949 (P.L.

12

30, No.14), known as the Public School Code of 1949, amended

13

July 4, 2004 (P.L.536, No.70), is amended to read:

14

Section 701.1.  Referendum or Public Hearing Required Prior

15

to Construction or Lease.--Except where the approval of the

16

electors is obtained to incur indebtedness to finance the

17

construction of a school project, the board of school directors

18

of any school district of the second, third or fourth classes,

19

shall not construct, enter into a contract to construct or enter

20

into a contract to lease a new school building or substantial

21

addition to an existing school building without the consent of

 


1

the electors obtained by referendum or without holding a public

2

hearing as hereinafter provided. In the event that a new school

3

building or a substantial addition to an existing building is to

4

be constructed or leased, the school board shall, by a majority

5

vote of all its members, authorize a maximum project cost and a

6

maximum building construction cost to be financed by the

7

district or amortized by lease rentals to be paid by the

8

district. Building construction cost shall consist of the cost

9

of all building construction including general construction

10

costs, plumbing, heating, electrical, ventilating and other

11

structural costs, equipment and fixtures and architectural and

12

engineering fees relating thereto, but not including costs for

13

site acquisition and development, rough grading to receive the

14

building, sewage treatment facilities or equivalent capital

15

contributions, and architectural and engineering fees relating

16

thereto. Building construction cost shall not include any

17

additional LEED costs. In all cases, a public hearing shall be

18

held not later than thirty (30) days before the school district

19

submits the initial building construction cost and LEED cost 

20

estimates to the Department of Education for approval. Notice of

21

the hearing shall be given not later than twenty (20) days

22

before the date of the scheduled hearing. In the event that the

23

maximum building construction cost authorization exceeds the

24

aggregate building expenditure standard hereinafter specified,

25

the aforesaid authorization of the school board shall be

26

submitted to the electors of the school district for their

27

approval within six (6) months prior to submission of the final

28

building construction cost bids to the Department of Education

29

for approval. Such referendum shall be held in the same manner

30

as provided by law for the approval of the incurring of

- 2 -

 


1

indebtedness by referendum. The question as submitted shall

2

specify the maximum project cost, the maximum building

3

construction cost and the annual sinking fund charge or lease

4

rental to be incurred by the school district and the portion of

5

such charge or rental expected to be reimbursed by the

6

Commonwealth. If the final building construction cost bids to be

7

submitted to the Department of Education for approval are less

8

than the aggregate building expenditure standard hereafter

9

specified but exceed by eight (8) per cent or more the initial

10

building construction cost estimates submitted to the Department

11

for approval, a second public hearing shall be held before the

12

Department shall give its final approval.

13

The applicable aggregate building expenditure standard shall

14

be a total amount calculated for each building or substantial

15

addition by multiplying the rated pupil capacity under the

16

approved room schedule by the following: two thousand eight

17

hundred dollars ($2,800) for each pupil of rated elementary

18

capacity; four thousand two hundred dollars ($4,200) for each

19

pupil of rated secondary capacity in grades seven, eight and

20

nine and five thousand two hundred dollars ($5,200) for each

21

pupil of rated secondary capacity in grades ten, eleven and

22

twelve and five thousand two hundred dollars ($5,200) for each

23

pupil of rated vocational-technical capacity in grades ten,

24

eleven and twelve to not include the cost of equipment and

25

fixtures in such vocational-technical schools: Provided,

26

however, That each of the preceding per pupil amounts shall be

27

adjusted by the Department of Education on July 1, 1974; and

28

annually thereafter through July 1, 2003, by multiplying said

29

amounts by the ratio of the composite construction cost index

30

compiled and published by the United States Department of

- 3 -

 


1

Commerce for the preceding calendar year to such index for the

2

next preceding calendar year; and Further Provided, however,

3

That each of the preceding per pupil amounts shall be adjusted

4

by the Department of Education on July 1, 2004; and annually

5

thereafter by multiplying said amounts by the ratio of the

6

Building Cost Index published by the McGraw-Hill Companies for

7

the preceding calendar year to such index for the next preceding

8

calendar year. Rated elementary pupil capacity or rated

9

secondary pupil capacity for any school building shall be the

10

rated pupil capacity determined on the basis of the method used

11

by the Department for school building reimbursement purposes

12

during the school year 1971-1972.

13

For purposes of this section:

14

(1)  "Site acquisition" includes the cost of land and mineral

15

rights, demolition and clearing, rights-of-way and related

16

utility relocations, surveys and soils analysis, and the cost of

17

all fees relating thereto.

18

(2)  "Site development" includes excavation, grouting or

19

shoring, special foundations for buildings, access roads to

20

site, utilities on site, extension of utilities to site.

21

(3)  "Equipment and fixtures" means property fixed or movable

22

which is incidental and necessary to conduct the educational

23

program, and includes, but is not limited to movable equipment

24

such as desks, chairs, tables, portable physical education

25

equipment, audio-visual equipment and science, homemaking,

26

industrial art and business equipment and instructional

27

materials and fixtures such as casework, laboratory equipment,

28

kitchen equipment, auditorium seating and any other special

29

fixtures or equipment required to conduct a particular

30

educational program.

- 4 -

 


1

(4)  "Substantial addition" means more than twenty (20) per

2

centum of the area and replacement value of the structure to

3

which the improvement is to be added.

4

(5)  "LEED" means the Leadership in Energy and Environmental

5

Design, a program designed by the United States Green Building

6

Council and committed to designing buildings in an energy-

7

efficient and environmentally conservative manner.

8

(6)  "LEED for schools rating system" means the most current

9

version of the Leadership in Energy and Environmental Design

10

(LEED) program designed by the United States Green Building

11

Council (USGBC) to measure the energy and environmental

12

performance of K-12 schools.

13

(7)  "LEED cost" means the design, construction and

14

registration costs directly attributable to achieving points

15

under the Leadership in Energy and Environmental Design (LEED)

16

for schools rating system, including, but not limited to, energy

17

performance benchmarking, life-cycle cost assessments, low-

18

impact development stormwater management technologies, energy

19

and lighting modeling, alternative energy technology, building

20

commissioning, and registration with the United States Green

21

Building Council (USGBC).

22

Section 2.  Section 2574(a) of the act, amended September 29,

23

1959 (P.L.992, No.407), is amended to read:

24

Section 2574.  Approved Reimbursable Rental for Leases

25

Hereafter Approved and Approved Reimbursable Sinking Fund

26

Charges on Indebtedness.--(a)  For school building projects for

27

which the general construction contract is awarded subsequent to

28

March 22, 1956, and for approved school building projects for

29

which the general construction contract was awarded but for

30

which a lease was not approved by the Department of [Public

- 5 -

 


1

Instruction] Education prior to March 22, 1956, the Department

2

of [Public Instruction] Education shall calculate an approved

3

reimbursable rental or approved reimbursable sinking fund

4

charges. Reimbursable sinking fund charges may include charges

5

for temporary indebtedness within constitutional limitations, if

6

the indebtedness is incurred for approved [permanent] 

7

improvements to the school plant including the cost of acquiring

8

a suitable site for a school building, the cost of constructing

9

a new school building, or the cost of providing needed additions

10

or alterations to existing buildings for which no bond issue is

11

provided and for which an approved obligation or obligations

12

other than bonds have been issued and the obligation or

13

obligations are payable within five (5) years from the date of

14

issue of the obligation in equal annual installments. As used in

15

this section, "building" shall include a permanent structure

16

that contains or is attached to relocatable or modular

17

classrooms. The term "relocatable or modular classroom" shall

18

mean a classroom not of a permanent nature which meets the

19

criteria and specifications of the Department of Education.

20

Approved reimbursable rental or sinking fund charge shall

21

consist of that part of the annual rental or sinking fund charge

22

attributable to--

23

(1)  The cost of acquiring the land upon which the school

24

buildings are situate, the cost of necessary rough grading to

25

permit proper placement of the building upon said land and the

26

cost of sewage treatment plants, as required by the Department

27

of Health, to the extent that such costs are deemed reasonable

28

by the Department of [Public Instruction] Education and the

29

interest on such costs of acquisition, grading and sewage

30

treatment plants earned subsequent to date the construction

- 6 -

 


1

contract is awarded, and

2

(2)  The approved building construction cost and the interest

3

on such construction cost.

4

* * *

5

Section 3.  This act shall take effect in 60 days.